Loading...
HomeMy WebLinkAboutPR 21990: APPROVING ADDITIONAL KITCHEN EQUIPMENT FOR 549 4TH STREET (THE PRESS BUILDING) PORT*ARTHUR ONOMIC DEVELOPMENT CORPORATION INTEROFFICE MEMORANDUM Date: June 15,2021 To: The Honorable Mayor and City Council Through: Ronald Burton,City Manager From: Floyd Batiste,CEO Port Arthur EDC RE: PR 21990—Approving the payment of$10,272.32 for additional kitchen egiiipment for 549 4th Street(The Press Building).Funding Available in Account No. 120-80-625-8513-00- 00-000. Introduction: The intent of this Agenda Item is to seek City Council's approval for the Port Arthur EDC to purchase five hand sinks and metal sheeting at the cost of$10,272.32 Background: There is an additional need for hand sinks and metal sheeting for the both the Lamar State College Port Arthur kitchens and the lease kitchen in The Press Building at a cost of $10,272.32. The board approved this measure at its board meeting on June 7, 2021. Budget Impact: The cost for the additional kitchen equipment is$10,272.32 and is available in Account No. 120-80-625- 8513-00-00-000. Recommendation: It is recommended that the City Council of the City of Port Arthur approve the purchase of the additional kitchen equipment. P.R. No. 21990 06/14/2021 JB RESOLUTION NO. A RESOLUTION APPROVING THE PAYMENT OF$10,272.32 FOR ADDITIONAL KITCHEN EQUIPMENT FOR 549 4TH STREET (THE PRESS BUILDING); FUNDS AVAILABLE IN EDC ACCOUNT NO. 120-80-625-8513-00-00-000 WHEREAS,the City Council deems it is in the public interest to authorize the City of Port Arthur Section 4A Economic Development Corporation ("PAEDC") to retrofit the property located at 549 4th Street in downtown Port Arthur; and WHEREAS,there is a need to purchase additional kitchen equipment(five hand sinks and metal sheeting) from ISI; and WHEREAS, PAEDC Board of Directors approved this additional expense at their Board meeting on June 7, 2021; and WHEREAS, this additional equipment is deemed necessary to complete the kitchens for Lamar State College Port Arthur teaching kitchen and the lease kitchen. NOW,THEREFORE,BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PORT ARTHUR: Section 1. That the facts and opinions in the preamble are true and correct. Section 2. That the City Council approves the additional expense of $10,272.32 as described in the document attached hereto as Exhibit "A" for the additional kitchen equipment necessary to complete 549 4th Street(The Press Building). Section 3. That a copy of the caption of this Resolution be spread upon the Minutes of the City Council. READ, ADOPTED AND APPROVED on this day of A.D., 2021, at a Meeting of the City Council of the City of Port Arthur, Texas, by the following vote: AYES: Mayor Councilmembers NOES: Thurman Bartie, Mayor ATTEST: Sherri Bellard, City Secretary APPROV •. -7 : I) Floyd Batis�, PAED C 0 APPRO AS TO FO : Guy N. Goodson, PAEDC Attorney #1873612 Page 2 APPROVED AS TO FORM: Valecia R. Tizeno, City Attorney APPROVED AS TO AVAILABILITY OF FUNDS: Kandy Daniel, nterim Finance Director #1873612 Page 3 EXHIBIT "A" #1873612 Page 4 ETriMark® Quote Foodservice Equipment,Supplies and Design 06/02/2021 Strategic Equipment, LLC dba TriMark Strategic dba TriMark Foodcraft dba ISI Commercial Refrigeration To: Project: From: Port Arthur Economic Development PA Economic Development Corp./ Strategic Equipment, LLC Corp. Wall Sheeting& Hand Sink/CX1 Chris Wiggins Floyd Batiste The Press Building 9010 West Little York Rd.,Suite 501 Procter Street Suite#100 549 4th Street 100 Port Arthur,TX 77640 Port Arthur,TX 77640 Suite 200 409-962-1119 (Contact) Houston,TX 77040 713-861-4455 ext 5508 (346) 237-4223 (Contact) Project Code:PAEDCLSC Change Order Item Qty Description Sell Sell Total 39 5 ea HAND SINK $220.08 $1,100.40 Advance Tabco Model No.7-PS-20-2X -. : Hand Sink,wall mounted, 14"wide x 10"front-to-back x 5" deep bowl, 20 gauge 304 stainless steel,with deck mounted fixed faucet, basket �' drain, NSF,cCSAus ITEM TOTAL: $1,100.40 40 1 ea SHEETING $6,973.12 $6,973.12 Fabricated Products Model No.SHEETING Supply and install approx. 128 square feet of 18 gauge stainless steel wall sheeting for side splash and inside corners. Installed with adhesive and chrome connecting strips and wall sheeting under hoods ITEM TOTAL: $6,973.12 41 1 ea SHEETING $2,198.80 $2,198.80 Fabricated Products Model No.SHEETING Supply and install approx. 198 square feet of 18 gauge stainless steel wall sheeting below one (1) hoods. Installed with adhesive and chrome connecting strips and ends ITEM TOTAL: $2,198.80 Merchandise $10,272.32 Delivery&Set n Place Total $10,272.32 PA Economic Development Corp./Wall Initial: Sheeting&Hand Sink/CX1 Port Arthur Economic Development Corp. Page 1 of 2 06/02/2021 This Quote shall be subject to TriMark's Terms of Sale http://www.trimarkua.com/SiteMedia/SiteResourcesfTenns/TriMark-Terms-and- Conditions-of Sale.pdf,which arc incorporated herein by reference and shall govern. The parties specifically agree that no signature shall be required in order for this Quote or its applicable terms and conditions to be deemed legally binding and enforceable on Customer where the intent to be so bound can be inferred(including by acceptance or retention of products or services),notwithstanding contrary requirements under any law. Regulated by The Texas Department of Licensing and Regulation,P.O.Box 12157,Austin,Texas 78711 1-800-803-9202,512-463-6599,wwww.tdlr.texas.gov AUSTIN:TACLB52729R/BEAUMONT:TACLA35912C/DALLAS:TALCB 16860C HOUSTON:TACLB2758OR I understand,agree to and accept the above terms and conditions. Acceptance: Date: Printed Name: Project Grand Total:$10,272.32 PA Economic Development Corp./Wall Initial: Sheeting&Hand Sink/CX1 Port Arthur Economic Development Corp. Page 2 of 2