Loading...
HomeMy WebLinkAboutPR 22026: CHANGE ORDER #3 FOR REPAIR OF SEVEN PUMP STATIONS IN THE AMOUNT OF $10,650.00 City of or-! rtlrrrr 7e.iu.r www.Po rtArth u rTx.gov INTEROFFICE MEMORANDUM Date: June 29, 2021 To: The Honorable Mayor and City Council Through: Ron Burton, Interim City Manager Kandy Daniel, Interim Finance Director From: Clifton Williams, Purchasing Manager RE: P.R. 22026—Change Order#3 for Repair of Seven Pump Stations in the amount of$10,650 Introduction: The intent of this agenda item is for City Council's approval of Change Order #3 to Triangle Rotating Equipment Specialist (TRES) in the amount of$10,650 for Repairs to Seven Pump Stations. Background: On February 18, 2020, City Council awarded TRES the contract to repair seven Pump Stations for the amount of$655,581.97 with Resolution 20-051.We submitted to the contractor in phases. The Pt phase consisted of 3 of the pump stations with totaled $143,522.97. Resolution 20-211 was a change order in the amount of$7,211 for Gulfway Underpass Pump Station in Phasel. Phase 2 is the El Vista Pump station which was awarded for $151,000. Resolution 21-109 was the second change order for the rental of the pumps while the new pump and motor were being delivered. Once work began to repair the Golf Course Pump Station 1 in Phase 4, it was determined it was better to replace pump rather than repair it. The additional cost will be $10,650. Budget Impact: Amount is charged to the Hurricane Harvey Account # 147-07-015-8515-00-40-000 Project #DS2617. "Remember,we are here to serve the Citizens of Port Arthur" 444 4th Street X Port Arthur,Texas 77641-1089 X 409.983.8182 X FAX 409.983.8294 • Recommendation: It is recommended that the City of Port Arthur City Council approve PR 22026 authorizing Change Order#3 with TRES of Orange, Texas in the amount of$10,650 "Remember,we are here to serve the Citizens of Port Arthur" P.O.Box 1089 Port Arthur,Texas 77641-1089 X 409.983.8101 X FAX 409.982.6743 P.R. No. 22026 06/29/2021 CEW] Page 1 of 3 RESOLUTION NO. A RESOLUTION AUTHORIZING THE CITY MANAGER TO EXECUTE CHANGE ORDER NO. 3 TO THE CONTRACT WITH TRIANGLE ROTATING EQUIPMENT SPECIALIST OF ORANGE, TEXAS FOR PHASE 2 IN THE AMOUNT OF $10,650 FOR DELETION OF REPAIR SERVICES AND ADDITION OF A NEW PUMP GOLF COURSE PUMP STATION FOR A NEW CONTRACT TOTAL OF $684,847.74 FUNDING IN HURRICANE HARVEY ACCOUNT NO. 147-07-015-8515-00-40-000, PROJECT NO. DS2617 WHEREAS, on February 18, 2020 per Resolution No. 20-051, the City Council approved a contract with Triangle Rotating Equipment Specialist (TRES) of Orange, Texas for the repair of seven (7) drainage pump stations, for a total of $655,581.97; and, WHEREAS, the seven (7) locations were given out in Four (4) phases and TRES is currently in Phase 4 which totals $150,333 for Golf Pump Station 1 and Landfill; and, WHEREAS, Change Order #1 for $7,211.20 for Phase 1 was awarded with Resolution 20-211 on June 23, 2020; and, WHEREAS, Change Order #2 for $11,404.57 for Phase 2 was awarded with Resolution 21-109 on March 16, 2021; and, WHEREAS, Change Order #3 is an additional cost of $10,650; totaling $160,983 for Phase 4 and a new total of $684,847.74 for all seven locations. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PORT ARTHUR: Section 1. That, the facts and opinions in the preamble are true and correct. Section 2. That, the City Council herein authorizes Change Order No. 3 with Triangle Rotating Equipment Specialist of Orange, Texas, for Phase 2 in the amount of $10,650, a copy of the Change Order is attached hereto as Exhibit"A". Section 3. That, a copy of this caption be spread upon the Minutes of the City Council. P.R. No. 22026 • 06/29/2021 CEW] Page 2 of 3 READ, ADOPTED AND APPROVED on this day of July, A.D., 2021, at a Regular Meeting of the City Council of the City of Port Arthur, Texas, by the following vote: Ayes: Mayor: Councilmembers: Noes: Thurman"Bill" Bartie Mayor Sherri Bellard City Secretary APPROVED AS TO FORM: APPROVED FOR ADMINISTRATION: (I,, d_.i. Valecia Ti no, Esq. Ron Burton City Attorney City Manager APPROVED AS FOR AVAILABILITY OF FUNDS: Gv Kandy Daniel (� Director of Finance P.R. No. 22026 06/29/2021 CEWJ Page 3 of 3 Alberto Elefano Director of Public Works 44 6,6Cet Clifton Wil Tams Purchasing Manager EXHIBIT "A" CHANGE ORDER NO. 3 ORIGINAL AGREEMENT DATE: April 27, 2020 PROJECT DESCRIPTION: Seven Drainage Pump Stations Phase 4 CHANGE IN SCOPE: Decrease in repair scope and increase in cost to replace with new pump CHANGE TO CONTRACT AMOUNT: ORIGINAL CONTRACT PRICE: $151,000 CURRENT CONTRACT PRICE(adjusted by previous CHANGE ORDER):$151,000 The Contract Amount due to this CHANGE ORDER will increase by: $10,650 The new CONTRACT AMOUNT including the CHANGE ORDER will be: $161,650 ORIGINAL CONTRACT DAYS: 60 NEW CONTRACT DAYS: 60 SIGNED AND AGREED TO on the_day of , 2021. TRIANGLE ROTATING EQUIPMENT SPECIALIST Print Name: Title: SIGNED AND AGREED TO on the_day of , 2021. CITY OF PORT ARTHUR BY: RON BURTON, CITY MANAGER , T.R.E.S. Machine, Inc. Quote P.O. Box 222 Nederland. TX 77627-0222 Date Quote 6'25,2021 4033 Name/Address City of Port Arthur Golf Course Station 1 3500 Jimmy Johnson Blvd Port Arthur.TX 77642 Rep Project I Description Qty Total THIS IS A CHANGE ORDER to be added to the original quote of the NEW I 10,650.00 Lo-Lift pump. Work that was scheduled to be performed at Golf Course Station One: (A)Furnish labor and material to remove old Lo-Lift pump. Upon removal of old pump.the City decided to purchase a new pump (B)The original bid to remove.repair.and re-install the old pump(Breakdot n listed below)$49.500.00 (1) Pull old pump and re-install$10.000.90 (2)Tear down inspect_and reassemble once repairs are complete$6.000.00 (3)Shorten column pipe approximately 4 ft..furnish new section of 36"pipe. fabricate a new flange: fabricate all new bushings.new shafting and top flange bearing on head. Furnish new gaskets.misc.bolting.blast and paint pump. S29.256.00 (4)Furnish crane.pick up and delivery twice for removal and installation. S2.400.00 (5)Furnish diver to jet mud out of pit and remove old p/ts of original suction sucen.$1.200.00 (6)Fabricate two(2)new suction screens,paint and install.$644.00 New Lo-Lift Pump$50,706.00 Pulling old pump and installing new Labor S6.400.00 Crane$1.200.00 Diver $1,200.00 Fabricate suction screen and install S644.00 Change order ($10.650.00) Total S 10.650.0 (