HomeMy WebLinkAbout(1) June 2021 Financial Report 2020-2021 Budget Monthly Report And Quarterly Investment Report June 2021 City of Port Arthur 2020 -2021 Budget Monthly Report June 30, 2021 Highlights: General Fund General Fund revenues are $70.4 million at June 30, 2021 which is $4.5 million above the expected amount. $14.8 million in property tax revenues has been received so far this fiscal year which is 6% above the budgeted level. Industrial tax revenue is $34.3 million with substantially all payments received. Sales tax collections through June are 9% above last fiscal year, 24% above the budgeted level and represent sales for the month of April. Operating expenditures total $43.9 million at June 30, 2021 which is below the budgeted level by $5.2 million. There are 529 budgeted positions in the General Fund for Fiscal Year 2021and there are currently 54 vacancies. Budget amendments will be requested throughout the year as needed so that the amended budget column will closely reflect where we expect to be at the end of the year. The General Fund amended budget currently has an estimated ending fund balance of $23.7 million which equates to approximately 126 days of operating expenditures. A budget amendment on August 3 reduced the estimated fund balance to $22.6 million or 120 days. At this level, the fund balance is still well in excess of the City’s policy to maintain a minimum 60-day operating fund balance plus $1.5 million. Water Fund Water Fund revenues total $22.1 million at the end of June which is above the budgeted level by $919,000. Water service charges received from industry exceed budget estimates by $415,000. A 3% increase in water rates and a 12% increase in sewer rates, effective May 1, 2021, will generate additional revenue going forward. Water Fund operating expenses total $14.4 million at June 30, 2021 which is under budget by $281,000. There are 120 budgeted positions in the Water Fund for Fiscal Year 2021 and 18 are vacant at this time. Staff will continue to monitor the fund to ensure that expenses remain in line with available revenues. Solid Waste Fund Solid Waste revenues total $6.7 million at June 30, 2021 which is below the estimate by $659,000. An increase to garbage rates was effective May 1, 2021. This increase along with a recent fee increase for Trash Collection and the installation of a truck scale at the Landfill will bring in additional revenue for the fund. Solid Waste operating expenses currently are over budget by approximately $1.3 million. A budget amendment was approved August 3 which increases the budget by $1 million with a transfer from the General fund. Unanticipated expenses related to equipment failures and TCEQ requirements led to the overage. There are currently 48 budgeted positions in Solid Waste with 4 vacancies. Pleasure Island Fund Pleasure Island revenues are slightly below the estimate at this time. In addition, operating expenses are $158,000 below the budgeted level which keeps expenses in line with available revenues. There are 6 budgeted positions in Pleasure Island with 2 vacancies. Capital Improvement Program This section includes street projects by district, drainage projects, general improvements by type, downtown revitalization projects, water utility projects, Pleasure Island improvements, and EDC improvements. The street improvements section has been expanded to include a summary page which shows the total allocations and expenses by district for all years (including closed out projects) and are further broken down by funding sources. The total allocation for all years is 48.3 million. A total of $18.6 million has been spent through June 30, 2021, leaving a balance of $29.7 million, of which $23.7 million is committed to open street projects and $5.9 million remains unallocated. The following 3 pages reflect open street projects by district and also includes unallocated funds. As of June 30, 2021, $33.6 million has been budgeted for open street projects. $9.9 million has been spent to date leaving a balance of $23.7 million to complete the open projects. There is currently $5.9 million remaining from year 1-3 allocations which is available for future projects. The current budget for drainage improvements is $68.9 million and is primarily funded by FEMA mitigation grants and CDBG. The CDBG Mitigation Downtown/Lakeview project was not funded so the budget has been reduced. $4.4 million has been spent to date, leaving a balance of $64.5 million to complete the projects. General Improvement projects include facility improvements, technology upgrades, parks & recreation renovations, public works projects and the replacement of a Fire Engine. The current budget is $27.4 million for these projects. Expenditures total $7.5 million spent to date, with $3.2 million spent this fiscal year and a balance remaining of $20 million. $5 million has been allocated for downtown revitalization which is primarily for Parking lot expansion and fiber optic improvements. $3 million is funded by a grant from EDA. $68,000 has been spent to date, leaving a remaining balance of $4.9 million. There is currently $83.2 million budgeted for Water Utility improvements, primarily for the construction of the Waste Water Treatment Plant. The water line replacement project has been postponed until next fiscal year. $6.7 million has been spent as of June 30 with a remaining balance of $76.5 million. The EDC Press Building renovation is currently budgeted at $10.9 million of which $4.7 million is funded by a grant from EDA. So far $3.5 million has been spent, leaving a remaining balance of $7.4 million to complete the project. A budget amendment in June increased the total budget to $10.9 million. Disaster Funds At this time the Hurricane Harvey Disaster Fund has total revenues of $29.8 million of which $834,000 was received this fiscal year. Expenditures currently total $33.6 million which leaves a deficit of $3.8 million. However, pending reimbursements total $540,000 which will reduce this deficit to $3.3 million. The COVID19 disaster has recorded revenues and donations of $3 million and has expenditures to date of approximately $3.4 million. The Hurricane Laura disaster has not yet received any reimbursements and has $2.6 million in expenditures. The City will make every effort to capture as much Federal assistance and insurance as possible for all disasters. Quarterly Investment Report At June 30, cash and investments for the City totaled $130.7 million. This increase of $39.1 million from the beginning of the quarter is primarily attributable to the receipt of bond proceeds in June and otherwise is in line with the City’s normal cash flow. Bank Deposits of $5.8 million make up approximately 4% of the portfolio while the remainder of $125 million (96%) is invested in authorized local government investment pools. The average yield for the quarter is .04% which is down slightly from the previous quarter. Interest earned this quarter is $5,900 and totals $56,300 fiscal year to date. All investments have been made in accordance with the City’s investment strategy and investment policy as previously approved by the City Council. Actual Actual Amended Y-T-D Y-T-D 18-19 19-20 Budget Actual Budget (Unaudited)20-21 Thru June Thru June Variance General Fund Summary Revenues Taxes Property Taxes 12,451,941 15,070,866 14,310,000 14,805,478 13,959,306 846,172 Industrial District Payments 30,834,585 31,000,321 34,348,093 34,302,868 34,302,868 - Sales Tax 10,344,480 11,157,471 9,970,000 9,340,329 7,477,488 1,862,841 Other Taxes 9,271,760 9,044,557 9,221,000 3,249,786 3,702,408 (452,622) Total Taxes 62,902,766 66,273,215 67,849,093 61,698,461 59,442,070 2,256,391 Licenses and Permits 533,616 909,340 490,423 928,023 367,767 560,256 Intergovernmental Revenue 153,694 147,301 119,900 90,367 89,910 457 Charges for Services 439,325 329,641 375,900 338,565 281,871 56,694 Fines and Forfeitures 1,435,675 622,406 838,100 441,800 628,560 (186,760) Interest and Miscellaneous 1,011,268 1,228,764 622,000 2,246,919 466,479 1,780,440 Total Operating Revenues 66,476,344 69,510,667 70,295,416 65,744,135 61,276,657 4,467,478 Transfers and Other Revenues 8,611,962 7,048,995 6,264,748 4,698,561 4,698,549 12 Total Revenues 75,088,306 76,559,662 76,560,164 70,442,696 65,975,206 4,467,490 Expenditures Administration 1,727,203 1,883,007 1,992,441 1,281,131 1,450,434 (169,303) City Secretary 1,726,778 1,461,297 1,906,844 1,266,774 1,364,206 (97,432) City Attorney 1,125,890 1,106,523 1,450,905 964,266 1,043,499 (79,233) Finance 2,211,079 2,176,724 2,558,958 1,665,733 1,830,448 (164,715) Information Technology 1,522,363 1,348,191 1,779,780 978,587 1,289,797 (311,210) Human Resources 617,878 641,416 817,891 459,361 580,994 (121,633) Development Services 5,429,004 5,618,838 6,429,760 3,896,924 4,629,012 (732,088) Civic Center 881,682 889,380 1,110,915 672,997 807,193 (134,196) Police 19,609,645 18,984,704 20,054,449 13,040,718 14,135,852 (1,095,134) Fire 14,060,054 13,518,178 14,846,424 10,349,069 10,682,189 (333,120) Public Works 8,250,401 8,329,006 9,462,703 5,601,204 6,806,845 (1,205,641) Health and Welfare 1,455,656 1,558,779 1,690,247 1,176,296 1,206,128 (29,832) Parks and Recreation 2,595,941 2,525,600 3,222,006 1,578,861 2,331,814 (752,953) Library 1,230,368 1,313,877 1,338,868 941,582 955,792 (14,210) Total Operating Expenditures 62,443,942 61,355,520 68,662,191 43,873,503 49,114,202 (5,240,699) Transfers and Other Expenditures $4,961,341 12,251,364 $17,523,141 13,243,444 13,243,444 - Total Expenditures 67,405,283 73,606,884 86,185,332 57,116,947 62,357,646 (5,240,699) Net Current Activity 7,683,023 2,952,778 (9,625,168) 13,325,749 3,617,560 Unassigned Beginning Fund Balance 24,633,956 30,306,307 33,259,085 33,259,085 33,259,085 Prior Period Adjustment (2,010,672) Unassigned Ending Fund Balance 30,306,307 33,259,085 23,633,917 46,584,834 36,876,645 Unassigned Fund Balance in Days 126 388 274 Minimum 60 Days + $1,500,000 City of Port Arthur 2020 - 2021 Budget June 30, 2021 Monthly Report Actual Actual Amended Y-T-D Y-T-D 18-19 19-20 Budget Actual Budget (Unaudited)20-21 Thru June Thru June Variance City of Port Arthur 2020 - 2021 Budget June 30, 2021 Monthly Report Water Fund Summary Revenues Water Service 11,311,232 12,527,698 13,256,029 9,505,337 9,942,022 (436,685) Water Service - Industry 5,010,731 4,213,097 4,800,000 4,015,650 3,600,000 415,650 Sewer Service 9,272,511 9,046,543 8,858,474 7,498,574 6,643,856 854,719 Other Charges for Services 665,381 333,498 417,000 416,885 312,750 104,135 Late Fees 541,125 470,489 500,000 348,541 375,000 (26,459) Interest and Miscellaneous 100,608 31,729 33,500 33,015 25,125 7,890 Total Operating Revenues 26,901,588 26,623,054 27,865,003 21,818,002 20,898,752 919,250 Transfers and Other Sources 410,000 410,000 410,000 307,500 307,500 - Total Revenues 27,311,588 27,033,054 28,275,003 22,125,502 21,206,252 919,250 Expenses 200 Administration 1,104,257 1,367,134 1,476,947 1,068,285 1,065,888 2,397 205 Customer Service 1,656,436 1,236,618 1,506,451 1,043,922 1,063,380 (19,458) 210 Water Purification 5,778,285 6,101,462 6,183,218 4,806,317 4,542,163 264,154 215 Water Distribution 3,799,913 3,656,026 3,201,816 2,656,924 2,355,321 301,603 220 Waste Water Conveyance 5,073,645 4,171,089 4,137,510 3,184,915 2,964,843 220,072 225 Wastewater Treatment 2,594,860 2,297,390 2,356,440 1,368,111 1,714,318 (346,207) 230 Environmental Regulatory Services 524,489 492,822 624,702 304,216 445,891 (141,675) Total Operating Expenses 20,531,885 19,322,541 19,487,084 14,432,690 14,151,805 280,886 Transfers and Other Uses 7,940,311 9,836,015 8,694,841 7,416,644 7,416,644 - Total Expenses and Other Uses 28,472,196 29,158,556 28,181,925 21,849,334 21,568,449 280,886 Net Current Activity (1,160,608) (2,125,502) 93,078 276,168 (362,196) Beginning Working Capital Balance 705,689 (454,919) (2,580,421) (2,580,421) (2,580,421) Ending Working Capital Balance (454,919) (2,580,421) (2,487,343) (2,304,253) (2,942,617) (As Adjusted) Actual Actual Amended Y-T-D Y-T-D 18-19 19-20 Budget Actual Budget (Unaudited)20-21 Thru June Thru June Variance City of Port Arthur 2020 - 2021 Budget June 30, 2021 Monthly Report Solid Waste Fund Summary Revenues Residential Service 4,093,900 4,132,097 4,515,000 3,468,387 3,386,250 82,137 Commercial Containers 2,133,107 2,390,597 2,605,000 1,850,199 1,953,750 (103,551) Landfill Charges 1,372,648 1,426,023 2,300,000 1,120,933 1,725,000 (604,067) Municipal Landfill Contracts 253,953 363,543 300,000 208,122 225,000 (16,878) Late Fees 153,487 144,539 150,000 96,026 112,500 (16,474) Interest and Miscellaneous 17,274 8,921 - 77 - 77 Total Revenues 8,024,369 8,465,720 9,870,000 6,743,744 7,402,500 (658,756) Expenses 300 Administration 144,400 258,483 247,276 190,473 137,642 52,831 305 Trash Collection 1,354,720 1,198,575 1,067,420 894,056 746,604 147,452 310 Residential Collection 1,404,331 1,476,342 1,531,813 1,226,952 1,123,760 103,192 315 Container Service 807,921 731,026 703,867 563,951 491,351 72,600 320 Landfill 2,871,386 3,293,537 3,536,826 3,568,947 2,640,971 927,976 Total Operating Expenses 6,582,758 6,957,963 7,087,202 6,444,379 5,140,328 1,304,051 Transfers and Other Uses 1,431,990 3,052,684 2,824,684 2,092,051 2,092,051 - Total Expenses and Other Uses 8,014,748 10,010,647 9,911,886 8,536,430 7,232,379 1,304,051 Net Current Activity 9,621 (1,544,927) (41,886) (1,792,686) 170,121 Beginning Working Capital Balance 2,586,210 2,595,831 1,050,904 1,050,904 1,050,904 Ending Working Capital Balance 2,595,831 1,050,904 1,009,018 (741,782) 1,221,025 Pleasure Island Summary Revenues Land Lease & Sales 547,242 593,719 615,430 458,899 461,573 (2,674) Dry Storage Rentals 24,873 23,707 29,400 15,347 22,050 (6,703) RV Park 248,176 291,764 264,960 216,481 198,720 17,761 Boat Slip Rentals 122,655 114,749 146,880 76,261 110,160 (33,899) Fuel Facility 4,359 11,239 3,000 2,939 2,250 689 Total Operating Revenues 947,305 1,035,178 1,059,670 769,927 794,753 (24,826) Transfers and Other Revenues - 300,000 - 87,715 - 87,715 Total Revenues 947,305 1,335,178 1,059,670 857,642 794,753 62,890 Expenses 400 Administration 488,380 755,514 637,680 402,919 454,381 (51,462) 405 RV Park 120,065 106,559 148,400 63,504 111,300 (47,796) 410 Marina 406,341 35,492 70,150 36,195 52,613 (16,418) 415 Parks 38,917 86,475 120,090 48,015 90,068 (42,053) Total Operating Expenses 1,053,703 984,040 976,320 550,633 708,361 (157,728) Transfers and Other Uses 72,118 187,500 102,000 76,500 76,500 - Total Expenses and Other Uses 1,125,821 1,171,540 1,078,320 627,133 784,861 (157,728) Net Current Activity (178,516) 163,638 (18,650) 230,509 9,892 Beginning Working Capital Balance 563,205 384,689 548,327 548,327 548,327 Ending Working Capital Balance 384,689 548,327 529,677 778,836 558,219 Streets Summary Remediation %Allocation %Allocation %Allocation Allocation Expense Balance Committed Unallocated District 1 17.94 111,566 18.93 567,900 18.93 757,200 1,436,666 248,872 1,187,794 675,831 511,963 District 2 9.26 57,611 20.45 613,500 20.45 818,000 1,489,111 104,617 1,384,494 842,399 542,095 District 3 18.08 112,473 13.16 394,800 13.16 526,400 1,033,673 148,544 885,129 358,630 526,499 District 4 54.71 340,290 47.46 1,423,800 47.46 1,898,400 3,662,490 341,986 3,320,504 1,320,179 2,000,325 100.00 621,940 100.00 3,000,000 100.00 4,000,000 7,621,940 844,019 6,777,921 3,197,039 3,580,882 Reconstruction Bonds %Allocation %Allocation %Allocation Allocation Expense Balance Committed Unallocated District 1 40.23 4,605,608 23.15 2,315,000 23.15 2,315,000 9,235,608 3,205,027 6,030,581 4,560,969 1,469,612 District 2 21.89 2,505,664 16.47 1,647,000 16.47 1,647,000 5,799,664 3,939,013 1,860,651 1,731,051 129,600 District 3 19.79 2,265,078 13.42 1,342,000 13.42 1,342,000 4,949,078 4,253,916 695,162 1,342,719 (647,557) District 4 18.09 2,070,990 46.96 4,696,000 46.96 4,696,000 11,462,990 1,930,915 9,532,075 10,376,506 (844,431) 100.00 11,447,340 100.00 10,000,000 100.00 10,000,000 31,447,340 13,328,871 18,118,469 18,011,245 107,224 EDC St Maint Allocation*Allocation*Allocation*Allocation*Expense Balance Committed Unallocated District 1 3,646,465 1,332,865 378,330 5,357,660 562,655 4,795,005 2,536,712 2,258,293 District 2 - - - - - - - - District 3 - - - - - - - - District 4 - 52,940 - 52,940 52,940 - - - 3,646,465 1,385,805 378,330 5,410,600 615,595 4,795,005 2,536,712 2,258,293 *Actual Received Grant Allocation Allocation Allocation Allocation Expense Balance Committed Unallocated District 1 3,608,158 - 3,608,158 3,608,158 - - - District 2 198,682 - 198,682 198,682 - - - District 3 - - - - - - - District 4 23,705 - 23,705 23,705 - - - 3,830,545 - - 3,830,545 3,830,545 - - - Allocation Allocation Allocation Allocation Expense Balance Committed Unallocated District 1 11,971,797 4,215,765 3,450,530 19,638,092 7,624,712 12,013,380 7,773,512 4,239,868 District 2 2,761,957 2,260,500 2,465,000 7,487,457 4,242,312 3,245,145 2,573,450 671,695 District 3 2,377,551 1,736,800 1,868,400 5,982,751 4,402,460 1,580,291 1,701,349 (121,058) District 4 2,434,985 6,172,740 6,594,400 15,202,125 2,349,546 12,852,579 11,696,685 1,155,894 Total 19,546,290 14,385,805 14,378,330 48,310,425 18,619,030 29,691,395 23,744,996 5,946,399 City of Port Arthur 2019 - 2021 Budget Monthly Report June 30, 2021 TotalYear 1 (FY17-19)Year 2 (FY20)Year 3 (FY21) Remediation Reconstruction EDC Street Maintenance Grant (GLO/CDBG) General Fd General Fd General Fd General Fd Bonds Total EDC St MaintEDC St Maint Grant EDC St Maint Grant Grant Year 1 (FY17-19)Year 2 (FY20)Year 3 (FY21) 8/6/2021 Total FY20-21 Project To Total Revised Actual Y-T-D Date Project Estimated Thru 9/30/20 Actual Actual Balance Year Project Cost (Unaudited)Thru June Thru 6/3/21 Remaining Funded by General Fund and Bonds 1 15th Street Stillwell - Vicksburg 827,957 - - 827,957 1 Nashville Street 7th - Proctor 1,224,290 1,107,886 74,762 1,182,648 41,642 - 2 Waco 14th - 15th C I 208,300 - 848 848 207,452 2 Atlanta Thomas - 5th St C I 379,000 - 28,762 28,762 350,238 2 Shreveport Thomas - 5th St C I 373,700 - 17,489 17,489 356,211 2 Dallas Thomas - 5th St 293,400 - 1,375 1,375 292,025 2 Austin Gulfway - 5th St 554,100 - 1,038 1,038 553,062 2 1st Street Broadway to Port Entrance 111,500 - 64,526 64,526 46,974 2 9th Ave Evergreeen/Catalina - 36th 199,828 - - 199,828 2 *Pavement Condition Survey 21,573 20,592 20,592 981 3 3rd ave 7th st-8th 36,850 - - 36,850 3 3rd ave 8th st-Thomas 70,000 - - 70,000 3 3rd ave Thomas Blvd-14th 33,000 - - 33,000 3 3rd ave 14th st-Gulfway 85,050 - - 85,050 3 4th ave SE end-25th 64,650 - - 64,650 3 4th ave 7th st-8th 39,100 - - 39,100 3 4th ave 8th st-9th 25,670 - - 25,670 3 Beaumont ave Rev Dr ransom -Thomas 103,890 - - 103,890 3 Nashville ave Rev Dr ransom-11th 61,700 - - 61,700 3 Allien pl Procter st-Seawall 85,560 - - 85,560 3 Forest ave 29th st-31st 48,100 - - 48,100 3 Granger st S 1st ave-Dead end 33,750 - - 33,750 3 14th st Bluebonnet ave-Woodworth 113,350 - - 113,350 3 14th st Woodworth blvd-4th 202,500 - - 202,500 3 29th st SW end-4th 46,670 - - 46,670 3 Foley ave W 7th-W Thomas 78,600 - - 78,600 3 W 6th st Abe Lincoln ave-Harry Denbo 93,330 - - 93,330 3 Avant ave Procter st-Seawall 81,190 - - 81,190 3 Memphis ave Gulfway dr-12th 64,578 - - 64,578 3 S 3rd ave Granger st-Broadway 35,500 - - 35,500 3 S 13th ave Greenwich st-Hwy 87 16,250 - - 16,250 3 Orange ave 7th st-Bluebonnet 153,055 - - 153,055 3 S. 11th ave S gulfway dr-Bufford 56,750 - - 56,750 3 S. 9th ave S gulfway dr-Bufford 56,600 - - 56,600 3 *Alamo 29th st-31st I 45,100 - 113 113 44,987 3 *Gulf ave 23rd st-25th I 35,800 - - 35,800 3 *31st st Memorial ave-Forrest I 107,500 - - 107,500 3 *Grand ave 29th st-31st I 46,350 - - 46,350 3 *Highland 29th st-31st I 46,350 - - 46,350 3 *Grannis ave W procter-7th I 55,555 - - 55,555 3 *23rd st Gulf ave-Memorial I 168,850 - - 168,850 3 *Ave a 25th st-Dead end I 65,900 - - 65,900 3 *Florida ave Thomas blvd-Gulfway I 103,445 - - 103,445 - Unallocated Remediation Funds (Yrs 1-3)511,963 511,963 Unallocated Reconstruction Funds (Yrs 1-3)1,469,612 1,469,612 8,535,766 1,128,478 188,913 1,317,391 7,218,375 Street Improvements - Open Projects City of Port Arthur 2019 - 2021 Budget Monthly Report June 30 2021 District 1 Total FY20-21 Project To Total Revised Actual Y-T-D Date Project Estimated Thru 9/30/20 Actual Actual Balance Year Project Cost (Unaudited)Thru June Thru 6/3/21 RemainingStreet Improvements - Open Projects Funded by EDC Street Maintenance and Grants 1 Lakeshore Drive Ph 2 12th Av-4186/4300-Stadium 723,536 14,500 14,500 709,036 1 5th Street Atlanta - Nashville 915,588 17,500 17,500 898,088 1 6th Street Atlanta - Nashville 929,588 - - 929,588 Unallocated EDC Street Maintenance Funds (Yrs 1-3)2,258,293 2,258,293 4,827,005 32,000 - 32,000 4,795,005 District 1 Open Street Projects 9,122,903 1,160,478 188,913 1,349,391 7,773,512 District 1 Unallocated Funds 4,239,868 - - - 4,239,868 Total District 1 13,362,771 1,160,478 188,913 1,349,391 12,013,380 * Remediation Project C=Complete I=In House Funded by General Fund and Bonds 1 * Williams Avenue Lakeshore - Procter 15,231 - - 15,231 1 Lakeshore Dr Lakeside - Williams - Stadium 1,514,000 677,681 1,654,149 2,331,830 (817,830) 1 *Williams Avenue 5th St - Lewis Dr 550,000 - 678 678 549,322 2 Lakeshore Dr Stadium - Duff 53,400 - - - 53,400 2 Williams Avenue 6th St - 7th St 7,320 - 1,347 1,347 5,973 2 16th St Vera - Main C I 9,810 - 1,313 1,313 8,497 2 Procter Ext Feeder - Atlantic C I 48,243 - 1,244 1,244 46,999 2 9th Ave Evergreeen/Catalina - 36th 363,427 - - 363,427 2 *Pavement Condition Survey 17,383 16,592 16,592 791 3 Dryden rd 9th ave-Rosedale 168,410 - - 168,410 3 Duff dr Lakeshore dr-Procter 67,620 - - 67,620 3 Las palmas Griffing dr-Evergreen 95,500 - - 95,500 3 Neches ave Lewis dr-NW end 66,050 - - 66,050 3 Pecos ave 7th st-Lewis 174,195 - - 174,195 3 Williams ave 6th st-Lewis 248,625 - - 248,625 3 Glenwood SE end-Lewis 73,960 - - 73,960 3 5th st San jacinto ave-Brazos 77,780 - - 77,780 3 Glenwood dr Las palmas dr-Evergreen 414,000 - - 414,000 3 7th st Williams ave-Stadium 165,000 - - 165,000 3 Procter st ext RR trk -Duff 519,445 - - 519,445 3 *14th st Williams ave-Duff I 53,305 - - 53,305 3 *Duff dr Lewis dr-13th I 80,000 - - 80,000 3 *13th st Duff dr-Williams I 50,000 - - 50,000 3 *Snider ave Gulfway dr-Radiance I 93,750 - - 93,750 Unallocated Remediation Funds (Yrs 1-3)542,095 542,095 Unallocated Reconstruction Funds (Yrs 1-3)129,600 - - 129,600 District 2 Open Street Projects 4,926,454 694,273 1,658,731 2,353,004 2,573,450 District 2 Unallocated Funds 671,695 - - - 671,695 Total District 2 5,598,149 694,273 1,658,731 2,353,004 3,245,145 * Remediation Project C=Complete I=In House Funded by General Fund and Bonds 1 * Northpark Drive W Park - Evergreen 21,420 1,350 1,350 20,070 1 Forest Drive Evergreen - Woodrow 637,500 172,800 521,084 693,884 (56,384) 1 8th Ave 32nd - Dead End 881,394 797,294 176,134 973,428 (92,034) 1 Sunken Court Ph 1&2Wilson -Tyrrell - Twin City 1,135,280 2,375,431 123,921 2,499,352 (1,364,072) District 2 District 3 Total FY20-21 Project To Total Revised Actual Y-T-D Date Project Estimated Thru 9/30/20 Actual Actual Balance Year Project Cost (Unaudited)Thru June Thru 6/3/21 RemainingStreet Improvements - Open Projects 2 Ferndale Drive Highland Dr - S Park Dr 423,948 1,350 1,038 2,388 421,560 2 Wilson Drive Evergreen - Highland 352,329 - 1,038 1,038 351,291 2 Avalon 39th - 32nd 259,500 - 1,038 1,038 258,462 2 40th St Everglades - Big Bend 559,329 - 1,038 1,038 558,291 2 Brazos Lake Arthur - Rice Farm Rd 60,400 - 1,038 1,038 59,362 2 76th St Twin City - Dead End C I 98,200 - 6,075 6,075 92,125 2 77th St Twin City - Dead End C I 96,500 - 23,952 23,952 72,548 2 9th Ave Evergreeen/Catalina - 36th 3,126 - - 3,126 2 *Pavement Condition Survey 13,143 12,545 12,545 598 3 10th ave 40th st-Dead end 50,400 - - 50,400 3 28th st 9th ave-NE end 68,444 - - 68,444 3 32nd st Woodrow dr-Twin City 229,350 - - 229,350 3 7th ave 32nd st-39th 58,489 - - 58,489 3 Evergreen dr Griffing dr-Ferndale 78,150 - - 78,150 3 Lansing ave 38th st-42nd 11,400 - - 11,400 3 Lexington ave 39th st-35th 272,455 - - 272,455 3 Park rd Lucian adams dr-60th 1500'133,000 - - 133,000 3 5th ave 25th st-28th 51,156 - - 51,156 3 28th st 4th ave-8th 85,600 - - 85,600 3 *37th st 5th ave-9th I 73,167 - - 73,167 3 *5th ave 32nd st-39th I 183,125 - - 183,125 3 *29th st 9th ave-5th I 81,670 - - 81,670 Unallocated Remediation Funds (Yrs 1-3)526,499 526,499 Unallocated Reconstruction Funds (Yrs 1-3)(647,557) - - (647,557) District 3 Open Street Projects 5,918,475 3,360,770 856,356 4,217,126 1,701,349 District 3 Unallocated Funds (121,058) - - - (121,058) Total District 3 5,797,417 3,360,770 856,356 4,217,126 1,580,291 * Remediation Project C=Complete I=In House Funded by General Fund and Bonds 1 Willow Avenue Maple - 60th St C 881,509 812,345 69,077 881,422 87 1 60th Street West Port Arthur - Canal C 903,247 861,655 6,660 868,315 34,932 1 *Lakeside Plaza H.O. Mills - Cashmere C I 320,000 - 286 286 319,714 2 Alabama Dorsey - Hall 94,000 - 1,500 1,500 92,500 2 Parks Wilson - Mississippi 74,200 - 1,038 1,038 73,162 2 Davis 365 - Dorsey 378,300 - 1,188 1,188 377,112 2 Mississippi Dorsey - Hall 92,800 - 1,151 1,151 91,649 2 Shirley West Port Arthur - 58th 459,600 - 1,038 1,038 458,562 2 Pastel Lavender - North End C I 41,200 - 15,754 15,754 25,446 2 Lakeside Plaza Waverly - Hwy 73 W C I 86,600 - 1,038 1,038 85,562 2 Ebony Bayou - Salisbury C I 54,400 - 8,623 8,623 45,777 2 Cashmere Cambridge - Lakeside Plaza C I 388,000 - 86,273 86,273 301,727 2 Houston Ave.H.O. Mills - Linkwood 192,000 - 1,278 1,278 190,722 2 50th St Linkwood - Shortline 162,700 - 1,313 1,313 161,387 2 Shortline W. 50th St - SE End 54,800 - 1,313 1,313 53,487 2 Waco 14th - DD7 Ditch 205,900 - 1,313 1,313 204,587 2 Atlanta Thomas - DD7 C I 287,100 - 1,313 1,313 285,787 2 Shreveport Thomas - DD7 C I 313,900 - 7,044 7,044 306,856 2 14 St.Stillwell - Houston 667,300 - 2,349 2,349 664,951 2 Dallas Thomas - DD7 252,200 - 1,605 1,605 250,595 2 Austin Gulfway - DD7 268,100 - 1,382 1,382 266,718 2 Sassine Entire Length 138,600 - 1,038 1,038 137,562 2 Weaver Entire Length 70,400 - 1,038 1,038 69,362 2 Hazel 59th - 60th 142,100 - 1,192 1,192 140,908 District 4 Total FY20-21 Project To Total Revised Actual Y-T-D Date Project Estimated Thru 9/30/20 Actual Actual Balance Year Project Cost (Unaudited)Thru June Thru 6/3/21 RemainingStreet Improvements - Open Projects 2 Diamond Avenue 60th - 63rd 359,000 - 1,380 1,380 357,620 2 Hazel/62nd Curve 50,000 - 1,038 1,038 48,962 2 60th Street Hazel - Jack 213,800 - 1,141 1,141 212,659 2 63th Street Pat Ave - Diamond Ave 514,600 - 1,382 1,382 513,218 2 9th Ave Evergreeen/Catalina - 36th 1,036,219 - - 1,036,219 2 *Pavement Condition Survey 46,401 44,291 44,291 2,110 3 15th st Aly ne of hous-Ft Worth 113,345 - - 113,345 3 47th st SW end-Shreveport 90,670 - - 90,670 3 Cherry ave Maple st-W60th 57,550 - - 57,550 3 El paso ave DS 1033n fm 365-90th 42,720 - - 42,720 3 Fort worth ave Thomas blvd-17th 148,270 - - 148,270 3 Hazel ave Hwy 73 w-W 59th 93,110 - - 93,110 3 Jade ave W 61st st-W 63rd 122,220 - - 122,220 3 Ray ave Hwy 73 w-58th 94,490 - - 94,490 3 Stilwell blvd nb Gillham cir-14th 35,505 - - 35,505 3 Stilwell blvd sb Gillham cir-19th 145,320 - - 145,320 3 65th st Garnet ave-W Port Arthur 163,220 - - 163,220 3 Wheatley ave SE end-NW end 40,900 - - 40,900 3 Wilson ave Dorsey st-FM 365 147,500 - - 147,500 3 14th st Beaumont ave-Savannah 104,930 - - 104,930 3 Golden Cherry ave-Daisy 21,200 - - 21,200 3 Grant ave W 53rd st-NW end 37,975 - - 37,975 3 Jade ave W 63rd st-FM 365 214,560 - - 214,560 3 Mauve ave Hwy 73 w-North end 27,500 - - 27,500 3 Mauve st W 58th st-Birch 114,250 - - 114,250 3 Nederland ave Gulfway dr-Gillham 227,360 - - 227,360 3 Ash ave W 58th st-Canal 44,150 - - 44,150 3 Center ave Mulberry st-Smith 23,055 - - 23,055 3 Danny Cherry ave-Daisy 21,200 - - 21,200 3 Grant ave SE end-W 53rd 65,850 - - 65,850 3 Hazel ave W 60th st-W 62nd 111,390 - - 111,390 3 Mobile ave Thomas blvd-Nederland 55,850 - - 55,850 3 Nick ave W 62nd st-W 63rd 50,050 - - 50,050 3 Norma st Canal st-W Port Arthur Rd 97,650 - - 97,650 3 Phyllis st SW end-NE end 43,450 - - 43,450 3 Ray ave Shirley st-W 61st 191,730 - - 191,730 3 San antonio ave Thomas blvd-Gulfway 103,555 - - 103,555 3 Smith st Roosevelt ave-Wheatley 57,400 - - 57,400 3 58th st Svc acc: 1162-Hazel 150,550 - - 150,550 3 Evelyn ave Fredrich st-Cox 16,400 - - 16,400 3 Fort worth ave 17th st-Zwolle 44,550 - - 44,550 3 Lin st SW end-Roosevelt 13,950 - - 13,950 3 Mimosa st Diamond ave-Hazel 115,270 - - 115,270 3 Amino st West end-W Port Arthur Rd 74,785 - - 74,785 3 Canal st W 61st st-W Port Arthur R 273,890 - - 273,890 3 Ellias W end-E end 125,070 - - 125,070 3 *Nederland ave Fort worth ave-Gulfway I 85,835 - - 85,835 3 *Orange ave Gulfway dr-19th I 60,000 - - 60,000 3 *12th st Austin ave-Savannah I 91,390 - - 91,390 3 *50th st Beaumont ave-NE end I 26,350 - - 26,350 3 *Augusta ave Thomas blvd-Nederland I 50,280 - - 50,280 3 *Lake charles ave Gulfway dr-NW end I 66,820 - - 66,820 3 *Beaumont ave H.o. mills blvd-50th I 63,700 - - 63,700 3 *Beaumont ave Thomas blvd-Nederland I 129,890 - - 129,890 3 *Mobile ave 14th st-NW end I 234,370 - - 234,370 3 *Wheatley ave W 53rd st-Phyllis I 63,610 - - 63,610 3 *Shirley st W 58th st-Ray I 126,110 - - 126,110 3 *Salsbury dr Prospect st-Dead end I 166,000 - - 166,000 Unallocated Remediation Funds (Yrs 1-3)2,000,325 2,000,325 Unallocated Reconstruction Funds (Yrs 1-3)(844,431) (844,431) 14,791,615 1,718,291 220,745 1,939,036 12,852,579 Total FY20-21 Project To Total Revised Actual Y-T-D Date Project Estimated Thru 9/30/20 Actual Actual Balance Year Project Cost (Unaudited)Thru June Thru 6/3/21 RemainingStreet Improvements - Open Projects Funded by EDC Street Maintenance and Grants 2 Jimmy Johnson Walk-ons 52,940 - 52,940 52,940 - District 4 Open Street Projects 13,688,661 1,718,291 273,685 1,991,976 11,696,685 District 4 Unallocated Funds 1,155,894 - - - 1,155,894 Total District 4 14,844,555 1,718,291 273,685 1,991,976 12,852,579 * Remediation Project C=Complete I=In House 33,656,493 6,933,812 2,977,685 9,911,497 23,744,996 5,946,399 - - - 5,946,399 39,602,892 6,933,812 2,977,685 9,911,497 29,691,395 Total All Districts Total Open Street Projects Total Unallocated Funds 8/6/2021 Total FY20-21 Project To Total Revised Actual Y-T-D Date Project Estimated Thru 9/30/20 Actual Actual Balance Project Cost (Unaudited)Thru June Thru 6/3/21 Remaining Upsize Pipes 11 & 12th at 7th & Lakeshore 678,890 - - 678,890 CDBG Mitigation Downtown Lakeview - - 51,464 51,464 (51,464) Drainage System at El Vista 6,879,028 131,013 239,194 370,207 6,508,821 Drainage System at Port Acres 18,032,177 340,107 748,005 1,088,112 16,944,065 Lake Arthur Detention Pond 20,854,801 1,388,595 721,254 2,109,849 18,744,952 Drainage System at Golf Course 18,337,358 208,142 377,386 585,528 17,751,830 Drainage Pump Stations 2,000,000 - 2,000,000 Drainage at Downtown Transit Facility 723,800 - - 723,800 Drainage Study 1,350,000 - 152,600 152,600 1,197,400 - 68,856,054 2,067,857 2,289,903 4,357,760 64,498,294 ERP Replacement 2,017,000 500,030 481,429 981,459 1,035,541 Cloud -based backups 108,000 72,026 72,026 35,974 Paper Digitization 630,000 - - 630,000 DR-Public Safety 145,000 - - 145,000 Parks and Rec System 15,000 - - 15,000 2,915,000 572,056 481,429 1,053,485 1,861,515 Repairs at Operations Bldg 550,000 52,081 52,081 497,919 Renovations to City Hall 962,000 237,919 237,919 724,081 Renovations to Electrical Building 200,000 43,125 43,125 156,875 Equipment Services Building 83,000 - - 83,000 Animal Shelter 6,650,000 - - 6,650,000 Police Substation 400,000 - - 400,000 Parks Division-19th St Renovation 750,000 - 23,450 23,450 726,550 New Health Building Aquis & Const 6,115,430 - 1,696,353 1,696,353 4,419,077 Old Health Bldg Renovation 100,000 100,000 Public Safety Facility 500,000 - - 500,000 Adams Building 100,000 - - 100,000 2545 Dallas - Building Renovations 2,978,000 2,953,477 1,413 2,954,890 23,110 - 19,388,430 3,286,602 1,721,216 5,007,818 14,380,612 Replace Fire Engine 850,000 - 849,756 849,756 244 Traffic Signal Mast Arm Program 800,000 - 131,656 131,656 668,344 Renovations to Recreation Center 619,300 192,655 20,454 213,109 406,191 Mosely Pool 82,000 82,000 - 82,000 - Renovations to Lakeview Pool Area 1,045,700 53,884 53,884 991,816 Eagles Park Walking Trail 64,125 64,125 64,125 - Drainage Improvements Total Drainage Projects General Improvements Information Technology Other Captial Improvements City of Port Arthur 2020 - 2021 Budget Monthly Report June 30 2021 City Facilities Parks & Recreation Renovations Public Works Fire Total FY20-21 Project To Total Revised Actual Y-T-D Date Project Estimated Thru 9/30/20 Actual Actual Balance Project Cost (Unaudited)Thru June Thru 6/3/21 RemainingOther Captial Improvements Adams Park Soccer Complex 565,000 - - 565,000 Barbara Jacket Park - Parking Lot Repairs 53,875 - - 53,875 Sabine Pass Boat Ramps 1,000,000 - 1,000,000 Washington Park Basketball Impr 80,000 - - 80,000 3,510,000 392,664 20,454 413,118 3,096,882 27,463,430 4,251,322 3,204,511 7,455,833 20,007,597 5,000,000 22,500 45,841 68,341 4,931,659 Waste Water Treatment Plant Engineering 6,282,200 4,794,592 560,338 5,354,930 927,270 Waste Water Treatment Plant Construction 60,560,000 - 2,263 2,263 60,557,737 Lift Stations 3,850,000 256,694 115,446 372,140 3,477,860 Water Tank Rehabilitation 1,750,000 127,890 647,627 775,517 974,484 Sabine Pass Collection Systems 1,100,000 118,776 40,310 159,086 940,914 TWDB WL Replacement Plan - - - - Lakeside Gravity Sewer Main 300,000 - - 300,000 El Vista Force Main 1,700,000 - 37,355 37,355 1,662,645 Hwy 365 Force Main 3,000,000 - - 3,000,000 Sewer(Water) Main Removal 300,000 - - 300,000 42nd St Force Main 1,000,000 - - 1,000,000 Collection Systems Rehab 1,000,000 - - 1,000,000 Landfill New Water Line 2,400,000 - 35,000 35,000 2,365,000 - - - 83,242,200 5,297,952 1,438,339 6,736,291 76,505,910 Boat Launch/Parking Lot Repairs 590,000 5,500 5,500 584,500 590,000 5,500 - 5,500 584,500 Press Building Improvements 10,873,100 2,075,462 1,385,078 3,460,540 7,412,560 10,873,100 2,075,462 1,385,078 3,460,540 7,412,560 Total EDC Improvements Total General Improvements Downtown Revitalization Water Utility Improvements Total Water Utility Improvements Pleasure Island Imrovements Total Pleasure Island Improvements EDC Imrpovements Actual Actual Actual Actual Y-T-D Actual 16-17 17-18 18-19 19-20 Actual FY17-FY21 (Unaudited)Thru May Total Hurricane Harvey Disaster Fund Summary Revenues Federal/State Grants 6,092,224 6,407,776 2,584,128 1,458,692 799,155 17,341,975 Contributions - Donations 10,682 27,424 - - 38,106 Insurance Proceeds - 10,015,834 1,261,707 1,130,441 35,138 12,443,120 Lease Proceeds - 2,646 - - 2,646 Total Revenues 6,102,906 16,453,680 3,845,835 2,589,133 834,293 29,825,847 Expenditures Salaries and Benefits 3,694,644 790,262 4,487 54,169 - 4,543,562 Supplies and Materials 63,291 1,636,543 263,806 105,837 - 2,069,477 Maintenance 121,462 2,171,350 1,474,738 522,596 - 4,290,146 Contractual Services 1,082,631 14,882,112 1,617,085 997,302 297,232 18,876,362 Capital Outlay 1,140,878 1,224,982 619,103 543,446 289,016 3,817,425 Total Expenditures 6,102,906 20,705,249 3,979,219 2,223,350 586,248 33,596,972 Net Current Activity - (4,251,569) (133,384) 365,783 248,045 Beginning Fund Balance - - (4,251,569) (4,384,953) (4,019,170) Ending Fund Balance - (4,251,569) (4,384,953) (4,019,170) (3,771,125) Summary by Category Debris Emergency Response Equipment Vehicles Facilities Contents Other DAC At Risk Total Revenues FEMA/State 13,747,234$ 2,199,266$ -$ 47,250$ 214,976$ -$ 531,078$ 602,171$ -$ 17,341,975$ Insurance - - 1,246,897 3,324,837 2,458,121 4,458,816 954,449 - - 12,443,120 Lease Proceeds - - - - - - 2,646 - - 2,646 Donations - - - - - - 38,106 - - 38,106 Total 13,747,234 2,199,266 1,246,897 3,372,087 2,673,097 4,458,816 1,526,279 602,171 - 29,825,847 Expenditures Personnel - 2,911,379 54,169 - - - 4,487 - 1,573,527 4,543,562 Supplies & Materials - - - - 2,069,477 - - - 2,069,477 Maintenance - - 524,849 846,502 1,963,044 506,837 448,914 - - 4,290,146 Contractual Services 12,875,438 - - - - - 2,933,469 3,067,455 - 18,876,362 Capital Outlay - - 379,728 1,474,944 1,353,645 320,868 288,240 - - 3,817,425 Total 12,875,438 2,911,379 958,746 2,321,446 3,316,689 2,897,182 3,675,110 3,067,455 1,573,527 33,596,972 Balance 871,796$ (712,113)$ 288,151$ 1,050,641$ (643,592)$ 1,561,634$ (2,148,831)$ (2,465,284)$ (1,573,527)$ (3,771,125)$ Reimbursements Pending FEMA Proj 43250 Hazard Response 539,147 - - - - - - - 539,147 Total - 539,147 - - - - - - - 539,147 City of Port Arthur 2020 - 2021 Budget Monthly Report May 31, 2021 Actual Y-T-D Actual 19-20 Actual FY20-21 (Unaudited)Thru June Total COVID 19 Disaster Fund Summary Revenues Federal/State Grants 598,840 2,395,360 2,994,200 Contributions-Donations 2,000 - 2,000 Total Revenues 600,840 2,395,360 2,996,200 Expenditures Salaries and Benefits 2,404,838 138,846 2,543,684 Supplies and Materials 133,473 60,521 193,994 Contractual Services 452,337 172,606 624,943 Total Expenditures 2,990,648 371,973 3,362,621 Net Current Activity (2,389,808) 2,023,387 Hurricane Laura Disaster Fund Summary Revenues Federal/State Grants - - - Total Revenues - - - Expenditures Salaries and Benefits 1,935,989 23,325 1,959,314 Supplies and Materials 103,998 2,312 106,310 Maintenance 2,180 223,404 225,584 Contractual Services 173,904 111,055 284,959 Total Expenditures 2,216,071 360,096 2,576,167 Net Current Activity (2,216,071) (360,096) City of Port Arthur 2020 - 2021 Budget Monthly Report June 30, 2021