HomeMy WebLinkAboutA. SUNGARD HTE - SUPPORT FOR ELECTRONIC METER REPLACEMENT PROJECTDate: Reference No. Subject
12/29/08
Consideration and approval of a proposal from Sungard page
1 of 1
HTE, in the estimated amount of $13,600 to provide custom
programming in support related to the electronic meter
replacement project.
RECOMMENDATION:
, r CITY OF PORT ARTHUR, TEXAS
MAYOR AND CITY COUNCIL COMMUNICATIONS
Presented for City Council consideration and approval is the cost estimate of $13,600 for custom
programming and support related to the electronic meter replacement project.
BACKGROUND:
The City has initiated the wholesale replacement of water meters throughout the City. Bronco Services
has been contracted to remove the existing meters and install radio read meters. This process will
require that all meter records in the computer system be updated to reflect the new meters. Our. softwaze
vendor, Sungard HTE, has provided the. attached estimate to prepaze a software modification to facilitate
this update. The softwaze will allow us to take the data that will be provided by Bronco and upload it
directly into our system. This will limit the amount of manual data entry required, and help us avoid
errors in this enormous process.
This cost will be funded through the project budget, account 301-1601-591.57-OQ GO-802.
Fay g
IT Manager
Rebecca Underhill, CPA
Assistant City Manager /Director of Finance
Prepared by: Disposition by Council: Processed:
Approved by:
~/ ( )Approve ( )Other (Describe) City Secretary
Date:
Z:1FitianceUennifer's FileslCouncil Communirations~FITE_Me[er Replacement Projecfdoc
su~caR~~
PUBLIC SECTOR
Pubtic Sector Solutions
', System. Change Request Form
CLIENT: City of Port Arthur, TX SCR NUMBER: PTAR CX 2008-6963
APPLICATION: Customer Information System DATE: 12/19/2008
REQUEST DESCRIPTION
Provide a data extraction module to be run on-demand, by cycle/route, that creates a data file tc be provided to US Bronco, the
company performing the meter exchanges. Provide a mass meter exchange upload process to upload exchanges from
exchange vendor's file. Meters must already exist in meter inventory for a successful exchange to occur. There are many
other error checks involved which will be discussed with vendor and client.
Vendor is already awaze of timing considerations so that exchanges do not interfere with billing. Acceptance and rejection
reports will be provided with information useful for identifying and tesolving exchange issues. The designated Part Arthur
staff member will receive training from SunGazd on how to run and interpret the exchange reports, and how to perform meter
exchange file transfer operations.
Any changes may require an additional SCR.
This work will be based on the current version and ma re uire that the client load this version as art of the SCR.
NOTE: Planned Environment 5_0 =Version, User Interface: X = NaviLine and/or X = SelectlGreen _=GUI
Request will be: _ =One Time Process, X =Custom Modification, _ =Base Feature
If Custom Modification then the estimated future cost for retrofittin this work is: 6 new ro ams, 3 new files
CONNECT CARE CASE #: 537726 TOTAL COST: $13,600.00
SUNGARD HTE, INC. CONFIRMATION: ~'o>~,,,. dfi..,~r DATE: 12/19/2008
CLIENT AUTHORIZATION: DATE:
RE UESTED COMPLETION DATE: Work will BEGIN within 2 weeks of recei t of si ed SCR.
INSTRUCTIONS:
1) This document must be signed and returned within 30 days of receipt. This quotation is onty valid for 30
days. Unreturned and unsigned SCR's will automatically be cancelled after 30 days.
2) Return a faxed, signed copy to HTE (407-304-1025).
3) Maintain a copy for your records.
4) Upon receipt of the fax, it will be processed through the HTE Accounting Department for invoicing.
INFORMATION
5) On site installation and training is not included in cost unless specified above.
6) If your organization has a modification maintenance agreement (Currently $100.OOlmodified object and is subject to
change), this modification will become part of the plan. If you do not have an agreement, you are responsible for
the cost to retrofit this mod into new releases.
INVOICE -
• For billing inquiries regarding this SCR, please use the number located at the top right of this form.
• Please remit 50% of the total cost to HTE's Accounting Department referencing this SCR #. Programming
will not begin until the 50% payment is received. '
• The second 50% will be invoiced upon completion of the project.
• Prices are quoted in U.S. dollars.
su~GaRO~
PUBLlC SECTOR
System Change Request Form
INSTRUCTIONS:
1) This document must be signed and returned within 30 days of receipt. This quotation is only valid for 30
days. Unretumed and unsigned SCR's will automatically be cancelled after 30 days.
2) . Return a faxed, signed copy to HTE (407-304-1025).
3) Maintain a copy for your records.
4) Upon receipt of the fax, it will be processed through the HTE Accounting Department for invoicing.
INFORMATION
5) On site installation and training is not included in cost unless specified above.
6) If your organization has a modification maintenance agreement (Currently $100.OOlmodified object and is subject to
change), this modification will become part of the plan. If you do not have an agreement, you are responsible for
the cost to retrofit this mod into new releases.
INVOICE -
• For billing inquiries regarding this SCR, please use the number located at the top right of this form.
• Please remit 50% of the total cost to HTE's Accounting Department referencing this SCR #. Programming
will not begin until the 50% payment is received.
• The second 50% will be invoiced upon completion of the project.
• Prices are quoted in U.S. dollars.