Loading...
HomeMy WebLinkAbout(D2) Utilities Dept Capital ProgramProject Name Project Description Engineering Firm Year Project Funded Project Cost Engineering Status Construction Status Notes Main WWTP - Procter Main WWTP Design FNI 6/24/2015 6,995,000$ 100%TWDB Approved Design in September 2021 Main WWTP - Procter Main WWTP Construction Awaiting Bids for Construction 4/29/2020 60,560,000$ 0% Will be Advertised for Bids in October 2021. (Qualified for $4,250,000 of Loan Forgiveness) Sanitary Sewer Collection System Rehabilitation Replace Sanitary Sewer Lines, Manholes and Service Lines City Wide In-house design/ Golden Triangle Consulting Engineers 6/17/2021 1,000,000$ 20% 0% Staff Evaluating Different Areas for this Project. Will Advertise for Bids in December 2021 Sabine Pass Sanitary Sewer Collection System Pipeburst Sanitary Sewer Pipe and Replace Manholes and Service Lines in Sabine Pass In-house design/ Golden Triangle Consulting Engineers 6/17/2021 500,000$ 50% 0% SSOI Approved by TCEQ in September 2021. Will Advertise for Bids in December 2021 Lakeside Gravity Sewer Main Replace Sanitary Sewer Lines on Lakeside Soutex Surveyors 6/17/2021 300,000$ 90% 0%Will Advertise for Bids in December 2021 El Vista Force Main El Vista Sewer Force Main AWC 6/17/2021 1,700,000$ 95% 0% Waiting for Permits from Railroad. Will Advertise for Bids in December 2021 Hwy 365 Force Main Hwy 365 Sewer Force Main SPI 6/17/2021 3,000,000$ 10% 0% Phase 1 of Engineering will be Completed by February 2022 46th Street Force Main 46th Street Force Main AWC 6/17/2021 1,000,000$ 100% 90% Construction to be Completed in October 2021 Landfill New Water Line Landfill Water Line AWC 2,400,000$ 95% 0% Waiting for Permits from Army Corps of Engineers. TxDot Permits Issued. Total 2021 COs 9,900,000$