Date: Referenee No. Subject Reject all bids for one (1) serf-propelled chip spreader for / Page
625-1801- the Public Works-Street Division I I of 3
3/14~3 531.93-03
RECOMMENDATIONS:
We recommend that the City Council reject all bids for one (1) self-propelled chip spreader for the
Public Works-Street Division due to the bids being non-responsive, and that the Public Works
Department be authorized to amend the specifications and re-advertise for bids.
BACKGROUND:
The Public Works-Street Division uses a self-propelled chip spreader in the reconstruction of city
streets to apply the two-course rock chip surface to some streets. We are currently using a 1991
model Etnyre spreader with 1,809 operating hours which cost $70,750 when purchased new. The unit
has begun to experience application computer problems, thus causing the incorrect amount of rock
chips to be applied or shutting us down completely. This is a piece of equipment that cannot be rented
on short notice like other common pieces of equipment.
Advertisement for bids were published on December 15, 2002 and December 22, 2002, with thirteen
(13) bid packets being picked up or mailed out. Three (3) bids were received and opened on January
15, 2003, to wit:
VENDOR
Geffs Manufacturing, Inc.
Pocatella, Idaho
EQUIPMENT PRICE
$138,500
EXTENDED
WARRANTY PRICE TOTAL
$2,660 w/SO Deduct. $141,160
R.B. Everett & Company
Houston, Texas
$187,455 NoBid $187,455
Cooper Equipment Company
(BuyBoard quote)
San Antonio, Texas
$188,830.26 No Bid $188,830.26
Cooper Equipment Company
San Antonio, Texas
$192,310 No Bid $I92,310
The two lowest bidders were asked to hold their bids for an additional twenty (20) days beyond the
initial sixty (60) day period in order to analyze the bids properly.
Geffs Manufacturing listed three (3) exceptions to the power train specifications as they relate to their
method of powering and braking their unit. These do not seem to be material THOUGH the power
train is a mechanical system versos a hydrostatic system as specified. Equipment Services personnel
Prepared by:LEM/vkl Disposition by Council: Processed by City Secretmy
Approved by:
( ) Approve ( ) Other (Describe) Date:
CITY OF PORT ARTHUR, TEXAS
MAYOR AND CITY COUNCIL COMMUNICATIONS
3/14/03
ReferenCe No.
625-1801-
531.93-03
I Subject Reject all bids for one (1) self-propelled chip spreader for
Public Works-SlxCet Division
Page
2 of 3
reviewed the exceptions and have determined them to be approved equals to the specifications. They
also took one (1) exception to the Rollover Protection System for the unit since it is not an OSHA
requirement on this category of equipment, and one (1) exception to the front brush guard requkement
since the unit has the chip hopper mounted on the front. They did not state their standard
manufacturer's warranty, but did quote an extended warranty as requested, all of which would be
handled through Mustang Tractor in Beaumont. This could not be verified by agenda deadline.
Though included for a response, a license from the Texas Department of Transportation-Motor
Vehicle Division in Geffs' name is not required since they are an out-of-state company. References
with similar equipment, supplied by G-efts shortly before agenda deadline, could not be reached for
comments on their experience with the Gefts chip spreader. Geffs' bid would be considered non-
responsive.
R.B. Everett indicated "lq/A" on several general specifications dealing with method of handling
warranty service on the unit, brakes and air compressor without clearly indicating if they were taking
exceptions, and did not otherwise qualify their responses. They indicated that a radio would not be
installed on the unit contrary, to the specifications, as well as indicating that they did not intend to
provide the specified engine shutdown/alarm system. As with Geffs, no front bush guard would be
provided due to the chip hopper mounting, nor would the Rollover Protection System be provided.
Everett did not state their standard manufacturer's warranty, nor did they bid an extended warranty
since the Entyre company does not offer such on their equipment. Everett does possess a proper
TxDOT motor vehicle license as an in-state converter and manufacturer's representative. Everett's
bid would be considered non-responsive..
Cooper did not indicate the brand name of the equipment bid, nor did they provide any equipment
brochures. They did not state their standard manufacturer's warranty or bid on an extended warranty,
nor were they going to provide a radio on the unit. They also had a number of responses as above
where N/A was shown with such not being otherwise qualified. They also showed an N/A response
regarding the TxDOT motor vehicle license requirement even though they are an in-state company.
Cooper's bid would be considered non-responsive due to no information being provided on the
equipment bid.
BUDGET/FISCAL EFFECT:
Funds for the purchase of the chip spreader was approved by the City Council in the FY 2003 Budget
in the Equipment Replacement Fund No. 625, Account No. 625-1801-531.93-03 in the amount of
$197,000, with that funding still being available.
IPrepared by:LEM/vld
Approved by:
/Disposition by Council:
( ) Approve
( ) Other (Describe)
Processed by City Secrelary
Date:
CITY OF PORT ARTHUR, TEXAS
MAYOR AND CITY COUNCIL COMMUNICATIONS
625-1801- the Public Works-Street Division 3 of 3
531.93-03
Date:
3/14/03
STAFF/EMPLOYEE EFFECT:
The purchase of the new chip spreader will allow the Street Division employees to be more efficient
in the course oftbeir work.
SUMMARY:
We recommend that the City Council reject all bids for one (1) self-propelled chip spreader for the
Public Works-Street Division duc to the bids being non-responsive, and that thc Public Works
Department be authorized to amend the specifications and re-advertise for bids.
Leslie E. McMaben, P.E.
Director of Public Works
Rebecca Underhill
Director of Finance
Director of Transportation
jo~Broussard, I , '
Purchasing Coordinator
P~epared by:LEM/vkl
Approved by:
Disposition by Council:
( ) Approve .
/l~ocessed by City Secretmy
Date:
( ) Other (De~rib~)