Loading...
HomeMy WebLinkAboutPR 15203: GULF BREEZE II (COMPLETION OF WATER SYSTEM)MEMORANDUM CITY OF PORT ARTHUR UTILITY OPERATIONS DEPARTMENT TO: Stephen Fitzgibbons, City Manager FROM: Kelly Eldridge, Director of Utility Operations (~L D l ag ~CG~. DATE: April 13, 2009 SUBJECT: Proposed Resolution No. 15203 COMMENTS I recommend that the City Council approve Proposed Resolution No. 15203, which accepts the Engineer's Certificate of Completion, Contractor's Certificate of Guarantee, and Contractor's Certificate and Release for the completion of public improvements to include the water system only to serve the Gulf Breeze II Apartments. BACKGROUND The Housing Authority of the City of Port Arthur developed a tract of land on Twin City Highway north of 53rd Street for the construction of the Gulf Breeze II Apartments. They hired Brownstone Construction, LTD as their contractor to perform this work in accordance with City Standards, and the water system improvements are now ready for acceptance by the City. BUDGET/FISCAL EFFECT The value of these water system facilities is estimated by their engineer at $87,775. STAFF/EMPLOYEE EFFECT City staff attended the Final Inspection and testing of the public water system to verify conformance with City Standazds. SUMMARY Approval of Proposed Resolution No. 15203 is recommended. P.R. No. 15203 04/13/09 RESOLUTION NO. A RESOLUTION AUTHORIZING ACCEPTANCE OF AN ENGINEER'S CERTIFICATE OF COMPLETION FROM ARCENEAUX & GATES CONSULTING ENGINEERS, INC., AND A CONTRACTOR'S CERTIFICATE AND RELEASE, AND CONTRACTOR'S CERTIFICATE OF GUARANTEE FROM BROWNSTONE CONSTRUCTION, LTD FOR THE COMPLETION OF THE PUBLIC WATER SYSTEM IMPROVEMENTS SERVING GULF BREEZE II APARTMENTS, AND AUTHORIZING THE CITY MANAGER TO SIGN THE CERTIFICATE OF ACCEPTANCE ON BEHALF OF THE CITY OF PORT ARTHUR, TEXAS. WHEREAS, the Housing Authority of the City of Port Arthur planned and developed a tract of land for the purpose of constructing the Gulf Breeze II Apartments development; and, WHEREAS, the Housing Authority of the City of Port Arthur contracted with Brownstone Construction, LTD for construction of the public water system throughout this development; and, WHEREAS, the Housing Authority of the City of Port Arthur has granted the City of Port Arthur adequate easement tracts for these public water utilities their property; and, WHEREAS, the City has received an Engineer's Certificate of Completion dated April 13, 2009 from Arceneaux & Gates Consulting Engineers, Inc. certifying that the public water system in this project has been completed according to City Standards, copy attached hereto and made a part hereof as Exhibit A, together with a Contractor's Certificate and Release (Exhibit B) and a Contractor's Certificate of Guarantee (Exhibit C), both executed by Doak Brown, Vice President of Brownstone Construction, LTD; NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PORT ARTHUR: Section 1. That the City Manager of the City of Port Arthur is hereby authorized to P.R. No. 15203 04/13/09 Page 2 execute on behalf of the City of Port Arthur a Certificate of Acceptance (Exhibit D) for the completion of the public water infrastructure. Section 2. That a copy of the caption of this Resolution be spread upon the Minutes of the City Council. READ, ADOPTED AND APPROVED THIS day of , 2009 at a Regular Meeting of the City Council of the City of Port Arthur, Texas, by the following vote: AYES: Mayor Councilmembers: NOES: Deloris Prince Mayor ATTEST: APPROVED AS TO FORM: r~ ~jf~ Terri Hanks City Secretary Mark Sokolow City Attorney APPROVED: Stephen Fitzgibbons City Manager r~~, ~.,~'d„ Kelly Eld idge Director of Utility Operations ~' EXHIBIT A ENGINEER'S CERTIFICATE OF COMPLETION Project GULF BREEZE II DEVELOPMENT Date Of Issuance: Apri113, 2009 Owner{s): Housing Authority of the City of Port Arthur /City of Port Arthur Owner's Project No.: N/A, Contract No. N/A Engineer: ARCENEAUX & GATES CONSULTING ENGINEERS, INC. Contractor: BROWNSTONE CONSTRUCTION, LTD. This Engineer's Certificate of Completion applies to all Work under the Contract Documents or to the following specified parts thereof: TO Housing Authority the City of Port Arthur /Ciri of Port Arthur [~+~] AND TO BROWNSTONE CONSTRUCTION. LTD. lcorrrRncroal The Work to which this Certificate applies has been inspected by authorized representatives of Owner, Contractor and Engineer, and that Work on the WATER SYSTEM is hereby declared to be complete in accordance with the Contract Documents. Please note that figaj a[)jvskment of valve boxes will be made when final grading is placed and completed. Aori18.2009 Dare of co>watEran ~ i ? P; E ' :F{,v 14 g / Executed by Engineer on /~~rl / /3 , 2009 ~ ~ ':~*1 f~~+ s JOE M. WILSON, JR. 7..- ............ ~ ...........ti,.» • 92067 . x ~s~ON AIE~?~ \ a\ v v~~v BY: ARCENEA a!< TES CONS GINEERS, ENC. [SEAL] 1/1 ExxISTT s CONTRACTOR'S CERTIFICATE OF GUARANTEE FROM: BROWNSTONE CONSTRUCTION. LTD TO: l~ewiNC ~4..d.Lr.,(, oFL_ ,G L~~ eF~iiett7r~z : ~~i~~ a-F ~rt I~sf~ut FOR: GULF BREEZE II R~JEFERENCE CONTRACT NO. TrL. /h)q BETWEEN THE ENTERED INTO THE _V' ' - DAY OF AND BROWNSTONE CONSTRUCTION LTD OF HOUSTON. TEXAS FOR: GULF BREEZE II RNON ALL MEN BY TNESE PRESENTS: 1. BROWNSTONE CONSTRUCTION, LTD. does hereby guarantee all of the work done under the above referenced wntract to be free from faulty materials in every particular, and frce from improper workmanship, and against injury from proper and usual weal; and agrees to replace or re- execute without cost to the Owner and (aerator such work az may be found to be improper or imperfect, and to make good all damage caused to other work or materials, due to such required replacement or re-execution. 2. This guarantee shall cover a period of one (I) year from the date of acceptance of all work under this Contract, az evidenced by the Engineer's Certificate of Completion. 3. This Certificate is given in connection of the 5nai payment under the contract between the Owner and BROWNSTONE CONSTRUCTION. LTD. and with the knowledge that it will be relied upon in malting such payment and that such payment would not be made except upon the truth of the matter contained in this af5davit IN WITNESS WHEREOF, the undersigned has signed and sealed this instrument this _~ day of~ ,200 (coRVOeatE seats BROWNSTON CONSTRUCTION. LTD.. by its eenetal parhrer BROWNSTONE CONSTRUCTION GP, LLC. t~~n BY: tlrT/e~ ~~ D-gown, Vice President In Doak Brown. being first duly sworn on oath, deposes and says, first that he is the Vice President of BROWNSTONE CONSTRUCTION GP. LLC.. [he eeneral Harmer of BROWNSTONE CONSTRUCTION. LTD.. second, that he has read dte foregoing certificate by him subscribed as Vice President of BROWNSTONE CONSTRUCTION GP. LLC the eeneral oartner of BROWN TONE CONSTRUCTION. LTD. Affiant further states that the matters and things stated herein are true. /7 ~ ~1 Subscribed and sworn to before me this ~_ day of C,C,p.}.c..(~ 20~. My commission expires a2'~K"o20/~ loffiI y '";y}., LINDA CARROLL ~ ~."' ~ "'~4 NOTARY PUBUC •;•'A.p:i~%~ Sm~e dTexea M~+n wbGe) `_~ Comm. Eap. 02-0&2012 Z2 EXHIBIT C CONTRACTOR'S CERTIFICATE ANC RELEASE FROM: BROWNSTONE CONSTRUCTION LTD. (None orcmaacmrl TO: ~auSinl~ n></fi /~? nFffr s~.Qt77arer~ C T of Y6 rf .~r ~r,2 twnn) REFERENCE CONTRACT NO. ENTERED INTO THE 6 DAY OF ~ ,BETWEEN THE AND BROWNSTONE CONSTRUCTION. LTD. (xsamcomacwt OF HOUSTON. TEXAS tcarl Isrm) FOR THE rllemed Proiee>) KNOW ALL MEN BY THESE PRESENTS: The undersigned hereby certifies that there is due from, and payable by, the Owner to [he Contractor under the contract and duly approved Change Orders and modifications the balazrce of No Dollars and 00/100 (50.001 2. The undersigned further certifies that in addition to the amount set forth in Paragraph 1, there aze outstanding and unseffied the following items which he claims aze just and due and owing by the Owner to the Contractor: (a) (b) (c) (d) (Itemise claims and amounts due) (If none, so state) 3. The undersigned further certifies that all work required under this contract, including work required under Change Order(s) numbered o has been performed in accordance with the terms thereof, and that them are no unpaid claims for matedaLs, supplies, or equipment and no claims of laborers or mechanics for unpaid wages arising out of the perfomtance of this contract, and that the wage rates paid by the Contractor were in conformity with the contract provisions relating to said wage rotes. 4. Except for the amounts stated under Paragraphs 1 and 2 hereof, the undersigned has received from the Owner atl sums of money payable to the undersigned under, or pursuant to, the above mentioned contract or any modifications or change thereof. That in consideration of the payment of the amount stated in Paragaph 1 hemof, the undersigned does hereby release the Owner and Operator from any and all claims arising order or by virtue of this contract, except the mmoum listed in Paragraph 2 hereof due from the Owner; provided, however, that if for any reason the Owner does not pay in full dte mmoum stated in Paragraph I hereof, said deduction shall not affect the validity of this release, but the amount so deducted shall be automatically included under Paragraph 2 as an mmount which the Contracmr has not released but will release upon payment thereof. The Contracor fuRher certifies that upon the payment of the amount listed in Paragraph 2 hereo f and of any amount which maybe deducted from Paragraph 1 hereof he will release [he Owner and Operator from any and all claims of any nature whatsoever arising out of said contract or modification thereof, and will execute such further releases or assurances as the Owner and Operator may request. IN SS WHEREOF, the undersigned has signed and sealed this instrumrnt this /o day of~~rYti, .2009. [~[ BROVWSTOTIE 1•ICrRUG1TON LTD Ico~NeduO try : BROWNSTONE CONSfRUCT10N GP, LLC, ita general paMer n:~a rm otomcerl Oaak Brwm, Yce President Doak Brown being fast duly swom on oath, deposes and says, first, that he is the Vice President of BROWNSTONE CONSTRUCTION GP. LLC. the ¢eneral partner of pr~,nr orcomo+m) BROWNSTONE CONSTRUCTION, LTD.. second, that he has read the foregoing certificate by him subscribed as Vice President of BROWNSTONE CONSTRUCTION GP LLC the general partner of BROWNSTONE CONSTRUCTION. LTD. Affiant further states that the matters and things staled herein aze true. Subscribed and swom to before me this ~_ day of 20~. My commission expires ~ -~ ~ - o~-Q/a2 ~l ~~\~(~j~ i (! ~~. ~ .sue ~•t: °.%`~Carun. Exp 02-0&2012 Ixohn P~5cl EXHIBIT D CERTIFICATE OF ACCEPTANCE FOR THE Public Water System to Serve the Gulf Breeze II Apartments for the Housing Authority of the City of Port Arthur IN THE CITY OF PORT ARTHUR To: Housing Authority of the City of Port Arthur Gentlemen: This is to certify that the City of Port Arthur, Texas, accepts the completion of the public water systems for the above development on the basis of the Engineers Certificate of Completion by Arceneaux & Gates Consulting Engineers, Inc., and the Contractor's Certificate of Guarantee, and the Contractor's Certificate and Release, both executed by Doak Brown, Vice President of Brownstone Construction, Ltd. Stephen Fitzgibbons City Manager ATTEST: Terri Hanks City Secretary