Loading...
HomeMy WebLinkAboutPR 22210: ACCEPTANCE OF THE 14" WATER LINE City of -_ rr rthur Texas INTEROFFICE MEMORANDUM Date: October 19,2021 To: The Honorable Mayor and City Council Through: Ronald Burton, City Manager From: Clyde Trahan, Interim Director of Utilities RE: P.R. No. 22210—Acceptance of the 14" Water Line Introduction: The intent of this Agenda Item is to seek the City Council's approval for the City Manager to sign the Certification of Acceptance for the relocation and replacement of a water line between 46th Street and 60th Street. Background: In September 2021, USA Rail Terminals Beaumont, LP (USA Rail) completed the construction of a railway terminal. To service the terminal, USA Rail replaced a 12"water line with a 14" water line HDPE, increasing the volume and strengthening the service connection due to the proximity of the nearby railways. USA Rail rerouted the path to minimize the effect of daily operations on the water line. The contractor for this project was High Roller Logistics, LLC. The project engineer was Soutex Surveyors & Engineers. The Project has been completed and is ready to be accepted by the City. Budget Impact: No budgetary impact. Recommendation: It is recommended that City Council approve Proposed Resolution No. 22210, authorizing the City Manager to accept the completion of the 14" water line as discussed/outlined above. "Remember,we are here to serve the Citizens of Port Arthur" P. R. No. 22210 10/19/21 bw Page 1 of 2 RESOLUTION NO. A RESOLUTION AUTHORIZING ACCEPTANCE OF THE ENGINEER'S CERTIFICATE OF COMPLETION, CONTRACTOR'S CERTIFICATE AND RELEASE, AND CONTRACTOR'S CERTIFICATE OF GUARANTEE FOR THE ACCEPTANCE OF A 14 INCH WATER LINE BETWEEN 46TH STREET AND 60TH STREET AND AUTHORIZING THE CITY MANAGER TO SIGN THE CERTIFICATE OF ACCEPTANCE ON BEHALF OF THE CITY OF PORT ARTHUR. WHEREAS, High Roller Logistics, LLC of Center, Texas has completed a 14" water line project to the satisfaction of the project engineer and the City staff; and, WHEREAS, the City has received the Engineer's Certificate of Completion, dated September 17, 2021, from Soutex Surveyors & Engineers of Port Arthur, Texas stating that to the best of their knowledge, the replacement and rerouting of the 14" water line has been completed in general accordance with City standards, a copy is attached hereto and made a part hereof as Exhibit "A", together with a Contractor's Certificate and Release (Exhibit "B") and Contractor's Certificate of Guarantee (Exhibit "C"), executed by High Roller Logistics, LLC of Beaumont, Texas; and, WHEREAS,this work has been done at no cost to the City of Port Arthur. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PORT ARTHUR: THAT,the facts and opinions in the preamble are true and correct; and, THAT, the City Manager of the City of Port Arthur is hereby authorized to execute on behalf of the City of Port Arthur a Certificate of Acceptance (Exhibit "D") for the completion of the replacement and rerouting of the 14"water line between 46th Street and 60th Street. P. R. No. 22210 10/19/21 bw Page 2 of 2 THAT, a copy of the caption of this Resolution be spread upon the Minutes of the City Council. READ, ADOPTED, AND APPROVED THIS day of , 2021 at a Regular Meeting of the City Council of the City of Port Arthur, Texas, by the following vote: AYES: Mayor ; Council members ; NOES: Thurman"Bill"Bartie Mayor ATTEST: APPROVED AS TO FORM: to ark- 4.il Sherri Bellard a ecia Tiz o City Secretary City Attorney APPROVED FOR ADMINISTRATION: Ronald Burton City Manager 0, , N Clyde rahan Interim Director of Utilities TBPE Firm No.F-5755 0.I 1 O TBPLS Firm No.10123800 LA EF.0005711 a OUTEX 3737 Doctors Drive - - Port Arthur,Texas 77642 SURVEYORS&ENGINEERS s Office(409)983.2004 Fax(409)983.2005 October 1, 2021 Water Utilities City of Port Arthur 444 4th Street Port Arthur, Texas 77640 Re: 14" Water Line Between 46th Street and 60th Street, Port Arthur,Texas Soutex# 19-0667 To Whom It May Concern: Please find enclosed following Close-Out Documents for the above referenced Subdivision: • Engineer's Certificate of Completion • Contractor's Certificate and Release • Contractor's Certificate of Guarantee • Water Line Pressure Test Certification • As-Built Plan set Respectfully submitted, JeremyMitchell, P.E. Project Engineer City of Port Arthur 1 EXHIBIT "A" (Engineer's Certificate of Substantial Completion) ENGINEER'S CERTIFICATE OF COMPLETION Project: 14" WATER LINE BETWEEN 46TH STREET AND 60TH STREET, PORT ARTHUR,TEXAS Date of Issuance: September 17, 2021 Owner(s): CITY OF PORT ARTHUR Owner's Project No.: Engineer: SOUTEX SURVEYORS &ENGINEERS Contractor: HIGH ROLLER LOGISTICS, LLC This Engineer's Certificate of Completion applies to all Work under the Contract Documents or to the following specified parts thereof: TO CITY OF PORT ARTHUR (OWNER) AND TO HIGH ROLLER LOGISTICS,LLC (CONTRACTOR) The Work to which this Certificate applies has been inspected by authorized representatives of Owner, Contractor and Engineer, and that Work is hereby declared to be complete in accordance with the Contract Documents on September 17,2021 -,-, .—�OF TF.w\\ DATE OF SUBSTANTIAL COMPLETION �• .S \,d e�t / /l / Executed by Engineer on / , 2021 : .. ...... I�Gt-iEL�, rer.• u,. . .............. ,.1• , S7S5 7ivy II • • JER Y MITC ELL, P.E. DSO X SU"iYORS&ENGINEERS 1/1 EXHIBIT "B" (Contractor's Certificate and Release) CONTRACTOR'S CERTIFICATE AND RELEASE FROM: HIGH ROLLER LOGISTICS, LLC (NAME OF CONTRACTOR) TO: The City of Port Arthur (OWNER) REFERENCE CONTRACT NO. ENTERED INTO THE DAY OF BETWEEN USA RAIL TERMINALS BEAUMONT, LP AND HIGH ROLLER LOGISTICS, LLC (NAME OF CONTRACTOR) OF CENTER,TEXAS (CITY) (STATE) FOR THE: CONSTRUCTION OF A 14" WATER LINE BETWEEN 46TH STREET AND 60TH STREET, PORT ARTHUR,TEXAS (NAME OF PROJECT) KNOW ALL MEN BY THESE PRESENTS: 1. The undersigned hereby certifies that there is due from, and payable by, the Owner to the Contractor under the contract and duly approved Change Orders and modifications the balance of $0.00 2. The undersigned further certifies that in addition to the amount set forth in Paragraph 1,there are outstanding and unsettled the following items which he claims are just and due and owing by the Owner to the Contractor: (a) None (b) None (c) None (d) None (ITEMIZE CLAIMS AND AMONTS DUE) (IF NONE,50 STATE) 3. The undersigned further certifies that all work required under this contract, including work required under Change Order(s) numbered NONE ,has been performed in accordance with the terms thereof,and that there are no unpaid claims for materials,supplies, or equipment and no claims of laborers or mechanics for unpaid wages arising out of the performance of this contract, and that the wage rates paid by the Contractor were in conformity with the contract provisions relating to said wage rates. 4. Except for the amounts stated under Paragraphs 1 and 2 hereof,the undersigned has received from the Owner all sums of money payable to the undersigned under,or pursuant to,the above mentioned contract or any modifications or change thereof. 1 5• That in consideration of the payment undersigned does hereby release the Owner hand Operator e amount Prom any andd inaph all claims arising under or by virtue of this contract,except the amount listed in Paragraph 2 hereof due from the Owner;provided,however,that if for any reason the Owner does not pay in full the amount stated in Paragraph 1 hereof,said deduction shall not affect the validity of this release,but the amount so deducted shall be automatically included under Paragraph 2 as an amount which the Contractor has not released but will release upon payment thereof. The Contractor further certifies that upon the payment of the amount listed in Paragraph 2 hereof,and of any amount which may be deducted from Paragraph 1 hereof,he will release the Owner and Operator from any and all claims of any nature whatsoever arising out of said contract or modification thereof,and will execute such further releases or assurances as the Owner and Operator may request. IN WITNESS WHEREOF,the undersigned has signed and sealed this instrument this 1 St day of October 20 21. (SEAL) HIGH ROLLER LOGISTICS LLC. (CONTRACTOR) By;Jacob J Bender JACOB J BENDER ,being first duly sworn on oath,deposes and says,first,that he is the CFO of HIGH ROLLER LOGISTICS LLC. (EXECUTIVE) (NAME OF COMPANY) • second,that he has read the foregoing certificate by him subscribed as CFO of HIGH ROLLER LOGISTICS,LLC. (ExEcurlvE) (NAME OF COMPANY) Affiant further states that the matters and things stated herein are true. 224,64 (NAME Su:;scribed and sworn to before me this ` day of 6ebilie./ ,20"'I . My commission expires l OA,1 (DATE) towBRENDA.srAh BUSHof Marun,vu� rEx�,y Pi 0�a4� 62 COYY.E7IP -12-2024 'NDTA Y PUBLIC 2 EXHIBIT "C" (Contractor's Certificate of Guarantee) CONTRACTOR'S CERTIFICATE OF GUARANTEE FROM: HIGH ROLLER LOGISTICS, LLC (NAME OF CONTRACTOR) TO: The City of Port Arthur (OWNER) REFERENCE CONTRACT NO. ENTERED INTO THE DAY OF BETWEEN USA RAIL TERMINALS BEAUMONT, LP AND HIGH ROLLER LOGISTICS, LLC (NAME OF CONTRACTOR) OF CENTER,TEXAS (CITY) (STATE) FOR: CONSTRUCTION OF A 14" WATER LLINE BETWEEN 46TH STREET AND 60TH STREET, PORT ARTHUR,TEXAS (NAME OF PROJECT) KNOW ALL MEN BY THESE PRESENTS: 1. HIGH ROLLER LOGISTICS, LLC does hereby guarantee all of the work done under the above referenced contract to be free from faulty materials in every particular, and free from improper workmanship, and against injury from proper and usual wear; and agrees to replace or re-execute without cost to the Owner and Operator such work as may be found to be improper or imperfect, and to make good all damage caused to other work or materials,due to such required replacement or re-execution. 2. This guarantee shall cover a period of one (1) year from the date of acceptance of all work under this Contract,as evidenced by the Engineer's Certificate of Completion. 3. This Certificate is given in connection with the final payment under the contract between the Owner and HIGH ROLLER LOGISTICS, LLC. and with the knowledge that it will be relied upon in making such payment and that such payment would not be made except upon the truth of the matter contained in this affidavit. IN WITNESS WHEREOF,the undersigned has signed and sealed this instrument this 1st day of October , 20 21 , (CORPORATE SEAL) HIGH ROLLER LOGISTICS,LLC. (CONTRACTOR) BY:JACOB J.BENDER (NAME,CFO) JACOB J BENDER ,being first duly sworn on oath,deposes and says,first,that he is the CFO of HIGH ROLLER LOGISTICS,LLC. (TITLE) (NAME OF COMPANY) second,that he has read the foregoing certificate by him subscribed as CFO (TITLE) of HIGH ROLLER LOGISTICS,LLC. (NAME OF COMPANY) Affiant further states that the matters and things stated herein are true. ..42"-C.e1/5 ate. nn (JACOB J BENDER) tSubscribed and sworn to before me thisday of°`-����v"b' v , 20a)/. My commission expires I 1 v6/7Z/ (DATE) ...40"tec BRENDA BUSH NOTARY PWUC-STATE Of TEXAS Ca v..P.,.°\?:,..L�l IDt 51 9441 S ,,/ COMM. EXP.5 1 01_ 4 1 24 II (NOTARY PUBLIC) 2 9�GG�� TBPE Firm No.F-5755 l._ ` fir. TBPLS Firm No.10123800 1_ LA EF.0005711 Q a 3737 Doctors Drive Port Arthur,Texas 77642 j SURVEYORS&ENGINEERS Office(409)983.2004 Fax(409)983.2005 September 22, 2021 Water Utility Administration City of Port Arthur P.O. BOX 1089 Port Arthur, Texas 77640 Re: 14"Waterline Relocation between 46th Street and 60th Street at USA Rail Terminals, Soutex#19-0667 Dear City of Port Arthur Water Utility Administration, This letter is to certify the following regarding USA Rail Terminals waterline testing: On September 17, 2021,the water line was tested for 2 hours at 126 psi.After two hours, the pressure was still holding at 126 psi,passing the allowable leakage test.Those present for the test were as follows: Mike Moore—High Roller Logistics, LLC Darrel Harmon —COPA Water Utility Administration Seth Mize, E.I.T. —Project Manager Please note the following: • A water sample was collected by the City of Port Arthur for a Bac-T test. Respectfully su•mi ted, ell, P.E., R.P.L.S. .EPy1Y J Project Engin:er Sri 11: 116941 Enclosures City of Port Arthur—USA Rail Terminals 14"Waterline Relocation 1 DiSal- PROPOSED 12" WATERLINE RELOCATION BETWEEN 46TH STREET AND 60TH STREET PORT ARTHUR, TEXAS re44,411e,„ Nivi, CITY OFFICIALS � V LOAM A ut. n.wwnMARA OM.rscc A ,it , v¢r oesrrmnc« CRAWL AMBER: L..L a.aAs r. s' �b . CO.A.a =PRA•mem: H RI.S iouA..Or At..oq es_v�► : kallafft ...RA u[um4wr COMM•dBRe a rviw / J SITE Mx rr. ..gr,•CA.RAVI UNIr6 WAS for Narmac SOLTTEX =.."` Pea An6......e.o. T.IA=SS.ROD4 4rAS SURVEYORS UM F..409.9QS.20D5 r=r"s 14 I. f' . ._., wo / !N ��v. .." i rr... ;r—zus rec.. ' I 4 �j 4 II ,, P .• • 1 I rswu��-I-: 6aaa� "'9 'L"�` . 1, ... Ili _ ! Ft— _ _ z=.. 'Ni • it '1117 t*I kJ i I as morn. I Jo41., V i 1 �T Ue. M.. rrar craw rrtRwUSF.o+. . TA 1W.G7.S9U1 SURVEYORS fr E`:CAVFAS Fa100 .POD] _,^ I rips .-._ .i f cwn.cTO.7. B-.MO.,.T,.Ts 1>a.T..TK N sod , Mg, 141--- °�- .�'��� ,...,....NOTE: .�...aB ro m.smucmB.r axE Tasr. .,.,.. ^(...k, • _ cor.T.,cra siui wamw.a o.mgTq 1B orEBnrai •i: .� .-....�, .,.... _ gm._ � Ex.REAM.mrmw as w.s.a.s BO ma,.x v-- ME.Mq.q BBo SATIr 41E 0•TPUESE BUT BE.E 4E i ..�. , y� RI TSIBBMEM."TWAT BRMS.OAS M OW.cT I REAPED TTATB OUT ., .�.—. .`. �..__ m rwrvw. SAID T."s MIAOW.TIE s TO a ='z2 .� ,_,. Ltd emanerm. ____ r I ;rY.1LS•. 3_ . t"- yam _ .�_-■! — —nn— i ' '— -... — — - — I-.. - 'd -t. g 1 I. --zw7=r„.—ris, I 1.waviran—r-il llommtrun Im.we••••••• 4rzirmen "—,: :...:1. ��.__';,s?T..; � r .n.r .�I _ `� I II 7.7 i 3 E 'WWI, SO ME( J07 O— vm+.n s m R�MM6.,im.77B1Y filyt L11W.YBS.YTh 0._ SURVEYORS 7Y ENGINEERS Pu10C.0E5.DWJ _._ Q3 w5 ....... INSET 1 "LI'•F• .i vierd. ........ .. .:: • :. Il ,..i' ', L.V.:Z•••1 ,.,_, ,,':: ii_ ill, , •••=:-'...—Z-'.--,=11,1 1 I :Ili I 1:.....r..;.z.T:erz.-Am.,'A— •= •:.KM 0.— •C•':, ........... . lg. •_._/-_...“..... .'"7.......,..., .,. .'.:.= ' I ''.. =1,==rius.•• =..:...2.r: -— SA>./. /,I 7/Vf, ,/ ,.••—• ...t—•— 41 , . , .. , . --...........„.......-, 16%i II I ! Vii ' .BUINI.TA z,17,, ...... Ia..-1,-.— leurrinet--,—Hill i.: : ,r—Ir.m....-. .......... il .4.. L. . . I: ill: .. 4."-v•-- TYPICL RTn1629 a CCNCRETE ,.....,,,, I I'd I nal=RCM INISTALLATION 001.11. 11.00 ar...0.0.0/.4.x......, MI6 TYPICAL ROAD a 71.1Cm ardartus.1 I• ........ S PI ,-ra 411060 \ I i/14,011.011I ?..."4:." .... /—.7.%--1 600 1 .0 / VI l -2. ,d LTJ I! li 1 1.Tk I -20) -ado -two I .7. ......:..1.=. • FAIINIIINSIOIlAta - 11fr.i.hiagalf r.,...nlig plYINWIT INSTALLAMON .....""*. f A . _..., , -4.03 -wee -""*0.1.00 0/.20 N. 0.1 ONO I.. 1.0 1.40 1014 1.10 2.1 2020 6100 6.0 6.00 1.011-""* SEM 70LL ;00...,s 0e, I 3 A OUTEX A 4A4ZATI;57""ls swarms&orzems r.-40•"I", ,......,,...., '''''' ...........•........... ..t.......,......., ,,,,-,x• snu..1 or 3 5, .limb. r=1:= r_..,rrrWrr.r—wrr.rr. r .,r . r....rr - — — -- rrwrr,rrr 4,.......... rr rbrrr atuninnsuamm RPM.NV r MIN rrr rw'r rr .wi ry�a.vnw�Tra Vao.r�.....r.- ,rrr `r.rwrrrr 'r.._wwr.rrru..rra,r rr r.a rwrrr��www��amr viarr r rrwr.�.....-� rrnrrrrrrr.r.rr.r+rr s- "�"r- Wr.r.rr-rr.rw.rwnr. IOdt . .. .br .r.rr.wruarw .r rrwr . ••r••—wrr._rn+ .r,.'ww./rr..r�wrr a'1 rrrr.r.ryrr .ww.rr...rwrwra.....r.+..a.r,w..V.w. r r.—rwr.r. wr.s.rrr ..w.+r.--:,-.r.wwrr r r.rr...»—rrrrrunrwrrwr. --a _.wrr.r..rwr.r ...nr.r.rwraww."'"" ,r.r_......r.r_ ttl..ryr."..rr▪ rrrr == --."?r L`r.w�.Ma. ---t -.. =1,1 --,, - ---.w �..nr.—::::wr.rrr—iw .rnrrr.r ==.- wrrrr r .�r�.irr� —r••WrartMr rr. rrr. rr_,rrwrrw. • .�r.rrrt.rr..Yr.rrr0—...rr. _r.r..errrr. ��� rw ... munereadwaskieuwrr ...w.r...—...wr.er....r...er .w. rrr. —.Yr .. r+.r _r .7...._r�rl�wn..rrrrw... 1 r▪rrr�_.rm.w.vr.r a�wZ..—wr..rrr �•a _..rrrrr+Mrr.rw�i.rrr.+V.rT r;rwr. r..—�rr..rr/ter rw rr.. »rr..r.r r ...rr wrw.i siw �.a• WLlm� d.++rwrrr.rr. ��•.'w.r+r»rw.r.+ .rr —., or—..wrAwrr w••rrr ....... r •••nwrrr.r..wr..rw..r.........w = r — rlru�a. en ......••—r �' •^ r' r' �r nrr,I.rrrrrrrrr.rrrrr..r r r .r._,--;.r.r..—=' rrrr ___ __ r..rPr.r...�r r—irrr.rwrr /.rrt.tirr_rw ^-wr —•..r....rr.r..rnr.r..r...r M _....r.w._..r.r_.r.. rr.1q— ,:r+rri..nn..r-_.s.s.r.r.....r...r rrr .o .rwrrr.r �rw. . Ir.»..r.rr—._.rr..rc... IIo T rr f _ nrw..r.-.r.r.r....r.r....rrrrrrwr rrr-..r.M�r....rrr.. w._..r.....wr } rr r �r.r i+rr f 11%1.111111111141111.�y+Y .....r .w�.r...ar r. r_r.r.rrr..�rr.r+r�r '..+.r.... r...,ay.r.no.rr_r.warr.+ iGW HAYi)lM•.' .�r—...rr.....rwr.rrr.....Tr....r.• r...wrwrr..r.r_r.r.rrrr..rrr.. Y.. 1 w rrr.r..rv�r.r- 41,1RO UTEX �7)7 Dore.Dn.. 9sosrr Tn.T ..a.� r na..u...rts.s S KAN SURVEYORS&t.KAhIDRS F�1W.9Ci.40uD _to Am.�"" .......r...,•..ibis -a.• »+...n.s ors.. ax¢-:J�r 7 , EXHIBIT "D" (City of Port Arthur's Certificate of Acceptance) City of(PortArthur, TeXas Department of Water Utilities CERTIFICATE OF ACCEPTANCE FOR 14 Inch Water Line Between 46th Street & 60th Street City of Port Arthur, Texas To: Soutex Surveyors & Engineers This document is to certify that the City of Port Arthur, Texas accepts the 14 Inch Water Line Between 46th Street & 60th Street on the basis of the City of Port Arthur, Texas Water Utilities Department, the Engineer's Certificate of Completion, the Contractor's Certificate and Release, and Contractor's Certificate of Guarantee from High Roller Logistics, LLC. Ronald Burton City Manager ATTEST: Sherri Bellard City Secretary