Loading...
HomeMy WebLinkAbout(4) City Council Presentation-Adams ParkSSgt. Lucian Adams Park Project Update Parks and Recreation Department SSgt. Lucian Adams Park Project Update March 2021 ➢Updated topographic survey April 2021 ➢Theft of electrical copper wiring ➢Received quote on electrical repairs in the amount of $84,395.68 ➢Received completed conceptual drawings for the proposed project May 2021 ➢Voters approved the proposition ➢Adjuster from TML came to investigate the electrical repairs June 2021 ➢Reached out to contractor regarding quote ➢Temporary disconnect was requested SSgt. Lucian Adams Park Project Update July 2021 ➢Concession stand and press box was demolished August 2021 ➢Received a quote from Bennett Electric for electrical repairs in the amount of $690,097.08 ➢Received check from TML in the amount of $67,450.72 ➢Began conversations regarding receiving dirt from other entities September 2021 ➢Parks and Recreation staff and Purchasing staff met with Bennet Electric regarding electrical repairs ➢Updated quote was submitted to TML October 2021 ➢Received an updated quote from Bennett Electric for electrical materials in the amount of $273,209.44 Demolished Concession Stand Conceptual Drawing Conceptual Drawing Conceptual Drawing City Owned Property Next Steps Continue conversations with local entities regarding obtaining dirt Master Plan