HomeMy WebLinkAboutPR 15232: HORSESHOE CONSTRUCTION - STONEGATE MANOR SECTION 1 SEWER REHABMEMORANDUM CITY OF PORT ARTHUR UTILITY OPERATIONS DEPARTMENT TO: Stephen Fitzgibbons, City Manager FROM: Kelly Eldridge, Director of Utility Operations %~G p i ~~ DATE: Apri128, 2009 SUBJECT: Proposed Resolution No. 15232 RECOMMENDATION I recommend that the City Council approve Proposed Resolution No. 15232 authorizing the execution ofa contract with Horseshoe Construction, Inc., of LaPorte, Texas, in the amount $124,600 for the Stonegate Manor Section One Sanitary Sewer Rehabilitation Project No. 426014. BACKGROUND This is our last Phase I SSES project, which was developed and designed in-house. The City has an active, constructed sanitary sewer overtlow (SSO) at the intersection of Taza Lane and the easement between FM 365 & Blackberry/Willow Bend Lanes. In order to eliminate this SSO, we propose to perform any point repairs necessary (at least one majorrepair) and rehabilitate the entire section by pipe bursting method, enlarging the pipe diameter in some sections. This is a much less disruptive and expensive rehabilitation method. During the advertising process, we issued eight (8) sets ofplans and specifications (2 to vendors and 6 to contractors), and all six contractors attended the mandatory pre-bid meeting on April 16, 2009. We received the following six (6) bids on April 22, 2009: Bidder Total Bid ALLCQ, Inc. $235,802.50 Beaumont, TX SIMCO Enterprises, LTD $335.050.00 Groves, TX Horseshoe Construction, Inc. $124,600.00 LaPorte, TX Huff & Mitchell, Inc. $235,850.00 Cypress, TX SKE Constmction $148,300.00 Alvin, TX Brystaz Contracting Inc. $519,550.00 Beaumont, TX BUDGET/FISCAL EFFECT Engineer's estimate: $200,000. Funds aze available in Fund No. 426-1625-532.83-00, Project No. 426014. STAFF/EMPLOYEE EFFECT City staff designed and will oversee this 120 day project. SUMMARY I recommend that the City Council approve Proposed Resolution No. 15232 authorizing the execution of a contractwith Horseshoe Construction, Inc., of LaPorte, Texas, in the amount $124,600 for the Stonegate Manor Section One Sanitary Sewer Rehabilitation Project No. 426014. P.R. No. 15232 04-28-09 RESOLUTION NO. A RESOLUTION AWARDING A CONTRACT AND AUTHORIZING THE EXECUTION OF SAID CONTRACT IN THE AMOUNT OF $124,600.00 FOR THE STONEGATE MANOR SECTION ONE SANITARY SEWER REHABILITATION PROJECT NO. 426014, BETWEEN THE CITY OF PORT ARTHUR AND HORSESHOE CONSTRUCTION, INC., OF LAPORTE, TEXAS, ACCOUNT NO. 426-1625-532.83-00, PROJECT N0.426014. WHEREAS, the City is currently under an Agreed Order with the TCEQ to rehabilitate its sanitary sewer system; and, WHEREAS, there exists a need to eliminate sanitary sewer overflows in our collection and treatment systems; and, WHEREAS, the City of Port Arthur advertised and received bids from six contractors for the Stonegate Manor Section One Sanitary- Sewer Rehabilitation Project No. 426014; and, WHEREAS, a copy of the bid tabulation is attached hereto as Exhibit "A"; NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PORT ARTHUR: THAT the City Council of the City of Port Arthur hereby awazds the contract for the Stonegate Manor Section One Sanitary Sewer Rehabilitation Project No. 426014 to the lowest responsive bidder to-wit; Horseshoe Construction, Inc., of LaPorte, Texas; for sewer line construction at $124,600.00; and, THAT the City Manager of the City of Port Arthur is hereby authorized to execute on behalf of the City of Port Arthur a contract between the City of Port Arthur and Horseshoe Construction, Inc. in the amount of $124,600.00, a copy attached hereto as Exhibit "B"; and, THAT the contractor shall not proceed on any phase or segment of this work until a Notice P.R. No. 15232 04-28-09 Page 2 of 3 to Proceed is issued with receipt of performance and payment bond and certificate of insurance; and, THAT, the said contract is an exact duplicate of a City Standazd Form contract except for the changes (if any) shown in the Certificate of Standazd Form Contract, a copy ofwhich is attached hereto as Exhibit "C", and said changes aze hereby approved; and, THAT, the contractor shall sign the contract documents as well as this resolution agreeing to the terms hereof; and, THAT, a copy of the caption of this Resolution be spread upon the Minutes of the City Council. READ, ADOPTED AND APPROVED THIS day of 2009 at a Regular Meeting of the City Council of the City of Port Arthur, Texas, by the following vote: AYES: Mayor Councilmembers: NOES: ATTEST: Deloris Prince Mayor APPROVED AS TO FORM: ~ ~~ Tern Hanks City Secretary Mazk Sokolow City Attorney P.R. No. 15232 04-28-09 Page 3 of 3 APPROVED FOR ADMINISTRATION: Stephen Fitzgibbons City Manager ~ ~~ Kelly EI ridge Director of Utility Operations APPROVED AS TO AVAILABILITY OF FUNDS: Rebecca Underhill Director of Finance Account No.: 426-1625-532.83-00 Project No.: 426014 AGREED TO: Horseshoe Construction, Inc. Date EXHIBIT A CITY OF PORT ARTHUR TEXAS Bid 'Cahulation Utility Operations Sanitary Sewer Rehab Stonegate Manor 1 Bid Opening llate: April 22, 2009 NAME OF BIDDEKS Horseshoe SKE Huff & Mitchell Construction Construction Allco Total Cost Total Cost Total Cost Total Cost Sanitary Scwcr Iichah Stone ate Manor 1 $124,000.00 $]48,3110.Up $235,802.50 $235,8511.0 Ycs Yes Yes Bid Bond 5'% Yes . _,,.__.,. ~rtir Alvin. TX Beaumont, TX C ress, TX ;~ % ~ f /' - Shawna Tuhhs, Purchasing Manager ~ ~ - b9 ace Brystar Contractinl Total Cost Yes TX Simco :nterprises Total Cost Yes TX BID TABLE : STONEGATE MANOR SECTION 1 SEWER REHABILITATION _ __ PROJECT NO: 426014 CITY OF PORT ARTHUR WATER UTILITIES DEPARTMENT _ BID DATE: APRIL 22, 2009. NO OF ADDENDUM =0 Date Advertised: April 5, 2009 _ NUMBER OF BID PACKAGES PICKED UP = 8 NUMBER OF BIDS RECEIVED = 6 ~ _ ~ ___ __ ____ _ _ --- Item # Brief Description of Work ite _ Unit Qty Horseshoe Const. SKE Const. Allco Inc. _ Huff & Mitchell _ See Full Description in Schedule Unit Price Total Unit Price _ Total Unit Price Total Unit Price Total _ - 1 er... Point Repair 8 inch Sew Each 4 100.00_ 400.00 ( __250.00 ~ ___1000.00 _ 2,250.00 9,000.00 2,000.00 8000.00 __ 2 _ _ Continue Beyond above PR LF 250_ 3.00 _ 750.00 1.00 _ 250.00 _51.45 12,862.50 3D.00 ~ 7500.00 3 ___ Pipe Bursting 8 inch to 8.625 LF 1000 _ 27.00 27000.00 28.00 _ 28000.00_ 47.46 47,460.00_ 40.00 40000.00 __ 4 _ Pipe Bursting 8 inch to10_750 _ _ LF _2000 30.00 60000.00 _36.00 _72000.00___ __49.63 99,260.00 _ 4.1.00 _ 82000.00 __ _ 5 Trench Safety System LF 40 0 1.00_ 400.00 1.00 400.00 1.00 400.00 1.00 __ 400.00 _ 6 __ R &R New Fence upto 6 ft.. __ __ LF _ 200 4.00 800.00 1.00_ 200.00 __ 25.00 5,000.00 25.00 5000.00 7 R &R New Fence over 6 ft.... _ LF 200 5.00 1000.00 _ 1.00 200.00 35.00 7,000.00 35.00 7000.00 8 Extra CS Sand......... CY 100 12.00 1200.00 1.00 100.00 49.00 4,900.00 15.00 1500.00 9 Extra Excavation....... CY 150 20.00 3000.00 75.00 11250.00 20.00 3,000.00 15.00 2250.00 10 Restore Laterals .............. Each 30 400.00 12000.00 550.00 16500.00 550.00 16,500.00 1,500.00 45000.00 11 Rehab/Coat Manholes LF 100 75.00 7500.00 85.00 8500.00 126.00 12,600.00 125.00 12500.00 12 Ad'ust/Raise Manhole Cover... Each 2 350.00 700.00 500.00 1000.00 550.00 1,100.00 450.00 900.00 13 New Std. Fiberglass MH... Each 1 1850.00 1850.00 2000.00 2000.00 4,170.00 4,170.00 3,000.00 3000.00 14 Saw Cut Pavement.......... LF 200 4.00 800.00 1.00 200.00 6.50 1,300.00 6.00 1200.00 15 Replace Conc/Asph Pavement SF 500 4.00 2000.00 3.00 1500.00 8.50 _4,250.00 20.00 10000.00 16 Extra Bypass Pumpin Each 2 100.00 200.00 100.00 200.00 1,000.00 2,000.00 2,300.00 4600.00 17 ............. Cash Allowance LS 1 5000.00 5000.00 5000.00 5000.00 5,000.00 5,000.00 5,000.00 5000.00 . Total: 124600.00 otal: 148300.00 _ Total: 235,802.50 Total: 235850.00 1 2 3 _ - 4 _-- Other Bidders: 5.Simco Ente~ses: $335,050.00 --- 6.Brystar Contracting: $ 519,550 00 _ - -- _ - _ _ _ ~ -~- ~__/' r __ I _.-- i --- i __ _ --_-_. _ _ - - ---- I , ~ a EXHIBIT B is available for review in the City Secretary's Office EXHIBIT C Page 1 of 2 (City of Port Arthur) (Law Department) (Requued Form) (7/8/88) (10/5/89) (3/15/90) (9-8-94) (p.2 Revised 9/18/90) CERTIFICATE OF STANDARD FORM CONTRACT FOR LAW DEPARTMENT REVIEW AND CITY COUNCIL AGENDA I certify that the contract (hereinafter called "said contract") affixed to the attached Proposed City Council Resolution No 15232 is an exact duplicate of an applicable standard form contract (the title of which is shows below) previously approved by the Law department and adopted as a standard form by City Council Resolution, except for the blanks that have been filled in with all necessary information and except for the changes described below. The title of the applicable standard form contract is: [] Federally Funded Construction Contract, Revised 1/5/88, 7/89, 8/89; 4/28/94 [X] Non-Federally Funded Construction Contract, Revised 1/5/88, 7/89, 8/89; 4/28/94 [ ] Federal -Professional Services -Engineering Contract, Revised 1/5/88, 5/89 (§ 10) 7/89/(§8); 10/89; 2/91 (§8) [ ] Non-Federal -Professional Services -Engineering Contract, Revised 1/5/88, 5/89(§ 10), 7/89(§8); 10/89; 2/91(§8) [ ] CDBG -Professional Services -Engineering Contract, Revised 1/5/88, 5/89 (§ 10), 7/89(§8), 10/89; 2/91 (§8) [ ] Federal -Professional Services -Non-Engineering (Consultant) Contract, Revised 1/5/88, 5/89 (§ 10), 7/89 (§8); 10/89; 2/91 (§8) [ ] Non-Federal -Professional Services -Non-Engineering (Consultant) Contract, Revised 1/5/88, 5/89 (§ 10), 7/89 (§8); 10/89; 2/91 (§8) [ ] CDBG -Professional services -Non-Engineering (Consultant) Contract, Revised 1/5/88, 5/89 (§ 10), 7/89 (§8); 10/89; 2/91 (§8) (] Other Standard Form Contract, described as follows: The changes are as follows: (Put an "X" in the appropriate [ ]) [X] None. [ ] The following described provisions at the indicated page, section, etc. of the standard form have been deleted from said contract: Page 1 of 3 (p2 Revised 9/18/90) (Certificate of Standazd Form Contract, page 2) DELETIONS Page Number Section or Paragaph No. and Subsection or Subparagraph Where Caption No. Deleted Provision Which and Caption Is Contains Provision Which Contains Provision Found On Standazd Form Deleted From Form Deleted From Form None. Description of Provision Deleted [ ] The following described provisions at the indicated page, section, etc. of the standazd form have been altered, modified, replaced or otherwise changed: ALTERATIONS, MODIFICATIONS, REPLACEMENTS, ETC. Page § & caption sub § & caption, etc. Sub § or Sub ¶ No. of said conhact Page No. § or ¶ No. & Caption & Caption Description which contains altered, Where of of of etc. provision; & Provision Found Standazd Form which Standard Form Provision Description of Alteration on Contains Provision which in etc. Standard Form Contains Provision Standard Form Page 2 of 3 p3 Revised 9/18/90) (Certificate of Standard Form Contact, page 3) [ ] The following provisions have been added to Said Contract: Page, Section and Caption Subsection and Caption, etc. of Said Contract Which Contains the Added Provision and Description Thereof I further certify that said attached proposed City Council Resolution contains the following provision: "That said contract is an exact duplicate of a City Standard Form Contract except for the changes described in the Certificate of Standard Form Contract, a copy of which is attached hereto as Exhibit "C" and is hereby incorporated by reference, and said changes are hereby approved." I understand that this certificate will be relied on by the Law Deparhnent in reviewing and approving (or rejecting) as to form and by the City Council in reviewing and adopting (or rejecting) said Resolution and Contract. Signed this ~L` day of ~~, 2009. Departmen Head Page 3 of 3