REQUEST:
Sabine Pass Community Center needs a new HVAC package unit (air conditioning and heat.) It is
determined the current package unit that cools and heats the building has failed and is need of
replacement. Associated Mechanical Services,Inc of Nederland,TX can do this work for$30,073.00 out
of account number 001-15-043-5312-00-20-000(Civic Center Dept Building Maintenance.)
ANALYSIS/CONSIDERATION:
The current HVAC package unit at the Sabine Pass Community Center needs replacement. Associated
Mechanical Services, Inc of Nederland, TX has provided a price for this work in the amount of
$30,073.00 out of account number 001-15-043-5312-00-20-000.
Prices were requested from the following:
• Associated Mechanical Services,Inc $30,073.00
• Air Comfort No response
• Cobb Air No response
• Efficient Systems No response
• TJ Morgan Cooling and Heating No response
• Honeywell No response
• Rutty and Morris No response
• ICM No response
• Rincon Air and Cooling No response
RECOMMENDATION
A resolution authorizing the City Manager to enter into an agreement with Associated Mechanical
Services,Inc of Nederland,TX to replace the current HVAC package unit at the Sabine Pass Community
Center in the amount of$30,073.00. Funds available in account number 001-15-043-5312-00-20-000.
BUDGETARY AND FISCAL EFFECT
Funds available in account number 001-15-043-5312-00-20-000
STAFFING EFFECT
None
PO 22250
P.R. No. 22250
11/19/2021 AJS
PAGE 1 of 3
RESOLUTION NO.
A RESOLUTION AUTHORIZING THE CITY MANAGER TO ENTER
INTO AN AGREEMENT WITH ASSOCIATED MECHANICAL
SERVICES, INC OF NEDERLAND, TX TO REPLACE THE CURRENT
HVAC PACKAGE UNIT AT THE SABINE PASS COMMUNITY CENTER
IN THE AMOUNT OF $30,073.00. FUNDS AVAILABLE IN ACCOUNT
NUMBER 001-15-043-5312-00-20-000.
WHEREAS, Sabine Pass Community Center is in need of a new HVAC package unit to
replace the current, failed unit for the cooling and heating of the building; and
WHEREAS, Associated Mechanical Services, Inc of Nederland, TX can do this work for
$30,073.00; now, therefore,
NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE
CITY OF PORT ARTHUR:
Section 1. That the facts and opinions in the preamble are true and correct.
Section 2. That,the City Manager is hereby authorized to execute an agreement with
Associated Mechanical Services, Inc of Nederland,TX to replace the current HVAC package unit at the
Sabine Pass Community Center in the amount of$30,073 MO, in substantially the same form as
attached hereto as Exhibit"A".
Section 3. That, a copy of the caption of this Resolution be spread upon the Minutes
of the City Council.
PO 22250
READ, ADOPTED, AND APPROVED, this day of December 2021, A.D., at a
Regular Meeting of the City Council of the City of Port Arthur, Texas by the following vote:
AYES:
Mayor:
Councilmembers:
•
NOES:
Thurman"Bill"Bartie, Mayor
ATTEST:
Sherri Bellard, City Secretary
APPROVED AS TO FORM:
.0/ ,
alecia Ti - 'i orney
APPROVED FOR ADMINISTRATION:
Ronald Burton, City Manager
APPROVED AS TO FUND AV ILITY:
Kandy D 1, Clifto illiams, CPPB
Interim Director of Finance Purchasing Manager
PO 22250
A CONTRACT BETWEEN THE CITY OF PORT ARTHUR AND
ASSOCIATED MECHANICAL SERVICES, INC. FOR
HVAC PACKAGE UNIT REPLACEMENT SERVICES.
THIS AGREEMENT, made this day 7th of December,2021,by and between
the City of Port Arthur, a municipal corporation organized under the laws
of the State of Texas,hereinafter called "OWNER" or"CITY" and Associated
Mechanical Services, Inc, hereinafter called "CONTRACTOR" acting by and through
John P. Weber, its Operations Manager.
WITNESSETH: That for and in consideration of the payment terms, conditions
and agreements set forth herein, OWNER and CONTRACTOR agree as follows:
1. The term of this Contract shall be five days from start date on Notice to Proceed.
The City can terminate this contract at its convenience which includes,but is not
limited to, funding not being available in any budget cycle with ten(10) days written
notice.
2. The Contractor will perform HVAC package unit replacement work at the Sabine
Pass Community Center as stated in the Contract Documents.
3. -During the term of-this—Con-tract,the Contractor will furnish at his own expense all
the materials, supplies, tools, equipment, labor, and other services necessary to
connection therewith, excepting those supplies specifically not required of Contractor
in the Specifications.
4 The CONTRACTOR agrees to perform all the work described in the specifications
and contract documents and to comply with the terms therein for the sum of
$ 30,073.00.
6. The term "Contract Documents" means and includes the following:
a) Agreement
b) Specifications
c) Notice to Proceed
7. This Agreement shall be binding upon all parties hereto and their respective heirs,
executors, administrators, successors, and assigns.
8. IN WITNESS WHEREOF, the parties hereto have executed, or caused to be executed
by their duly authorized officials,this Agreement in(2 copies) each of which shall be
deemed an original on the date first above written.
A- 1
Signed on the day of 2021.
ATTEST CITY OF PORT ARTHUR
BY
CITY SECRETARY
Signed on the day of 2021.
ATTEST CONTRACTOR:
ASSOCIATED MECHANICAL
SERVICES, INC.
BY
CITY SECRETARY
A- 2
SSOC/ATEO TACLA 022513C
MECHANICAL SERVICES, NC.
RESIDENTIAL COMMERCIAL CENTRIFUGAL REFRIGERATION
November 10, 2021
City of Port Arthur
3401 Cultural Center Drive
Port Arthur, Texas 77642
Attn: Adam Saunders
Re: Sabine Pass Community Center
Dear Adam,
Associated Mechanical Services, Inc. is pleased to quote the following,
A. Provide labor and materials to replace (1) existing Carrier RTU with new
Carrier RTU and curb adapter.
$30,073.00
***Unit has 14-16 week delivery***
Thanks for the opportunity to work with you on this project. If you should have any
questions please feel free to contact me at any time.
Sincerely,
John P. Weber
President
Operations Manager
Houston Austin Nederland
P.O. Box 1818 NEDERLAND, TEXAS 77627-1818 OFFICE: (409) 721-5050 FAX: (409) 721-5055
Regulated by the Texas Department of Licensing and Regulation• P.O.Box 12157•Austin,TX 78711 •(800)803-9202
Enerity
r
City of - city.
J
orl rt7
Texas
Robert A."Bob"Bowers Civic Center
3401 Cultural Center Drive—Port Arthur,TX 77642—409-985-8801
SCOPE OF WORK
Gas Package AC Unit
Sabine Pass Community Center, 5262 South Gulfway Drive(Hwy 87 S.), Sabine Pass Tx 77655
A price is needed for this scope of work by noon on Friday, 11/12/21. A pre-bid meeting will be held at 3p
on Monday, 11/8/21 at the location.
The following is the scope of work for which a price is needed:
o Furnish and install an 18-ton package AC unit with gas heat
o Furnish and install a new Curb Adapter to adapt existing Curb to new Package unit
o Furnish crane for lifting of equipment at job site
o Furnish reconnection to existing gas piping supply line to unit
o Furnish reconnection to existing electrical wiring to new package unit
o HVAC technicians labor to install and start up new package unit equipment.
o Removal,transportation, and disposal of old equipment
Please email price to adam.saunders@portarthurtx.gov by noon on 11/12/21.