HomeMy WebLinkAboutPR 22291: RATIFICATION OF REPAIRS TO THE LANDFILL'S CATERPILLAR D8T City of
or[ r1lrrrr '
www.PortArthurTx.gov
INTEROFFICE MEMORANDUM
Date: December 01, 2021
To: The Honorable Mayor and City Council
Through: Ronald Burton, City Manager
From: Flozelle Roberts, EIT, MEng, MBA, Director of Public Works
RE: P.R. No. 22291 —Ratification of Repairs to the Landfill's Caterpillar D8T
Dozer
Introduction:
Proposed Resolution No. 22291 seeks City Council's ratification of repairs to the Landfill's
Caterpillar D8T dozer.
Background:
The Landfill's daily use of equipment number 2342, a Caterpillar D8T bulldozer, renders its
repairs necessary and immediate. Council approved resolution 21-390 on September 28, 2021,
which approved the repair of unit 2342 for $58,491. Upon delivery, the mechanic discovered
that the pivot shaft and track shoes also required replacement. The additional repairs have
increased the original quote of$58,491.00 by $10,701.32 for a new total of$69,192.32.
Budget Impact:
Funding is available in the Landfill Equipment Maintenance Account,Account Number 403-50-
320-5318-00-00-000.
Recommendation:
It is recommended that the City Council approve P.R. 22291, which ratifies the additional
repairs to the Landfill's Caterpillar D8T dozer.
/meg
"Remember,we are here to serve the Citizens of Port Arthur"
444 4th Street X Port Arthur,Texas 77641-1089 X 409.983.8182 X FAX 409.983.8294
P. R.No.22291
12/01/2021 meg
Page 1 of 3
RESOLUTION NO.
A RESOLUTION REQUESTING THE RATIFICATION OF THE REPAIRS
TO EQUIPMENT NO. 2342, CATERPILLAR D8T DOZER, FOR THE
LANDFILL BY MUSTANG CAT OF BEAUMONT, TEXAS, IN THE
AMOUNT OF$10,701.32 FOR A NEW TOTAL OF$69,192.32. FUNDS ARE
AVAILABLE IN THE LANDFILL EQUIPMENT MAINTENANCE
ACCOUNT NO. 403-50-320-5318-00-00-000.
WHEREAS, the City's landfill requires the employment of a bulldozer to maintain
operations and compliance with the Texas Commission on Environmental Quality's (TCEQ)
regulations; and,
WHEREAS,the Landfill's daily use of equipment number 2342 renders its repairs necessary
and immediate; and,
WHEREAS,City Council approved Resolution No. 21-390, which approved the repair of
unit 2342 for$58,491.00; and,
WHEREAS,upon delivery to the mechanic, it was determined that a pivot shaft and track
shoes were damaged and required replacement; and,
WHEREAS, the additional repairs are authorized pursuant to Section 252.022(a)(2) a
procurement necessary to preserve or protect the public health or safety of the municipality's
residents; and,
WHEREAS,it is further authorized pursuant to Section 252.022(a)(3)because of unforeseen
damage to public machinery, equipment, or other property; and,
WHEREAS, the additional repairs have increased the original quote of $58,491.00 by
$10,701.32 to a revised cost of$69,192.32 as delineated in Exhibit B; now, therefore,
P. R.No.22291
12/01/2021 meg
Page 2 of 3
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PORT ARTHUR:
THAT, the fact and opinions in the preamble are true and correct; and,
THAT, the City Council hereby approves and ratifies the expenses of the additional
unforeseen repairs to equipment number 2342,a Caterpillar D8T dozer in the amount of$10,701.32
to a new total of$69,192.32; and,
THAT, a copy of the caption of this resolution be spread upon the minutes of the City
Council.
READ,ADOPTED,AND APPROVED,this day of 2021
AD, at a regular meeting of the City Council of the City of Port Arthur, Texas, by the following
vote:AYES:Mayor:
Councilmembers:
NOES:
Thurman "Bill"Bartie, Mayor
ATTEST:
Sherri Bellard, City Secretary
P. R.No.22291
12/01/2021 meg
Page 3 of 3
APPROVED AS TO FORM:
Valecia R. Tizeno, Esq., City Attorney
APPROVED FOR ADMINISTRATION:
Ron Burton, City Manager
Flozelle Roberts, EIT, MEng, MBA, Director of Public Works
t(i4bA._
Clifton illiams, PPB, Purchasing Manager
Cl-A-i•-- J;)1
Kandy Daniel, Interim Director of Finance
P. R. 22291
Exhibit
A
Meiii oran duni
City of Port Arthur, Texas
Interoffice Memo
TO: Ron Burton, City Manager
FROM: Justin Thomas, Landfill Superintendent
DATE: November 10, 2021
SUBJECT: Change Order for Repair Landfill Dozer
Council Approved Resolution 21-390 on September 28, 2021. The Resolution was
for the repair of Unit Number #2342, a Caterpillar (CAT) D8T Dozer at the
Landfill. The estimate was for $58,491, but once the vehicle was delivered to the
shop, they discovered that pivot shaft need to be replaced, replace some damaged
track shoes. This will be an additional $6,798.28 which will be a new total of
$65,289.28. Public works will go back to council for the ratification for the
additional cost once work is complete
ApOv edit'
diNde
Ron Burton, City ►) . ager
� �I l ,�, II.V:L �. izi
IUSTANG OAT
y lu�dluul� _ , , ,_
,1 T ram, rC
i ot}/
` ` "' LET'S WORK TOGETHER
Customer Name: CITY OF PORT ARTHUR Estimate#: 47616
Customer#: 0588741 Estimate Date: 7/26/21
Contact Name: Justin Thomas Job/WO#:
JUSTIN.THOMAS@PORTARTHURT Model/Serial D8T/AW400806
X.GOV
t:409-983-8171 Sales Rep: Casey Jorgensen
CJorgensen@mustangcat.com
Customer PO# m:254-434-8245
Current Hours:
MR Thomas
Thank you for considering Mustang CAT and the opportunity to provide Product Support for your machine.
Our recommended solution is based on our current understanding of your requirements and is summarized
below. Please contact me if your requirements have changed or if you have any questions about the products
and services we are recommending. When you are ready to move forward, please sign and date on the
bottom of the page and return it to me. We look forward to working with you!
DESCRIPTION PARTS LABOR MISC EXTENDED
GCI - Inspection $ 350.00 $ 350.00
GCI-Wash $1,500.00 $1,500.00
R&I Complete Under Carriage $8,200.00 $8,200.00
Wash Tracks $656.00 $656.00
Swap track Pads $18,303.00 $1,968.00 $20,271.00
2 272-6009 4170 Link AS-
Track
344 6V-1723 4170 Bolt-Track
4 6V-1724 4170 Bolt-Track
Master
4 6V-1725 4170 Bolt-Track
Master
344 7G-6442 4170 Nut-Track
Repair both Pivot shaft seals. Possible $1,000.00 $3,300.00 $4,300.00
Warranty Won't know till dissassembly
New Idlers. $14,273.00 $14,273.00
2 244-1323 4159 Idler GP-
Track
4 3S-1349 4159 Washer-Hard
4 8T-4934 4159 Bolt
2 244-1324 4159 Idler GP-
Track
4 3S-1349 4159 Washer-Hard
MACHINERY RENTAL USED EQUIPMENT PARTS&SERVICE 888.NEXT.CATI82S$39.8228 M USTANGCAT.WM
4 8T-4934 4159 Bolt
New Bottom Rollers $10,264.00 $10,264.00
8 246-0779 4180 Roller GP-
Track-Double Flange
8 246-0775 4180 Roller GP-
Track-Single Flange
New Sprockets $1,957.00 $1,957.00
70 7H-3608 4155 Nut
10 278-2375 4155 Segment-
Sprocket
70 5P-7665 4155 Bolt
70 6V-5841 4155 Washer-Hard
Labor Discount -$3,500.00 -$3,500.00
SUBTOTALS: $45,797.00 $12,474.00 $ .00 $58,271.00
'SUPPLY CHARGE IS 2%OF INVOICE TOTAL-MAXIMUM CHARGE OF$100.00 SUPPLY CHARGE: $ 100.00
`ENVIRONMENTAL FEE 15 3%OF INVOICE TOTAL-MAXIMUM CHARGE OF$120.00 ENVIRONMENTAL FEE: $120.00
SALES TAX: $ .00
**Subject to additional parts/labor upon disassembly TOTAL: $58,491.00
Accepted by:
Printed Name Date Customer Signature
Page 2 of 6 visit us online ac www.MustangCAT.com
P. R.22291
Exhibit
B
f
Id,l , ,1 , ,..� , ,t; MUSTANG CAT
LET'S WORK TOGETHER
Customer Name: CITY OF PORT ARTHUR Estimate#: 51697
Customer#: 0588741 Estimate Date: 11/4/21
Contact Name: Justin Thomas Job/WO #: B042691
JUSTIN.THOMAS@PORTARTHURT Model/Serial D8T/AW400806
X.GOV
t:409-983-8171 Sales Rep: Koby Box
KBox@mustangcat.com
Customer PO# t:713-452-7338 m:936-336-0046
Current Hours:
MR Thomas
Thank you for considering Mustang CAT and the opportunity to provide Product Support for your machine.
Our recommended solution is based on our current understanding of your requirements and is summarized
below. Please contact me if your requirements have changed or if you have any questions about the products
and services we are recommending. When you are ready to move forward, please sign and date on the
bottom of the page and return it to me. We look forward to working with you!
DESCRIPTION PARTS LABOR MISC EXTENDED
Orignal Price-Opportunity#47616 $58,491.00 $58,491.00
Remove& Install Pivot Shaft( Replace $2,640.04 $2,100.00 $4,740.04
Bushings& Bearings)
Replace Cracked/Damaged Track Shoes $1,778.28 $1,778.28
88 Track Shoes $3,963.00 $3,963.00
SUBTOTALS: $8,381.32 $2,100.00 $58,491.00 $68,972.32
'SUPPLY CHARGE 15 2%OF INVOICE TOTAL-MAXIMUM CHARGE OF$100.00 SUPPLY CHARGE: $ 100.00
'ENVIRONMENTAL FEE IS 3%OF INVOICE TOTAL-MAXIMUM CHARGE OF$120.00 ENVIRONMENTAL FEE: $ 120.00
SALES TAX: $ .00
**Subject to additional parts/labor upon disassembly TOTAL: $69,192.32
Accepted by:
Printed Name Date Customer Signature
MACHINERY RENTAL USED EQUIPMENT PARTS&SERVICE 886.NEXT.CATI888.639.8228 MUSTANGCAT.CoM
Jorge Morales
From: Jorge Morales
Sent: Wednesday, November 17, 2021 3:38 PM
To: Flozelle C. Roberts
Subject: FW: [NON-CoPA] RE: [NON-CoPA] Fwd: City Of Port Arthur Quote
Goof afternoon,
Please see email thread for the cost of each track shoe...
Thank you,
Jorge A. Morales
Environmental Operation Manager
City of Port Arthur/Landfill
From: Koby Box<KBox@mustangcat.com>
Sent: Wednesday, November 17, 2021 1:47 PM
To:Jorge Morales<jorge.morales@portarthurtx.gov>
Subject: [NON-CoPA] RE: [NON-CoPA] Fwd: City Of Port Arthur Quote
Part#329-9270 125.96/ea.
Koby Box g MUST `
Product Support Sales Representative ':i;:J;�!�,, i...Jiit:.ltgi:' .
Product Support Mustang CAT
Cell: (936) 336-0046 7990 Eastex Frwy.
Office: (409) 892-8412 Beaumont, TX 77708
f in e, Oo www.mustancicat.com/
From:Jorge Morales<jorge.morales@portarthurtx.gov>
Sent: Wednesday, November 17, 2021 11:21 AM
To: Koby Box<KBox@mustangcat.com>;Justin Thomas<justin.thomas@portarthurtx.gov>
Subject: RE: [NON-CoPA] Fwd: City Of Port Arthur Quote
Good morning Koby,
Do you have the original price that the track shoes cost?
Thank you,
Jorge A. Morales
Environmental Operation Manager
City of Port Arthur/Landfill
From: Koby Box<KBox@mustangcat.com>
Sent: Wednesday, November 17, 2021 8:41 AM
To:Jorge Morales<jorge.morales@portarthurtx.gov>;Justin Thomas<iustin.thomas@portarthurtx.gov>
Subject: [NON-CoPA] Fwd: City Of Port Arthur Quote
Please see attached revised estimate.
Thank you,
KB
Get Outlook for iOS
From: Brent Coghlan <BCoghlan@mustangcat.com>
Sent:Wednesday, November 17, 2021 8:38:25 AM
To: Koby Box<KBox@mustangcat.com>
Subject: City Of Port Arthur Quote
Thank You,
Brent Coghlan
Developmental Supervisor
Office: 713-452-7638
Cell: 713-816-0154
Bcoghlan@mustangcat.com
MUSTANG CAT
Disclaimer
2
The information contained in this communication from the sender is confidential. It is intended solely for use by the recipient and
others authorized to receive it. If you are not the recipient, you are hereby notified that any disclosure, copying, distribution or
taking action in relation of the contents of this information is strictly prohibited and may be unlawful.
This email has been scanned for viruses and malware by Mimecast Ltd, an innovator in Software as a Service (SaaS) for business.
This email and its attachments may be confidential and are intended solely for the
use of the individual to whom it is addressed. Any views or opinions expressed are solely those of the author and do not
necessarily represent those of the City of Port Arthur. If you are not the intended recipient of this email and its
attachments,you must take no action based upon them, nor must you copy or show them to anyone. Please reply to the
sender if you believe you have received this email in error.
4.1 \ EXPLORE OUR NEW VIDEO SERIES FEATURING
THE OPERATORS OF TEXAS
LET'S WORK TOGETHER
MUSTANG IT
Disclaimer
The information contained in this communication from the sender is confidential. It is intended solely for use by the recipient and
others authorized to receive it. If you are not the recipient, you are hereby notified that any disclosure, copying, distribution or
taking action in relation of the contents of this information is strictly prohibited and may be unlawful.
This email has been scanned for viruses and malware by Mimecast Ltd, an innovator in Software as a Service (SaaS) for business.
3