Loading...
HomeMy WebLinkAboutPR 22305: AUTHORIZTION OF RAW WATER TRANSFER PUMP NO. 102 MAINTENANCE AND REBUILD AT THE WATER PURIFICATION PLANT City of ort rthu — Texas INTEROFFICE MEMORANDUM Date: December 20, 2021 To: The Honorable Mayor and City Council Through: Ronald Burton, City Manager From: Calvin Matthews, Water Utilities Director RE: PR No. 22305 —Authorization of Raw Water Transfer Pump No. 102 Maintenance and Rebuild at the Water Purification Plant Introduction: The intent of this Agenda Item is to seek City Council's authorization for Raw Water Transfer Pump No. 102 maintenance and rebuild at the Water Purification Plant. Raw Water Transfer Pump No. 102 is in need of maintenance and rebuild due to normal wear and tear. This pump is critical to the drinking water supply for the City of Port Arthur by pumping raw water from the reservoir into the Water Purification Plant. Water Purification staff solicited informal bids for this pump maintenance and rebuild; the lowest bidder was IPS Pump Services. IPS Pump Services bid $29,250.00 to rebuild Raw Water Transfer Pump No. 102. Funds are available in Account No. 410-40-210-5318-00-00- 000, Equipment Maintenance. Background: Raw Water Transfer Pump No. 102 is in need of maintenance and rebuild due to normal wear and tear. This pump is critical to the drinking water supply for the City of Port Arthur by pumping raw water from the reservoir into the Water Purification Plant. Water Purification staff solicited informal bids for this pump maintenance and rebuild: the lowest bidder was IPS Pump Services. "Remember,we are here to serve the Citizens of Port Arthur" City of V:1,-1 rthu�— Texas Budget Impact: Water Purification staff solicited informal bids for this pump maintenance and rebuild; the lowest bidder was IPS Pump Services. IPS Pump Services bid $29,250.00 to rebuild Raw Water Transfer Pump No. 102. Funds are available in Account No. 410-40-210-5318-00-00- 000, Equipment Maintenance. Recommendation: It is recommended that City Council approve PR No. 22305, authorizing the Raw Water Transfer Pump No. 102 maintenance and rebuild at Water Purification Plant. "Remember,we are here to serve the Citizens of Port Arthur" PR No. 22305 12/20/21 bw Page 1 of 3 RESOLUTION NO. A RESOLUTION AUTHORIZING THE CITY MANAGER TO EXECUTE A CONTRACT WITH IPS PUMP SERVICES OF HOUSTON, TEXAS FOR THE MAINTENANCE AND REBUILD OF RAW WATER TRANSFER PUMP NO. 102 AT THE WATER PURIFICATION PLANT IN THE TOTAL NOT-TO-EXCEED AMOUNT OF $29,250.00; FUNDING AVAILABLE IN ACCOUNT NO. 410-40-210-5318-00-00-000, EQUIPMENT MAINTENANCE. WHEREAS, Raw Water Transfer Pump No. 102 is in need of maintenance and rebuild due to normal wear and tear; and, WHEREAS, Raw Water Transfer Pump No. 102 is critical to the drinking water supply for the City of Port Arthur by pumping raw water from the reservoir into the Water Purification Plant; and, WHEREAS, three (3) quotes were received and IPS Pump Services of Houston, Texas submitted the lowest most responsive bid as specified in the bid tabulation attached hereto as Exhibit"A"; and, WHEREAS, IPS Pump Services provided the lowest, most responsible quote of $29,250.00 for the maintenance and rebuild of Raw Water Transfer Pump No. 102 (Exhibit"A"); and, WHEREAS, maintenance and rebuild of this pump is necessary for continued supply of potable water to the City. NOW THEREFORE,BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PORT ARTHUR, THAT,the facts and opinions in the preamble are true and correct; and, THAT, in order to protect the uninterrupted supply of potable water supply, the City Council hereby authorizes the City Manager to execute a contract, in substantially the same form attached hereto as Exhibit "B", with IPS Pump Services of Houston, Texas for the maintenance PR No. 22305 12/20/21 bw Page 2 of 3 and rebuild of Raw Water Transfer Pump No. 102 at the Water Purification Plant for a total not- to-exceed amount of$29,250.00; and, THAT, funding is available in Water Utilities Budget Account No. 410-40-210-5318-00- 00-000, Equipment Maintenance; and, THAT, a copy of the caption of this resolution be spread upon the minutes of the City Council. READ, ADOPTED, AND APPROVED THIS day of 2022,at a Regular Meeting of the City Council of the City of Port Arthur,Texas, by the following vote: AYES: Mayor Councilmembers: NOES: Thurman"Bill" Bartie Mayor ATTEST: APPROVED AS TO FORM: Sherri Bellard Valecia Tizen City Secretary City Attorney PR No. 22305 12/20/21 bw Page 3 of 3 APPROVED FOR ADMINISTRATION: APPROVED AS TO AVAILABILITY OF FUNDS: kcA,_ ‘LvnA,\_C Ronald Burton Kandy Dan l City Manager Interim Finance Director Calvin Matthews Clifto Wil iams, CPPB Water Utilities Director Purchasing Manager EXHIBIT "A" (Bid Tabulation) ICZ A ``t mg ic "! 2 o sg o c b O • m � a z fa 4 - t x t mg c `° n B -, b " r`' O •a a �3 PO CD p" 0 2. 0 Iv z ba � O o. Co z m ~ ° cr. y 0 0 '-' = z -� O � 5 '7 Z rt y a �, , i c -s f2. " a. o in � �sCI a. a e F.. CD E. n ap 0 x a E . n n AD - o (*Ay OD CA et) q A A w EXHIBIT "B" (Contract) RAW WATER TRANSFER PUMP NO. 102 FOR WATER PURIFICATION PLANT THIS AGREEMENT, made this day of , 2022, by and between the City of Port Arthur, a municipal corporation organized under the laws of the State of Texas, hereinafter called "OWNER" or "CITY" and IPS Pump Services of Houston, Texas hereinafter called "CONTRACTOR" WITNESSETH: That for and in consideration of the payment terms, conditions and agreements set forth herein, OWNER and CONTRACTOR agree as follows: 1. This contract shall be for 3 months from the date stated on the Notice to Proceed. The City can terminate this contract at its convenience which includes, but is not limited to, funding not being available in any budget cycle with thirty (30) days written notice. 2. The Contractor will perform work as stated in the Contract Documents. 3. During the term of this Contract, the Contractor will furnish at his own expense all of the materials, supplies, tools, equipment, labor and other services necessary to connection therewith, excepting those supplies specifically not required of Contractor in the Specifications. 4. The CONTRACTOR agrees to perform all the work described in the specifications and contract documents and to comply with the terms therein for the following cost: Rebuild Raw Water Transfer Pump No. 102 for the Water Purification Plant$29,250.00 5. The term"Contract Documents" means and includes the following: a. Agreement b. General Information c. Specifications d. Bid/Quote e. Notice to Proceed 6. This Agreement shall be binding upon all parties hereto and their respective heirs, executors, administrators, successors and assigns. 7. IN WITNESS WHEREOF, the parties hereto have executed, or caused to be executed by their duly authorized officials,this Agreement in (2 copies) each of which shall be deemed an original on the date first above written. Signed on the day of , 2022. ATTEST: CITY OF PORT ARTHUR BY: Sherri Bellard Ronald Burton City Secretary City Manager Signed on the day of , 2022. WITNESS: IPS PUMP SERVICES BY: Print Name: Title: ar:R III CAYSON PUMP SERVICES Quote # BD21055 City of Port Arthur, Fairbanks-Morse Vertical Transfer Pump 102 \ti orkscope: Thank you for choosing IPS/Cayson Pump Services to repair your equipment. Below is the work scope for your vertical pump by IPS/Cayson Pump Services. Delivery 4-5 weeks ARO 1. Pump arrived with a log wedged between impeller and case 2. Record pump length and measurement's,match mark all components and take pictures 3. Inspect and record and reg, fits look for wear damage/ cracks and record. 4. Send Parts out for blast and paint Repair: Pump Shaft:The shaft has wear at the bearing fit areas. Replace shaft. 1. Manufacture new per sample 2. Straighten shaft 3. Inspect and record sizes. 4. Clean and prep for assembly Line Shaft (4):The shafts have wear at bearing fit area. Flip shafts 1. Set up shaft,polish and detail thread ends 2. Straighten shafts T.I.R.002" 3. Inspect and record sizes 4. Clean and prep for assembly Top Shaft: This shaft has wear at bearing fits. Replace. 1. Manufacture new per sample 2. Straighten shaft T.I.R. .002" 3. Inspect and record sizes 4. Clean and prep for assembly Motor Shaft: Reuse. 1. Set up shaft,polish and detail thread ends 2. Straighten shaft 3. Inspect and record sizes 4. Clean and prep for assembly IPS Pump Services 8301 W.Monroe Rd Houston,TX 77061 832.867.9266 bdillard@caysonpu ip.corn /1:1(0,° —7) CAYSON Pt;%1P SERVICES Quote # BD21055 Line shaft Couplings: QTY. 5 1. Inspect for fit. 2. Clean and prep for assembly Suction bell:The suction bell has normal wear. Suction bell will be coated with epoxy inside and out 1. Remove bearing 2. Record sizes 3. Weld suction bell male register 6 each places 4. Machine all fits and faces 5. Manufacture and install new bearing 6. Inspect and record sizes 7. Clean and prep for assembly First Stage Impeller.The impeller shows signs of normal wear 1. Handwork impeller vanes 2. Balance impeller to 4W/N@1800RPMs. 3. Inspect 4. Clean and prep for assembly Discharge Bowl: Bowl has normal wear. Coat bowl with epoxy inside and out I. Weld male register 6 each places 2. Machine male register 3. Manufacture and install new bearing 4_ Inspect and record sizes 5. Clean and prep for assembly Column (4): Columns have excessive clearance on male registers. 1. Weld male register 6 each places 2. Machine all fits/faces/bores 3. Manufacture and install new bearing 4. Inspect and record sizes 5. Clean and prep for assembly Head:The head shows normal wear. 1. Inspect and record sizes. 2. Blast and paint two coats epoxy. IPS Pump Services 8301 W.Monroe Rd Houston,TX 77061 832-867.9266 bdillard@caysonpump.com (Ftlaz, CAYSON PUMP SERVICES Quote # BD21055 Stuffing Box: Shows signs of normal wear, 1. Weld male register 4 each places 2. Machine all fits/faces 3. Manufacture and install new bronze bearing 4. Inspect and record sizes 5. Clean and prep for assembly Assembly: 1. Check and record bearing clearances 2. Check to see balance report 3. Check and record shaft run out. 4. Insure all parts are clean and coated. 5. Assemble pump complete 6. Touch up paint 7. Tag and prep for shipping Description Quantity Net Each Net Total Repair pump per scope 1 $24,375.00 $24,375.00 Field Service to install rebuilt pump 1 $4,875.00 $4,875.00 Total $29,250.00 Best Regards, Bobby Dillard Account Manager (832) 867-9266 IPS Pump Services 8301 W.Monroe Rd Houston,TX 77061 832.867.9266 bdillard@caysonpump.com