PR 22287: AWARDING A CONTRACT TO STRAIGHT LINE SERVCES, DEMO GROUP A-T
City ofval my V1)!-t rthu'— Texas INTEROFFICE MEMORANDUM Development Services Department Code Compliance-Demolition Division Date: January 19, 2022 To: Ronald Burton, City Manager;Pamela Langford,Assistant City Manager/Director of Development Services From: Darlene Thomas-Pierre, Code Compliance Manager Re: P. R. NO. 22287 — AWARDING A CONTRACT TO STRAIGHT LINE SERVICES, OF BUNA, TEXAS, FOR DEMOLITION OF SIX (6) RESIDENTIAL STRUCTURES WITH TRANSITE (GROUP A-T)LOCATED THROUGHOUT THE CITY COMMENT Nature of the Request: Staff recommends that the City Council adopt P. R. No. 22287 authorizing the City Manager to execute a contract with Straight Line Services, of Buna, Texas, in the amount of$25,097.20 for demolition of six (6) residential structures with transite located throughout the city. Staff Analysis/Considerations: Bids for demolition of twenty-three (23) residential structures with transite were received on November 17, 2021. Straight Line Services, of Buna,Texas,is the lowest responsible bidder for six(6) residential structures with transite; their bid is $25,097.20 for Group A-T, to be completed within twelve (12) calendar days from the date they receive a Notice to Proceed. Bid award is based on the lowest and most responsive bid. Leeds Environmental Services bid was disqualified for Group A-T; Ex Nihilo Development, LLC., bid $99,750.00 (24 days); DD Demolition, LLC., bid$26,560.00(15 days); EZ Demolitions&Underground bid$43,700.00 (12 days); and DCD Construction LLC.,bid$29,707.00(18 days). See chart below. The bid tabulation follows. CONTRACTOR GROUP A-T Leeds Environmental Services; Cleveland, Texas Disqualified Ex Nihilo Development,LLC.; Omaha,Nebraska $99,750.00 DD Demolition,LLC.;Beaumont,Texas $26,560.00 EZ Demolitions&Underground;Houston,Texas $43,700.00 *Straight Line Services; Buna,Texas $25,097.20 DCD Construction LLC.;Orange, Texas $29,707.00 *Successful Bidder (CONTINUED) 1 PR 22287 DEMO CONTRACT—STRAIGHT LINE SERVICES 1/19/22 PAGE 2 OF 2 Recommendation: Staff recommends that the City Council adopt P. R. No. 22287 thereby authorizing the City Manager to execute a contract with Straight Line Services, of Buna, Texas, in the amount of $25,097.20 for demolition of six (6) residential structures with transite located throughout the city. Budget Consideration: Acceptance of this recommendation will not require a budget amendment. Funding is available in Account No. 001-13-035-5470-00-10-000(General Fund; Other Contractual Service). Attachment: Bid Tabulation cc: Sharon Flanagan, Clifton Williams DEMOLITION OF SIX(6)RESIDENTIAL STRUCTURES WITH TRANSITE: GROUP A-t(TRANSITE-6) TYPE OF STRUCTURE(S) 8625 Davis Avenue Residence/Collapsed Attached Garage(Remove all concrete/driveway/slabs/sidewalk /right&rear fence/fallen trees/trash/debris/high grass/underbrush; leave front&left fence/City sidewalk/apron) 8230 Sassine Avenue Residence/Attached Garage(Remove all concrete/slabs/driveway/sidewalk/fallen trees/trash/debris/high grass/underbrush) 6149 Willow Avenue Residence/Attached Garage/Shed(Remove all concrete/driveway/rear fence/small trees/trash/debris/high grass/underbrush; leave apron) 1608 Maple Street Residence(Remove all concrete/driveway/sidewalk/slabs/bricks/poles/blocks/fallen trees/trash/debris/high grass/underbrush; leave City sidewalk/apron) 848 W. Rev. Ransom Howard Residence(Remove all concrete/driveway/sidewalk/fallen trees/trash/debris/high Street aka 7th Street grass/underbrush; leave City sidewalk/apron) 812 Abe Lincoln Avenue Residence(Remove all concrete/driveway apron/fallen trees/rear&right fence;leave left fence;remove all trash/debris/high grass/underbrush) "Remember we are here to serve the Citizens of Port Arthur" 2 P. R. NO. 22287 1/19/22 VH RESOLUTION NO. A RESOLUTION AWARDING A CONTRACT TO STRAIGHT LINE SERVICES, OF BUNA, TEXAS, IN THE AMOUNT OF $25,097.20 AND AUTHORIZING THE EXECUTION OF A CONTRACT BY THE CITY MANAGER FOR DEMOLITION OF SIX (6) RESIDENTIAL STRUCTURES WITH TRANSITE (GROUP A-T) LOCATED THROUGHOUT THE CITY, TO BE CHARGED TO ACCOUNT NO. 001-13-035-5470-00-10-000 (GENERAL FUND-OTHER CONTRACTUAL SERVICE) BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PORT ARTHUR: THAT the City Council of the City of Port Arthur hereby awards a contract for demolition of six (6) residential structures with transite (Group A-T) in the City of Port Arthur, to the best and lowest responsible bidder to-wit: Straight Line Services, of Buna, Texas,as delineated in Exhibit"A"; and, THAT the City Manager of the City of Port Arthur is hereby authorized and directed to execute on behalf of the City of Port Arthur a contract between the City of Port Arthur and Straight Line Services, of Buna, Texas,for the contract price of$25,097.20 (a copy of said contract is attached hereto as Exhibit "B"); and, THAT said contract is a duplicate of the standard form Contract previously approved by the City's Legal Department; and, THAT a copy of the caption of this Resolution be spread upon the Minutes of the City Council. READ, ADOPTED, AND APPROVED this the 1st day of February, A.D., 2022, at a Regular Meeting of the City Council of the City of Port Arthur, Texas by the following vote: AYES: MAYOR: Councilmembers: 3 P. R. NO. 22287 1/19/22 VH NOES: MAYOR ATTEST: APPROVED AS TO FORM: 02W Xtv &44J `U CITY SECRETARY CITY AT ORNEY APPROVED FOR ADMINISTRATION: . çMANAGER DE CO A A ASSISTANT CITY MANACR/DIRECTOR OF DEVELOPMENT SERVICES APPROVED AS TO AVAILABILITY OF FUNDS: APPROVED FOR PURCHASING: n iA,..„ INTERIM DIRECTOR OF FINAN PURCHASING MANAGER 4 • � rr rrEXlllt � =? � 0- � 00 °� _ C7 CG GC CC O o : o C4. o, NayO.. O it..) kJ O — _ kJ 00 O A w N a0 a: is:; p; z • • • Na 00 ,D t n 7> .. Y cn - k 0 . IN = rn A S ? • et, 0 to C C'%1 O !. ^^I; z •• =C = suo . ' ° C 27 w aa < x - o � C el) a C7 e a b 7 d A -t A ? = ee'17 a ; A ^ < `C 0 A Ap d 0 ny ec, , + tli C _CC c a3 c A . 4 AA A O D � eeo 00 Z p O fa m n N S W .Z —► J F. O .C7 N ca o c � ^ ~ �n � ir,Vs =CIVdCcVdvdry CD _ CA — m 1 . . CA CA CA CA V y CA CA CA CA CA = '•1. 'Z •- c t= a c c c = c c c c c a °' e r to m m m m m m _ m m m m m m m O .92 _ E cn �C 'D ry = = = �� a= = = = = = '3 T ('�eD A A A A A f: A A A A A A a a a aaa : a. aaaaaa a 2 . dc. t7 O 2 _ a H '-` 7 �. m m m := o .+ N N N N N N N N N N N tit = .= C 0- D. Les 69 b5 b5 b5 Ff9 :! FA big us bA bA bA EA c , GM A N w w A CA A to kJ N W co, N 0, O x �' "! J r•• -.1 00 i.+ .+ c O 00 J N tz 'to la.) CA �Ai ^r O �1 00 r•+ w 00 -1 00 \.D �1 00 is O © 00 �l e ✓ 'C sc O•N ..1 w .1 O, C -4 N A 00 00 o :P. ei ^ O O CN O O O N 00 O CD A O 0 vim. — © O O O O O C C O O O O O O C oe A A . A. to .. 4. 41, A A is A A . 0 2' c, CA EA EA EA EA EA EA CA EA EA EA 6A CA C m d Cr A m 00 to �+ •.► r+ C ee .t.. i. r•+ �1 Ch w — ,.C: .-+ ►L w 00 00 cA O Z O J 0 0 �O 00 C. %► (!1 v !n N V1 O 00 �1 CA MI TJ 00 O w tJ1 O O O en C to 0 0 0 0 .] 9 --I 0 --A0 0 0 0 0 © o o O O O eD n JI0in000 00000000 z 0 0 0 0 0 0 © © © © © © © © ^ `o c. N w W w w N :n N N N w w W d = - CD ..? q .-,-. 6A cis bA GA bA bA fi EA EA EA EA 6A C v �/�iI 1 c S N N 0 . co t, to LA A � c.. a w w w to to 4. C N 00 to N �1 -4 t ou J J J J v 00 y k ] 0 'J1 O O to to 'Jr 0, :n to to O to a O O O O O .O 0 O 0 O O O O O C O O O O O 0 0 0 O O O O 0 0 0 0 0 0 0 O 0 0 O O 0 0 O �] CE, A W W W N N N N N ►.. r z b to to Cd 0 - A O N A O DO 0 0 - N W y O a r.3 W — v. H+ 00 ►.j O O "+ W © L=1 en MI3 Y. ... rAW WaC — — — (Al 0C" cr d ogG. . og1S6" o"i0 N CD CI e r. ' un C0 `� o ,I, eD.lr v� tov� ,"" C)z T y z � „ .� r. z -. nz o 6— o• 0 -o 2 D 0 0 = o ; ; Z - d n . — .- C fD '� `� ` z z: z x 0 0 to N CP = fp W "_ IA+ 6. G .t aaaaaa � ° t tml — n C° big 5A bA bA bA C7 C7 C7 d d C7 CV m < C n N ,.o 4D .G .Q 60 .G .0 f7 O. o = O' ii �l o'. ;A, �1 `L ' m m m m m m O y g �+ x0000wAUc t = = P = = H � o ( r) r. m 44 u c00w w o a. n a c, E. a. a ... Ivo =. a A IN NI IN N W W ~ IN IN IN No tad MT M O a A EA EA 6A EA EA EA EA EA bA EA EA C• r . C w 5el) m N W © OA k A 5 00 W U1 CA r0 CA A O ►+ N to reJ1 00 1=g O A. A .. W © W 000 © © W 000 C% - < Oo O CA O N O J \O 0 0 1 CA CA err O O T o A O N o 0 0 Q, A N m rt O O O O O O O 0 0 0 0 0 0 a M o--. N he .7 OC 7.. A A .' N 0 A N N A A A CA 0 E 9 f) 6 EA EA (A bA (/) :AEA LA EA bA EA B O m d S eD ... N+ �+ �+ Oo --. �+ r+ IN (� zd2 AW INO, ••L 00 --+ o Uri co W 0 O CIi 00 L. !--a1 iA-, :, N v i. '!i O O Zo Oo N (p CA .p -1 e/i N CA O CA N N O O O O Ori ',I O e!1 O O O CA :li 0 0 0 0 0 A O O O O O O O O 0 0 0 o 0 = (ca , O O O 0 O 0 0 0 0 0 C7 '1ifk 'itC.. C... W d.. NJo A N IN) IN W W CCI) td 0 I ` 65 EA EA EA EA ,EA 5A EA LA LA EA EA LA m d y ,y C d 3 o B w w n R C C� C, A 00 U., C, 4D W LaA C 0 a. c 'co 00 'c is 00 -1 0o is cA 'o -1 i00A .4 x o O co UI cA o o C, 1-, CA o CA CA O X c o o O O o O o O o O o 0 0 0 0 0 0 0 o o o 0 0 c o 0 0 0 0 o co o 0 0 0 0 y 00 00 `..• oN N ..• y 00 00 ON 00 00 r r 2 C7 a a a O .+ O N N O •A- O N oAo © A W N h O Y c- p' G- C-' r • — ,p C r �l C yv d C'7 �' N 'C 0 /1 , W - s , ^ r' a "o n r. Cr1 �. •. N = y 4 t .. 4 t ^. O �' in ;� C 'SJ C O ^r '. e.o'. c C7 m C� W .4 ro , < C — c `� �7 C x 2 T 2 x tD C p C 31 = C tD 0. N S ="C7 C.") .4 w N N W b.) IN N N N N N IN) N N J CO Z V2 O N A C EA 6A 69 6A EA 6A 6A fA 69 EA 6A EA EA 6A C C) = N C .� — - O a' A A n 7 G n to --1 r 1 00 J --] �l W r 1 �] --7 �] �7 v] C A is.) Co N Co IN) N J N • 'Li N �1 N N E/, "i -' './) r) O © O O © © © O © O 0 0 0 0 ] X C `I S O O O O O O O O O O O O O O C /1 O © © © © © © © O © © © © © e% Az l 1 O © O O O O O O O O O O O O C B co A r. Cn .r gam OA W W A . W N : W N W W W A ; 0 SO 6A 6A EA EA EA EA 0 EA EA EA EA EA EA 0 co as m CD n p y GO ; o a, O\ --a O1 A A A W A UNA --A0 M A A In00 00 00 — N cn 00 N A N .q !J U 00 .0 ,D '. N A A �1 01 CPI A O U O © O O CA O za O -I O O O O C O O O O O O O Cf O © © © O O "'S 0 0 0 0 0 0 0 © © 0 © © wo fir- f C.1 liC r Ailli.0 Vow y CN A C.r Cd 6) y ,.O N N N N N •- t' 2 C = co cc . 0 sz N A ' 0000 O © .• N td Ci y fl• tI• p; yw Cn 00 ..3 00 •• w0 ,, n4 n C" •• r A w w .-. a C17 E r �' �' S r �' C 0 "a tNj C n O c fp .1 O ° .1 A .1 et et n Z a c C n ;, C o n C 4ti 3 H Vic. C �, .0 fD � z z 2 C p = fD •• A -- a ch cr w S.) M Z O 0 MD Y-a 1 , N Se W W IS) N '-' CN IN) Ca N IN) W › fp �l c rn -L 'n -. N Q. N n c to) 6R 6A CM to) tf Cf• (A CA CM CM CM 6A 2 CD N y et. ,—. C fro o @ = � � 00 � aNC's � 00 � 00 � o, rop � O N �1 �.l �l 7-4 �l 7-4 N �1 N �d N VD -7 0' O © (0 C O C C C O © 0:, O O y j� p 't 0 0 0 0 0 0 0 0 o C © 0 0 C S /� 0 0 0 0 O 0 0 0 0 0 0 0 0 A a' l ) O © O C 0 C 0 0 0 C O O O r 2 ~' IS) — -*� N A JI A C, Cr) CO A �-• --+ W A CII CCM I-d Az mus CM EA 6A 6A 6A 69 CA 69 69 69 69 CM 0 C y 0 Cr co ma 0 a A C w O -i ; a. o o � � � � 0. 0000 ;0 .• .• � 0000 A �: .a 00 N A C\ N 00 00 00 !A N `D to ^ N :A \p A U CO ,.^. A N N Ct C\ 00 O - .- © A Ji © v. A N O O CA CIi N C „— `o 00000b0000000 C7 0 0 0 0 0 0 0 0 0 0 0 0 0 fo A N .• • C ~ f ~ ! ! o i� a Exhibit B DEMOLITION CONTRACT CITY OF PORT ARTHUR THE STATE OF TEXAS COUNTY OF JEFFERSON THIS AGREEMENT is made and entered into this day of February, 2022 by and between the City of Port Arthur, hereinafter called the "CITY", and Straight Line Services, of Buna, Texas, hereinafter called the "CONTRACTOR", in consideration of the mutual agreements contained herein and for a total sum of Twenty-five thousand,. ninety-seven dollars and twenty cents ($25,097.20); we do hereby agree to all terms, conditions and specifications contained herein and attached hereto; and we do hereby declare VALID this AGREEMENT and CONTRACT: WITNESSETH: SECTION I THE CONTRACTOR SHALL: A. Furnish all labor, materials, tools, machinery, qualified supervision and all other items and services necessary for satisfactory completion of specifications and agreements contained herein for demolition of structures and cleanup at the property described as Group A-T described in the attached bid sheets. B. "Start the herein specified work on the date stated in the "Notice to Proceed", and further diligently pursue same until satisfactorily completed on or before twelve (12) calendar days, time being of the essence. It is further understood that if the contract is not completed by the foregoing completion date, (or the said date as extended pursuant to provisions of this contract), the CONTRACTOR shall be assessed liquidated damages of one hundred fifty dollars ($150.00) per day for each day the contract is not completed after said date. All Contractors are required to have a Landfill Permit, which includes a minimum escrow account of one thousand dollars ($1,000). If you opt not to set up an escrow account, you must pay as you dispose by cash or cashier's check. C. Perform all work in accordance with the terms of this AGREEMENT and the DEMOLITION SPECIFICATIONS attached hereto. D. Be responsible for obtaining all necessary and general and special permits and pay any and all fees for said permits and any other fees, public or private, which may be required by the United States, the State of Texas, Jefferson County, or the City of Port Arthur, to satisfactorily complete the work as specified and agreed to herein. E. Furnish certificates of insurance to the City's Purchasing Agent evidencing that the CONTRACTOR has obtained Workman's Compensation, General Liability and Automobile Liability Insurance, which is required by the CITY for Exhibit [3 performance of the work specified here. Minimum amounts of such insurance to be obtained by the CONTRACTOR are as follows: 1. Statutory Texas Workman's Compensation Insurance (with waiver of subrogation in favor of the City, its officers, employees and agents. 2. Commercial General Liability occurrence type insurance (products/ completed operations coverage must be included and the City and its officers, employees, and agents must be named as an additional insured): a. Bodily injury $500,000 single limit per occurrence or $500,000 each person/$500,000 per occurrence for contracts of$100,000 or less; or Bodily injury $1,000,000 single limit per occurrence or$500,000 each person/$1,000,000 per occurrence for contracts in excess of$100,000; and, b. Property Damage $100,000 per occurrence regardless of contract amount; and, c. Minimum aggregate policy year limit of$1,000,000 for contracts of $100,000 or less; or, Minimum aggregate policy year limit of$2,000,000 for contracts in excess of$100,000. 3. Commercial Automobile Liability Insurance (Including owned, non-owned and hired vehicles coverage's). a. Minimum combined single limit of$500,000 per occurrence, for bodily injury and property damage. b. If individual limits are provided, minimum limits are $300,000 per person, $500,000 per occurrence for bodily injury and $100,000 per occurrence for property damage. F. Furnish to the Purchasing Agent, City of Port Arthur, prior to commencing work, certificates of insurance meeting the above listed insurance requirements for any sub-contractors, haulers, or independent workmen used by the CONTRACTOR in performance of the work specified herein. G. Ensure that competent and qualified supervision is present on the job site. at all times while work is in progress and that all demolition work is pursued in such a manner as to maximize the safety of all workmen, the general public and surrounding property. H. Comply with the Civil Rights Act of 1964 and Section 109 of the Housing and Community Development Act of 1974, to wit: No person in the United States shall, on the ground of race, color, national origin, or sex be excluded from participation in, be denied the benefits of, or be subjected to discrimination under any program or activity funded in whole or part with funds made available under this title. 2 Exhibit B SECTION II. THE CITY SHALL: A. Inspect the demolition work in progress to ensure that such work is being carried out in accordance with the terms of this AGREEMENT and the DEMOLITION SPECIFICATIONS attached hereto. B. Compensate the CONTRACTOR according to the following method: Except as hereinafter provided, payment for the Demolition Contract will be made in a lump sum after completion and acceptance of the contract work. One progress payment may be requested when at least fifty percent (50%) of the contract work is completed. Ten percent (10%) of the progress payment will be retained. This retainage will be held in escrow by the City for a maximum of thirty (30) days after satisfactory completion and acceptance of the Contract to guarantee the completion of work. Thirty (30) days after said completion and acceptance, final payment shall be made in a lump sum or total agreed price less the progress payment, if made, by check issued by the City of Port Arthur and made payable to the CONTRACTOR for the satisfactory completion of the work, described herein. Any payments are subject to satisfactory intermediate and final inspections by the City. Further, an applicable request for payment must be made by the CONTRACTOR prior to each payment. SECTION III General Conditions: A. If performance by the CONTRACTOR is prevented or delayed as a direct result of acts of a public enemy, acts of the property owner, fire, epidemics, or acts of God, such as floods, earthquakes, hurricanes, tornadoes and rain, an extension of one (1) working day of additional time will be allowed to the CONTRACTOR for each working day lost from such cause, provided the CONTRACTOR, within three (3) days after the beginning of such delay, gives written notice to the City. B. If for any reason, other than those specified above, the CONTRACTOR at any time fails for a period of five (5) consecutive working days to supply enough skilled workers or otherwise neglects to execute the work properly, the CITY, after these five (5) working days may give written notice to the CONTRACTOR terminating his contract. C. The CONTRACTOR shall repair or replace, if necessary, to the City's satisfaction, any damage to the work site, the adjacent areas, the access areas to the work site and to any elements within these areas that may have suffered damage as a result of the CONTRACTOR'S or any of the subcontractor's operations. The CONTRACTOR shall leave these areas in a satisfactory and 3 Exhibit B workmanlike condition, at least equal to that existing before the CONTRACTOR hereunder started his work. D. The CONTRACTOR agrees to indemnify and hold harmless the City of Port Arthur, Texas from any and all claims, and damages of any and every kind for injury to or death of any person, and damages to property arising out of the demolition. E. Any amendments to this contract shall be written and must be executed by both the CITY and the CONTRACTOR prior to the implementation of any such change. F. This CONTRACT and AGREEMENT embodies and represents all of the rights, duties and obligations of the CITY and the CONTRACTOR and any oral or written agreements prior to the date first above written, not included or embodied herein shall be declared void and not be binding or of benefit to any of the parties herein mentioned. SECTION IV Particular Requirements: A. Other particular work requirements are contained in the DEMOLITION SPECIFICATIONS, which are attached hereto and made a part hereof as Exhibit "B-1". B. ALL DEMOLITION BIDS SHALL INCLUDE REMOVAL OF CONCRETE SLABS, PORCHES, STEPS, ETC., UNLESS OTHERWISE NOTED. SECTION V If the CONTRACTOR materially defaults in (a) failing to have liability insurance; (b) not completing the CONTRACT within the time required; or (c) uses demolition procedures that are dangerous to the health and safety of residents and/or adjoining residents, the Director of Code Enforcement has the authority to issue a cease and desist order until this matter can be reviewed by the City Council. 4 Exhibit B SIGNED AND AGREED TO this day of , A.D. 2022: STRAIGHT LINE SERVICES WITNESSED SIGNED AND AGREED TO this day of , A.D. 2022: CITY OF PORT ARTHUR CITY MANAGER WITNESSED 5 EXHIBIT"B-1" DEMOLITION SPECIFICATIONS CITY OF PORT ARTHUR I. TITLE The provisions embraced within these sections and subsections shall constitute; be known as; and will be referred to herein and in any relevant AGREEMENT and CONTRACT as "DEMOLITION SPECIFICATIONS". II. SCOPE The scope and purpose of these specifications is to establish certain regulations, general requirements, and particular requirements necessary for the demolition, removal and cleanup of the unsafe and/or unsanitary structure(s) as required by the Inspections Department of the City of Port Arthur. III. CONTRACTOR BIDS Contracts for the demolition of structures will be awarded in accordance with the terms and conditions listed in the Community Services Department's BID FORM FOR DEMOLITION. The completion of the demolition package will be of vital importance to the City. The number of calendar days given on the proposal form will be used to establish the completion date as used in the Contract. In case the work is not completed within the time specified in the Contract, there shall be liquidated damages of one hundred fifty dollars ($150) per day for each day exceeding the completion date. IV. INSURANCE REQUIREMENTS A. The Contractor shall, upon submission of bid, furnish the City with certificates of insurance, indicating the existence of Statutory Workman's Compensation Insurance, General and Auto Liability, Public Liability, and Property Damage Insurance. Such insurance must be issued by a company authorized to do business in the State of Texas. Such a certificate must contain a provision requiring not less than fifteen (15) days prior notice in writing to the City of any change or termination of said insurance. All insurance is to remain in force until the job of clearing the premises has been completed and the work has been accepted by the City. B. The Contractor/Successful Bidder must obtain and furnish to the City proof of insurance in the following minimum amounts: 1. Statutory Texas Workman's Compensation Insurance: 2. Commercial General Liability occurrence type insurance City of Port Arthur, its officers, agents, and employees must be named as an additional insured): a. Bodily injury $500,000 single limit per occurrence or$500,000 each person/$500,000 per occurrence for contracts of$100,000 or less; or Bodily injury $1,000,000 single limit per occurrence or$500,000 each person/$1,000,000 per occurrence for contracts in excess of$100,000; and, 1 EXHIBIT"B-1" b. Property Damage$100,000 per occurrence regardless of contract amount; and, c. Minimum aggregate policy year limit of$1,000,000 for contracts of $100,000 or less; or, Minimum aggregate policy year limit of$2,000,000 for contracts in excess of$100,000. 3. Commercial Automobile Liability Insurance (Including owned, non-owned and hired vehicles coverage's). a. Minimum combined single limit of$500,000 per occurrence, for bodily injury and property damage. b. If individual limits are provided, minimum limits are $300,000 per person, $500,000 per occurrence for bodily injury and $100,000 per occurrence for property damage. V. PERMITS The Contractor/Successful Bidder must obtain from the City of Port Arthur and all other governmental entities, at his own expense, all necessary general and special permits and pay any and all fees for said permits and any other fees,public or private. All Contractors are required to have a Landfill Permit, which includes a minimum escrow account of one thousand dollars ($1,000). If you opt not to set up an escrow account,you must pay cash or by cashier's check as you dispose. VI. GENERAL CONDITIONS AND REQUIREMENTS The following list of conditions and requirements are to be understood as being a general guide in the demolition of structures. It must be noted, however, that there are special requirements listed below in Section VII of these specifications, which are in addition to these general requirements for demolition, and that it is the responsibility of the Contractor/Successful Bidder to comply with all particular requirements. A. It is understood and agreed that the Contractor/Successful Bidder will function and operate as an independent contractor. Any liability incurred by the Contractor/Successful Bidder will accrue only to that party as an independent contractor and not to the City of Port Arthur. B. No work under a City DEMOLITION CONTRACT shall be subcontracted by the Contractor/Successful Bidder without prior, written approval of the Community Services Department. No subcontractor will be approved unless that subcontractor meets the same insurance requirements specified for and required of the Contractor. C. The demolition work specified herein shall be performed in a safe, satisfactory condition, starting with the roof and working down, with the safety and welfare of all people and property being of the highest priority. D. All materials, debris, and rubble from the demolition of the structure(s) specified herein will become the property of the Contractor/Successful Bidder. Salvage can only begin immediately prior to the beginning of demolition. 2 EXHIBIT"B-1" E. The Contractor/Successful Bidder will be held responsible for repair of broken or damaged water, gas, or any other type of lines, which occur during the course of the demolition work. The Contractor shall repair or replace, if necessary, to the City's satisfaction, any damage to the work site, the adjacent areas, the access areas to the work site and to any elements within these areas that may have suffered damage as a result of the Contractor's or any of the subcontractor's operations. The Contractor shall leave these areas in a satisfactory condition. F. The Contractor/Successful Bidder shall haul off all debris and unsalvageable materials; and no debris or rubble which may pose a threat to public safety will be left on the site overnight. No such debris or material will be placed on a sidewalk or public right-of-way so that it poses a danger to any person. G. All demolition work must be carried out to the satisfaction of the City's Inspections Official. H. The City (without prejudice to any other right or remedy it may have) has the right to terminate the contract in the event of any default by the Contractor after giving the Contractor seven (7) days written notice. Such notice of termination shall be subsequent to default by the Contractor and after receiving written notice from the City certifying cause for such action. In addition to other events of default or grounds for termination identified in the contract, it shall be considered default by the Contractor whenever he/she shall: 1. Declare bankruptcy, become insolvent, or assign his/her assets for the benefit of his/her creditors. 2. Violate or disregard provisions of the Contract or instruction from the Owner. 3. Fail to prosecute the work according to the agreed Schedule of Completion, including amendments and/or modifications thereof. 4. Fail to provide a qualified superintendent, competent workmen or subcontractors, or proper materials, or failure to make prompt payment therefor. If the Contract is terminated as provided above or as provided in the Contract, the City will engage another contractor to complete the work. Payment for the completion of such work will come from funds obligated by the City under its contract with the original Contractor. J. METHOD OF PAYMENT Payment shall be made as provided in Section II of the contract. K. PAYMENT WITHHELD Any part or the whole of any payment may be withheld by the City to the extent deemed necessary and reasonable should evidence of the following be discovered: 3 EXHIBIT"B-1" 1. Defective work not corrected. 2. Claims filed against the Contractor. 3. Reasonable evidence indicating the probability of filing claims against the Contractor. 4. Failure of the Contractor to make proper payments to subcontractors or for materials or for labor. 5. The contract cannot be completed for the then unpaid balance. 6. Unsatisfactory progress of the work by the Contractor. When the above grounds are removed, the amount withheld because of them shall be paid to the Contractor subject to and within the other terms of this contract. L. CONTRACT PAYMENT RETAINAGE Contract payment retainage shall be as provided in the Contract. VII. PARTICULAR WORK REQUIREMENTS The following particular work requirements and conditions apply specifically to the building(s) or structure(s) which are located at and described as: DEMOLITION OF SIX (6) RESIDENTIAL STRUCTURES WITH TRANSITE: GROUP A-t(TRANSITE-6) TYPE OF STRUCTURE(S) 8625 Davis Avenue Residence/Collapsed Attached Garage(Remove all concrete/driveway/slabs/ sidewalk/right&rear fence/fallen trees/trash/debris/high grass/underbrush; leave front&left fence/City sidewalk/apron) 8230 Sassine Avenue Residence/Attached Garage(Remove all concrete/slabs/driveway/sidewalk/fallen trees/trash/debris/high grass/underbrush) 6149 Willow Avenue Residence/Attached Garage/Shed(Remove all concrete/driveway/rear fence/small trees/trash/debris/high grass/underbrush; leave apron) 1608 Maple Street Residence(Remove all concrete/driveway/sidewalk/slabs/bricks/poles/blocks/ fallen trees/trash/debris/high grass/underbrush;leave City sidewalk/apron) 848 W.Rev. Ransom Howard Residence(Remove all concrete/driveway/sidewalk/fallen trees/trash/debris/high Street aka 7t'Street grass/underbrush;leave City sidewalk/apron) 812 Abe Lincoln Avenue Residence(Remove all concrete/driveway apron/fallen trees/rear&right fence; leave left fence;remove all trash/debris/high grass/underbrush) A. Before any building or structure is demolished, its utilities shall be safely disconnected. The Contractor shall serve notice to all suppliers of utilities to the building to be demolished and have them disconnect the services and remove all meters and equipment belonging to them. Forty-eight (48) hours' written notice must be given the City for termination of their utilities. All piping and wiring shall be properly terminated. Any costs incurred in the termination of utilities and services shall be borne by the Contractor. 4 EXHIBIT"B-1" B. Demolition and clean-up includes, but is not limited to, the removal of all lumber, doors, windows, wire, sheet metal, appliances, furniture, loose rock,brick, mortar, concrete, and the cleaning and removal of all rubbish, trash or other debris that would inhibit or prevent the mechanical mowing of said lot and premises. C. Fill, grade and level with clean fill dirt all depressions in the earth which exist beneath demolished building(s) or structure(s) and all ruts or other depressions created during the demolition work when the average depth of such depressions exceeds three (3) inches. D. Any trees and shrubs designated by the Code Enforcement/Inspections Department will be cut down and removed from the premises. E. The grass at the demolition site shall be mowed to a height not exceeding two (2) inches. F. All sewer lines exposed through demolition work must be cut off within two (2) inches of the surface to the ground or concrete slab and must be plugged with concrete in such a manner as to prevent ground water incursion into the City's sanitary sewer system. G. REMOVAL OF STEPS AND CONCRETE PORCHES UNLESS OTHERWISE NOTED. H. HAZARDOUS MATERIALS Materials defined by the Environmental Protection Agency to be hazardous to the environment or persons, shall be disposed of in accordance with all local, state and federal government regulations and governing laws. This shall be the responsibility of the Contractor. The Contractor shall furnish written proof of such disposal. I. PERFORMANCE AND PAYMENT BOND REQUIREMENTS Per Government Code Chapter 2253. Bonds. If the contract exceeds fifty thousand dollars ($50,000) a payment bond is required. If the contract exceeds one hundred thousand dollars ($100,000) a performance bond is required. Performance and Payment Bonds shall be furnished on prescribed forms in the amount of one hundred percent (100%) of the contract price with corporate surety duly authorized to do business in the State of Texas. Attorneys-in-fact who sign Bonds must file with each bond a certified and effective date copy of their Power of Attorney. 5 DEMOLITION CONTRACT CITY OF PORT ARTHUR THE STATE OF TEXAS COUNTY OF JEFFERSON THIS AGREEMENT is made and entered into this day of February, 2022 by and between the City of Port Arthur, hereinafter called the "CITY", and Straight Line Services, of Buna, Texas, hereinafter called the "CONTRACTOR", in consideration of the mutual agreements contained herein and for a total sum of Twenty-five thousand, ninety-seven dollars and twenty cents ($25,097.20); we do hereby agree to all terms, conditions and specifications contained herein and attached hereto; and we do hereby declare VALID this AGREEMENT and CONTRACT: WITNESSETH: SECTION I THE CONTRACTOR SHALL: A. Furnish all labor, materials, tools, machinery, qualified supervision and all other items and services necessary for satisfactory completion of specifications and agreements contained herein for demolition of structures and cleanup at the property described as Group A-T described in the attached bid sheets. B. "Start the herein specified work on the date stated in the "Notice to Proceed", and further diligently pursue same until satisfactorily completed on or before twelve (12) calendar days, time being of the essence. It is further understood that if the contract is not completed by the foregoing completion date, (or the said date as extended pursuant to provisions of this contract), the CONTRACTOR shall be assessed liquidated damages of one hundred fifty dollars ($150.00) per day for each day the contract is not completed after said date. All Contractors are required to have a Landfill Permit, which includes a minimum escrow account of one thousand dollars ($1,000). If you opt not to set up an escrow account, you must pay as you dispose by cash or cashier's check. C. Perform all work in accordance with the terms of this AGREEMENT and the DEMOLITION SPECIFICATIONS attached hereto. D. Be responsible for obtaining all necessary and general and special permits and pay any and all fees for said permits and any other fees, public or private, which may be required by the United States, the State of Texas, Jefferson County, or the City of Port Arthur, to satisfactorily complete the work as specified and agreed to herein. E. Furnish certificates of insurance to the City's Purchasing Agent evidencing that the CONTRACTOR has obtained Workman's Compensation, General Liability and Automobile Liability Insurance, which is required by the CITY for performance of the work specified here. Minimum amounts of such insurance to be obtained by the CONTRACTOR are as follows: 1. Statutory Texas Workman's Compensation Insurance (with waiver of subrogation in favor of the City, its officers, employees and agents. 2. Commercial General Liability occurrence type insurance (products/ completed operations coverage must be included and the City and its officers, employees, and agents must be named as an additional insured): a. Bodily injury $500,000 single limit per occurrence or $500,000 each person/$500,000 per occurrence for contracts of$100,000 or less; or Bodily injury $1,000,000 single limit per occurrence or$500,000 each person/$1,000,000 per occurrence for contracts in excess of$100,000; and, b. Property Damage $100,000 per occurrence regardless of contract amount; and, c. Minimum aggregate policy year limit of$1,000,000 for contracts of $100,000 or less; or, Minimum aggregate policy year limit of$2,000,000 for contracts in excess of$100,000. 3. Commercial Automobile Liability Insurance (Including owned, non-owned and hired vehicles coverage's). a. Minimum combined single limit of$500,000 per occurrence, for bodily injury and property damage. b. If individual limits are provided, minimum limits are $300,000 per person, $500,000 per occurrence for bodily injury and $100,000 per occurrence for property damage. F. Furnish to the Purchasing Agent, City of Port Arthur, prior to commencing work, certificates of insurance meeting the above listed insurance requirements for any sub-contractors, haulers, or independent workmen used by the CONTRACTOR in performance of the work specified herein. G. Ensure that competent and qualified supervision is present on the job site at all times while work is in progress and that all demolition work is pursued in such a manner as to maximize the safety of all workmen, the general public and surrounding property. H. Comply with the Civil Rights Act of 1964 and Section 109 of the Housing and Community Development Act of 1974, to wit: No person in the United States shall, on the ground of race, color, national origin, or sex be excluded from participation in, be denied the benefits of, or be subjected to discrimination under any program or activity funded in whole or part with funds made available under this title. 2 SECTION II. THE CITY SHALL: A. Inspect the demolition work in progress to ensure that such work is being carried out in accordance with the terms of this AGREEMENT and the DEMOLITION SPECIFICATIONS attached hereto. B. Compensate the CONTRACTOR according to the following method: Except as hereinafter provided, payment for the Demolition Contract will be made in a lump sum after completion and acceptance of the contract work. One progress payment may be requested when at least fifty percent (50%) of the contract work is completed. Ten percent (10%) of the progress payment will be retained. This retainage will be held in escrow by the City for a maximum of thirty (30) days after satisfactory completion and acceptance of the Contract to guarantee the completion of work. Thirty (30) days after said completion and acceptance, final payment shall be made in a lump sum or total agreed price less the progress payment, if made, by check issued by the City of Port Arthur and made payable to the CONTRACTOR for the satisfactory completion of the work, described herein. Any payments are subject to satisfactory intermediate and final inspections by the City. Further, an applicable request for payment must be made by the CONTRACTOR prior to each payment. SECTION III General Conditions: A. If performance by the CONTRACTOR is prevented or delayed as a direct result of acts of a public enemy, acts of the property owner, fire, epidemics, or acts of God, such as floods, earthquakes, hurricanes, tornadoes and rain, an extension of one (1) working day of additional time will be allowed to the CONTRACTOR for each working day lost from such cause, provided the CONTRACTOR, within three (3) days after the beginning of such delay, gives written notice to the City. B. If for any reason, other than those specified above, the CONTRACTOR at any time fails for a period of five (5) consecutive working days to supply enough skilled workers or otherwise neglects to execute the work properly, the CITY, after these five (5) working days may give written notice to the CONTRACTOR terminating his contract. C. The CONTRACTOR shall repair or replace, if necessary, to the City's satisfaction, any damage to the work site, the adjacent areas, the access areas to the work site and to any elements within these areas that may have suffered damage as a result of the CONTRACTOR'S or any of the subcontractor's operations. The CONTRACTOR shall leave these areas in a satisfactory and 3 workmanlike condition, at least equal to that existing before the CONTRACTOR hereunder started his work. D. The CONTRACTOR agrees to indemnify and hold harmless the City of Port Arthur, Texas from any and all claims, and damages of any and every kind for injury to or death of any person, and damages to property arising out of the demolition. E. Any amendments to this contract shall be written and must be executed by both the CITY and the CONTRACTOR prior to the implementation of any such change. F. This CONTRACT and AGREEMENT embodies and represents all of the rights, duties and obligations of the CITY and the CONTRACTOR and any oral or written agreements prior to the date first above written, not included or embodied herein shall be declared void and not be binding or of benefit to any of the parties herein mentioned. SECTION IV Particular Requirements: A. Other particular work requirements are contained in the DEMOLITION SPECIFICATIONS, which are attached hereto and made a part hereof as Exhibit "B-1". B. ALL DEMOLITION BIDS SHALL INCLUDE REMOVAL OF CONCRETE SLABS, PORCHES, STEPS, ETC., UNLESS OTHERWISE NOTED. SECTION V If the CONTRACTOR materially defaults in (a) failing to have liability insurance; (b) not completing the CONTRACT within the time required; or (c) uses demolition procedures that are dangerous to the health and safety of residents and/or adjoining residents, the Director of Code Enforcement has the authority to issue a cease and desist order until this matter can be reviewed by the City Council. 4 SIGNED AND AGREED TO this day of , A.D. 2022: STRAIGHT LINE SERVICES WITNESSED SIGNED AND AGREED TO this day of , A.D. 2022: CITY OF PORT ARTHUR CITY MANAGER WITNESSED 5 EXHIBIT"B-1" DEMOLITION SPECIFICATIONS CITY OF PORT ARTHUR I. TITLE The provisions embraced within these sections and subsections shall constitute; be known as; and will be referred to herein and in any relevant AGREEMENT and CONTRACT as "DEMOLITION SPECIFICATIONS". II. SCOPE The scope and purpose of these specifications is to establish certain regulations, general requirements, and particular requirements necessary for the demolition, removal and cleanup of the unsafe and/or unsanitary structure(s) as required by the Inspections Department of the City of Port Arthur. III. CONTRACTOR BIDS Contracts for the demolition of structures will be awarded in accordance with the terms and conditions listed in the Community Services Department's BID FORM FOR DEMOLITION. The completion of the demolition package will be of vital importance to the City. The number of calendar days given on the proposal form will be used to establish the completion date as used in the Contract. In case the work is not completed within the time specified in the Contract, there shall be liquidated damages of one hundred fifty dollars ($150) per day for each day exceeding the completion date. IV. INSURANCE REQUIREMENTS A. The Contractor shall, upon submission of bid, furnish the City with certificates of insurance, indicating the existence of Statutory Workman's Compensation Insurance, General and Auto Liability, Public Liability, and Property Damage Insurance. Such insurance must be issued by a company authorized to do business in the State of Texas. Such a certificate must contain a provision requiring not less than fifteen (15) days prior notice in writing to the City of any change or termination of said insurance. All insurance is to remain in force until the job of clearing the premises has been completed and the work has been accepted by the City. B. The Contractor/Successful Bidder must obtain and furnish to the City proof of insurance in the following minimum amounts: 1. Statutory Texas Workman's Compensation Insurance: 2. Commercial General Liability occurrence type insurance City of Port Arthur, its officers, agents, and employees must be named as an additional insured): a. Bodily injury $500,000 single limit per occurrence or$500,000 each person/$500,000 per occurrence for contracts of$100,000 or less; or Bodily injury $1,000,000 single limit per occurrence or$500,000 each person/$1,000,000 per occurrence for contracts in excess of$100,000; and, 1 EXHIBIT"B-1" b. Property Damage $100,000 per occurrence regardless of contract amount; and, c. Minimum aggregate policy year limit of$1,000,000 for contracts of $100,000 or less; or, Minimum aggregate policy year limit of$2,000,000 for contracts in excess of$100,000. 3. Commercial Automobile Liability Insurance (Including owned, non-owned and hired vehicles coverage's). a. Minimum combined single limit of$500,000 per occurrence, for bodily injury and property damage. b. If individual limits are provided, minimum limits are $300,000 per person, $500,000 per occurrence for bodily injury and $100,000 per occurrence for property damage. V. PERMITS The Contractor/Successful Bidder must obtain from the City of Port Arthur and all other governmental entities, at his own expense, all necessary general and special permits and pay any and all fees for said permits and any other fees,public or private. All Contractors are required to have a Landfill Permit, which includes a minimum escrow account of one thousand dollars ($1,000). If you opt not to set up an escrow account,you must pay cash or by cashier's check as you dispose. VI. GENERAL CONDITIONS AND REQUIREMENTS The following list of conditions and requirements are to be understood as being a general guide in the demolition of structures. It must be noted, however, that there are special requirements listed below in Section VII of these specifications, which are in addition to these general requirements for demolition, and that it is the responsibility of the Contractor/Successful Bidder to comply with all particular requirements. A. It is understood and agreed that the Contractor/Successful Bidder will function and operate as an independent contractor. Any liability incurred by the Contractor/Successful Bidder will accrue only to that party as an independent contractor and not to the City of Port Arthur. B. No work under a City DEMOLITION CONTRACT shall be subcontracted by the Contractor/Successful Bidder without prior, written approval of the Community Services Department. No subcontractor will be approved unless that subcontractor meets the same insurance requirements specified for and required of the Contractor. C. The demolition work specified herein shall be performed in a safe, satisfactory condition, starting with the roof and working down, with the safety and welfare of all people and property being of the highest priority. D. All materials, debris, and rubble from the demolition of the structure(s) specified herein will become the property of the Contractor/Successful Bidder. Salvage can only begin immediately prior to the beginning of demolition. 2 EXHIBIT"B-1" E. The Contractor/Successful Bidder will be held responsible for repair of broken or damaged water, gas, or any other type of lines, which occur during the course of the demolition work. The Contractor shall repair or replace, if necessary, to the City's satisfaction, any damage to the work site, the adjacent areas, the access areas to the work site and to any elements within these areas that may have suffered damage as a result of the Contractor's or any of the subcontractor's operations. The Contractor shall leave these areas in a satisfactory condition. F. The Contractor/Successful Bidder shall haul off all debris and unsalvageable materials; and no debris or rubble which may pose a threat to public safety will be left on the site overnight. No such debris or material will be placed on a sidewalk or public right-of-way so that it poses a danger to any person. G. All demolition work must be carried out to the satisfaction of the City's Inspections Official. H. The City (without prejudice to any other right or remedy it may have) has the right to terminate the contract in the event of any default by the Contractor after giving the Contractor seven (7) days written notice. Such notice of termination shall be subsequent to default by the Contractor and after receiving written notice from the City certifying cause for such action. In addition to other events of default or grounds for termination identified in the contract, it shall be considered default by the Contractor whenever he/she shall: 1. Declare bankruptcy, become insolvent, or assign his/her assets for the benefit of his/her creditors. 2. Violate or disregard provisions of the Contract or instruction from the Owner. 3. Fail to prosecute the work according to the agreed Schedule of Completion, including amendments and/or modifications thereof. 4. Fail to provide a qualified superintendent, competent workmen or subcontractors, or proper materials, or failure to make prompt payment therefor. If the Contract is terminated as provided above or as provided in the Contract, the City will engage another contractor to complete the work. Payment for the completion of such work will come from funds obligated by the City under its contract with the original Contractor. J. METHOD OF PAYMENT Payment shall be made as provided in Section II of the contract. K. PAYMENT WITHHELD Any part or the whole of any payment may be withheld by the City to the extent deemed necessary and reasonable should evidence of the following be discovered: 3 EXHIBIT"B-1" 1. Defective work not corrected. 2. Claims filed against the Contractor. 3. Reasonable evidence indicating the probability of filing claims against the Contractor. 4. Failure of the Contractor to make proper payments to subcontractors or for materials or for labor. 5. The contract cannot be completed for the then unpaid balance. 6. Unsatisfactory progress of the work by the Contractor. When the above grounds are removed, the amount withheld because of them shall be paid to the Contractor subject to and within the other terms of this contract. L. CONTRACT PAYMENT RETAINAGE Contract payment retainage shall be as provided in the Contract. VII. PARTICULAR WORK REQUIREMENTS The following particular work requirements and conditions apply specifically to the building(s) or structure(s)which are located at and described as: DEMOLITION OF SIX(6)RESIDENTIAL STRUCTURES WITH TRANSITE: GROUP A-t(TRANSITE-6) TYPE OF STRUCTURE(S) 8625 Davis Avenue Residence/Collapsed Attached Garage(Remove all concrete/driveway/slabs/ sidewalk/right&rear fence/fallen trees/trash/debris/high grass/underbrush; leave front&left fence/City sidewalk/apron) 8230 Sassine Avenue Residence/Attached Garage(Remove all concrete/slabs/driveway/sidewalk/fallen trees/trash/debris/high grass/underbrush) 6149 Willow Avenue Residence/Attached Garage/Shed(Remove all concrete/driveway/rear fence/small trees/trash/debris/high grass/underbrush;leave apron) 1608 Maple Street Residence(Remove all concrete/driveway/sidewalk/slabs/bricks/poles/blocks/ fallen trees/trash/debris/high grass/underbrush; leave City sidewalk/apron) 848 W.Rev.Ransom Howard Residence(Remove all concrete/driveway/sidewalk/fallen trees/trash/debris/high Street aka 7'h Street grass/underbrush; leave City sidewalk/apron) 812 Abe Lincoln Avenue Residence(Remove all concrete/driveway apron/fallen trees/rear&right fence; leave left fence;remove all trash/debris/high grass/underbrush) A. Before any building or structure is demolished, its utilities shall be safely disconnected. The Contractor shall serve notice to all suppliers of utilities to the building to be demolished and have them disconnect the services and remove all meters and equipment belonging to them. Forty-eight (48) hours' written notice must be given the City for termination of their utilities. All piping and wiring shall be properly terminated. Any costs incurred in the termination of utilities and services shall be borne by the Contractor. 4 • EXHIBIT"B-1" B. Demolition and clean-up includes, but is not limited to, the removal of all lumber, doors, windows,wire, sheet metal, appliances, furniture, loose rock, brick, mortar, concrete, and the cleaning and removal of all rubbish, trash or other debris that would inhibit or prevent the mechanical mowing of said lot and premises. C. Fill, grade and level with clean fill dirt all depressions in the earth which exist beneath demolished building(s) or structure(s) and all ruts or other depressions created during the demolition work when the average depth of such depressions exceeds three (3) inches. D. Any trees and shrubs designated by the Code Enforcement/Inspections Department will be cut down and removed from the premises. E. The grass at the demolition site shall be mowed to a height not exceeding two (2) inches. F. All sewer lines exposed through demolition work must be cut off within two (2) inches of the surface to the ground or concrete slab and must be plugged with concrete in such a manner as to prevent ground water incursion into the City's sanitary sewer system. G. REMOVAL OF STEPS AND CONCRETE PORCHES UNLESS OTHERWISE NOTED. H. HAZARDOUS MATERIALS Materials defined by the Environmental Protection Agency to be hazardous to the environment or persons, shall be disposed of in accordance with all local, state and federal government regulations and governing laws. This shall be the responsibility of the Contractor. The Contractor shall furnish written proof of such disposal. I. PERFORMANCE AND PAYMENT BOND REQUIREMENTS Per Government Code Chapter 2253. Bonds. If the contract exceeds fifty thousand dollars ($50,000) a payment bond is required. If the contract exceeds one hundred thousand dollars ($100,000) a performance bond is required. Performance and Payment Bonds shall be furnished on prescribed forms in the amount of one hundred percent (100%) of the contract price with corporate surety duly authorized to do business in the State of Texas. Attorneys-in-fact who sign Bonds must file with each bond a certified and effective date copy of their Power of Attorney. 5