Loading...
HomeMy WebLinkAboutPR 22327: CONTRACT WITH PREFERRED FACILITIES GROUP FOR REPAIRS TO VARIOUS PARKS www.PortArthurTx.gov INTEROFFICE MEMORANDUM Date: January 24, 2022 To: The Honorable Mayor and City Council Through: Ron Burton, City Manager From: Chandra Alpough, Director of Parks and Recreation RE: P.R. 22327—Contract With Preferred Facilities Group For Repairs To Various Parks Introduction: The intent of this Agenda Item is to request the City Council's approval of P.R. No. 22327 authorizing the City Manager to execute a contract with Preferred Facilities Group of Beaumont, Texas for repairs to Lakeside Park, Mosley Pool, County Park Girls and Little League Field, Cecil Reynolds Park Bellaire Field and Lions Park through BuyBoard Cooperative Purchasing Contract Number 581-19 in an amount not to exceed$79,909.92. Background: On August 27, 2020, Hurricane Laura caused significant damage to the City of Port Arthur. Various parks and facilities were severely affected. Preferred Facilities Group of Beaumont, Texas submitted quotes for roof panel repairs at Lakeside Park, pavilion roof repairs at Mosley Pool,replacement of the canopy, fence, dugout and bleacher repairs at County Park, dugout and fence repair at Cecil Reynolds Park and sign and climber ladder replacement at Lions Park. Repairs to these parks and facilities are necessary in order to provide continued use for the citizens of Port Arthur. Budget Impact: Funding in the amount of$79,909.92 is available for this purpose in the Hurricane Laura Fund Account LAUR25-GRE-EQM&LAUR-GRE-BUM and will be submitted for reimbursement by insurance and/or FEMA. Recommendation: It is recommended that the City Council approve P.R.No. 22327 authorizing the City Manager to execute a contract with Preferred Facilities Group of Beaumont, Texas for repairs to Lakeside Park, Mosley Pool, County Park Girls and Little League Field, Cecil Reynolds Park Bellaire Field and Lions Park through BuyBoard Cooperative Purchasing Contract Number 581-19 in an amount not to exceed $79,909.92. "Remember,we are here to serve the Citizens of Port Arthur" P.O.Box 1089 X Port Arthur,Texas 77641-1089 X 409.983.8182 X FAX 409.983.8294 P. R.No. 22327 1/09/2022 ca RESOLUTION NO. A RESOLUTION AUTHORIZING THE CITY MANAGER TO ENTER INTO A CONTRACT WITH PREFERRED FACILITIES GROUP OF BEAUMONT, TEXAS FOR THE REPAIRS TO LAKESIDE PARK, MOSLEY POOL, COUNTY PARK, CECIL REYNOLDS PARK AND LIONS PARK IN A TOTAL AMOUNT NOT TO EXCEED $79,909.92; FUNDING AVAILABLE IN CAPITAL ACCOUNT NO. LAUR25-GRE-EQM& LAUR-GRE-BUM WHEREAS, on August 27, 2020, Hurricane Laura caused significant damages to the City of Port Arthur; and, WHEREAS,various parks and facilities were severely affected by Hurricane Laura; and, WHEREAS, one (1) quote was received from four (4) companies for the repairs to Lakeside Park, Mosley Pool, County Park, Cecil Reynolds Park and Lions Park; and, WHEREAS, the quote tabulation is attached hereto and made a part hereof as Exhibit "A"; and WHEREAS, Preferred Facilities Group of Beaumont, Texas has submitted a quote via BuyBoard Texas Contract 581-19 for the following repair services: 1)roof panel repairs to Lakeside Park in the amount of$3,942.51; 2)pavilion roof repairs at Mosley Pool in the amount of$10,246.48; 3)replacement of canopy, fence and bleacher repairs at County Park Girls Field in the amount of$31,741.81; 4)dugout repairs at County Park Little League Field in the amount of $9,725.09; 5)dugout and fence repair at Cecil Reynolds Park Bellaire Field in the amount of $15,511.78; & 6)sign and climber ladder replacement at Lions Park in the amount of$8,742.25, for a total not to exceed amount of$79.909.92. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PORT ARTHUR: Section 1. That the facts and opinions in the preamble are true and correct. P. R.No. 22327 1/09/2022 ca Section 2. That the City Council hereby authorizes the City Manager to execute a contract, in substantially the same form, attached hereto as Exhibit "B", with Preferred Facilities Group of Beaumont, Texas for the repairs to Lakeside Park, Mosley Pool, County Park-Girls Field. County Park-Little League Field, Cecil Reynolds Park Bellaire Field, and Lions Park in the total not to exceed amount of$79,909.92 and will be submitted for reimbursement by insurance and/or FEMA. Section 3. That a copy of the caption of this Resolution be spread upon the Minutes of the City Council. READ, ADOPTED AND APPROVED THIS day of A.D., 2022, at a Regular Meeting of the City Council of the City of Port Arthur, by the following vote: AYES:(Mayor) Councilmembers: NOES: Thurman Bill Bartie, Mayor ATTEST: Sherri Bellard. City Secretary APPROVED AS TO FORM: L al Tizeno,Vsq., City Attorney P. R.No. 22327 1/09/2022 ca APPROVED FOR ADMINISTRATION: Ron Burton, City Manager Chandra Alpough, Director of Parks and Recreation ehekau/L.: Clifton Williams, CPPB, Purchasing Manager APPROVED AS TO AVAILABILITY OF FUNDS: kC-A. —6.A ,,r),,,,„01 Kandy Daniel,Y Interim Director of Finance P. R.No. 22327 1/09/2022 ca EXHIBIT "A" Y tf) O a) N L N 0_ N 7 7 0 N r a a a _ O O 0 0 EA Z Z Z J co I) co-0-- — a) a) e- 0 0 0 IV Ca d to 0 a a Y ui o O o v a z z z Y /Y OS 0)O 0 0 0 0. 0 'C so = c 7 c d a a a 3 +,, 2 O o 0 Z r�^ U J yg Z Z Z D t /1 Q O Z 13„. CO (I) N W IC CO W� - - = = =O >. 6 - aaaW J _J 0 0 o5 zzz UY W O o0 }' a m 0 0 0 JO aa) N C a' 0 Z 0 —I0 0 0 o o z z z Q 2 0 Y L i 0 o 0 0 o 0 0 D W c c a Ct Q rn 0 0 0 ac' ; Z Z Z = J_ W 0 w > 1- c) U E LU " E Q E E Q m ao CO m J a n 0 0 L w o 0 O 2 ++ a) U V : 7 ) EE y + C _ LPL (0 0O C.) U o C.) ai cn c m Q 2 Q m a) d d 03 P. R.No. 22327 1/09/2022 ca EXHIBIT "B" EXHIBIT A ;', 1% PREFERRED -•••%1 FACILITIES GROUP - USA 10/25/21 J. Lewis City of Port Arthur 444 S.4Tn Port Arthur,Texas 77640 Project: "Hurricane Laura Lakeside Park Repairs" Subject: "Proposal" Dear Mr. Lewis, We are pleased to submit our proposal utilizing our 581-19 Buy Board Texas Contract based on local CCI and coefficient of.89. Proposal Recap: • Furnish and install 4' section Of 24-gauge corrugated roof panel attaching to existing steel support frame. Proposal Cost $ 3,942.51 Bond (if applicable) $ Total Price $ 3,942.51 Exclusions: Unforeseen items beyond specified scope listed above,overtime, and liquidated damages. We estimate approximately ten(10) working days to complete upon material delivery. This pricing is based on recommended work hours of Monday thru Friday 7:00 am to 5:00 pm. Once accepted this proposal turns into a lump sum contract. Please contact us at 409-842-8293 at your convenience to discuss this estimate. Respectfully submitted, Preferred Facilities Group-USA Brian Shipp Project Manager cc: PFG/file 21.0163 sot. he,.st >:05 Deep E:7st Texas Ceotrui Texas Texas;uif Coast EXHIBIT B 01* PREFERRED iirookik FACILITIES GROUP - USA 10/25/21 J. Lewis City of Port Arthur 444 5.4Th Port Arthur,Texas 77640 Project: "Hurricane Laura Mosley Pool Repairs" Subject: "Proposal" Dear Mr. Lewis, We are pleased to submit our proposal utilizing our 581-19 Buy Board Texas Contract based on local CCI and coefficient of.89. Proposal Recap: • Remove,furnish, and install 552 Sq ft. ribbed corrugated metal roof to pavilion next to large pool. Proposal Cost $ 10 246.48 Bond (if applicable) $ Total Price $ 10,246.48 Exclusions: Unforeseen items beyond specified scope listed above, overtime, and liquidated damages. We estimate approximately ten(10)working days to complete upon material delivery. This pricing is based on recommended work hours of Monday thru Friday 7:00 am to 5:00 pm. Once accepted this proposal turns into a lump sum contract. Please contact us at 409-842-8293 at your convenience to discuss this estimate. Respectfully submitted, Preferred Facilities Group-USA Brian Shipp Project Manager cc: PFG/file 21.0165 ;:east Texas Deep East iexa.s Central !exc.-6 Texas rGatt Coast 01,% EXHIBIT C PREFERRED FACILITIES GROUP - USA Mailing Address: PO Box 20658 12/8/21 Beaumont, TX 77720-0658 J. Lewis O (409)842-8181 City of Port Arthur IS (409)842-2274 444 S.4Th pfg@pfg-usa.com Port Arthur,Texas 77640 40, pfg-usa.com Project: "Hurricane Laura County Park Girls Field" Job Order Contracting Subject: "Proposal" Co-Op Purchasing Agreements Dear Mr. Lewis, Indefinite Delivery,Indefinite We are pleased to submit our rough order magnitude proposal utilizing our 581-19 Buy Board Quantity-ID1Q Texas Contract based on local CCI and coefficient of.89. Multiple Award Construction Contracts-MACC Proposal Recap: • Furnish and Install 25'x14'fabric canopies with tension cables and hardware. Task Order Contracts • Remove and replace bottom row 8"w x 14'L metal bleacher and attach.Secure T oC structure to concrete pad. • Remove furnish and replace bottom row bleacher metal brackets 8"X9". Construction Management— • Remove and replace 50'x4'section of metal chain link fence with galvanized posts and Agent or At-Risk top brackets. Proposal Cost $ 30,967.62 Design Build Bond (if applicable) $ 774.19 Total Price $ 31,741.81 Government Commercial Exclusions: Unforeseen items beyond specified scope listed above,overtime,and liquidated damages. Education We estimate approximately fifteen(15)working days to complete upon material delivery. Industrial This pricing is based on recommended work hours of Monday thru Friday 7:00 am to 5:00 pm. Once accepted this proposal turns into a lump sum contract. Please contact us at 409-842-8293 Infrastructure at your convenience to discuss this estimate. Respectfully submitted, Communications Preferred Faci ' 'es Group-USA Corporate/Retail - -- Brian Shipp Assembly Project Manager cc: PFG/file 21.0161 Southeast Texas Deep East Texas Central Texos Texas Gulf Coast EXHIBIT I) PREFERRED 00" FACILITIES GROUP - USA Mailing Address. PO Box 20653 12/8/21 Beaumont,TX 77720-0658 J. Lewis O (409)842-8181 City of Port Arthur a (409)842-2274 444 S.4Th pfg@pfg-usa.com Port Arthur,Texas 77640 pfg-usa.com Project: "Hurricane Laura County Park Little Field Repairs" Job Order Contracting Subject: "Proposal" Co-Op Purchasing Agreements Dear Mr. Lewis, Indefinite Delivery,Indefinite We are pleased to submit our rough order magnitude proposal utilizing our 581-19 Buy Board Quantity-IDIQ Texas Contract based on local CCI and coefficient of.89. Multiple Award Construction Proposal Recap: Contracts-MACC • Furnish and replace 1 metal dugout roof. • Furnish and replace 1 metal roof over bleachers. Task Order Contracts TOC Proposal Cost $ 9,725.09 Bond (if applicable) $ Construction Management- Total Price $ 9,725.09 Agent or At-Risk Design Build Exclusions: Unforeseen items beyond specified scope listed above, overtime, and liquidated damages. Government We estimate approximately ten(10)working days to complete upon material delivery. Commercial This pricing is based on recommended work hours of Monday thru Friday 7:00 am to 5:00 pm. Once accepted this proposal turns into a lump sum contract. Please contact us at 409-842-8293 Education at your convenience to discuss this estimate. Respectfully submitted, Industrial Preferred Facilities Group-USA Infrastructure Brian Shipp Project Manager Communications cc: PFG/file :1.0162 Corporate/Retoil Assembly Southeast Texas Deep East Texas Central Texas Texas Gulf Coast EXHIBIT E 1 PREFERRED FACILITIES GROUP - USA Mailing Address: PO Box 20658 12/8/21 Beaumont, rx 77720-0658 J. Lewis 0 (409)842-8181 City of Port Arthur e (409)842-2274 444 5.4Th • pfg@pfg-usa.com Port Arthur,Texas 77640 yew pfg-usa.corn Project: "Hurricane Laura Bellaire Cecil Repairs" Job Order Contracting Subject: "Proposal" Co-Op Purchasing Agreements Dear Mr. Lewis, Indefinite Delivery,Indefinite We are pleased to submit our rough order magnitude proposal utilizing our 581-19 Buy Board Quantity-IDIQ Texas Contract based on local CCI and coefficient of.89. Multiple Award Construction Contracts-MACC Proposal Recap: • Furnish&install 36.5'x 8'corrugated metal roof on cinder block dugout. Task Order Contracts • 4"channel support beam attached to top of brick dugout. TOC • Metal support brackets. • 2.2'x 4' corrugated metal panels with screws. Construction Management- • Furnish&install metal chain link fence with gates. Agent or At-Risk • 38.9'x 7.5' chain link fence. • 9' 2-3/8 OD gal. fence poles. Design Build • 7.5'x 4' metal chain link gates. • 8' 1-5/8 OD pole for gate. • 4' 1-5/8 OD gal. pole for gate. Government • 4.4'x 3.8' chain link gate. • Furnish and install section of metal link fence(first base line softball field). Commercial • 27.3'x 3.8' chain link fence. • 3'x 4'chain link gate. Education Proposal Cost $ 15,511.78 • Industrial Bond (if applicable) $ Total Price $ 15,511.78 Infrastructure Communications Corporate/Retail Assembly Southeast Texas Deep East Texas Central Texas Texas Gulf Coast 0000,144k PREFERRED 00"4 FACILITIES GROUP - USA Mailing Address: Exclusions: PO Box 20658 Beaumont, TX 77720-0658 Unforeseen items beyond specified scope listed above,overtime, and liquidated damages. O (409)842-8181 (409)342-2274 We estimate approximately fifteen(15)working days to complete upon material delivery. pfg@pfg-+uacom v pfg-usa.com This pricing is based on recommended work hours of Monday thru Friday 7:00 am to 5:00 pm. Once accepted this proposal turns into a lump sum contract. Please contact us at 409-842-8293 Job Order Contracting at your convenience to discuss this estimate. Co-Op Purchasing Agreements Respectfully submitted, Preferred Facilities Group-USA Indefinite Delivery,Indefinite Quantity-IDIQ __ Multiple Award Construction Brian Shipp Contracts-MACC Project Manager Task Order Contracts cc: PFG/file 21.0160 TOC Construction Management— Agent or At-Risk Design Build Government Commercial Education Industrial Infrastructure Communications Corporate/Retail Assembly Southeast Texas Deep East Texas Central Texas Texas Gulf Coast EXHIBIT F . PREFERRED 000,01N FACILITIES GROUP - USA Mailing Address: PO Box 20658 12/8/21 Beaumont,TX 77720-0658 J. Lewis el (409)842-8181 City of Port Arthur a (409)842-2274 444 S.4Th pfg@pfg-usa.com Port Arthur,Texas 77640 pfg•usa.com Project: "Hurricane Laura Lions Park Repairs" Job Order Contracting Subject: "Proposal" Co-Op Purchasing Agreements Dear Mr. Lewis, Indefinite Delivery,Indefinite We are pleased to submit our rough order magnitude proposal utilizing our 581-19 Buy Board Quantity-IDIQ Texas Contract based on local CCI and coefficient of.89. Multiple Award Construction Proposal Recap: Contracts-MACC • Furnish and install%"treated plywood sign 4x8. • Remove,furnish, replace and install 8'6"x8'6"sign frame. Task Order Contracts • Furnish and install 4.6'x2.5"corrugated metal panel. TOC • Furnish and install 4.9'x4.3'climber ladder installed with brackets and mounted to floor pad. Construction Management— Agent or At-Risk Proposal Cost $ 8,742.25 Bond (if applicable) $ Design Build Total Price $ 8,742.25 Government Exclusions: Commercial Unforeseen items beyond specified scope listed above,overtime,and liquidated damages. We estimate approximately ten(10)working days to complete upon material delivery. Education This pricing is based on recommended work hours of Monday thru Friday 7:00 am to 5:00 pm. Industrial Once accepted this proposal turns into a lump sum contract. Please contact us at 409-842-8293 at your convenience to discuss this estimate. Infrastructure Respectfully submitted, Preferred fa ilities Group-USA Communications l Brian Shipp Corporate/Retail Project Manager cc: PFG/file Assembly 21-0164 OY"41 Southeast Texas Deep Eost Texas Central Texas Texas Gulf Coast