HomeMy WebLinkAboutPR 22332: SLUDGE PROCESSING AT THE WASTEWATER TREATMENT PLANTS City of t rthu Texas INTEROFFICE MEMORANDUM Date: January 20, 2022 To: The Honorable Mayor and City Council Through: Ronald Burton, City Manager From: Calvin Matthews, P.E., Water Utilities Director RE: PR 22332—Sludge Processing at the Wastewater Treatment Plants Introduction: The Wastewater Treatment Plants (WWTPs) have had ongoing issues with their dewatering centrifuges' operational capabilities.The centrifuges are used to dewater excess biological solids (sludge) which build up within the WWTP as part of the biological treatment process. With the centrifuges offline at the Port Acres WWTP, due to delays in obtaining repair parts, the solids built up in the plant to the level the plant was facing potential sludge overflow. This could cause the plant to exceed its permitted discharge limit. To prevent this, the excess or waste solids had to be removed from the process. The removal of the solids required an alternative method of dewatering to allow disposal at the City's landfill. Due to the importance of excess sludge removal from activated sludge WWTPs and the lack of standby centrifuges at the City's WWTPs,bids were received by the Water Utilities Department for emergency waste sludge dewatering and hauling. Sprint Waste Services was the lowest,most responsible bidder and was contracted to process sludge with a mobile belt press and haul it to the City's landfill. Due to repair delays to the centrifuges at the City's WWTPs and the inability to operate the plant without this required service, the original contract sum of $80,000 was exceeded and needs to be increased by $10,777.76 to $90,777.76. This funding will cover the existing amount owed to Sprint Waste.This amount is within the allowable 25%limit of contract increases.After this payment,the contract will be terminated and a new contract will be bid.The requested total projected budgetary amount of this proposed resolution is budgeted for in Account No. 410-40-225-5470-00-00-000, Other Contractual Services. "Remember,we are here to serve the Citizens of Port Arthur" City of r,rr rtftur Texas Background: The Wastewater Treatment Plants' centrifuges have been in various stages of repair and out of service due to delays in parts delivery. To accommodate the daily flow of waste and to prevent potential sludge overflow, Sprint Waste Services was contracted to press and haul away waste. Budget Impact: The contract needs to be increased by $10,777.76 to the new budgetary amount of$90,777.76, and is budgeted for in Account No. 410-40-225-5470-00-00-000, Other Contractual Services. Recommendation: It is recommended that Council approve Proposed Resolution No. 22332, approving the increased contract amount to Sprint Waste Services as outlined/discussed above. "Remember, we are here to serve the Citizens of Port Arthur" P. R. No. 22332 1/20/22 bw Page 1 of 3 RESOLUTION NO. A RESOLUTION AUTHORIZING THE CITY MANAGER TO AMEND THE SLUDGE DEWATERING CONTRACT WITH SPRINT WASTE OF TEXAS,LP OF PORT ARTHUR, TEXAS, INCREASING THE ORIGINAL CONTACT AMOUNT BY $10,777.76 TO A NEW TOTAL NOT TO EXCEED AMOUNT OF $90,777.76; FUNDING AVAILABLE IN ACCOUNT NO. 410-40-225-5470-00-00-000, OTHER CONTRACTUAL SERVICES. WHEREAS, pursuant to Resolution No. 21-210, City Council approved a dewatering contract with Sprint Waste of Texas, LP in a total not to exceed amount of$80,000.00; and, WHEREAS, due to repair delays to the centrifuges for the Wastewater Treatment Plants (WWTPs), the contract with Sprint Waste had to be extended, costing the City an additional $10,777.76,thereby increasing the original contract amount to a new total of$90,777.76; and, WHEREAS,the original contract was authorized pursuant to Section 252.022(a)(3)of the Texas Local Government Code because of the unforeseen damage to public machinery,equipment, or other property. NOW THEREFORE,BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PORT ARTHUR: THAT,the facts and opinions in the preamble are true and correct; and, THAT, the sludge dewatering contract with Sprint Waste is hereby amended to increase the original contract amount by $10,777.76 to a new total not to exceed amount of$90,777.76. THAT,the funding is budgeted and available in Account No. 410-40-225-5470-00-00-000 (Other Professional Services); and, THAT, a copy of the caption of this Resolution shall be spread upon the Minutes of the Meeting of the City Council. P. R. No. 22332 1/20/22 bw Page 2 of 3 READ, ADOPTED, AND APPROVED this day of , 2022 at a Regular Meeting of the City Council of the City of Port Arthur, Texas by the following vote: AYES: Mayor Councilmembers: NOES: Thurman"Bill"Bartie Mayor ATTEST: Sherri Bellard City Secretary APPROVED AS TO FORM: Ui' -bAitA41,� alecia Tiz o City Attome APPROVED FOR ADMINISTRATION: Ronald Burton Calvin Matthews, P.E. City Manager Water Utilities Director P. R. No. 22332 1/20/22 bw Page 3 of 3 APPROVED AS TO THE AVAILABILITY OF FUNDS: (� 1 n�J 1 ) ;ri� l c/�1CL Kandy Daniel Clifton Williams, CPPB Interim Director of Finance Purchasing Manager AGREED TO: SPRINT WASTE OF TEXAS By: Print Name Title