HomeMy WebLinkAboutPR 12147:BARBARA JACKET PARKCITY OF PORT ARTHUR
MEMORANDUM
TO: Stephen B. Fitzgibbons, City Manager DATE: 04/09/03
FROM: Dr. Albert T. Thigpen, Interim Director of Parks and Recreation' -
RE: P. R. # 12147, A Resolution Authorizing Phase II of the Barbara Jacket
[Gillham Circle] Park Conceptual Plan Improvements to Arceneaux and
Gates Consulting Engineering, Inc. At A Not To Exceed Cost of $10,000.
Fund No. S0~-I G01-591.59, Project No. CIP 1 I0
Recommendation
COMMENT
I recommend that the City Council adopt Proposed Resolution No. 12147
authorizing the City Manager to execute a contract with Arceneaux and
Gates Consulting Engineering, Inc. to proceed with Phase II of the Barbara
Jacket (Gillham Circle) Park Conceptual Ran Improvements at a not to
exceed cost of $ I 0,000.
Backgrouno
The Parks and Recreation Department at the request ofthe City Council and
City Manager has been engaged in a orocess to identify ~mprovements for
Barbara Jacket Park Said process has been divided ~nto two [2) phases.
Phase I culminated ~n a reoort to City Council by Ron Arceneaux and staff
delineating design parameters for a walking trai and other improvements.
City Council orovided additional ideas and concepts they wanted explored.
This resolution authorizes the Arceneaux and Gates Consulting Engineering,
Inc. firm to proceed with additional analysis of design and grant possibilities
in accordance with City Council and administration requests.
P. R. 12147 CAM Arceneaux and Gates Engr.
Barbara Jacket Park
Page 2
Budqetary/Fiscal Effect
Approval of this resolution would authorize expenditure of funds up to
$1 O, 000 from Fund No. 301-1601-591.59-00, Project No. CIP 110
[Capital Projects and other Contractual Services, EDC Youth Projects].
Funds are available for this purpose.
Employee/Staff Effect
None
Summary
I recommend that the City Council adopt Proposed Resolution No. 12147
authorizing the City Manager to execute a contract with Arceneaux and
Gates Consulting Engineering, Inc. to proceed with Phase of the Barbara
Jacket (Gillham Circle) Park Conceptual Plan Improvements at a not to
exceed cost of $10,000.
P.R. No. 12147
Resolution No.
A RESOLUTION AUTHORIZING PHASE II OF THE BARBARA
JACKET (GILLHAM CIRCLEI PARK CONCEPTUAL PLAN
IMPROVEMENTS TO ARCENEAUX & GATES CONSULTING
ENGINEERING, INC. AT A NOT TO EXCEED COST OF $10.000.
FUND NO. 301-1601-591.59-00, PROJECT NO. CIP 110.
Whereas. Phase I has been completed as authorized by the City Manager;
Whereas, the City Council of the City of Port Arthur is desirous of examining
potential park improvements and alternatives at Barbara Jacket Park; and.
Whereas, the City Council after receiving an initial Phase I report from Arceneaux
& Gates Consulting Engineering, Inc. on potential park uses, impmvements and
alternatives requested further investigation; and,
Whereas, the firm of Arceneaux & Gates Consulting Engineering, Inc. possesses
the necessary, professional training and has done slgnifican! preliminary
background work on project work to provide improvements to Barbara Jacket Park,
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE
CITY OF PORT ARTHUR THAT. the City Manager is hereby authorized to enter
into the agreement with the firm of Arceneaux and Gates Consulting Engineering,
Inc. to provide professional engineering work in accordance with scope of work
proposal attached hereto, and made part hereof, as Exhibit "A" for Phase II- Park
Conceptual Master Plan for Barbara Jacket Park at a cost not to exceed $10,000.
THAT, a copy of the caption of this Resolution be spread upon the Minutes of the
City Council..
READ, ADOPTED, AND APPROVED THIS
day of , A.D.,
2003, at a Regular Meetings of the City Council of the City of Port Arthur, by the following
vote: MAYOR
AYES:
NOES:
ATTEST:
Evangeline Green, City Secretary
APPROVED AS TO FORM:
Mark Sokolow. City Attorney
APPROVED AS TO ADMINISTRATION:
Stephen B. Fitzgibbons, City Manager
R~.0~.~OVED A~Q AVAILABILITY OF FUNDS:
Rebecca Underhill, Director of Finance
MAYOR
Exhibit A
ARCENEAUX & GATES
Consulting Engineers, Inc.
Engineers · Surveyors · Planners
August 26, 2002
Dr. Albert T. Thigpen
Assistant DirecTor of Human Resources
Ct%Y OF PO~T ARTHUR
PO Box 1089
Port Arthur. Texas 77641-1089
Proposal for Professional Services
]rnprovements for Barbara Jacket Park
Port Arthur, Texas - File No. 02-CPA-260
Dear Dr. Thigpen:
Thank you for requesting our Proposal to conduct a preliminary engineering study to evaluate
proposed improvements at Barbara Jacket Park. n particular, the study is defined as a two-
phase process to consider the scope of initial hiking trail, parking and lighting improvements
and to prepare a master conceptual plan for the park. We recommend service levels, more
fully described below, to complete the two phases of work.
SCOPE OF BASIC SERVICES
Phase I - Hikin(~ Trail Improvements Plan
Gather existing records from the Cit~/ such as aerial phOtos, construction plans,
reports, etc. relating to the park and adjacent street right-of-way.
· 2, Investigate current standards of the American Association of State Highway
Transportation Officials (AASHTO) for hike and bike trails.
Prepare alternative cross section exhibits illustrating design of single or multi-purpose
use trail.
Investigate possible construction materials and report on advantage/disadvantage of
each.
5. Prepare a preliminary conceptual alignment for primary and secondary hiking trails.
One Turtle Creek Square 3501 Turtle Creek Dr~ve, Suite 102 Port Arthur. Texas 77642 (409) 724-7888 FAX {409) 724-1447
Dr. Albert T. Thigpen
City of Port Arthur
August'26, 2002
Page Two
6. Investigate the need for parking and lighting improvements to support the trails.
7. Prepare preliminary estimate of probable construction cost for Phase I improvements.
Phase II - Park Conceptual Master Plan
Utilizing information developed in Phase I, complete a master plan for developing and
improving Barbara Jacket Park with other amenities. Concepts will consider the
eventual removal of elevated storage tank. Areas of study will consider alternatives for
constructing additional parking, lighting, drainage, landscaping, accessibility,
playground equipment, baseball field(s), basketball courts, multi-use pavilions and
similar park improvements.
Investigate the possible use of Texas Parks and Wildlife Department grant programs
to implement both Phase I and Phase II plans.
Update the site concept drawing with topographic survey provided by the City.
Prepare a letter report with exhibit(s) for use by '[he City including preliminary estimate
of probable construction cost for each component of the park improvements included
in the master plan.
COMPENSATION AND SCHEDULE
We propose a professional fee in the amount of Four Thousand Five Hundred Dollars
($4,500.00) for Phase I Services and a professional fee not exceeding the amount of Seven
Thousand Five Hundred Dollars ($7,500.00) for Phase II Services. We will bill monthly for
services directly chargeable to this project on the basis of the attached Schedule of Rates for
Professional Services. Upon authorization to proceed, the Phase I Services can be
completed within 45 days. The Phase II Services can be completed within 75 after
authorization. We purpose to establish a contingency fee of $2500.00 for
public meetings, additional research, and other misc. cost.
Dr. Albert T. ThigPen
City of Port Arthur
August, 26. 2002
Page Three
We look forward to working with you and our staff in this assignment.
q uestions about our Proposal, please contact me.
Very truly yours,
ARCENEA UX & GATES CONSULTING ENGINEERS, INC.
If you have any
Ro~ PE, PLS ~
President/~EO ' /
Enclosure: Schedule of Rates
ACP, EED TO:
C~TY OF POKT ARTflOK
BY: STEPHEN FITZGIBBONS
CITY MANAGER