HomeMy WebLinkAboutA. HGAC (THROUGH HOUSTON FREIGHTLINER) - PURCHASE 3 EIGHT CY DUMP TRUCKSCity of Port Arthur, Texas
Mayor and City Council Communication
DATE: REFERENCE N0. SUBJECT: Page:
625-1801- Authorize Purchase of Three (3) -Eight (8) CY
21 May 09 531.93-04 Dump Trucks for Drainage Division 1 of 1
RECOMMENDATION:
We recommend that the City Council authorize the purchase of three (3) -eight (8) CY dump
trucks, from H-GAC through Houston Freightliner, Sterling and Western Star of Houston,
Texas for an amount of $200,878.
BACKGROUND:
In Ordinance 09-03, the City Council authorized the creation of a new drainage crew for
increased ditching operations. This four-person crew requires a Gradall, a service truck, and
three eight-cubic yard dump trucks. This crew and equipment will be used for drainage
improvements throughout the city, reducing the amount of time required for cleaning and
regrading ditches city-wide. The Gradall has already been purchased, with the other
equipment to be purchased soon.
We have received an H-GAC quote for this equipment as follows:
ITEM uanti Unit Price
H-GAC 8 CY dump truck from Houston 3 $ 66,626
Freightliner, Sterling and Western Star
HG-AC Fee $ 1,000
TOTAL $ 200,878
BUDGETARY/FISCAL EFFECT:
Funds are available in account 625-1801-531.93-04.
EMPLOYEE/STAFF EFFECT:
Purchase of these vehicles will allow the Drainage Division to increase ditching maintenance
activities and other City projects.
SUMMARY:
We recommend that the City Council authorize the purchase of three (3) -eight (8) CY dump
trucks, from H-GAC through Houston Freightliner, Sterling and Western Star of Houston,
Texas for an amount of $200,878.
~~
~
DC~ •G~
e,ti~
~ ~ L_ ~~~ ~
Ross E. Blackketter, P.E. Deborah Echols, CPA
Direc t5r of Public ork/s J Director of Finance
i~ r' ~ .~S-v~
awna Tubbs
Purchasing Manager
PREPARED BY: DISPOSTnON OF CIfY COUNCIL: PROCESSED BY:
REB reb
APPROVED BY: APPROVED OTHER
C' Mana er COMMENTS: Ci Secrets
Z:~xngineertdocument55CAMS13xDumpTrudcs-GoId09.xls 5!22/2009
_I II~~ CONTRACT PRICING WORKSHEET
t ~/ `._/ For Standard Equipment Purchases Contract Hill-07
No.: Date ~ 5!22/2009
Prepared:
This Form must be prepared by Contractor, and provided to End User Jo attach to Purchase Order, with copy to H-GAC
The H-GAC administrative jee shall be calculated and shown as a separate line item. Please type or print legibly.
aoymg :City of Port Arthur
Agency: Contrnecor: :Houston Freightliner/Sterling
Pers°no ;Clifton Williams P B "d iMichael McCarthy
Phone: Phone: 1713-580-8122
Ps:: ra:: :713-672-9449
e,naa: Eo,a~;: m mccarthv(c~strhouston. com
P,vdnct EB
Code: oeseripnoo: i 2010 Freightliner M2-106-70
A. Product Item Base Unit Price Per Contractor's H-GAC Contract: sa6sat
B. Published Options -Itemize below -Attach additional sheet(s) if necessary -Include Option Code in description if applicable.
(Note: Published Options aze options which were submitted and priced in Contractor's bid.)
Description Cost Description Cost
Vertical Exhaust 0 Back Up Alarm 20
Allison 3500 RDS Automatic Transmission 5384 Vehicle Interface for Body Builder 130
158" Wheelbase 63 Cummins ISB 260 HP 1131
l l/32x3.5x10 5/16 Frame 151 Horiz MufilerNertical Exhaust Step Mtd 331
Front Tow Hooks 23 2009 Model Year Increase 1750
Air Conditioner 341 BW AD-9 Air Dryer 131
.
Single Air Horn 43 Subtotal From Additional Sheet(s):
9144
it Cab Mounts 50 Subtotal B: 18692
C. Unpublished Options -Itemize below /attach additional sheet(s) if necessary..
(Note: Unpublished options are items which were not submitted and priced in Contractor's bid.)
Description Cost Description Cost
0
0
~
- Subtotal From Additional Sheet(s):
~
Subtotal C: 0
Check: Total cost of Unpublished Options (C) cannot exceed 25% of the total of the Base Unit: For this transaction the percentage is:
Price plus Published Options (A+B).
. Otber Cost Items Not Itemized Above (e.g. Installation, Freight, Delivery, Etc.)
Description Cost Description Cost
Freight 1093
Subtotal D: € 1093
. Total Cost Before Any Applicable Trade-In /Other Allowances /Discounts (A+B+C+D) - 66626
Quantity Ordered:~3 X SubtotalofA+B+C+D: 66626 = SubtotalE:s 199878
F. H-GAC Fee Calculation (From Curren[ Fee Tables) Subtotal F: S 1000
G. Trade-Ins /Other Allowances /Special Discounts
Description Cost Description Cost
Subtotal C-
Delivery Date:: H. Total Purchase Price (E+F+G): zoos7g
CONTRACT PRICING WORKSHEET
For Standard Equipment Purchases Contract HTll-07
No.: Date 5/21/2009
Prepared:
This Form mast be prepared by Contractor, and provided to End User to attach to Purchase Order with copy to H-GAC.
The H-GAC administralrve jee steal! be calculated and shown as a separate line kem. Please type ar print legibly.
a°Y1°g ;City of Port Arthur
Agency: contraeror: :Houston Freightliner/Sterling
eonmcr :Clifton Williams
Person: PreParea :Michael McCarthy
BY:
Phooe: Phone: 1713-580-8122
Paa: P,z: ;713-672-9449
emaa: EmaJ: mmccarthv(o~strhouston.com
Pmd°`~ EB
coae: Description: i 2009 Freightliner M2-106-70
A. Product Item Base Unit Price Per Contractor's H-GAC Contract:
B. Published Options -Itemize below -Attach additional sheet(s) if necessary -Include Option Code in description if applicable.
(Note: Published Options are options which were submitted and priced in Contractor s bid.)
Description Cost Description Cost
10' 6-8 CU YD Dump Body 8725
Cab Shield 244
Dump Apron #80 175
0
Subtotal From Additional Sheet(s):.
Subtotal B: 9144
C. Unpublished Options -Itemize below /attach additional sheet(s) if necessary.
(Note: Unpublished options are items which were not submitted and priced in Contractor s bid)
Description Cost Description Cos[
'
Subtotal From Additional Sheet(s):
~
Subtotal C: 's 0
Check: Total cos[ of Unpublished Options (C) cannot exceed 25% of the total of the Base Uni[i For this transaction the percentage is: 0%
Price plus Published Options (A+B).
D. Other Cost Items Not Itemized Above (e.g. Installation, Freight, Delivery, Etc.)
Description Cost Description Cost
Subtotal D: i 0
. Total Cost Before Any Applicable Trade-In /Other Allowances /Discounts (A+B+C+D) 9144
Quantity Ordered: ~ X Subtotal ofA+B+C+D: 9144 - Subtotal E: i 0
F. H-GAC Fee Calculation (From Current Fee Tables) - Subtotal F: [
. Trade-Ins /Other Allowances /Special Discounts -
Description Cost Description Cost
Subtotal G: i 0
Delivery Date:: H. Total Purchase Price (E+F+G):