Loading...
HomeMy WebLinkAboutPR 22366: UPDRADE OF THE LEACHATE ELECTRICAL PANELS AT THE LANDFILL City of litort rthr�— www.PortArthurTx.gov INTEROFFICE MEMORANDUM Date: February 08, 2022 To: The Honorable Mayor and City Council Through: Ronald Burton,City Manager eitt From: Flozelle C. Roberts, EIT, MEng, MBA, Director of Public Work W RE: P.R.No. 22366—Upgrade of the leachate electrical panels at the andfill Introduction: This agenda item seeks City Council's authorization to purchase new leachate electrical panels at the Landfill. Background: Leachate,rain water that filters through the wastes at the landfill, must be collected and disposed of via a pumping system in accordance with state and federal regulations. The system's containers and electrical components, which include stainless steel outer doors, a disconnect switch,a level meter,and conduit, require replacement. Staff requested quotes for the replacement material from three (3)vendors, and Quest Services, LLC of Ferris, Texas, presented the lowest quote of$34,047.96. Budget Impact: Funding is available in the Other Contractual Services, account number 403-50-320-5470-00- 00-000. "Remember,we are here to serve the Citizens of Port Arthur" 444 4th Street X Port Arthur,Texas 77641-1089 X 409.983.8182 X FAX 409.983.8294 Recommendation: It is recommended that the City Council approves P.R. 22366 authorizing the replacement of the leachate panel materials for the Landfill by Quest Services, LLC of Ferris,Texas. "Remember,we are here to serve the Citizens of Port Arthur" P.O.Box 1089 X Port Arthur,Texas 77641-1089 X 409.983.8101 X FAX 409.982.6743 P.R.22366 02/08/2022 meg/JM Page 1 of 4 RESOLUTION NO. A RESOLUTION AUTHORIZING THE CITY MANAGER TO EXECUTE A CONTRACT WITH QUEST, LLC. OF FERRIS, TEXAS FOR THE UPGRADE OF THE LEACHATE PANELS AT THE CITY'S LANDFILL SYSTEM, WITH A PROJECTED BUDGETARY IMPACT AMOUNT OF $34,047.96.FUNDING IS AVAILABLE IN THE SOLID WASTE LANDFILL OTHER CONTRACTUAL SERVICES ACCOUNT NUMBER 403-50-320- 5470-00-00-000. WHEREAS, the City of Port Arthur Landfill generates leachate that requires collection and disposal via a pumping system; and, WHEREAS,the pumping system's containers and electrical components, which includes stainless steel outer doors, a disconnect switch, a level meter, and conduit require replacement; and, WHEREAS, city staff solicitated and received three (3) quotes for the replacement material,and Quest Services,LLC of Ferris,Texas,provided the lowest and most responsive quote of$34,047.96 (see Exhibit A); now,therefore; BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PORT ARTHUR: THAT, the facts and opinions in the preamble are true and correct; and, THAT, the City Council of the City of Port Arthur hereby authorizes the City Manager to execute a contract,in substantially the same form,attached hereto as Exhibit"B",with Quest,LLC of Ferris, Texas for the upgrade of leachate electrical panels and various components, with a projected budgetary impact amount of$34,047.96; and, THAT. a copy of the caption of this Resolution be spread upon the Minutes of the City Council. P.R.22366 02/08/2022 MEG/JM Page 2 of 3 READ, ADOPTED AND APPROVED this the day of , A.D. 2022 at a meeting of the City of Port Arthur, Texas by the following vote: Ayes: Mayor: Councilmembers: Noes: Thurman "Bill" Bartie Mayor ATTEST: Sherri Bellard City Secretary APPROVED AS TO FORM: APPROVED FOR ADMINISTRATION: , S111-4tiAlrd- 41- 64cl/ Valecia Ti eno, Esq. Ronald Burton City Attorney City Manager P. R.22366 02/08/2022 MEG/JM Page 3 of 3 APPROVED AS FOR AVAILABILITY OF FUNDS: Kandy Kel Interim Director of Finance Flozelle C. Roberts, EIT, MEng, MBA Director of Public Works Clifton Williams, CPPB Purchasing Manager P. R. 22366 02/08/2022 MEG/JM Page 4 of 4 EXHIBIT "A" � d o z en o z w C n � y Cz N O Q N 7.1 Crs CA N tEl 1-3 4 P. R.22366 02/08/2022 MEG/JM Page 4 of 4 EXHIBIT "B" CONTRACT FOR REPAIRS TO LEACHATE ELECTRICAL PANEL SYSTEMS THIS AGREEMENT,made this day of , 2022, by and between the City of Port Arthur, a municipal corporation organized under the laws of the State of Texas, hereinafter called "OWNER" or "CITY" and Quest Services, LLC a limited liability corporation herein acting by and through hereinafter called "CONTRACTOR". WITNESSETH: That for and in consideration of the payment terms, conditions and agreements set forth herein, OWNER and CONTRACTOR agree as follows: 1. The term of this Contract shall be 90 days from start date on Notice to Proceed. The City can terminate this contract at its convenience which includes, but is not limited to, funding not being available in any budget cycle with thirty (30) days written notice. 2. The Contractor will perform work as specified in the attached contract documents. 3. During the term of this Contract,the Contractor will furnish at his own expense all of the materials, supplies, tools, equipment, labor and other services necessary to connection therewith, excepting those supplies specifically not required of Contractor in the Specifications. 4. The CONTRACTOR agrees to perform all the work described in the specifications and contract documents and to comply with the terms therein for the not to exceed sum of$34,047.96. 5. The term "Contract Documents" means and includes the following: a) Agreement b) Bid/Quote/Estimate c) Notice of Award d) Notice to Proceed 6. This Agreement shall be binding upon all parties hereto and their respective heirs, executors, administrators, successors and assigns. 7. IN WITNESS WHEREOF, the parties hereto have executed, or caused to be executed by their duly authorized officials, this Agreement in (2 copies) each of which shall be deemed an original on the date first above written. A- 1 Signed on the day of 2022. ATTEST CITY OF PORT ARTHUR BY Sherri Bellard, Ronald Burton, CITY SECRETARY CITY MANAGER Signed on the day of 2022. WITNESS: CONTRACTOR: QUEST SERVICES,LLC By Print Name: Print Name: Title: A-2 Quest, LLC getvic Estimate 4142 FM 660 Ferris,TX 75125 Date Estimate# es 1/17/2022 1050-2181 Name/Address City of Port Arthur Landfill 4732 West Hwy Texas 73 ' Beaumont,TX 77705 Project Site Assessment Jul... Description Qty Rate Total January 2022 REVISED ESTIMATE WITH UPDATED PRICING: July 2021 Site Assessment at City of Port Arthur Landfill: As requested per Justin Thomas.Travel to site to evaluate risers for any needed repairs/maintenance. LCR-42: Needed repairs at riser location: -new stainless steel outer door -new complete disconnect switch -new level meter -conduit needs to be sealed LCR-43: Needed repairs at riser location: -new stainless steel outer door -new complete disconnect switch -new level meter -conduit needs to be sealed LCR-44: Needed repairs at riser location: -new break out box -conduit needs to be sealed -door gasket(ants) LCR-44B: Needed repairs at riser location: -new break out box -conduit needs to be sealed -door gasket(ants) QUEST appreciates your business! Subtotal Sales Tax (0.0%) Total Page 1 _' ► Quest, LLC Estimate 4142 FM 660 Ferris,TX 75125 Date Estimate# WVices <-0 1/17/2022 1050-2181 Name/Address City of Port Arthur Landfill 4732 West Hwy Texas 73 Beaumont,TX 77705 Project Site Assessment July... Description Qty Rate Total LCR-45: Needed repairs at riser location: -new break out box -conduit needs to be sealed -replace door gasket(ants) LCR-46: Needed repairs at riser location: -new stainless steel panel -new conduit-rewired power source —motor/pump end/transducer Mobilization 1 1,500.00 1,500.00T Labor Principal 1 4,500.00 4,500.00T Per Diem 1 2,000.00 2,000.00T Electrical 1 5,500.00 5,500.00T Materials 1 17,547.96 17,547.96T Misc Materials:If needed as per e-mail request 1 3,000.00 3,000.00T *Pricing DOES NOT include any freight costs. *Tax not included-tax exempt certificate required. *Pricing valid for thirty(30)days from estimate date. OI lEST appreciates your business! Subtotal Sales Tax (0.0%) Total Page 2 Opri Quest,LLC Estimate t 4142 FM 660 ,,,"...4j1 Ferris, TX 75125 Date Estimate# getvices,e 1/17/2022 1050-2181 Name/Address City of Port Arthur Landfill 4732 West Hwy Texas 73 Beaumont,TX 77705 Project Site Assessment July... Description Qty Rate Total ----µ—CHANGE ORDER---- January 17,2022 >Increased price of Mobilization from$1,200.00 to$1,500.00. (+$300.00) >Increased price of Labor-Principal from$4,000.00 to$4,500.00. (+$500.00) >Increased price of Per Diem from$1,800.00 to$2,000.00. (+$200.00) >Increased price of Sub Contractor from$4,000.00 to$5,500.00. (+$1,500.00) >Increased price of Parts from$14,247.85 to$17,547.96. (+$3,300.11) >Added 1 Parts.(+$3,000.00) Total change to estimate+$8,800.11 QUEST appreciates your business! Subtotal $34,047.96 Sales Tax (0.0%) moo Total $34,047.96 Page 3