HomeMy WebLinkAboutPR 22464: CHANGE ORDER NO. 2 TO THE CONTRACT WITH ELITE CONTRACTORS & EQUIPMENT LTD AND CERTIFICATE OF COMPLETION City of 1,11\\41 ort rthut� www.PortArthurTx.gov INTEROFFICE MEMORANDUM Date: March 23, 2022 To: The Honorable Mayor and City Council Through: Ron Burton; City Manager From: Flozelle C.Roberts,EIT,MEng, MBA; Director of Public Works RE: P.R. 22464: Lakeshore Drive Phase 3 & 4 Roadway Reconstruction Project-Close Out, Change Order No. 2, and Release of Retainage; Project No. ST1P44-CON Introduction: The intent of this agenda item is to authorize the City Manager to accept the Close Out Documents, Change Order No. 2 and release retainage in the amount of $111,622.85 for the Lakeshore Drive Phase 3 & 4 Roadway Reconstruction Project. Background: Pursuant to Resolution No.20-148,Elite Contractors&Equipment,LTD of Kirbyville,Texas was awarded the project for the Lakeshore Drive Phase 3&4 Roadway Reconstruction Project. The awarded project had a budgetary impact of$2,599,396.00 for a contract period of 300 calendar days. Change Order No. 1 was approved by Council pursuant to Resolution 21-250 for the addition of 68 calendar days changing the original contract completion date from May 23,2021to the new contract completion date of July 30, 2021. Change Order No. 2 is being submitted by Elite Contractors & Equipment, LTD of Kirbyville, Texas to reflect a deduct in the amount of $366,938.96 revising contract quantities to reflect as-built quantities amending the original contract amount of$2,599,396.00 to the new contract amount of$2,232,457.04. The City of Port Arthur has also received Close Out Documents from Elite Contractors & Equipment, LTD of Kirbyville,Texas that includes the Certificate of Substantial Completion establishing completion as August 5, 2021, the Contractor's Certificate and Release, the Contractor's Certificate of Warranty, and the Contractor's Certificate of Debts Paid. Elite Contractors & Equipment, LTD of Kirbyville, Texas is also asking for release of retainage in the amount of$111,622.85. "Remember,we are here to serve the Citizens of Port Arthur" 444 4th Street X Port Arthur,Texas 77641-1089 X 409.983.8182 X FAX 409.983.8294 PR No.22464 3/21/2022 mje Page 4 of 4 APPROVED AS TO FORM: APPROVED FOR ADMINISTRATION: .Gt�--yy Cad 6, • alecia Tizeflo Ron Burton City Attorney City Manager APPROVED AS FOR AVAILABILITY OF FUNDS: Kandy Daniel lj Interim Director of Finance Flozelle Roberts, EIT, MEng, MBA Director of Public Works Clifton Williams, CPPB Purchasing Manager EXHIBIT A CITY OF PORT ARTHUR DATE: December 2,2021 PROJECT: LAKESHORE DRIVE PHASE 3 AND 4 ROADWAY RECONSTRUCTION OWNER: CITY OF PORT ARTHUR CONTRACTOR: ELITE CONSTRUCTION AND EQUIPMENT CHANGE ORDER NO.: 02 FINAL THE FOLLOWING CHANGES IN THE CONTRACT DOCUMENTS ARE HEREBY MADE: Add/Delete Construction Items and/or quantities to the Contract and Revise Contract to reconcile final quantities: Item New Original Unit No. Item Item Code Description Unit Quantity New Quantity Price Amount PAVING AND DRAINAGE DEDUCTION 24 808.002 Fre Hydrant Assembly EA 5.00 4.00 55,050.00 55,050.00 29 401.001 Alton done Existing Storm Sewer LF 982.00 491.00 $25.00 512,275.00 33 465.004 3s3 Precast Boz EA 2.00 1.00 54,500.00 54,500.00 34 4640.001 18"HDPP Storm Sewer LF 274.00 223.00 550.00 51,550.00 42 506.001 Construction Entrance/Exit EA 1.00 0.00 5100.00 5100.00 43 506.002 Fabric Silt Fence LF 5850.00 213.00 53.50 519,729.50 44 506.003 Erosion Control Log EA 29.00 21.00 5250.00 52,000.00 46 402.001 Trench Excavation Protection LF 3832.00 2720.00 S2.00 52,224.00 47 531.004 Concrete Aprons EA 2.00 0.00 510,000.00 520,000.00 48 10000.001 Supplemental Costs LS 059234092 0.00 5500,000.00 5296,170.46 49 124.001 Certified Arborist LS 1.00 0.00 55,000.00 55,000.00 TOTAL AMOUNT DEDUCTED 5369,598.96 ADDITION 530.001 5"Thick Concrete Driveway SY 2400.00 2438.00 570.00 $2,660.00 TOTAL AMOUNT ADDED $2,660.00 UTILITIES DEDUCTION TOTAL AMOUNT DEDUCTED 50.00 ADDITION TOTAL AMOUNT ADDED 50.00 CHANCE ORDER TOTAL AMOUNT DEDUCTED ($366,938.96) ORIGINAL CONTRACT AMOUNT: 52,599,396.00 NET FROM PREVIOUS CHANGE ORDERS: $0.00 TOTAL AMOUNT OF THIS CHANCE ORDER: -$366,938.96 PERCENT OF THIS CHANGE ORDER: -14.12% TOTAL PERCENT CHANGE ORDER TO DATE: -14.12% NEW CONTRACT AMOUNT: $2,232,457.04 ACCEPTED BY: �e PREPARED BY: frAtet ELITE CONTRACTORS AN QUIPIIIENT age UMBURG&POLK,INC. APF i 1 APPROVED BY: .l 1/ 411,11/: _41 hallilymezali JOAN CANNATELLA,P.E. F OZEL C.ROBERTS, a T,M.ENG, :A CITY ENGINEER D '2 OR OF P iti C WORKS ATTESTED BY: RON BURTON CLIFTON WILLIAMS,CPBB EXHIBIT B CERTIFICATE OF SUBSTANTIAL COMPLETION Purchase Order No.: Project Name: Lakeshore Drive Phase 3 and 4 Roadway Reconstruction Project Contractor: Elite Contractors and Equipment Description of Work: Reconstruction of roadway between Stadium Drive and Lakeside Drive. Including intersections. The work performed under this contract has been reviewed and found to be substantially complete. The date of substantial completion is hereby established as August 5,2021. KNOW ALL MEN BY THESE PRESENTS: 1.) The stage of construction where, in the opinion of the City of Port Arthur, all items of the work necessary to enable the assets to be utilized without restrictions for the purpose for which the asset was constructed have been completed; and 2.) All pay items are complete and all necessary testing as required by the Laws and regulations and/or Contract Documents have been completed. Punch List A list of items to be completed or corrected, prepared by the CONTRACTOR and verified and amended by the ENGINEER, is attached hereto.The failure to include any items on such list does not alter the responsibility of the CONTRACTOR to complete all work in accordance with the contract documents.The CONTRACTOR shall complete or correct the work on the list of items attached hereto within 60 days from the above date of substantial completion.The responsibilities shall be as set out in the Contract Documents or on the attached hereto. If not specified in an attachment or in the Contract Documents the CONTRACTOR is responsible for maintenance, utilities and insurance. rPe Ar-1-0 4,A ///3/2-7 CONTRACTOR NAME SIGNATURE DATE RECOMMENDED FOR ACCEPTANCE 5dita-44A—Lit- +POILiTn` y../�%� /2/ 3/21 ENGINEER NAMSIGN'TURE DATE The City of Port Arthur accepts the work as Substantially Complete. City of Port Arthur, Department of Public Works. PROJECT MANAGER SIGNATURE DATE CITY ENGINEER SIGN,i,' - DATE rt-AD?:V11-'‘'E104 tatiPir3 t k3kZ/WZ PUBLIC WORKS DIRECTOR NA l'E DATE EXHIBIT C CONTRACTOR'S CERTIFICATE AND RELEASE FROM.: Elite Contractors and Equipment LTD N4meof fontractor) TO: CH1 �F dr ' 7 ! (Owner) REFERENCE CONTRACT NO.: 19-230 and 19-231 r-� CONTRACT ENTERED INTO THE 7 DAY OF �E'C C ^���� , BETWEEN THE CITY OF PORT ARTHUR AND Elite Contractors and Equipment LTD OF Kirbyville, Texas FOR THE LAKESHORE DRIVE PHASE 3 AND 4 ROADWAY RECONSTRUCTION PROJECT KNOW ALL MEN BY THESE PRESENTS: 1) The undersigned hereby certifies that there is due from,and payable by,the Owner to the Contractor under the contract and duly approved Change Orders and modification the balance of$ 3 2/L4'1.aW 2) The undersigned further certifies that in addition to the amount set forth in Paragraph 1, there are outstanding and unsettled the following items which he claims are Just and due and owing by the Owner to the Contractor: a. PC, b. /VC)/ • c. Pim d. t/l'u+ (Itemise claims and amounts due) (II none,so state) 3) The undersigned further certifies that all work required under this contract,including work required under Change Order(s) numbered 1-2 , has been Performed in accordance with the terms thereof, and that there are no unpaid claims for material,supplies,or equipment and no claims of laborers or mechanics for unpaid wages arising out of the performance of this contract, and that the wage rates paid by the contractor were in conformity with the contract provisions relating to said wage rates. 4) Except for the amounts stated under Paragraphs 1 and 2 hereof, the undersigned has received from the Owner all sums of money payable to the undersigned under,or pursuant to,the above-mentioned contract or any modifications or changes thereof. 5) That in consideration of the payment of the amount stated in Paragraph 1 hereof, the undersigned does hereby release the Owner and Operator from any and all claims arising under or by virtue of this contract, except the amount listed in Paragraph 2 hereof due from the Owner, provided however,that If for any reason the Owner does not pay in full he amount stated in Paragraph 1 hereof, said deduction shall not affect the validity of this release, brut the amount so deducted shall be automatically included under Paragraph 2 as an amount which th 'Contractor has not released but will release upon payment thereof. The Contractor further certifies that Upon the payment of the amount listed in Paragraph 2 hereof,and of an amount which may be deducted from Paragraph 1 hereof,he will release the Owner and Operator from any and all claims of any nature whatsoever arising out of said contract of modification thereof, and will execute such further releases or assurances of the Owner and operator may request. IN WITNESS WHEREOF,the undersigned has signed and sealed this instrument this day of CE -f,2021. (SEAL) Elite Contractors and Equipment LTD (Contractor) By: President (Signature and Title of Officer) Breck Sauls ,being first duly sworn on oath,deposes and says,first,that he is the (Affiant) President of Elite Contractors and Equipment LTD ,second,that he has read the foregoing certificate by him (Title) (Name of Company) . subscribed as President of Elite Contractors and Equipment LTD (Name of Company) Affiant further states that the matters and things stated herein are true. (Affiant) / Subscribed and sworn to before me this � day of IXCt-',11 r'i,2021. My commission expires PoC"f 4C11 a . BRANDI p BERTMAN (Notary) `1,.:\,41 J,••h NOTARY Ip g2O4862*Q048624'` % ';�; My Commission Expires ayo. April 29.2025 '•1\`.wm\ll\1R11yi1S1\\\\l\\\11\RI\',K EXHIBIT D CONTRACTOR'S CERTIFICATE OF WARRANTY FROM: Elite Contractors and Equipment LTD (Name of tractor) TO: Cr4Ge— r (Owner) REFERENCE CONTRACT NO.: 19-230 and 19-231 ,v1JJ CONTRACT ENTERED INTO THE � DAY OF Cf 4,I v BETWEEN THE City of Port Arthur,Texas AND Elite Contractors and Equipment LTD OF Kirbyville, Texas FOR THE LAKESHORE DRIVE PHASE 3 AND 4ROADWAY RECONSTRUCTION PROJECT KNOW ALL MEN BY THESE PRESENTS: 1) Elite Contractors and Equipment LTD ,does hereby guarantee all of the work done under the above (Contractor) referenced contract to be free from faulty materials in every particular, and free from improper workmanship,and against injury from proper and usual wear;and agrees to replace or re-execute without cost to the Owner and Operator such work as may be found to be improper or imperfect,and to male good all damage caused to other work or materials,due to such required replacement or re-execution. 2) This guarantee shall cover a period of one (1) year from the date of acceptance of all work under this contract,as evidenced by the Contractor's Certificate of Completion, 3) This Certificate is given in connection of the final payment under the contract between the Owner and Elite Contractors and Equipment LTD , and with the knowledge that it will be relied upon in making such payment ant that such payment would not be made except upon the truth of the matter contained in this affidavit. Sr `='1 IN WITNESS WHEREOF,the undersigned has signed and sealed this instrument this day of (Ce-41 , 2021. SEAL pie Contractors and Equipment LTD • (Contractor) BY:� President (Signature and Title of Officer) Breck Sauls being first duly sworn on oath,deposes and says,first, (Affiant) That he is the President of Elite Contractors and Equipment LTD ,second,that he has read the (Title) (Name of Company) foregoing certificate by him subscribed as President of Elite Contractors and Equipment LTD (Name of Company) Affiant further states that the matters and thinks stated herein are true. (Affiant) • 1!C� Subscribed and sworn to before me this day of e2021. My commission expires Ppr1'1 J9 L . v % ,*aY..' s BRANDI D BERTMAN i (Notary) �• ��_. NOTARY ID#204962-4 My Commission Expires 5 'F$r'h+ April 29,2025 i • • EXHIBIT E CONTRACTOR'S CERTIFICATE OF DEBTS PAID PROJECT: Lakeshore Drive Phase 3 and 4 Roadway Reconstruction Project LOCATION: Port Arthur,Texas OWNER: City of Port Arthur STATE OF TEXAS; COUNTY OF JEFFERSON; The undersigned hereby certifies that, except as listed below, payment has been made in full and all obligations have otherwise been satisfied for all material and equipment furnished,for all work,labor,and services performed, and for all known indebtedness and claims against the Contractor for damages arising in any manner in connection with the performance of the Contract referenced above for which the Owner's property might in any way be held responsible or encumbered. Exceptions: • Contractor: Elite Contractors and Eqipment LTD Kirbyville , Texas Signature: Printed Name: Breck) Sauls Date: /`/ 3 2J • r')Subscribed and sworn to before me this day of C ,2021 My Commission expires ; BRANDI D BERTMAN 1: '.r NOTARY ID#204962.4 (Notary) ♦ •i ;. ♦ �, � My Commission Expires April 29,2025 EXHIBIT F J. pQp ,.LL,� }, C W m mD D a D D D a m W T N JN N T T N u u w pw N ,+ N T-i D n b T b b 8 O $ $ t $ N N O 0� OC N O n W°� OVe P u W u O a O O a O 3 R aQ g a c o 3 0 E �' $ '!n'' n " ` £ e D n �' a y D �d a y n e w u o " 'z ,„. ... ,,m. & g $ 2 a �. .. s gZ �' 3 xx xxx yY ° G � 'yaw a'p� '� ama^� g .$o n fur P.o R a m v › ,740 :2- rd ms . ,- Nd A >= ym 3 o m ya a 3 a a S ^ o RRRRR ag c3 82.43�3—;a° —� a—rF,F—^" 8a 9 n h 3 3a X Vi a°° A A — :-D a %d R R o' s 2 l v y i 8' c� = o - 3 'Sm 11 Ff 8 GG7., q ; qNo ; r7,ggq wv ; ;; ; ;, ; 9 ; ;G ; ; GGggqq; Gwr“ =Ki2GG Zo 3 ,1 A ,Sw 4 :.' m N N 80 O ONaVN bOmNN N mpN . oomo" _ OC 888888888888888888888888888888888888888858888888 ' 0 ;ev V yU N U✓ . NAUN NNNN 1 GK . m a OOONNOW008Nbl0080830000OU00088UU8U8888808E,a88 ' ^ 888888888888888888888888888888888888888888888888 2 ° in U U U �Uy,U Y U W W U V U w V V�U U u U U U y r U J N U N r a g U§U V N U U Oa °Ni - ,O O N U a vVi U v.O U u u,.U,O N U�V.,u v N b a , `+ W N ti a 888888888888888888888888888888888858888888888888888 ? 22 C _m b N N M p F. .* 3 2 q y� Y2 o 3 $ 0 en " f888 8 $ 2 D 888 8888 8,' 8 $ i > P v 3 U U U U ...ANN U U U 9 g P 1 C d g i8, a a n c n d /, O0 33 v I 1 R 8 o g o 0 oti U uD+ a T2 O= 3 4 8 8 8 8 8'6'88 8 8 8 ' 3 O A fi' H M a " a 1 w E '“'1". U P N> N v n g F 55�� gg qq� Q x m f 0 0 0 0 1°1 o e e o e e e e e e e o 8 § 8 0 0 0 0 0 0 o 8 o V E K g ;o V o 0 0 0§b o 0 0 0 6 e i 'zi " 888888888888888888 888888888888888048888888888888888 b A 8 L. u 0, N O MI'. e08 0 0 o m z e 888 8888 80 8 ..7 U U U U U U U U NV. ''s b W b Q$ P o C n 00 § H § ... m �. z 8 o E 8 888 8888 88 8 , 1 WN vs+v,v, v,��H l Mo �r r 2 " a3 888888888888888888808888888888888008888888888888888 30 C 'C O '4 oa w V. Nrd 8 O 0 8 � W O V N tNO O b 6', w W a V >P yym0i�, w8 v � n ww ati88 8888888888888888888888 8888888 , 8888888 v. t. U U U 12Y,v.v..., U U U H Op N O -rU —U D N U �+Y b N ,,++ N !Oil N v 12 U a �p 5 �p 83 Q a r U U U r 8,tUi,O U O V N v 5e� O N 1. '"ooNoiF,'n' g § E 'A ;A 800 ^„ 800e8iR§'go v'a'i '•".�S'"'� 03000§ 06 0 888888888888888888888888888888888888888888888888888 _ 6 `pQ am j R 0 3 O g o g S ,° - ». 0 41-51 0 9 .9.2,„ E ` `n o,m z A F7 w :°' ° ;1 w n 3 y s. ° n ! S a a m ,a a n. s 3 g .. 2 . c 3 o f o g il� '^`^'^'^'^'^"^8t-881st"6 o o o n'st1o'�'o o gtmr.vo a 000eo="8888 000�'o N3 =8aa ° 888888888888888888888888888888888888888888888888888 A • o a . UI t' 'E" a ' rau„'& .1 �a' .ab+ m w “;w0.ov 1;;118W8,5 4 `" Z. 0- ,486,888S8888888888888888888888888888888888888808888888 ^G s BHN w �"aY� � —Yr� ��K�� oY��g ^� T,v,wr:,'^mti"2oeN8P ; ' ��s�8r t�s �s &� g � 08Mnss�s § No - N5282888 288858888888888888888888888888888888888888888888888 EXHIBIT G City of Or( rthu Texas www.PortArthurTx.gov CERTIFICATE OF COMPLETION Date: March 21, 2022 Project: Lakeshore Drive Phase# & 4 Roadway Reconstruction Project—Close Out Project No. ST1P44 To: All Concerned I HEREBY CERTIFY THAT this project was completed on August 5, 2021 and that the work was under periodic inspection during construction by Public Works Engineering, City Inspector. That to the best of my knowledge, the project was constructed substantially in accordance with the plans and specifications, and that record documents were received and are on file in Public Works Engineering. Subtni ed by: A ii 4 / 4.0 -- 1.01:* , I / or iii• Floz:a'obert T, MEng, MBA Director of Public Works "Remember,we are here to serve the Citizens of Port Arthur" P.O.Box 1089 X Port Arthur,Texas 77641-1089 X 409.983.8101 X FAX 409.982.6743 EXHIBIT H CITY OF PORT ARTHUR, TEXAS DEPARTMENT OF PUBLIC WORKS CERTIFICATE OF ACCEPTANCE FOR... LAKESHORE DRIVE PHASE 3 & 4 ROADWAY RECONSTRUCTION PROJECT- ST1P44-CON To: Elite Contractors& Equipment of Kirbyville, Texas This document is to certify that the City of Port Arthur, Texas accepts the completion of the Lakeshore Drive Phase 3 &4 Roadway Reconstruction Project on the basis of the recommendation of the City of Port Arthur's Public Works' Engineering Department and receipt of the Certificate of Completion, Contractor's Certificate of Debts Paid, Contractor's Certificate of Release, Contractor's Certificate of Warranty executed by Elite Contractors & Equipment of Kirbyville, Texas. Ron Burton City Manager Sherri Bellard City Secretary