HomeMy WebLinkAboutPR 22466: AUTHORIZING CHANGE ORDER NO. 1 TO THE CONTRACT WITH MCINNIS CONSTRUCTION, INC. FOR REPAIRS TO THE DEPARTMENT CLUB Memorandum
City of Port Arthur, Texas
Robert A. "Bob"Bowers Civic Center
To: The Honorable Mayor and City Council
Through: Ron Burton,City Manager
From: Adam J Saunders,Civic Center Dir
RE: Proposed Resolution No. P.R. 22466
REQUEST:
The Department Club at 1924 Lakeshore Drive is in need of repair and maintenance. In November of
2021 the Council passed Res 21-459. This Resolution was for Phase III of the repairs and maintenance.
It has been determined additional repairs will be needed at the Department Club. The additional repairs
are mainly to the window sashes. The damage to these areas were not determined until after demolition
of these areas in preparation to the repairs approved for Phase III. These additional repairs will be
Change Order #1. The cost of this Change Order #1 is $34,106.70. The total amount of Phase III is
$292,606.70,which includes this Change Order#1.
McInnis Construction, Inc. of Silsbee will perform the work for a cost of$34,106.70. Funds available in
account 307-21-049-8512-00-10-000.
ANALYSIS/CONSIDERATION:
There are a lot of needed repairs at the building. Phase I and II have been performed. Phase III is the
next step in the repairs and restoration of the Department Club. Change Order#1 to the Phase III repairs
is needed.
RECOMMENDATION
A resolution authorizing the City Manager to enter into an agreement with McInnis Construction,Inc.of
Silsbee for Change Order#1 to Phase III repairs and maintenance of the Department Club in the amount
of$34,106.70.
BUDGETARY AND FISCAL EFFECT
Funds available in account 307-21-049-8512-00-10-000.
STAFFING EFFECT
None
P.R. No. 22466
PO 22466
P.R. No. 22466
03/22/2022 AJS
PAGE 1 of 3
RESOLUTION NO.
A RESOLUTION AUTHORIZING THE CITY MANAGER TO EXECUTE CHANGE
ORDER NO. 1 WITH MCINNIS CONSTRUCTION, INC. OF SILSBEE, TEXAS FOR
PHASE III REPAIRS TO THE DEPARTMENT CLUB INCREASING THE CONTRACT
AMOUNT BY $34,106.70 TO A NEW TOTAL OF $292, 606.70. FUNDS AVAILABLE IN
ACCOUNT 307-21-049-8512-00-10-000, PROJECT NO. BU0011
WHEREAS, the City Council approved Resolution No. 21-459 at the November 9, 2021
Council Meeting, an agreement with McInnis Construction of Silsbee, Texas for Phase III repairs
to the Department Club in the amount of$258,500.00; and
WHEREAS, it has been determined additional repairs to mainly window sashes is
needed; and
WHEREAS,the damage to the window sashes and other areas was determined after the
demolition of areas in preparation for Phase III repairs to the Department Club, these repairs will
be Change Order No. 1; and
WHEREAS, McInnis Construction, Inc. of Silsbee, Texas will do this work for
$34,106.70; and
WHEREAS,approval of Change Order No. 01 is deemed an appropriate action.
NOW THEREFORE BE IT RESOLVED BY THE CITY COUNCIL OF THE
CITY OF PORT ARTHUR:
Section 1. That the facts and opinions in the preamble are true and correct.
Section 2. That,the City Manager is hereby authorized to execute Change Order No.
1 with McInnis Construction, Inc of Silsbee, Texas for damage to the window sashes and other
areas was determined after the demolition of areas in preparation Phase III repairs at the
Department Club, in substantially the same form as attached hereto as Exhibit"A".
Section 3. That,the funding for said agreement is $34,106.70.
Section 4. That, a copy of the caption of this Resolution be spread upon the Minutes
of the City Council.
PO 22466
READ, ADOPTED, AND APPROVED, this day of March, 2022, A.D., at a
Regular Meeting of the City Council of the City of Port Arthur, Texas by the following vote:
AYES:
Mayor:
Councilmembers:
•
NOES:
Thurman"Bill"Bartie, Mayor
ATTEST:
Sherri Bellard, City Secretary
AP : 'OVED AS TO FORM:
///,
_. i I en/ • /
jA
Valecia Ti eno CityAttorneyI
APPROVED FOR ADMINISTRATION:
Ron Burton, City Manager
APPROVED AS TO FUND AVAILABILITY:
c i', Uk
Kandy Danie Clifton Williams, CPPB
Interim Director of Finance Purchasing Manager
PO 22466
EXHIBIT "A"
CHANGE ORDER
PROJECT: Federated Women's Club-Phase III CHANGE ORDER NO: 1
CONTRACTOR: McInnis Construction DATE: 03.21.2022
675 S 4'St ARCHITECT'S PROJECT NO.: 20037
Silsbee,Texas CONTRACT DATE: 01.25.2021
CONTRACT FOR: Rehabilitation(Historic)
This Contract is changed as follows:
01 1 WINDOWS
I Meeting Room
Replace 6-Upper Sashes $10,200.00
Replace 6-Lower Sashes $8,400.00
Men's Restroom
Replace 1 -Lower Sash $1,400.00
Women's Restroom
Replace 2-Lower Sashes $2,800.0
Replace 2-Upper Sashes $5,100.00
Stage Repairs
Replace door that was damaged due to the return vent&patch floor
where the vent was located on the stage $1,758.00
15%Overhead/Profit $4,448.70
TOTAL: $34,106.70
**See attached breakdown
Not valid until signed by the Owner,Architect,and Contractor.
The original Contract Sum was $258,500.00
Net change by previously authorized Change Orders $00.00
The Contract Sum prior to this Change Order was $258,500.00
The Contract sum will be increased by this Change Order in the amount of $34,106.70
The new Contract Sum including this Change Order will be $292,606.70
The Contract Time will be increased by zero(00)days.
The date of Substantial Completion as of the date of this Change Order therefore is Date on Notice to Proceed.
NOTE The summary does not reflect changes in the Contract Sum Cr Contract Time which have been authorized byConstn ction Change Directive.
The LaBiche Architectural Group McInnis Construction City of Port Arthur
7999 Gladys • -•u-,Suite 101 675 S 4v'St 3401 Culture Ctr.Dr.
Beaumont r 06 Silsbee,Texas 7765. t Port Arthur,Texas 77642
By: / , /�//_� By: lir/V., 1i .Aarw By
t 9. 9 1•,
Date:
��; Date: Date:
cc ssA
JIr':• 11592 - .
';..rFOF��
r-` 1 I F } `
1111111
Change Order MCINNIS CONSTRUCTION. INC.
PROJECT: CHANGE ORDER NUMBER: I OWNER
City of Port Arthur
Historic Rehabilitation of Federated DATE: 3/21/2022 ARCHITECT
Women's Club-Phase 111
1924 Lakeshore Drive,Port Arthur,TX ARCHITECT'S PROJECT NO: CONTRACTOR
TO CONTRACTOR: FIELD ❑
Mclnnis Construction INC
675 S 4th St CONTRACT DATE: 1/25/2021 OTHER ❑
Silsbee Tx
CONTRACT FOR: LNVA
The Contract is changed as follows:
Re:
1.) Meeting Room:
Replace(6)upper sashes $ 10,200.00
Replace(6)lower sashes $ 8,400.00
2.) Men's Restroom
Replace(I)lower sash on window $ 1,400.00
(new hardware,install weights and make operable)
3.) Women's Restroom
Replace(2)lower sashes $ 2,800.00
Replace(3)upper sashes $ 5,100.00
4.) Stage Repairs
Replace door that was damaged due to the return vent and patch floor where the
vent was located on the stage $ 1,758.00
Subtotal $ 29,658.00
15%Overhead/Profit $ 4,448.70
Total $ 34,106.70
The original Contract Sum was $ $258500.00
The net change by previously authorized Change Orders $
The Contract Sum prior to this Change Order was S $258,500.00
The Contract Sum will be increased by this Change Order in
the amount of $ $34,106.70
The new Contract Sum including this Change Order will be $ $292,606.70
The Contract Time will be unchanged by 0 (0)days
The date of Substantial Completion as of the date of this Change Order therefore is
NOT VALID UNTIL SIGNED BY THE ARCHITECT,CONTRACTOR AND OWNER.
The Labiche Architectural Group, Inc. McInnis Construction City of Port Arthur
ARCHITECT(Firm name) CONTRACTOR(Firm name) OWNER(Finn name)
7999 Gladys Ave.,STE 101 675 S 4th St Silsbee TX 3401 Culture Ctr.Dr.
ADDRESS ADDRESS ADDRESS
BY(Signature) BY(Signature) BY(Signature)
Colin Bledsoe
Typed name Typed name Typed name
3/17/2022
DATE DATE DATE
1655
ar St.
Shaffer Mfg., Inc. Beaumo t, TX�77701
409-838-6556 main
409-838-9001 fax
Proposal For Casework: 02/25/22
Proposal For Casework# 5345-Additions 1
Job: Women's Department
Port Arthur,TX
Scope of Work:
1) 1 Doors, 3'-0"x 7'-0"x 1-518",As per existing
*Material Poplar, Paint Grade
1112" Plywood Panels, Paint Grade
2)Repair Stage Floor w/Pine Hardwood,Where Return Air Is
Total $ 1,758.00
(tax not included)
"*Note:Pricing is based on standard,matte finish laminate colors only.(Unless otherwise noted)
Premium colors will be subject to a price increase.
Page 1 of 1
Gold Star Windows & Doors
6585 tattoo Fwy
Beaumont,TX 77705 Date 3/15/2022
408-499-0019 shane
rsllc@hotmail.com
ins
Customer Name: Mcinnis Construction J Womens dub
Street Address: 1924 Lakeshore DR
City,ST ZIP: Port Arthur,TX 77640
Phone Number:
Quantity Description Amount
Replace Lower Sash in mens bathroom,Apply privacy film,
Install new hardware,Reattach the weights and make the S 1,4130,00 1 1,400.00
window operable
Replace Lower Sash in the main room,Install new hardware, S 1 400.00 f 11,400.00
Reattach the weights and make the window operable
l3 Replace upper Sash in the main room,Install new hardware, f 1,7613.00 S 10,200.00
Reattach the weights and make the window operable
3 Replace upper Sash in the womens bathroom,install new $ 1,700.0G 5 5.100 OC
hardware,Reattach the weights and make the window operable
Replace Lower Sash In worsens bathroom,Apply privacy film,
2 Install new hardware,Reattach the weights and make the f 1,400.00 5 2,800.00
window operable
Total Contract Price 7,900.0i
The remaining balance it due upon completion,Induding change orders as ordered by the cu*omen.A 3%charge will be added far credit and transactions.No additional work will be
performed unless stead in uniting,Goldstar will provide at materials for completing the removal and Installation of the product.All Job-related debris wit be removed from the presets by
Goldstar Customer If responsible or the remove and re-Installation of blinds,curtains,security systems,a/c units,etc.In some instances.damage to landscape is unavoidable.The Owner,
by making final payment under this contract,waives arty claim that I may have against Goldstar Ion damages for defects Mat an known to Owner or apparent upon re:mortade Inspection when
final payment is mace.Products are ordered the cay this contract Is signed.Alterations cannot be made to the product once ordered.A 50%restoddng lea vita apply to all products not
installed:Goldstar reserves the right In 54 lien and to fie suit for Items that are not paid for by the Owner.In the event that the Owner does not pay the full amount of the contract price
'along with any change order amounts),Goldstar may fie a construction/contredors tenor may file suit against the Owner to coped any money Oct under this contract.All warranty
information s backed by the ranufactwer.This quote is sold after 60 dayt and must be canceled within 3 days for a full refund.GoldStar is not responsible far securing moo approve'or
verifying qty or pattsh ordinances.Note:attached eshlbits and schedules are part of this comrad.A 50%deposit Is required at time of sale and remaining balance is due In full at completion
of work.
I understand that I am responsible for removal and re-installation of blinds,curtlans,security systems,a/c units.
I understand that there is a 505E restccong fee if l elect not to move forward with the installation.
I understand mat a 50%deposit Is required at the time of sale and remaining balance is due in full at completion of work.
agree to the terms and conditions outlined above.
Signature Date__