Project Status
March 2022
1
City of Port Arthur Landfill
1
Current SCS Projects
Repair of Monitoring Wells and Gas Probes and Plug and Abandon Existing Well
2022 Air Services/Groundwater and Gas Monitoring
City/Bechtel Soil Project
Erosion and Sediment Control Engineering
South Detention Pond Engineering
Alternative Daily Cover Permit Modification
Groundwater Assessment Monitoring and Reporting, Update Background Report, and Well Development
2
2
Repair of Monitoring Wells and Gas Probes and Plug and Abandon Existing Well
Monitoring Wells and Gas Probes are in Need of Various Stages of Repair/Replacement. 4 Gas Probes were Noted as Needing Repair during Latest TCEQ Inspection
SCS Contract Services
Repair or Replace 15 Groundwater Monitoring Wells and 6 Gas Monitoring Probes
Plug and Abandon Existing Well
During December 2021 TCEQ Inspection, the Following Concerns Were Noted:
4 gas probes are in need of repair
Other concerns:
No methane monitoring of 2 on-site structures - Resolved
No continuous monitoring of 2 on-site structures - Resolved
No gas monitoring during the October – December 2020 Monitoring Period - Resolved
A conflict with the permit and actual number of on-site gas probes - Resolved
A tank in the retention pond - Resolved
3
3
Chronology of Gas Probe Repair
11/10/2021 SCS conducts a proactive independent evaluation of the gas probes and groundwater monitoring wells
11/19/2021 SCS submits report to City Staff recommending repairs of gas probes and groundwater monitoring wells and will provide proposal for any work the City requests
12/21/2021 TCEQ audits gas monitoring event
01/20/2022 TCEQ provides preliminary Exit Interview of gas monitoring audit noting 4 gas probes in need of repair
02/14/2022 SCS submits proposal to repair gas probes and monitoring wells
02/21/2022 SCS submits proposal to prepare bid package for repair of gas probes and monitoring wells
02/24/2022 City receives letter from TCEQ with Notice of Violation (NOV) including repair of gas probes requesting description of corrective action taken by 03/21/2022
03/03/2022 City informs SCS of TCEQ 02/24/2022 NOV
03/07/2022 SCS submits proposal to prepare bid package and conduct construction management and construction quality assurance for repair of gas probes and monitoring wells
03/09/2022 SCS submits a revised proposal to repair gas probes and monitoring wells
03/14/2022 City issues PO to SCS for repair of gas probes and monitoring wells
03/21/2022 SCS issues letter to TCEQ with description of corrective action taken for the items noted in the TCEQ NOV, including a copy of the PO for SCS to repair gas probes and asking
for an extension for repairing the gas probes
03/22/2022 TCEQ sends email granting an extension to repairing the gas probes since the project has been approved by the City
Based on discussions with TCEQ staff, this item will be considered resolved upon completion of the requested repairs, scheduled to begin 04/04/2022.
4
4
2022 Air Services, Groundwater and Gas Monitoring
Conduct Semi-Annual Groundwater Monitoring, Quarterly Gas Monitoring, and Annual Air Compliance Services
SCS Contract Services
2 Semi-Annual Groundwater Monitoring Events
4 Quarterly Gas Monitoring Events
Annual Air Quality Services including:
Title V Reporting
Emissions Inventory and Emissions Fee Calculations
2022 Greenhouse Gas Reporting
NSPS 2021 Reporting
Alternate Source Demonstrations and other As-Needed Tasks
5
5
City/Bechtel Soil Project
Significant opportunity reduce cost of imported cover soil
SCS Contract Services
Project Management
Limited Scope Permit Amendment
TxDOT Permitting and Design Bid Package
Soil Stockpile Operations Bid Package
Revise SWP3
Follow-up to Limited Scope Permit Amendment
Allowance
6
6
Erosion and Sediment Control Construction
Step in addressing TCEQ Ordering Provision from March 30, 2021 Proposed Agreed Order
SCS Contract Services
Prepare Construction Plans, Specifications and City Bid Documents
7
7
South Detention Pond Construction
Construct South Detention Pond in accordance with TCEQ Permit
SCS Contract Services
Prepare Construction Plans, Specifications and City Bid Documents
Bid Package is Complete, scheduled to be included with Erosion and Sediment Control Bid Package
8
8
Alternative Daily Cover Permit Modification
Temporary Authorization and Permit Modification to Add Spray-On Alternative Daily Cover
SCS Contract Services
Prepare Initial Temporary Authorization
Prepare Second Temporary Authorization
Prepare Permit Modification
Initial Temporary Authorization submitted 03/24/2022
City has already acquired equipment and materials
9
9
Groundwater Assessment Monitoring and Reporting, Update Background Report, and Well Development
Conduct TCEQ Requested Groundwater Assessment Monitoring and Report on Findings and Update Background Report. Also, Develop Groundwater Wells with High Turbidity
SCS Contract Services
Conduct Groundwater Assessment Monitoring and Reporting
Update Background Report
Develop Groundwater Wells with High Turbidity
10
10
Project Progress To-Date
11
11
History of SCS’ Services for the City
12
Continuous since 2002
Comprehensive landfill services
Landfill Design and Permitting
Groundwater monitoring
Landfill gas monitoring
Air quality
Stormwater
Initial permit application, landfill design & groundwater characterization
Permit modifications
Site Development Construction Plans
Cell design and CQA
Air quality permitting and reporting
Environmental monitoring / reporting
Groundwater
Landfill gas monitoring
Greenhouse gas reporting
12
Resources of SCS
Leadership in Solid Waste Engineering
Solid Waste Facility engineering/permitting is our core business
Unsurpassed experience in TCEQ permitting
Over 1,000 professional and support staff
Routinely rated No. 1 or 2 in solid waste services by Engineering News Record in the U.S.
20+ year history of providing engineering, permitting, and monitoring services for the City of Port Arthur
13
13
SCS ENGINEERS
SOLID WASTE ENGINEERING SERVICES: PROJECT TEAM ORGANIZATION
City of Port Arthur
Project Manager
J. Roy Murray, P.E.
Stormwater/SWPPP
Joseph Krasner, PE
Groundwater
Gil Gabaldon, PG
Sam Franco, PE
Andrew Ard, EIT
Ricardo Espinoza, EIT
Landfill Construction
Plans
Jeff Reed, PE
Naima Rahman, Ph.D.
TCEQ Permitting
Jeffery Reed, PE
Sam Franco, PE
Andrew Ard, EIT
SCS Additional Technical Support Staff
An engineering and technical staff of over 1,000 well versed in the design and construction of solid waste facilities.
Landfill Gas Design
Ryan Kuntz, PE
Brett DeVries, Ph. D., PE
Senior Quality Review
Landfill Engineering
Jeff Reed, PE
Geotechnical Engineering
Robert Isenberg, PE, PG
Landfill Gas-to-Energy
Steve Hamilton
Solid Waste Permitting
Kevin Yard, PE, BCEE
Air Quality Permitting
Joseph Krasner, PE
CQA
Ricardo Espinoza, EIT
Landfill Gas O & M
Jason Lewallen
Rusty Fusilier, PE
14
SCS ENGINEERS
SOLID WASTE ENGINEERING SERVICES PROJECT TEAM EXPERIENCE
15
15
Thank you,
SCS ENGINEERS
J. Roy Murray, P.E.
Houston Office
817-358-6156 (direct)
281-455-0566 (cell)
Kevin Yard, P.E., BCEE
Bedford Office
972-523-2414 (cell)
16
16