HomeMy WebLinkAbout(P1) 2022April12 City PtA Street Program (2)City of Port Arthur
Street Program
APRIL 12, 2022 UPDATE
DISTRICT 1 –PROJECTS
RED –ROUND 3 PROJECTS
GREEEN –REMAINING PROJECTS
DISTRICT 1 –COMPLETED
District Round Project #Street Name From Street To Street Pavement
Width (ft)
Measured
Width (ft)
Pavement
Length (ft)Street Type Rehab Method Asphalt (tons) Completed Cost 2018 Estimate
Amount
City
Forces
(Y/N)
Complete
1 2019 ST1P01 NASHVILLE 7TH PROCTOR 20 1057 1,141,558$ 1,285,344$ N C
1 2018 R17154 BLUEBONNET 19TH GULFWAY 2160 Concrete Pavement 1,307,402$ 1,307,402$ N C
1 2018 I22WDW WOODWORTH THOMAS 7TH Drainage
Improvements 1,186,999$ 1,186,999$ N C
1 1 I22W7 W 7TH ST MLK (SH82)ABE LINCOLN AVE 2933 1,468,959$ 1,468,959$ N C
1 2018 I22W8 W 8TH ST FOLEY JOE LOUIS 4704 1,254,267$ 1,254,267$ N C
1 2018 R17087 48" STORMSEWER GULFWAY @ 9TH AVE N
1 2 NEW ORLEANS GULFWAY STADIUM 22 1740 468 39,769$ Y C
1 1 5TH AVE SOUTH TREMONT BROADWAY 480 SABINE PASS C
1 & 4 2 ST1P12 WACO GULFWAY 7TH 20 3632 Asphalt Overlay 888 75,465$ 151,223$ Y C
1 2 ST1P15 ATLANTA THOMAS 5TH 20 2500 Asphalt Overlay 611 51,944$ 379,000$ Y C
1 2 ST1P16 SHREVEPORT THOMAS 5TH 20 2500 Asphalt Overlay 611 51,944$ 373,700$ Y C
1 3 ST1P16 14TH ST HOUSTON FORT WORTH 1500 0 208,300$ 40,364$ N C
1 3 ST1P16 14TH ST FORT WORTH AUSTIN 1500 0 7,454$ 16,912$ N C
1 3 ST1P16 14TH ST AUSTIN STILLWELL 20 3690 902 86,907$ 110,850$ N C
1 3 ST1P18 DALLAS ZOWOLLE DITCH THOMAS 3044 N C
1 3 ST1P18 DALLAS THOMAS 5TH 1800 N C
1 1 ST1P19 /21 AUSTIN ZWOLLE DITCH 4TH 3500 281,172$ 554,100$ N
1 1 ST1P20 12 ST 6TH AVE WOODWORTH 1000
1 1 ST1P21 AUSTIN 8TH 4TH 800
1 2 ST1P22 24TH ST GULF MEMORIAL 24 3510 1,030 87,516$ Y C
1 2 ST1P32 9TH ST HOUSTON FORT WORTH 22 1123 302 25,667$ Y C
1 2 ST1P34 EL PASO AVE LAKESHORE PROCTOR 22 658 177 15,039$ Y C
1 2 ST1P37 MARSHALL GULFWAY 10TH 22 2606 701 59,562$ N C
1 3 ST3008 ALAMO 29TH ST 31ST ST 18 910 Open Ditch Asphalt Asphalt Overlay 200 17,017$ 45,100$ Y C
1 3 29TH ST MEMORIAL AVE GULF 18 2100 462 39,270$ Y C
1 3 ST3004 3RD AVE GULFWAY DR 14TH ST 27 630 C & G Composite Asphalt + Flex Base 208 31,185$ 85,050$ C
1 3 ST3012 31ST ST MEMORIAL AVE FORREST AVE 18 2150 Open Ditch Asphalt Asphalt Overlay 473 40,205$ 107,500$ Y C
1 4 ST3014 FOREST AVE 29TH ST 31ST ST 18 962 Open Ditch Asphalt 212 17,989$ 48,100$ Y C
1 3 ST3020 GRAND AVE 29TH ST 31ST ST 18 927 Open Ditch Asphalt Asphalt Overlay 204 17,335$ 46,350$ Y C
1 3 ST3022 HIGHLAND 29TH ST 31ST ST 18 927 Open Ditch Asphalt Asphalt Overlay 204 17,335$ 46,350$ Y C
DISTRICT 1 COMPLETED PROJECT TOTAL =10.42 7,686,789$ 8,800,970$
DISTRICT 1 - COUNCILWOMAN HOLMES
DISTRICT 1 COMPLETED PROJECTS
156,529$ 293,400$
MILES DISTRICT 2 TOTALS ($) =
DISTRICT 2 –PROJECTS
RED –ROUND 3 PROJECTS
GREEEN –REMAINING PROJECTS
DISTRICT 2 –COMPLETED
District Round Project #Street Name From Street To Street Pavement
Width (ft)
Measured
Width (ft)
Pavement
Length (ft)Street Type Rehab Method Asphalt (tons) Completed Cost 2018 Estimate
Amount
City
Forces
(Y/N)
Complete
2 2019 EDC002 LAKESHORE DR PH1 12AVE Beg. Conc. Sect.27 1490 Asphalt C & G 555,842$ 555,842$ N C
2 2020 C43150 LAKESHORE DR PH2 End Conc. Sect.STADIUM 33 1780 Asphalt C & G 723,536$ 723,536$ N C
2 1 ST1P10 CAROLINA AVE GULFWAY SOUTH 23 1267 CONCRETE C&G 356 $ 30,274 Y C
2 1 CAROLINA AVE GULFWAY NORTH 23 1293 CONCRETE C&G 363 $ 30,896 C
2 1 ST1P04 15th Street VERA MAIN 20 Open Ditch Asphalt 0 $ - Y C
2 1 ST1P26 5th Street STADIUM DUFF DR 20 2265 C & G Composite 554 $ 47,062 Y C
2 2 6th Street WILLIAMS AVE DUFF DR 20 730 C&G Composite 178 $ 15,168 N C
2 1 ST1P29 6th Street BRAZOS DUFF DR 20 3430 C & G Composite 838 $ 71,268
2 2 ST1P30 8th Street WILLIAMS DUFF DR 22 760 C & G Composite 204 $ 17,370 Y C
2 2 ST1P44 LAKESHORE STADIUM WILLIAMS 22 1525 CONCRETE C&G CONCRETE $ 2,592,358 $ 1,514,000 Y C
2 2 ST1P45 LAKESHORE WILLIAMS LAKESIDE 22 965 CONCRETE C&G Y C
2 3 ST3034 DRYDEN RD 9TH AVE ROSEDALE DR 23 2636 Open Ditch Asphalt 741 $ 62,986 168,410$ Y C
2 3 ST3045 SNIDER RADIANCE AVE GULFWAY 1850 18 Open Ditch Asphalt 407 $ 34,595 93,750$ Y C
2 3 ST3034 DRYDEN RD 9TH AVE ROSEDALE DR 23 2636 Open Ditch Asphalt 741 $ 62,986 168,410$ Y C
DISTRICT 2 COMPLETED PROJECT TOTALS =3.94 4,244,340$ 3,223,948$ MILES DISTRICT 2 TOTALS ($) =
DISTRICT 2 - COUNCILMAN JONES
COMPLETED PROJECTS
DISTRICT 3 –PROJECTS
RED –ROUND 3 PROJECTS
GREEEN –REMAINING PROJECTS
DISTRICT 3 –COMPLETED PROJECTS
District Round Project #Street Name From Street To Street Pavement
Width (ft)
Measured
Width (ft)
Pavement
Length (ft)Street Type Rehab Method Asphalt
(tons) Completed Cost 2018 Estimate
Amount
City
Forces
(Y/N)
Complete
3 1 ST1P02 Sunken Court NORTH PARK TWIN CITY 1,135,280$ 2,520,767$ N C
3 1 ST1P03 Sunken Court N C
3 2 ST1P17 FOREST DRIVE EVERGREEN WOODROW CONC PAVEMENT 1,042,660$ 980,063$ N C
3 ST1P11 8TH AVE 32ND BOB HOPE SCHOOL 24 1331 CONC PAVEMENT 881,394$ 946,740$ C
3 2 ST1P23 38TH RACHEL LANSING 24 300 88 $ 8,360 Y C
3 2 ST1P24 42ND 9TH AVE WENTWORTH AVE 24 760 ASPHALT 223 $ 21,179 N C
3 46TH TWIN CITY WAL MART 22 1609 ASPHALT 433 $ 41,101 Y C
3 COLORADO AVE RICE FARM ROAD JIMMY JOHNSON 18 1080 Open Ditch Asphalt 238 $ 22,572 Y C
3 76TH BRAZOS TWIN CITY 20 1020 Open Ditch Asphalt 249 $ 23,687 Y C
3 77TH TWIN CITY BRAZOS 20 1020 Open Ditch Asphalt 249 $ 23,687 Y C
3 60TH US69 9TH AVE 18 3816 Open Ditch Asphalt BASE + ASPH OVERLAY 2,006 $ 181,156 183,494$ Y C
3 9TH AVE 32ND 36TH 22 1306 ASPHALT BASE + ASPH OVERLAY 351 $ 33,361 Y C
3 WOODLAWN NORTH PARK BERNHARDT 22 1308 Open Ditch Asphalt 352 $ 33,412 Y C
3 2 EVERGREEN GRIFFING DR ROSEDALE 22 650 175 $ 16,604 Y C
3 STIP35 EVERGREEN NORTH PARK TYRRELL PKWY 18 1020 ASPHALT C&G 224 $ 21,318 Y C
3 2 ST1P36 FOREST DRIVE GRIFFING DR EVERGREEN 20 830 203 $ 19,274 Y C
3 1 ST1P50 40TH EVERGLADES BIG BEND
3 1 ST1P52 76TH TWIN CITY SOUTH OF BRAZOS 22 941 253 $ 24,037 98,200$ Y C
3 1 ST1P53 77TH TWIN CITY SOUTH OF BRAZOS 22 1032 277 $ 26,362 96,500$ Y C
3 1 ST1P57 3RD AVE 32ND 36TH 20 1285 314 $ 29,841 N C
3 1 MEMORIAL FEEDER 31ST 29TH Y C
3 1 ST1P89 JIMMY JOHNSON @ WALK ON'S $ 52,940 52,940$ C
3 3 ST3057 PARK RD LUCIAN ADAMS DR 60TH 1500' NORTH 18 2310 Open Ditch Asphalt 508 $ 48,279 133,000$ Y C
3 3 STFEM 60TH ST US69 9TH AVE 18 3806 837 $ 181,155 199,697$ y c
DISTRICT 3 COMPLETED PROJECT TOTALS =4.8152 3,867,658$ 5,211,401$
DISTRICT 3 - COUNCILMAN KINLAW
MILES DISTRICT 3 TOTALS ($) =
DISTRICT 3 COMPLETED PROJECTS
DISTRICT 4 –PROJECTS
RED –ROUND 3 PROJECTS
GREEEN –REMAINING PROJECTS
DISTRICT 4 –COMPLETED PROJECTS
DISTRICT ROUND CITY PROJECT Street Name From Street To Street Pavement Width (ft)Measured Width (ft)Pavement Length (ft)Street Type Rehab Method Asphalt (tons) Completed Cost 2018 Estimate Amount City Forces (Y/N)
Complete
4 1 STI1P05 WILLOW MAPLE 60TH ST 881,422$ 881,422$ C
4 1 ST1P06 60TH ST WEST PTA RD CANAL $ 868,315 903,247$ C41Viterbo Road Spur 93 END C41ST1P33Cedar St 58th St NORTH END 28 2616 895 $ 85,049
4 2 ST1P27 64th St Garnet W PORT ARTHUR RD 22 3401 914 $ 86,877 N C41ST1P2558th St Ray Ave CEDAR ST 0 $ -
4 1 ST1P38 Pine Ave.60th St. DEAD END41ST1P36Sharon Dr Cambridge QUEENS 23 1055 297 $ 28,174 Y C
4 1 ST1P38 Pine Ave.60th St. DEAD END 18 1300 286 $ 27,170 Y C41ST1P42Waco Ave Gulfway THOMAS BLVD Cost captured in District 1 C
4 1 ST1P61 LAKESIDE PLAZA SH73 CASHMERE 27 800 264 $ 34,995 320,000$ Y C43AST1P64ALABAMADORSEYHALL181302Open Ditch Asphalt 286 $ 27,212 94,000$ N C
4 ST1P65 PARKS WILSON MISSISSIPPI 18 1450 319 $ 30,305 74,200$ N C43AST1P66DAVIS365DORSEY182617Open Ditch Asphalt $ 134,510 378,300$ N C
4 3A ST1P067 MISSISSIPPI HALL DORSEY 18 1297 Open Ditch Asphalt $ 72,352 92,800$ N C43AST1P69PASTELSH73NORTH OF SHIRLEY 20 1069 Open Ditch Asphalt 261 $ 34,995 41,200$ N C
4 3A ST1P72 HOUSTON AVE LINKWOOD SH 73 20 1250 Open Ditch Asphalt 306 $ 53,145 192,000$ N C43AST1P7350THLINKWOODSHORTLINE191120260 $ 32,361 162,700$ N C43AST1P74SHORTLINE50TH EAST END 20 631 154 $ 37,171 54,800$ N C
4 3A ST1P078 14TH HOUSTON AVE AUSTIN AVE 20 1477 Open Ditch Asphalt 361 $ 124,322 667,300$ N C43AST1P079DALLASTHOMAS5TH AVE 20 3082 C & G $ 112,056 252,200$ N C
4 3A ST1P81 SASSINE RENEE ST FM 365 18 1206 Open Ditch Asphalt 265 $ 45,507 138,600$ N C43ASTP182WEAVERSASINE AVE LOUISIANA AVE 18 738 162 $ 34,382 70,400$ N C
3A LOUISIANA RENEE ST FM 365 18 1127 248 $ 23,567 N C43AST1P83HAZEL61ST ST SH 73 20 3634 888 $ 206,644 142,100$ N C
4 3A ST1P84 DIAMOND AVE 60TH ST 63 RD ST 1000 0 $ 166,630 359,000$ N C
4 3 ST1P86 60TH ST DD7 LEVEE HAZEL AVE 20 2200 538 $ 144,663 213,800$ C4263RD ST EASY DIAMOND 20 1400 342 $ 204,087 Y C
4 3 ST1P87 63RD ST DIAMOND AVE PAT AVE 20 3296 806 $ 204,087 514,600$ C43ST1P8763RD ST BOBBY JADE AVE 20 1505 368 $ 28,565 43,262$ Y C
4 1 ST3062 15TH HOUSTON FORT WORTH 1200 $ 113,345 113,345$ Y C41ST306347TH ST WEST END SHREVEPORT 20 1632 $ 90,670 Y C
4 ST3069 NEDERLAND AVE FORT WORTH AVE GULFWAY DR 25 1236 Open Ditch Asphalt 378 $ 35,878 85,835$ Y C4ST3070ORANGE AVE GULFWAY DR 19TH ST 20 1080 Open Ditch Asphalt 264 $ 25,080 60,000$ Y C4ST307712TH ST AUSTIN AVE SAVANNAH 20 1645 Open Ditch Asphalt 402 $ 38,201 91,390$ Y C
$ - 4 ST3079 50TH ST BEAUMONT AVE NE END 18 527 Open Ditch Asphalt 116 $ 11,014 26,350$ Y C
4 ST3080 AUGUSTA AVE THOMAS BLVD NEDERLAND AVE 20 905 Open Ditch Asphalt 221 $ 21,016 50,280$ Y C4ST3084LAKE CHARLES AVE GULFWAY DR NW END 19 1266 Open Ditch Asphalt 294 $ 27,929 66,820$ Y C
4 ST3089 BEAUMONT AVE H.O. MILLS BLVD 50TH ST 15 1274 Open Ditch Asphalt 234 $ 22,189 63,700$ Y C
4 ST3102 BEAUMONT AVE THOMAS BLVD NEDERLAND AVE 19 1758 Open Ditch Asphalt, C
& G 408 $ 38,783 129,890$ Y C
4 ST3107 MOBILE AVE 14TH ST West End 23 2038 Open Ditch Asphalt, C & G 573 $ 54,426 234,370$ Y C
4 ST3108 WHEATLEY AVE W 53RD ST PHYLLIS ST 20 1145 Open Ditch Asphalt 280 $ 26,589 63,610$ Y C4ST3111SHIRLEY ST RAY AVE WEST PTA ROAD 20 4791 Open Ditch Asphalt Extend Limits 1,171 $ 201,654 126,110$ Y C
11.57 $ 4,435,338 6,707,631$
DISTRICT 4 - COUNCILMAN KENNETH MARKS
DISTRICT 4 COMPLETED PROJECTS
MILES DISTRICT 4 TOTALS ($) =DISTRICT 4 COMPLETED PROJECT TOTALS =
APRIL 2022 -COMPLETED PROJECT
TOTALS
COMPLETED
TOTAL STREET
LENGTH (MILES)
COMPLETED
COSTS
10.42 7,686,789$
3.94 4,244,340$
4.82 3,867,658$
11.57 4,435,338$
APRIL 2022 COMPLETED PROJECT TOTAL = 30.74 20,234,125$
DISTRICT 1 COMPLETED PROJECTS =
DISTRICT 2 COMPLETED PROJECTS =
DISTRICT 3 COMPLETED PROJECTS =
DISTRICT 4 COMPLETED PROJECTS =
ENGINEERING REMAINING STREETS
W/ COMPLETION PERCENTAGES
TOTAL STREET
LENGTH (MILES)
REMAINING
COST TOTALS
PERCENTAGE
COMPLETE BY
COST
18.69 5,553,216$ 58.1%
6.08 897,466$ 82.5%
7.11 11,787,338$ 24.7%
12.21 3,888,390$ 53.3%
APRIL 2022 REMAINING PROJECT TOTAL = 44.08 22,126,410$ 47.8%
PERCENTAGE
COMPLETE (APRIL 2022)
STREET MILES
35.8%
39.3%
40.4%
48.7%
41.1%
DISTRICT 4 REMAINING PROJECTS =
DISTRICT 1 REMAINING PROJECTS =
DISTRICT 2 REMAINING PROJECTS =
DISTRICT 3 REMAINING PROJECTS =
CITY OF PORT ARTHUR –JANUARY
2022 FINANCE TOTALS