Loading...
HomeMy WebLinkAboutF. PURCHASE OF STREET MATERIALS - ROAD BUILDING MATERIALSCity of Port Arthur, Texas Mayor and City Council Communication DATE: 23 Jun 09 REFERENCE NO 001-1203- 531.36/86- 00 &CDBG SUBIECr: Award Annual Purchase of Streets Materials -ROAD BUILDING MATERIALS Page: 1 of 2 RECOMMENDATION: We recommend that the City Council award the bids for annual purchase of Streets materials -ROAD BUILDING MATERIALS to Transit Mix Concrete & Materials, APAC -Texas, AMF Materials & Transport, and Vulcan Construction Materials, LP as listed below. These materials will be utilized by the Public Works Department, Streets Division for street maintenance, the City Streets Program, and streets funded under the CDBG program. hese bids will be in efrect fora roximatel one 1 ear. BACKGROUND: These are annual contracts for ROAD BUILDING MATERIALS that will be used by the Streets Division for maintenance and construction. Bids were received and opened for these materials on 20 May 2009. Bids were received from six (6) vendors as shown in the table below. ROAD BUILDING MATERIALS ITEM UNIT CO ST % Diff VENDOR 2008 2008 1a. TYPE "PE" GR. 3 PRECOATED (Delivered) TON NO Bid $ 61.10 NlA APAC TYPE "PE" GR. 3 PRECOATED (Pleked-up) • TON No Bld $ 54.50 N!A APAC 1 b. TYPE "PE" GR. 4 PRECOATED (Delivered) TON $ 61.85 $ 61.10 -1.2% APAC TYPE "PE" GR. 4 PRECOATED (Picked-up) • TON $54.50 $54.50 0.0% APAC 2. BLACKBASE (Delivered) TON $ 82.35 $ 75.00 $.9% Vulcan BLACKBASE (Picked-up) • TON $ 75.00 $ 75.00 0.0% APAC 3. LIMESTONE (Delivered to City stockpile) TON $ 24.00 $ 24.00 0.0% Transit Mix LIMESTONE (Derryerea tojob site) TON $ 25.00 $ 25.00 0.0°~ Transit Mix LIMESTONE (Picked-up) TON $ 21.00 $ 21.00 0.0°~ Transit Mix 4. 670 LIMESTONE (Delivered to cny stockpile) TON $ 35.00 $ 35.00 0.0°k Transit Mix 610 LIMESTONE(Deiiveredtojobslte) TON $ 36.00 $ 36.00 0.0% Transit Mix 610 LIMESTONE (Pioked-up) TON $ 32.00 $ 30.00 -6.3% Trensit Mix 5. TYPE "D" HO7MIX (Delivered) TON $ 68.55 $ 68.10 -0.7% APAC TYPE "D" HOTMIX (Picked-up) TON $ 60.00 $ 60.00 0.0% APAC 6. TYPE "D" HOTMIX -COLD LAID (Delivered) TON $ 82.35 $ 81.60 -0.9°/s APAC TYPE "D" HOTMIX -COLD LAID (Picked-up) TON $ 75.00 $ 75.00 0.0% APAC 7. ROMAYOR SAND (Del. to city stockpile) TON $ 28.00 $ 28.00 0.0% Transit Mix ROMAYORSAND(Deiiveredtojobsite) TON $ 29.00 $ 29.00 0.0°h Transit Mix ROMAYOR SAND (Pioked-up) TON $ 25.00 $ 25.00 0.0% Transit Mix 8. CMNT STAB SAND (1'!Z SACK -Base Bitl) (Delivered to City stockpile) TON $ 22.00 $ 22.00 0.0% Transit Mix CMNT STAB SAND (1~/=SACK -Base Bid) (Delivered to job site) TON $ 22.00 $ 22.00 0.0% Transit MIX CMNT STAB SAND (1~/=SACK-Base Bid) (Picked- up) TON $ 17.00 $ 17.00 0.0% TrdnSIt MIX 9a. CMNT STAB SAND (~!2 SACK -Inc. Increase) TON $ 2.00 $ 2.00 0.0% Transit Mix 9b. CMNT STAB SAND (t/=SACK-Inc.Deerease) TON $ 2.00 $ 2.00 0.0% Transit Mix PREPARED BY: REB/klb DISPOSITION OF CITY COUNCIL: PROCESSED BY: APPROVED BY: APPROVED OTHER Ci Mana er COMMENTS: Ci SeQeta Z:lengineeAtlowments\CAMS1GaldenrotlsU2oad81dgMtIS09-Gold.>ns 6/25/2009 I City of Port Arthur, Texas Mayor and City Council Communication 001-1203- Award Annual Purchase of Streets Materials -ROAD 23 Jun 09 531.36/86- BUILDING MATERIALS 00 &CDBG ROAD BUILDING MATERIALS (cont.) 2of2 ITEM UNIT COST °h Diff VENDOR 2008 2008 10. CONCRETE RUBBLE (Del. to City stockpile) TON $ 25.00 $ 19.00 -24.0% AMF Materials CONCRETE RUBBLE (Del. toiob seta) TON $ 25.00 $ 19.00 -24.0% AMF Materials CONCRETE RUBBLE (Picked-up) TON $ 22.00 $ 16.00 -27.3% AMF Materials 11a. HEARTH SLAG o"-1'/ "SIZE Dal. eo ci stock) TON No Bid No Bid NIA HEARTH SLAG 0^-1'J "SIZE (Del. eo ob site) TON No Bid No Bid N!A HEARTH SLAG 0"-1'/ "SIZE Picked-u) TON No Bid No Bid N/A 11b. HEARTH SLAG 1'J "-3"SIZE Del. to CI stock TON No Bid No Bid N/A HEARTH SLAG 1'/ "J" 81ZE Del. W ob site) TON No Bid No Bid N/A HEARTH SLAG 1'/ "J" SIZE Picked-u TON No Bid No Bid NIA 12. GRADE 3 COMMERCIAL ROCK (Deltvered) TON $ 40.25 $ 37.1D -7.8°k APAC GRADE 3 COMMERCUL ROCK (Picked-up) TON $ 33.50 $ 30.50 -9.0% APAC 13. GRADE 4 COMMERCIAL ROCK (Delivered) TON $40.25 $ 37.10 -7.8°~ APAC GRADE 4 COMMERCUL ROCK (Picked-up) TON $ 33.50 $ 30.50 -9.0°/a APAC 14. s/ "LIMESTONE AGGREGATE Delivered) TON $40.25 $ 37.10 -7.8°/a APAC sJ "LIMESTONE AGGREGATE Pickedri " TON $ 33.50 $ 30.50 -9.0% APAC For Items 1a and 1b, TYPE "PE" GR. 3 & 4 PRECOATED (Picked-up) and Item 2 BLACKBASE (Picked-up), Martin Marietta laterials is located in San Antonio and is too great a distance for pick up at the plant. In spite of having the a slightly higher bid on Item 14. a/s" LIMESTONE (Picked-up) at $32.00 per ton, compared with $30.50 ~r ton by APAC, Transit Mix has a plant within Port Arthur. The cost and time savings by being able to pick-up locally rather ian driving to Beaumont for APAC, more than offsets the unit cost difference. are budgeted in accounts 001-1203-531.36/86-00 and CDBG recommend that the City Council award the bids for annual purchase of Streets materials -ROAD BUILDING MATERIALS Transit Mix Concrete & Materials, APAC -Texas, AMF Materials & Transport, and Vulcan Construction Materials, LP as listed ove. These materials will be utilized by the Public Works Department, Streets Division for street maintenance, the Gty ~eets Program, and streets funded under the CDBG program. These bids will be in effect for approximately one (1) year. Ross E. Blackketter, P.E. Director of Public Works Shawna Tubbs Purchasing Manager BY: BY: OF CITY COUNCIL: Deborah Echo s, CPA Director of Finance APPROVED OTHER BY: Z:lengineerWowmentslCAMS\Goldenrods\ROadBldgMgs09-Gold.~ds 6/25/2009