HomeMy WebLinkAboutF. PURCHASE OF STREET MATERIALS - ROAD BUILDING MATERIALSCity of Port Arthur, Texas
Mayor and City Council Communication
DATE:
23 Jun 09 REFERENCE NO
001-1203-
531.36/86-
00 &CDBG SUBIECr:
Award Annual Purchase of Streets Materials -ROAD
BUILDING MATERIALS Page:
1 of 2
RECOMMENDATION:
We recommend that the City Council award the bids for annual purchase of Streets materials -ROAD BUILDING
MATERIALS to Transit Mix Concrete & Materials, APAC -Texas, AMF Materials & Transport, and Vulcan
Construction Materials, LP as listed below. These materials will be utilized by the Public Works Department,
Streets Division for street maintenance, the City Streets Program, and streets funded under the CDBG program.
hese bids will be in efrect fora roximatel one 1 ear.
BACKGROUND:
These are annual contracts for ROAD BUILDING MATERIALS that will be used by the Streets Division for
maintenance and construction.
Bids were received and opened for these materials on 20 May 2009. Bids were received from six (6) vendors as
shown in the table below.
ROAD BUILDING MATERIALS
ITEM UNIT CO ST % Diff VENDOR
2008 2008
1a. TYPE "PE" GR. 3 PRECOATED (Delivered) TON NO Bid $ 61.10 NlA APAC
TYPE "PE" GR. 3 PRECOATED (Pleked-up) • TON No Bld $ 54.50 N!A APAC
1 b. TYPE "PE" GR. 4 PRECOATED (Delivered) TON $ 61.85 $ 61.10 -1.2% APAC
TYPE "PE" GR. 4 PRECOATED (Picked-up) • TON $54.50 $54.50 0.0% APAC
2. BLACKBASE (Delivered) TON $ 82.35 $ 75.00 $.9% Vulcan
BLACKBASE (Picked-up) • TON $ 75.00 $ 75.00 0.0% APAC
3. LIMESTONE (Delivered to City stockpile) TON $ 24.00 $ 24.00 0.0% Transit Mix
LIMESTONE (Derryerea tojob site) TON $ 25.00 $ 25.00 0.0°~ Transit Mix
LIMESTONE (Picked-up) TON $ 21.00 $ 21.00 0.0°~ Transit Mix
4. 670 LIMESTONE (Delivered to cny stockpile) TON $ 35.00 $ 35.00 0.0°k Transit Mix
610 LIMESTONE(Deiiveredtojobslte) TON $ 36.00 $ 36.00 0.0% Transit Mix
610 LIMESTONE (Pioked-up) TON $ 32.00 $ 30.00 -6.3% Trensit Mix
5. TYPE "D" HO7MIX (Delivered) TON $ 68.55 $ 68.10 -0.7% APAC
TYPE "D" HOTMIX (Picked-up) TON $ 60.00 $ 60.00 0.0% APAC
6. TYPE "D" HOTMIX -COLD LAID (Delivered) TON $ 82.35 $ 81.60 -0.9°/s APAC
TYPE "D" HOTMIX -COLD LAID (Picked-up) TON $ 75.00 $ 75.00 0.0% APAC
7. ROMAYOR SAND (Del. to city stockpile) TON $ 28.00 $ 28.00 0.0% Transit Mix
ROMAYORSAND(Deiiveredtojobsite) TON $ 29.00 $ 29.00 0.0°h Transit Mix
ROMAYOR SAND (Pioked-up) TON $ 25.00 $ 25.00 0.0% Transit Mix
8. CMNT STAB SAND (1'!Z SACK -Base Bitl) (Delivered to
City stockpile) TON $ 22.00 $ 22.00 0.0% Transit Mix
CMNT STAB SAND (1~/=SACK -Base Bid) (Delivered to
job site) TON $ 22.00 $ 22.00 0.0% Transit MIX
CMNT STAB SAND (1~/=SACK-Base Bid) (Picked-
up) TON $ 17.00 $ 17.00 0.0% TrdnSIt MIX
9a. CMNT STAB SAND (~!2 SACK -Inc. Increase) TON $ 2.00 $ 2.00 0.0% Transit Mix
9b. CMNT STAB SAND (t/=SACK-Inc.Deerease) TON $ 2.00 $ 2.00 0.0% Transit Mix
PREPARED BY:
REB/klb DISPOSITION OF CITY COUNCIL: PROCESSED BY:
APPROVED BY: APPROVED OTHER
Ci Mana er COMMENTS: Ci SeQeta
Z:lengineeAtlowments\CAMS1GaldenrotlsU2oad81dgMtIS09-Gold.>ns 6/25/2009
I City of Port Arthur, Texas
Mayor and City Council Communication
001-1203- Award Annual Purchase of Streets Materials -ROAD
23 Jun 09 531.36/86- BUILDING MATERIALS
00 &CDBG
ROAD BUILDING MATERIALS (cont.)
2of2
ITEM UNIT COST °h Diff VENDOR
2008 2008
10. CONCRETE RUBBLE (Del. to City stockpile) TON $ 25.00 $ 19.00 -24.0% AMF Materials
CONCRETE RUBBLE (Del. toiob seta) TON $ 25.00 $ 19.00 -24.0% AMF Materials
CONCRETE RUBBLE (Picked-up) TON $ 22.00 $ 16.00 -27.3% AMF Materials
11a. HEARTH SLAG o"-1'/ "SIZE Dal. eo ci stock) TON No Bid No Bid NIA
HEARTH SLAG 0^-1'J "SIZE (Del. eo ob site) TON No Bid No Bid N!A
HEARTH SLAG 0"-1'/ "SIZE Picked-u) TON No Bid No Bid N/A
11b. HEARTH SLAG 1'J "-3"SIZE Del. to CI stock TON No Bid No Bid N/A
HEARTH SLAG 1'/ "J" 81ZE Del. W ob site) TON No Bid No Bid N/A
HEARTH SLAG 1'/ "J" SIZE Picked-u TON No Bid No Bid NIA
12. GRADE 3 COMMERCIAL ROCK (Deltvered) TON $ 40.25 $ 37.1D -7.8°k APAC
GRADE 3 COMMERCUL ROCK (Picked-up) TON $ 33.50 $ 30.50 -9.0% APAC
13. GRADE 4 COMMERCIAL ROCK (Delivered) TON $40.25 $ 37.10 -7.8°~ APAC
GRADE 4 COMMERCUL ROCK (Picked-up) TON $ 33.50 $ 30.50 -9.0°/a APAC
14. s/ "LIMESTONE AGGREGATE Delivered) TON $40.25 $ 37.10 -7.8°/a APAC
sJ "LIMESTONE AGGREGATE Pickedri " TON $ 33.50 $ 30.50 -9.0% APAC
For Items 1a and 1b, TYPE "PE" GR. 3 & 4 PRECOATED (Picked-up) and Item 2 BLACKBASE (Picked-up), Martin Marietta
laterials is located in San Antonio and is too great a distance for pick up at the plant.
In spite of having the a slightly higher bid on Item 14. a/s" LIMESTONE (Picked-up) at $32.00 per ton, compared with $30.50
~r ton by APAC, Transit Mix has a plant within Port Arthur. The cost and time savings by being able to pick-up locally rather
ian driving to Beaumont for APAC, more than offsets the unit cost difference.
are budgeted in accounts 001-1203-531.36/86-00 and CDBG
recommend that the City Council award the bids for annual purchase of Streets materials -ROAD BUILDING MATERIALS
Transit Mix Concrete & Materials, APAC -Texas, AMF Materials & Transport, and Vulcan Construction Materials, LP as listed
ove. These materials will be utilized by the Public Works Department, Streets Division for street maintenance, the Gty
~eets Program, and streets funded under the CDBG program. These bids will be in effect for approximately one (1) year.
Ross E. Blackketter, P.E.
Director of Public Works
Shawna Tubbs
Purchasing Manager
BY:
BY:
OF CITY COUNCIL:
Deborah Echo s, CPA
Director of Finance
APPROVED
OTHER
BY:
Z:lengineerWowmentslCAMS\Goldenrods\ROadBldgMgs09-Gold.~ds 6/25/2009