HomeMy WebLinkAboutPR 22491: CHANGE ORDER NO. 02 WITH MCINNIS CONSTUCTION, INC., THE DEPARMENT CLUB, REPAIRS Memorandum
City of Port Arthur, Texas
Robert A. "Bob"Bowers Civic Center
To: The Honorable Mayor and City Council
Through: Ron Burton, City Manager
From: Adam J Saunders, Civic Center Dir
RE: Proposed Resolution No. P.R. 22491
REQUEST:
The Department Club at 1924 Lakeshore Drive is in need of repair and maintenance. In November of
2021 the Council passed Res 21-459. This Resolution was for Phase III of the repairs and maintenance.
In March of 2022 the Council passed Res 22-141. This Resolution was for Change Order#1.
It has been determined additional materials and days will be needed for the repairs and maintenance at the
Department Club.
These materials are for the installation of mosaic tile over the wood floor substrate in order to get the tile
setting manufacturer's warranty on the tile floor installation.The contractor found a very springy wood
floor substrate during demolition. This material helps prevent cracking of tile and grout after it has been
installed.These additional requirements were determined when the tile setting material manufacturer
visited the site and informed the contractor and architect the additional materials would now be needed.
Sixty days need to be added to the completion of the project due to the delays caused by the need to have
two HVAC units installed. There was a major delay in getting the equipment in and installed.
The additional material and additional days will be Change Order#2. The cost of this Change Order#2 is
$2,537.48. The total amount of Phase III is $295,144.18, which includes this Change Order#2.
McInnis Construction, Inc. of Silsbee will perform the work for a cost of$2,537.48. Funds available in
account 307-21-049-8512-00-10-000.
ANALYSIS/CONSIDERATION:
There are a lot of needed repairs at the building. Phase I and II have been performed. Phase III is the
next step in the repairs and restoration of the Department Club. Change Order#2 to the Phase III repairs
is needed.
RECOMMENDATION
A resolution authorizing the City Manager to enter into an agreement with McInnis Construction,Inc. of
Silsbee for Change Order#2 to Phase III repairs and maintenance of the Department Club in the amount
of$2,537.48.
BUDGETARY AND FISCAL EFFECT
Funds available in account 307-21-049-8512-00-10-000, Project No. BU0011.
STAFFING EFFECT
None
PO 22491
P.R. No. 22491
04/20/2022 AJS
PAGE 1 of 3
RESOLUTION NO.
A RESOLUTION AUTHORIZING THE CITY MANAGER TO EXECUTE CHANGE
ORDER NO. 02 TO THE CONTRACT BETWEEN THE CITY OF PORT ARTHUR AND
MCINNIS CONSTRUCTION, INC. OF SILSBEE, TEXAS FOR PHASE III REPAIRS
TO THE DEPARTMENT CLUB INCREASING THE CONTRACT BY SIXTY (60)
DAYS AND THE AMOUNT BY $2,537.48 TO A NEW TOTAL OF $295,144.18 . FUNDS
AVAILABLE IN ACCOUNT 307-21-049-8512-00-10-000 PROJECT NO. BU00111
WHEREAS, the City Council approved Resolution No. 21-459 at the November 9, 2021
Council Meeting, an agreement with McInnis Construction of Silsbee, Texas for Phase III repairs
to the Department Club in the amount of$258,500.00; and
WHEREAS, the City Council approved Resolution No. 22-141 at the March 29, 2022
Council Meeting, Change Order No. 1 to Phase III repairs to the Department Club in the amount
of$34,106.70 to a new total of$292,606.70; and
WHEREAS, it has been determined that sixty(60) additional days are needed to the
completion of the project due to delays caused by the installation of HVAC equipment; and
WHEREAS, during the demolition of floor areas in preparation for Phase III repairs to
the Department Club, it was determined additional material was needed to prevent cracking of
floor tiles; and
WHEREAS, these additional days and repairs will be Change Order No. 2; and
WHEREAS, McInnis Construction, Inc. of Silsbee, Texas will do this work for
$2,537.48; and
WHEREAS, approval of Change Order No. 2 is deemed an appropriate action.
NOW THEREFORE BE IT RESOLVED BY THE CITY COUNCIL OF THE
CITY OF PORT ARTHUR:
Section 1. That the facts and opinions in the preamble are true and correct.
Section 2. That, the City Manager is hereby authorized to execute Change Order No.
2 with McInnis Construction, Inc of Silsbee,Texas for to Phase III repairs at the Depaihuent Club.
Section 3. That, the funding for said agreement is $2,537.48.
PO 22491
Section 4. That, a copy of the caption of this Resolution be spread upon the Minutes
of the City Council.
READ, ADOPTED, AND APPROVED, this day of May, 2022, A.D., at a
Regular Meeting of the City Council of the City of Port Arthur, Texas by the following vote:
AYES:
Mayor:
Councilmembers:
NOES: .
Thurman"Bill" Bartie, Mayor
ATTEST:
Sherri Bellard, City Secretary
AP OVED AS TO FORM:
ec'a Tize o CityAttorn
Li .v.Lto eiub-e-A 4 6 e cZ)
ey
i �,
APPROVED FOR ADMINISTRATION:
Ron Burton, City Manager
APPROVED AS TO FUND AVAILABILITY:
Pr.
-t ___6_1(..1) NiStii,
Kandy Daniel, Clifton Williams, CPPB
Interim Director of Finance Purchasing Manager
PO 22491
EXHIBIT "A"
PO 22491
CHANGE ORDER
PROJECT: Federated Women's Club-Phase III CHANGE ORDER NO: 2
CONTRACTOR: McInnis Construction DATE: 04.12.2022
675 S 4th St ARCHITECTS PROJECT NO.: 20037
Silsbee,Texas CONTRACT DATE: 01.25.2021
CONTRACT FOR: Rehabilitation(Historic)
This Contract is changed as follows:
Item# DESCRIPTION DAYS AMOUNT
01 Additional materials-Allset(material)and Kerdi(membrane)
Breakdown attached $2,206.50
02 Increase in contract days due to HVAC,Window and Tile delays 60
Subtotal $2,206.50
15%Overhead/Profit $330.98
TOTAL: $2,537.48
**See attached breakdown
Not valid until signed by the Owner,Architect,and Contractor.
The original Contract Sum was $258,500.00
Net change by previously authorized Change Orders $34,106.70
The Contract Sum prior to this Change Order was $292,606.70
The Contract sum will be increased by this Change Order in the amount of $2,537.48
The new Contract Sum including this Change Order will be $295,144.18
The Contract Time will be increased by zero(60)days.
The date of Substantial Completion as of the date of this Change Order therefore is July 3,2022.
NOTE The summary does not reflect changes in the Contract Sum or Contract Time which have been authorized by Construction Change Directive.
The LaBiche Architectural Group McInnis Construction City of Port Arthur
7999 Gladys i e ue,Suite 101 675 S 4th St 3401 Culture Ctr. Dr.
Beaumon s Silsbee,Texas 77656 Port Arthur,Texas 77642
By: By: By:
Date:de
6Z � Date: Q �f/i 3l ZL Date:
C 1k
11592 7
60
ter
NIIIIIIIN
ytC:111111111111111111111
Change Order MCINNIS CONSTRUCTION. INC.
•
PROJECT: CHANGE ORDER NUMBER: 2
City of Fort Arthur OWNER
Historic Rehabilitation of hederated DATE: 4/11/2022 ARCHITECT
Women's Club-Phase Ill
1924 Lakeshore Drive,Port Arthur,'1'X ARCHITECT'S PROJECT NO: CONTRACTOR 1
t U C;U1'1 I KAI_1 UK:
McInnis Construction INC FIELD ❑
675 S 4th St CONTRACT DATE: 1/25/2021 pTHER ❑
Silsbee Tx
CONTRACT FOR: City of Port Arthur
The Contract is changed as follows:
1.) Additional materials-Allset(setting material)and kerdi(membrane) $ 2,206.50
Breakdown attached
2) Increase in contract days due to HVAC,window,and tile delays. 60 days
Subtotal $ 2,206.50
15%Overhead/Profit $ 330.98
Total $ 2,537.48
The original Contract Sum was $ $292,606.70
The net change by previously authorized Change Orders $
The Contract Sum prior to this Change Order was $ $292,606.70
The Contract Sum will be increased by this Change Order in
the amount of $ $2,537.48
The new Contract Sum including this Change Order will be $ 5295,I44.18
The Contract Time will be increased by 60 (60)days
The date of Substantial Completion as of the date of this Change Order therefore is
NOT VALID UNTIL SIGNED BY THE ARCHITECT,CONTRACTOR AND OWNER.
The Labiche Architectural Group, Inc. McInnis Construction City of Port Arthur
ARCHITECT(Firm name) CONTRACTOR(Firm name) OWNER(Firm name)
7999 Gladys Ave.,STE 101 7 S 4th St Silsbee TX 3401 Culture Ctr.Dr.
ADDRESS ADDRESS
BY(Signature) BY(Sign u ) BY(Signature)