Loading...
HomeMy WebLinkAboutPR 15355: HANDICAP RANTS AT THOMAS BLVD. & SECOND AVENUEMEMORANDUM PUBLIC WORKS DEPARTMENT TO: Stephen B. Fitzgibbons, City Manager FROM: Ross E. Blackketter, P.E., Director of Public Works SUBJECT: P. R.# 15355, L. Mobley Concrete Construction for Construction of Handicap Ramps at Intersection of Thomas Blvd. and Second Ave. DATE: 07-July-09 RECOMMENDATION: It is recommended that the City Council approve Proposed Resolution No. 15355 authorizing the City Manager to execute an agreement with L. Mobley Concrete Construction of Houston, Texas for construction of eight (8) handicap ramps at the intersection of Thomas Boulevard and Second Avenue for the total amount of $16,000. Funds are available in account 001-1204- 531.84-00. BACKGROUND: Because of the recent drainage improvements constructed at the intersection of Thomas Boulevard and Second Avenue, the handicap ramps need to be rebuilt. Accordingly, quotes were solicited for the construction of eight (8) handicap ramps at the intersection of Thomas Boulevard and Second Avenue. Four Vendors were contacted; McZeal Concrete of Port Arthur, TX; Norman Hwy Contractors of Orange, TX; W & W Construction of Port Arthur, TX and L. Mobley Concrete Construction of Houston, TX. L. Mobley Concrete Construction was the only one of these vendors to submit a quote for this intersection. His quote was $16,000 for the construction of eight (8) handicap ramps at that intersection. BUDGETARY/FISCAL EFFECT: Funds are available in account 001-1204-531.84-00. EMPLOYEE/STAFF EFFECT: None. SUMMARY: It is recommended that the City Council approve Proposed Resolution No. 15355 authorizing the City Manager to execute an agreement with L. Mobley Concrete Construction of Houston, Texas for construction of eight (8) handicap ramps at the intersection of Thomas Boulevard and Second Avenue for the total amount of $16,000. Funds are available in account 001-1204- 531.84-00. Ross E. Blackketter, P.E. Director of Public Works REB/klb Z:\engineer\Documents\CAMS\Mobley - HC Ramps-Thomas Blvd & 2n0 Ave.doc P.R. 15355 07/06/09 klb RESOLUTION NO. A RESOLUTION AUTHORIZING THE CITY MANAGER TO EXECUTE AN AGREEMENT WITH L. MOBLEY CONCRETE CONSTRUCTION OF HOUSTON, TEXAS FOR CONSTRUCTION OF EIGHT (8) HANDICAP RAMPS AT THE INTERSECTION OF THOMAS BOULEVARD AND SECOND AVENUE FOR THE TOTAL AMOUNT OF $16,000; ACCOUNT 001-1204-531.84-00 WHEREAS, there is a need to reconstruct handicap ramps at the intersection of Thomas Boulevard and Second Avenue in conjunction with drainage improvements at that location; and, • WHEREAS, the City solicited quotes for the construction of handicap ramps for this and, WHEREAS, one (1) quote was received and opened on 19 June 2009 for the above referenced Contract and has been evaluated by Public Works and Purchasing; and, WHEREAS, L. Mobley Concrete Construction was the only bidder with a total of $16,000; now, therefore, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PORT ARTHUR: THAT, the City Council of the City of Port Arthur hereby awards the quote in the amount of $16,000 for construction of handicap ramps at the intersection of Thomas Boulevard and Second Avenue to L. Mobley Concrete Construction of Houston, Texas as shown on Exhibit "A" attached hereto and made a part hereof; and, THAT, the City Manager is hereby authorized to execute an agreement with L. Mobley Concrete Construction of Houston, Texas (attached as Exhibit "B'~ for construction of handicap ramps at the intersection of Thomas Boulevard and Second Avenue, account 001-1204-531.84- 00; and, P.R. 15355 Page 2 THAT, a copy of the caption of this Resolution be spread upon the Minutes of the City Council. READ, ADOPTED, AND APPROVED this the _ day of , A.D. 2009 at a meeting of the City of Port Arthur, Texas by the following vote: AYES: Mayor, Councilmembers: Mayor ATTEST: City Secretary APPROVED FOR ADMINISTRATION: Stephen B. Fitzgibbons City Manager ~ ~~ Ross E. Blackketter, P.E. Director of Public Works APPROVED AS TO FORM: -vim ~.K.~ City Attorne ~ gti (o2hA{.~= vim) APPROVED AS TO AVAILABILITY OF FUNDS: A: ~cG~,G~`~lG Deborah Echolsl, CPA Director of Finance n ~ ~ ~ II Shawna Tubbs Purchasing Manager Z:\engineer\Documents\Resol utions\PR15355 EXHIBIT A Page 1 of 2 CiK~ oIlAAAAltha~i ~ Date of Request: CITY OF PORT ARTHUR QUOTE SHEET (Specifications are attached) June 18.2009 Department Requesting Quote: Public Works Quote Request: Construction of Handicap Ramns at the Intersection of Thomas Blvd and 2nd Avenue Quote due date & time: Thursday. June 25.2009 at 1:00 P.M. Quotes Returned: Ouotes are to be faxed to (4091 983-8291, e-mailed to cilliams o,portarthur.net or hand delivered to the Purchasine Division on the 2" floor of Citv Hall Questions, plegse contact: Purchasing Division. Clifton Williams. (4091 983-8160 Amount/Price~~ ~~/ 1 Work will be complete in ~~ calendar days L~~~ COMPANY NAM ~e.-e__ ~O ~I._2 Y `cz PRINTED NAME G ATURE AD/DRESS q~ i-~ UPHONE Shawna Tubbs, Purchasing Manager ~(~u ~ ~`~ ~O~ CITY, STATE, ZIP MAID L 1.11~~09 Date EXHIBIT 6 CONSTRUCTION SERVICES AGREEMENT Construction of Handicap Ramps at Various Intersections Along Procter Street THIS AGREEMENT, made this the 14"' of July 2009, by and between the City of Port Arthur, a municipal corporation organized under the laws of the State of Texas, hereinafter called "OWNER" or "CITY" and L. Moblev Concrete Construction hereinafter called "CONTRACTOR". WITNESSED: That for and in consideration of the payment terms, conditions and agreements set forth herein, OWNER and CONTRACTOR agree as follows: The Contract shall commence within ten (10) days of the execution of the Contract by the OWNER. The work to be performed under this Contract will be completed within 12 days of commencement. 2. The CONTRACTOR will perform the work as delineated in the Scope of Work and Specifications attached hereto. 3. During the term of this Contract, the Contractor will furnish at his own expense all of the materials, supplies, tools, equipment, labor and other services necessary to connection therewith, excepting those supplies specifically not required of Contractor in the Specifications and Scope of Work. The CONTRACTOR agrees to perform all the work described in the specifications and contract documents and to comply with the terms therein for the total cost of $16.000 5. The CONTRACTOR will commence the work required by the Contrail Documents upon receipt of a Notice to Proceed. 6. The term "Contract Documents" means and includes the following: 1) Agreement 3) Addenda 4) General Information 5) Specifications 6) Bid 7) Notice to Proceed Z:\engineer\Documents\Contracts\Mobley-HC Ramps-Thomas&Second-09.doc 1 7. This Agreement shall be binding upon all parties hereto and their respective heirs, executors, administrators, successors and assigns. 8. IN WITNESS WHEREOF, the parties hereto have executed, or caused to be executed by their duly authorized officials, this Agreement in (2 copies) each of which shall be deemed an original on the date first above written. Signed on the day of July 2009. OWNER: CITY OF PORT ARTHUR Stephen 6. Fitzgibbons, City Manager Signed on the day of July 2009. CONTRACTOR: L. MOBLEY CONCRETE CONSTRUCTION Lee Mobley, Owner Z:\engineer\Documents\Contracts\Mobley-HC Ramps-Thomas&Second-09.doc 2