Loading...
HomeMy WebLinkAboutK. ELDRIDGE CONSTRUCTION, INC. - BOARDWALK FISHING PIER WALKWAYCITY OF PORT ARTHUR, TEXAS MAYOR AND CITY COUNCIL COMMUNICATION DATE REFERENCE SUBJECT PAGE NUMBER AWARDING OF A BID FOR THE RETRIEVAL 07/20/09 i2vzsoavm.sz-oo AND REINSTALLATION OF BOARDWALK 1 of I IKEBDW FISHING PIER It is recommended to award the bid for the retrieval and reinstallation of the Boardwalk Fishing Pier Walkway to Eldridge Construction, Inc., in the amount of $7,000.00 be confirnied. The walkway is the primary (sole) means of reaching the fishing pier from the boazdwalk (bank) side of the pier. Its restoration is necessary to provide full utility of the pier to citizens and visitors. Background The bridge between the shore and the fishing pier is the sole means of reaching the pier. During Humcane Rita the bridge was washed loose. Eldridge Construction, Inc. was found to be the sole source able to retrieve the bridge. Humcane Ike again resulted in the bridge being washed loose. Once the Fire Department was able to locate the bridge via sonar technology, the City reviewed options (external and internal [i.e. using City equipment]) to retrieve the bridge. Once again Eldridge Construction, Inc. was determined to be the sole source to retrieve the bridge and was contacted; however, due to ihev schedule their availability was not known. As soon as they became available the bridge was retrieved and reset. The City's Engineering Department has been asked to review the bridge's bank/pier connections to possibly provide more durable connections to the pier and shore. The City received a sole bid from, and it recommended that the city council confirm, the award of the bid to Eldridge Construction, Ina Comoanv Name Location of Bidder Bid Eldridge Construction, Inc. Port Arthur $7,000.00 Budgetary and fiscal effect Funding in the amount of $7,000.00 is available for this purpose. [Account 121-2300-90132-00 IKEBDW]. Staffing effect None Summary Lt is recommended to award the bid for the retrieval and reinstallation of the Boardwalk Fishing Pier Walkway to Eldridge Construction, Inc., in the amount of $7,000.00 be confirmed. The walkway is the primary (sole) means of reaching the fishing pier from the boardwalk (bank) side of the pier. r storation is ec s to provide full utility of the pier to ci ' ens and visitors. f y~ Albe higpen hawna Tubbs Deborah s Interim Director of Purchasing Manager Director of Finance Parks & Recreation ATTka APPROVED OTHER (DESCRIBE) I CITY SECRETARY DATE