Loading...
HomeMy WebLinkAbout(D1) Council Update on District 3 Drainage Projects 8-16-22 District 3 Drainage Projects Review 404 Project Partners Stonegate Project Lake Arthur Project Timeline Highlights Description of Lake Arthur Project Impact Area Structures Description of Lake Arthur Project Impact Area Street Ponding 1 Multi-faceted Process of FEMA 404 HMGP Agency Contribution CITY OF PORT ARTHUR ARDURRA ENGINEERING FIRMS FEMA/TDEM OTHER AGENCIES IDENTIFY THE NEED FOR MITIGATION; PRIORITIZE PROJECTS; ESTABLISH PROJECT SCOPE AND DESIRED OUTCOME; PROVIDE INTERNAL DATA; PROVIDE MATCHING FUNDING PREPARE APPLICATION; PROVIDE ELIGIBILITY GUIDANCE ON DESIRED SCOPE; RUN BCA; ANSWER RFI; COORDINATE INFORMATION FROM ALL SOURCES; INTERFACE WITH FEMA/TDEM PROVIDE ENGINEERING ANALYSIS AND PROJECTED OUTCOMES; HYDROLOGIC STUDIES; OFFER ENGINEERING GUIDANCE AND ALTERNATIVES TO MEET DESIRED OUTCOME INTERPRET APPLICATION DATA; CHALLENGE MODEL DATA FOR PROJECTS; DEVELOP RFIS; APPROVE/DISAPPROVE PROJECTS GRANT JURISDICTIONAL APPROVAL; PROVIDE COMPLIMENTARY PROJECT SCOPES; OFFER FEEDBACK REGARDING PROJECT IMPACTS 2 Lake Arthur Drainage Project Review Factors of Damage Depth Function (DDF) Square Footage Value Type of Property (residential v commercial) Slab Type Finished Floor Elevation Reconstruction Value (cost to replace damaged sq ft) % of Mean Damage Water Surface Elevation – Existing (from H&H Model) Water Surface Elevation – Post Mitigation (from H&H Model) Content and Displacement Values Contingent Factors = Social/Economic Benefits are Added 3 Stonegate Drainage Project Stonegate Project has achieved a BCR of 1.14 within the FEMA guidance and allowable factors and components. Project is in FEMA approval review process. 14-month construction phase upon approval and bid (2 month bid process) Project total cost ($17.4M) CDBG-DR/HMGP 4 Stonegate Drainage Project Project Area - Improvements along the Golf Course, 9th Avenue and Jimmy Johnson Blvd. Impact Area Streets Lake Arthur Dr Pleasant Hill Champions Ct Greenway Point Dr 9th Avenue Oakmont Dr Roshan Ct Royal Dr Birchwood Dr Jimmy Johnson Blvd Memorial Blvd Golfhill Dr Greenhill Dr Sugarhill Ct Anchor Dr Regency Dr Turtle Creek Blvd 5 Document Path: P:\0093\003\Deliverables\2020.07.DD (Port Arthur Submittal 1)\Compilation_Docs\Exhibits\EX03_Landuse.mxd Oakmont Drive Golfhill Drive Jimmy Johnson Blv d 9th Avenue Lake Arthur Drive Gre e nwa y Poin t e Drive STONEGATE PROJECT AREA JIMMY JOHNSON 9TH AVENUE LAKE ARTHUR DR 6 STONEGATE IMPACT AREA 7 8 9 10 Lake Arthur Drainage Project Review 11 Lake Arthur Drainage Project Review 2YR FLOOD INUNDATION 1.84’ 10YR FLOOD INUNDATION 2.6’ 100YR FLOOD INUNDATION 3.42’ 50YR FLOOD INUNDATION 3.16’ 25YR FLOOD INUNDATION 2.86’ 500YR FLOOD INUNDATION 4’ AVG HOME ELEVATION 4.78’ range 3.17’ - 6.55’ 11% = 3-4’; 59% 4- 5’; 30% +5’ 12 Lake Arthur Drainage Project Review 13 Lake Arthur Drainage Project Review STRUCTURAL ELEVATION HOME FLOODING DRAINAGE CAPACITY STREET FLOODING 14 15 Lake Arthur Drainage Project Review THE WATERMARK OF HARVEY 50+” RAINFALL IN 4 DAYS LAKE ARTHUR DRAINAGE SYSTEM IS BUILT FOR 2 YR EVENT DD7 SYSTEM WAS OVERWHELMED- WATER OVERTOPPED SYSTEM SHEET FLOODING FROM SURROUNDING COUNTY WATERSHED REGIONAL CAPACITY CAN NOT BE ADDRESSED IN LOCAL PROJECT RE-FORMULATION OF PLAN TO ADDRESS STREET INUNDATION TARGET USE OF CDBG-DR FUNDING 16