Loading...
HomeMy WebLinkAbout(D1) Council Update on District 3 Drainage Projects 8-16-22 - CopyDistrict 3 Drainage Projects Review 404 Project Partners Stonegate Project Lake Arthur Project Timeline Highlights Description of Lake Arthur Project Impact Area Structures Description of Lake Arthur Project Impact Area Street Ponding Multi-faceted Process of FEMA 404 HMGP Agency Contribution CITY OF PORT ARTHUR ARDURRA ENGINEERING FIRMS FEMA/TDEM OTHER AGENCIES IDENTIFY THE NEED FOR MITIGATION;PRIORITIZE PROJECTS;ESTABLISH PROJECT SCOPE AND DESIRED OUTCOME;PROVIDE INTERNAL DATA;PROVIDE MATCHING FUNDING PREPARE APPLICATION;PROVIDE ELIGIBILITY GUIDANCE ON DESIRED SCOPE; RUN BCA;ANSWER RFI;COORDINATE INFORMATION FROM ALL SOURCES; INTERFACE WITH FEMA/TDEM PROVIDE ENGINEERING ANALYSIS AND PROJECTED OUTCOMES;HYDROLOGIC STUDIES;OFFER ENGINEERING GUIDANCE AND ALTERNATIVES TO MEET DESIRED OUTCOME INTERPRET APPLICATION DATA;CHALLENGE MODEL DATA FOR PROJECTS; DEVELOP RFIS;APPROVE/DISAPPROVE PROJECTS GRANT JURISDICTIONAL APPROVAL;PROVIDE COMPLIMENTARY PROJECT SCOPES;OFFER FEEDBACK REGARDING PROJECT IMPACTS Lake Arthur Drainage Project Review Factors of Damage Depth Function (DDF) Square Footage Value Type of Property (residential v commercial) Slab Type Finished Floor Elevation Reconstruction Value (cost to replace damaged sq ft) % of Mean Damage Water Surface Elevation –Existing (from H&H Model) Water Surface Elevation –Post Mitigation (from H&H Model) Content and Displacement Values Contingent Factors = Social/Economic Benefits are Added Stonegate Drainage Project Stonegate Project has achieved a BCR of 1.14 within the FEMA guidance and allowable factors and components. Project is in FEMA approval review process. 14-month construction phase upon approval and bid (2 month bid process) Project total cost ($17.4M) CDBG-DR/HMGP Stonegate Drainage Project Project Area - Improvements along the Golf Course, 9th Avenue and Jimmy Johnson Blvd. Impact Area Streets Lake Arthur Dr Pleasant Hill Champions Ct Greenway Point Dr 9th Avenue Oakmont Dr Roshan Ct Royal Dr Birchwood Dr Jimmy Johnson Blvd Memorial Blvd Golfhill Dr Greenhill Dr Sugarhill Ct Anchor Dr Regency Dr Turtle Creek Blvd DocumentPath:P:\0093\003\Deliverables\2020.07.DD(PortArthurSubmittal1)\Compilation_Docs\Exhibits\EX03_Landuse.mxd± Source:Esri, DigitalGlobe,GeoEye, Earthstar Geographics,CNES/AirbusDS,USDA, USGS, AeroGRID IGN andthe GISUserCommunity LEGEND Project_Area Major Streams (Project) LandUse GA H D I C R L 1 R L 2 R R R S 1 R S 2 T U W Feet 0 200 400 8001,200 CoordinateSystem Sources Projection:NAD83StatePlane(Grid) 1.Source1 Zone:TexasSouth Central 2.Source2 Units:U.S.Feet 3.Source3 4.Source4 Notes STONEGATE PROJECT AREA JIMMY JOHNSON 9TH AVENUE LAKE ARTHUR DR STONEGATE IMPACT AREA Lake Arthur Drainage Project Review Lake Arthur Detention $19,100,000.00 Storm Frequency Avg Existing *WSE (ft) Avg Existing Inundation- Home Flooding (ft) Avg Pre- Mitigation Structure Loss Value ($) After mitigation *WSE (ft) Avg Proposed Inundation Home Flooding (ft) Avg Post Mitigation Structure Loss Value ($) Avg Difference in *WSE (ft) Avg Diff in WSE (inch) 2 YR 1.84 -2.93 $ 170,374.00 1.63 -3.14 $ 54,446.75 0.21 2.52 10 YR 2.6 -2.17 $ 1,323,864.38 2.22 -2.55 $ 494,013.63 0.38 4.56 25 YR 2.86 -1.92 $ 3,103,187.74 2.28 -2.49 $ 632,944.85 0.58 6.96 50 YR 3.16 -1.35 $ 7,673,098.67 2.54 -2.04 $ 1,889,448.30 0.62 7.44 100 YR 3.42 -1.35 $ 7,505,570.21 2.73 -2.04 $ 1,875,955.74 0.69 8.28 500 YR 4 -0.78 $18,150,801.30 3.14 -1.64 $ 3,422,338.64 0.86 10.32 * Avg Finished Floor Elevation (FFE) for 270 properties in the project impact area is 4.78 ft * WSE -Water Surface Elevations Lake Arthur Drainage Project Review 2YR FLOOD INUNDATION 1.84’ 10YR FLOOD INUNDATION 2.6’ 100YR FLOOD INUNDATION 3.42’ 50YR FLOOD INUNDATION 3.16’ 25YR FLOOD INUNDATION 2.86’ 500YR FLOOD INUNDATION 4’AVG HOME ELEVATION 4.78’ range 3.17’ -6.55’11% = 3-4’; 59% 4-5’; 30% +5’ Lake Arthur Drainage Project Review Lake Arthur Drainage Project Review STRUCTURAL ELEVATIONHOME FLOODINGDRAINAGE CAPACITYSTREETFLOODING Node Name 2-YearStormFrequency 10-YearStorm Frequency 25-YearStorm Frequency 50-YearStorm Frequency 100-Year StormFrequency 500-Year StormFrequency Existing Depth (ft) Propose d Depth (ft) Differenc e (PR- EX) Existing Depth (ft) Propose d Depth (ft) Differenc e (PR- EX) Existing Depth (ft) Propose d Depth (ft) Differenc e (PR- EX) Existing Depth (ft) Propose d Depth (ft) Differen ce (PR- EX) Existing Depth (ft) Propose d Depth (ft) Differen ce (PR- EX) Existing Depth (ft) Propose d Depth (ft) Differen ce (PR- EX) IndianValley Dr 0.38 0.42 0.03 1.09 1.09 0.00 1.22 1.09 -0.13 1.22 1.22 0.00 1.26 1.26 0.00 1.37 1.36 0.00 Indian RiverDr 0.58 0.62 0.03 1.29 1.29 0.00 1.42 1.29 -0.13 1.42 1.42 0.00 1.46 1.46 0.00 1.57 1.56 0.00 IndianFallsDr -0.02 0.02 0.03 0.69 0.69 0.00 0.82 0.69 -0.13 0.82 0.82 0.00 0.86 0.86 0.00 0.97 0.96 0.00 Brazos Ave 1.22 1.13 -0.09 2.09 1.58 -0.50 2.34 1.59 -0.75 2.65 1.85 -0.80 2.90 2.04 -0.86 3.50 2.61 -0.90 AngelFireCv 0.72 0.80 0.09 1.43 1.43 0.00 1.78 1.43 -0.35 1.78 1.78 0.00 1.86 1.86 0.00 2.09 2.08 -0.01 BreckenridgeCt 0.77 0.76 -0.01 1.41 1.40 0.00 1.77 1.40 -0.37 1.78 1.77 -0.01 1.93 1.90 -0.02 2.23 2.20 -0.02 RollingRockDr 0.69 0.61 -0.08 1.28 1.22 -0.07 1.42 1.22 -0.20 1.80 1.67 -0.13 2.02 1.77 -0.24 2.60 2.02 -0.58 Lake Arthur Dr 0.62 0.14 -0.48 1.80 1.05 -0.75 2.17 1.09 -1.08 2.44 1.55 -0.89 2.77 1.69 -1.07 3.40 2.15 -1.25 Kelliwood Dr 0.76 0.81 0.05 1.91 1.41 -0.50 2.28 1.36 -0.92 2.54 1.78 -0.76 2.87 2.00 -0.86 3.50 2.34 -1.17 Royal Meadows St 1.24 -0.01 -1.25 1.54 1.12 -0.42 1.70 1.44 -0.26 2.16 1.61 -0.55 2.47 1.66 -0.80 3.10 1.94 -1.16 Kylewood Ct 0.46 -0.35 -0.81 1.23 1.06 -0.17 1.46 1.10 -0.36 1.48 1.46 -0.02 1.67 1.59 -0.08 2.12 1.90 -0.22 Jasonwood Ct -0.77 -0.96 -0.19 0.58 0.56 -0.03 0.84 0.62 -0.23 1.20 0.84 -0.36 1.77 1.29 -0.48 2.57 2.25 -0.31 Markwood Ct -0.58 -0.59 -0.01 1.03 0.96 -0.07 1.07 0.98 -0.10 1.48 1.07 -0.41 2.10 1.66 -0.44 3.00 2.60 -0.39 Sherylwood Dr -0.48 -0.57 -0.09 0.86 0.89 0.03 1.18 0.91 -0.27 1.20 1.18 -0.02 1.44 1.32 -0.12 2.22 1.94 -0.28 Stevewood Dr 0.91 0.87 -0.04 1.44 1.19 -0.25 1.79 1.31 -0.48 2.07 1.58 -0.49 2.36 1.77 -0.59 3.00 2.35 -0.66 KandywoodDr 1.08 1.06 -0.02 1.64 1.31 -0.33 1.99 1.46 -0.53 2.25 1.71 -0.55 2.56 1.92 -0.64 3.20 2.52 -0.68 Lisa Wood Ct 0.53 0.38 -0.15 1.30 1.29 -0.01 1.54 1.21 -0.33 1.58 1.54 -0.04 1.82 1.71 -0.11 2.34 2.26 -0.08 Table 9 AveragePonding Depth Comparison Existingvs Proposed Lake Arthur Drainage Project Review THE WATERMARK OF HARVEY 50+” RAINFALL IN 4 DAYS LAKE ARTHUR DRAINAGE SYSTEM IS BUILT FOR 2 YR EVENT DD7 SYSTEM WAS OVERWHELMED-WATER OVERTOPPED SYSTEM SHEET FLOODING FROM SURROUNDING COUNTY WATERSHED REGIONAL CAPACITY CAN NOT BE ADDRESSED IN LOCAL PROJECT RE-FORMULATION OF PLAN TO ADDRESS STREET INUNDATION TARGET USE OF CDBG-DR FUNDING