Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
PR 22552: AUTOMOBILE PHYSICAL DAMAGE CLAIM, TMLIRP
4 City of co ort rtlrtlr�- Teras INTEROFFICE MEMORANDUM Office of Safety & Risk Management Date: August 25, 2022 To: Ron Burton, City Manager From: Trameka A. Williams, Director of Human Resources RE: A Resolution Approving a Property Damage Settlement in the Amount of$98,917.51 for Damages to City of Port Arthur Trash Unit#2207 Nature of the request: On June 2, 2022, Trash Unit #2207 (2018 Freightliner 108SD), was damaged when the arm of the unit struck a powerline, causing fire damage to the unit. Staff Analysis, Considerations: The City has Automobile Physical Damage insurance coverage through Texas Municipal League Intergovernmental Risk Pool (TMLIRP) with a $2,500.00 deductible. TMLIRP has offered the City a settlement of $98,917.51, less the $2,500.00 deductible, making the final settlement offer $96,417.51 (Exhibit "A" attached). This amount is sufficient to cover all estimated property damages for Unit #2207. If additional damages are discovered, TMLIRP may issue a supplemental payment. Recommendation: I recommend approval of Proposed Resolution No. 22552 authorizing the + property damage settlement against TMLIRP for damage sustained to Trash Unit #2207 (2018 Freightliner 108SD). TMLIRP has offered to settle the claim for $98,917.51, less the $2,500.00 deductible, making the final settlement offer $96,417.51. This is considered a fair and reasonable settlement. Budget Considerations: The funds received will be deposited in the Insurance Proceeds Account, 001-00-000-4744-00-00-000, HINGF. "Remember we are here to serve the Citizens of Port Arthur" P.R. No. 22552 08/25/22 TAW RESOLUTION NO. A RESOLUTION AUTHORIZING THE CITY MANAGER TO EXECUTE SETTLEMENT OF AN AUTOMOBILE PHYSICAL DAMAGE CLAIM IN THE AMOUNT OF $98,917.51 MADE AGAINST TEXAS MUNICIPAL LEAGUE INTERGOVERNMENTAL RISK POOL (TMLIRP) AS A RESULT OF PROPERTY DAMAGE TO SOLID WASTE TRASH TRUCK #2207 WHEREAS, on June 2, 2022, Trash Truck #2207 (2018 Freightliner 108SD) was damaged when the arm of the truck struck a powerline causing fire damage; and, WHEREAS, as a result of the damage, a claim was filed with Texas Municipal League Intergovernmental Risk Pool (TMLIRP); and, WHEREAS, TMLIRP has offered to settle the claim for $98,917.51 , less the Automobile Physical Damage deductible amount of $2,500.00, making the final settlement offer $96,417.51 , which is considered a fair and reasonable settlement. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PORT ARTHUR, TEXAS: Section 1 . That, the facts and opinions in the preamble are true and correct. Section 2. That, the City Manager is hereby authorized to execute settlement in the amount of $98,917.51 , less the Automobile Physical Damage deductible amount of $2,500.00, making the final settlement offer $96,417.51 , for the claim against TMLIRP in substantially the same form as delineated in Exhibit "A". Section 3. That, a copy of this Resolution be spread upon the minutes of the City Council. READ, ADOPTED, AND APPROVED this day of , AD, 2022, at a Meeting of the City Council of the City of Port Arthur, Texas, by the following vote: AYES: Mayor , Councilmembers NOES: Thurman Bill Bartie, Mayor ATTEST: Sherri Bellard, City Secretary APPROVED AS TO FORM: )462 eik, Lair/ Val Tizeno, City Attorney APPROVED FOR ADMINISTRATION: Ronald Burton, City Manager EXHIBIT " A " :::.`":' On The Go Appraisals 14699 Brown Road Tomball,TX 77377 Phone:(833)219-9001 Fax:( ) - Email:claims©otgappraisals.com Tax ID:85-3394097 Date: 6/22/2022 Year; 2018 Reference #: 047450000438 Make: Freightliner Estimated By: Wayne Smith Model: 108SD Name: City of Port Arthur Unit#: 2207 Address: 103 HO Mills Hwy VIN: 3ALHG5FE8JDKA1376 City/State/Zip: Port Arthur,TX 77640 Style: Conventional Cab Phone: 409-983-8535 Plate/State: 138 7454- TX Inspected Date: WMI: FIN: Claimant: Odometer: 74869 Date of Loss: Color: Claim Contact: Date Of Loss: Contact Title: Inspected At: City of Port Arthur Contact Phone: x Claim Number: AU170855 Contact Email: File Number: 2349359 Operation Description Part# Type Labor Paint Parts Misc Wheels &Tires - Painted I * Replace Rear Wheels New 11.20 8 @ $289.22 $2,313.76 2 ^ Replace Rear Tires New Intl 8 @ $619.76 $4,958.08 New Group(8) 3 ^ Replace Towing to&from Sandblaster Sublet 1 @ $2,250.00 $2,250.00 Frame, Box and Crane 4 Replace Set Up and Measure Frame New F 3.50 5 Replace Adjust Front&Rear Alignment New M 4.00 6 * Replace Mid-Ship Five Piece Crossmember New F 2.50 1.00 1 @ $1,266.92 $1,266.92 7 * Replace Suspension Crossmember New F 2.50 1.00 2 @ $685.23 $1,370.46 8 Replace 3 Axle Frame Rail(Right) New F 36.50 4.00 1 @ $4,117.52 $4,117.52 9 Replace 3 Axle Frame Rail(Left) New F 34.50 4.00 1 @ $4,117.52 $4,117.52 10 ^ R&I Container Box 24.00 11 * Repair Sandblast,Paint Frame Rails, Sublet 1 @ $4,450.00 $4,450.00 Suspension,from Backo_ 12 ^ Repair Sand Blast&Paint Box,Grappler Sublet 1 @ $7,550.00 $7,550.00 &Partial Crane - - 13 ^ Replace Hydraulic Hoses on Grappler New 6.00 1 @ $450.00 $450.00 14 ^ Replace Hucks&Collars New 1 @ $650.00 $650.00 Fuel Tank (Left) 15 * Replace Fuel Tank(Left) New Incl 1 @ $1,155.75 $1,155.75 16 ^ Replace Drain&Refill New 0.80 Drive Shaft w/Carrier Bearing 17 R&I Drive Shaft Assembly M 2.00 Rear Suspension, Axles 18 * Replace Shock,Rear(Left) New M 1.00 2 @ $106.09 $212.18 19 * Replace Shock,Rear(Right) New M 1.00 2 @ $106.09 $212.18 20 * Replace Rebush Rear Suspension New M 20.00 1 @ $1,500.00 $1,500.00 Rear Suspension, Air Ride 21 Replace Air Spring,Rear(Left) New M 1.10 1 @ $182.64 $182.64 22 Replace Air Spring,Rear(Right) New M 1.10 1 @ $157.18 $157.18 AdjustRite'" Copyright©2021 PPG Industries.All rights reserved. Page 1 of 4 Date Submitted to TMLIRP:08/17/2022 12:15 PN On The Go Appraisals 14699 Brown Road Tomball, TX 77377 Phone:(833)219-9001 Fax: ( ) - Email:claims©otgappraisals.com Tax ID:85-3394097 Date: 6/22/2022 Year: 2018 Il Reference #: 047450000438 Make: Freightliner Estimated By: Wayne Smith Model: 1085D Name: City of Port Arthur Unit#: 2207 23 Replace Lateral Rod-Front(Left) New M 0.50 1 @ $144.89 $144.89 24 Replace Lateral Rod-Front(Right) New M 0.50 1 @ $144.89 $144.89 25 Replace Lateral Rod-Rear(Left) New M 0.50 1 @ $144.89 $144.89 26 Replace Lateral Rod-Rear(Right) New M 0.50 1 @ $144,89 $144.89 Rear Axle&Brakes-------- 27 * Replace Torque Rod,Front Axle New Intl M 1 @ $116.59 $116.59 28 * Replace Rear Axle Housing Front New M 16.50 3.00 1 @ $6,493.28 $6,493.28 29 Non-Adjacent Overlap Adj -0.20 30 * Replace Rear Axle Housing Rear New M 15.00 3.00 1 @ $4,952.14 $4,952.14 31 Non-Adjacent Overlap Adj -0.20 32 * Replace Torque Rod,Rear Axle New Intl M 1 @ $116.59 $116.59 33 * Replace Hub Meter New Inca M 1 @ $71.30 $71.30 34 ^ Replace Fluid New 2 @ $39.95 $79.90 Rear Crossmember&Lamps 35 * Replace Tall Lamp New 0.40 2 @ $41.69 $83.38 36 A Replace Chassis Harness New 10.00 1 @ $1,835.20 $1,835.20 37 A Replace Air Lines&Hoses New 8.00 1 @ $950.00 $950.00 Electronic Control Modules 38 A Replace Cab ECU New M 1.50 1 @ $1,024.13 $1,024.13 39 A Replace Engine ECU New M 1.00 1 @ $2,655.21 $2,655.21 40 A Replace Trans ECU New M 2.00 1 @ $1,412.36 $1,412.36 41 A Replace A/C ECU New M 1.00 1 @ $298.83 $298.83 42 A Replace Brake-ABS Control Unit New M 1.00 1 @ $275.83 $275.83 43 A Replace Air Tanks New M 4.00 1 @ $3,066.86 $3,066.86 44 A Replace Brake Valves New M 6.00 1 @ $712.36 $712.36 45 A Replace Cores New M 1 @ $1,175.00 $1,175.00 46 A Replace Programming New M 5.00 Calculated Values 47 ^ Shop Supplies Mtrls $1,688.25 48 ^ Hazardous Waste $10.00 49 A Two stage paint. 50 A Paint Materials Mtrls $858.55 An '*' indicates user change of database part and 'A' indicates manually entered or custom database rows. Estimate Notes: Sandblasting and painting was quoted by Red Bear Industries 409-835-0888 AdjustRite'" Copyright©2021 PPG Industries.All rights reserved. Page 2 of 4 Date Submitted to TMLIRP:08/17/2022 12:15 Pb F On The Go Appraisals 14699 Brown Road Tomball, TX 77377 Phone:(833)219-9001 Fax:( ) - Email:claims@otgappraisals.com Tax ID:85-3394097 Date: 6/22/2022 Year: 2018 Reference#: 047450000438 Make: Freightliner Estimated By: Wayne Smith Model: 108SD Name: City of Port Arthur Unit#: 2207 Summary Amount Rate Disc Total Body Labor 60.4 $110.00 0.00% $6,644.00 Paint Labor 15.6 $110.00 0.00% $1,716.00 Mechanical 85.2 $165.00 0.00% $14,058.00 Frame 79.5 $140.00 0.00% $11,130.00 Misc. Labor 0.0 $0.00 0.00% $0.00 Parts $62,812.71 0.00% $62,812.71 Misc. $2,556.80 Sub-total $98,917.51 Sales Tax 0.00 Total $98,917.51 Betterment $0.00 Deductible $(2,500.00) Grand Total $96,417.51 Repair Facility: Appraised By: Wayne Smith Address: License #1: License #2: Phone: () - Phone: 281-236-6792 Email: Email: wsmith@otgappraisals.com Agreed With: License 1: License 2: Fed Tax ID: Registration #: AdjustRite'" Copyright©2021 PPG Industries.All rights reserved. Page 3 of 4 Date Submitted to TMLIRP:08/17/2022 12:15 PN