HomeMy WebLinkAboutPR 15409: FTA GRANT FUNDING ASSISTANCECI TY OF PO R T ARTHUR
P LA NNI NG DE PT.
~. ~.
To: Steve Fitrgibbons, City Manager and City Council
From: Colleen Russell, Planning Director
Date: 8/6/2009
Re: PR 15409
Background:
The previous resolution 09-114 only authorized the application for funds
while and this proposed resolution authorizes the execution and
acceptance of the funds
Recommendation:
The Council is asked to approve proposed resolution 15409 so the grant
funds may be accepted with preauthorization from the FTA.
P.R No. 15409
08/03/2009 CWR
RESOLUTION NO.
A RESOLUTION AUTHORIZING THE ACCEPTANCE OF
A FTA (FEDERAL TRANSIT ADMINISTRATION) GRANT
FUNDING ASSISTANCE FOR FUNDING ASSISTANCE
FOR FISCAL YEARS 2008-09 AND 2009-10 ON BEHALF OF
PORT ARTHUR TRANSIT SYSTEM
WHEREAS, the Federal Transit Administration makes Port Arthur Transit eligible for
$4,722, 975 dollazs for financial assistance for the operations and expenditures; and
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PORT ARTHUR:
THAT the City Manager or his designee is hereby authorized to accept and execute said grant
agreement in substantially the same form as attached hereto as Exhibit "A" for this $4,414,777 with
the City match of $1,752,577 as well as apply for additional monies up to $4,722,975
THAT a copy of the caption of this Resolution be spread upon the Minutes of the City Council.
READ, ADOPTED AND APPROVED this day of August, A.D. 2009, at a Regular
Meeting of the City Council of the City of Port Arthur, Texas, by the following vote: AYES:
MAYOR
COUNCILMEMBERS:
P.R N0.15409
08/03/2009
Page 2 of 2
ATTEST:
Mayor
City Secretary
APPROVED AS TO FORM:
City Attorney
APPROVED FOR ADMINISTRATION:
Ci Manager. p
. ;' C Xl
Director of Ptannin
Director of Fina
EXHIBIT "A"
• Page 2
1y~ro
9. (p
N
.,
Arthur
Operating .2009-2010
will amend as tunds b
>LI Line item
ti Total
$
000.00
400 reaerai
$ 320,000.00 ~no.~"
$ 80,000.00
11.33.20 on
propane fueling sta
terminal improvements $ ,
100,000.00 $ 80,000.00 $ 20,000.00
11.34.01 111204 Paratransit Buses $ 750,000.00 $ 622,500.00
00 $
$ 127,500.00
00
900
11
111315 Vans $
$ 70,000.00
000.00
45 $ 58,100.
$ 36,000.00
$ .
,
9,000.00
11 42,11 Support vehicle
114403 Maint shop improvements $ ,
310,000.00 $ 248,000.00 $ 62,000.00
11.42.06
shop equipment
$
~ 20,000.00
00
0 $ 16,000.00
00
000
$ 16 $
S 4,000.00
4,000.00
11.32.07 security equip
30 ft buses-fixed routes $
$ .
20,00
2,400,000.00 .
,
$ 1,992,000.00 $ 408,000.00
11.12.03
01
9 Operations $ 2,052,354.00 $1,026,177.00 $1,026,177.00
00
.
30.0 $ 6 167 354.00 $ 4,414,777.00 $1 752,577.
__.---
$4,722,975.00 $4,722,9Zbr.00
.,
Capital Projects
Propane Station
Terminal Upgrade
6 Paratransit Vehicles
Aerial Platform
2 Vans
Pickup Truck
wilding Renovation
Air Condition System -upgrade
Qamera System
Bus Replacement Cost (8 years @300,000)
Total
Less City's Match - 20%
FTA -Capita! 80%
OPERATIONS
Fiscal Year 2009
Fiscal Year 2010
Less City's Match - 50%
FTA -Operations - 50%
Total FTA Budget
S 400,000
100, 000
750,000
20,000
70, 000
45,000
300, 000
10,000
20,000
2,400,000
$ 4,115,000
S (823x000)
S 3,292,000
2,052,354
2,000,000
4,052.354
$ (z.o2s,n7>
S 2,026,177
S 3,292,000
3 2,026,177
E 5, 318, f 77
DOT ~ FTA
U.S. Department of Transportation
Application
Federal Transit Administration
Recipient I D: 1553
Recipient Name: CITY OF PORT ARTHUR
Project ID: TX-PA-5307
Budget Number: 1 -Budget Pending Approval
Project Information: capital, and operating
Part 1: Recipient Information
Project Number: TX-PA-5307
Recipient ID: 1553
Recipient Name: CITY OF PORT ARTHUR
Address: P.O. BOX 1089 ,PORT ARTHUR, TX 77641 1089
Telephone: (409) 963-8135
Facsimile: (409) 983-8137
Union Information
Recipient ID: 1553
Union-Name: NONE - - - - -
Address 1:
Address 2:
City: , 00000 0000
Contact Name:
Telephone: () -
Facsimile: O 0-0000
E-mail:
Website:
Part 2: Project Information
Project Type: Grant ~ Gross Project $6,167,354
Cost:
file://C:\Documents and Settings\planning_dir\I,ocal Settings\Temporary Internet Files\OLK3E\TX... 4/3/2009
Project Number: TX-PA-5307 AdjustmentAmt $0
Project Description: capital, and operating Total Eligible Cost: $6,167,354
Recipient Type: City TotaIFTAAmt: $4,414,777
FTA Project Mgr: Abel Ayala, Total State Amt. $0
817.978.0560/Pearlie Tiggs Total Local Amt: 752
577
$1
,
,
Recipient Contact: Colleen Russell Other Federal
New/Amendment:
None Specified
Amt: $0
Amend Reason: Initial Application Special Cond Amt $0
Fed Dom Asst. #: 20507 Special Condition: None Specified.
Sec. of Statute: 5307-2 S.C. Tgt. Date: None Specified
State Appl. ID: None Specified S.C. Eff. Date: None Specified
Start/End Date: Oct. 01, 2008 -Sep. 30, 2010 Est. Oblig Date: None Specified
Recvd. By State: Pre-Award Yes
EO 12372 Rev: Not Applicable Authority?:
Review Date: None Specified Fed. Debt
Authority?: No
Planning Grant?: NO Final Budget?: No
Program Oate
(STIP/UPWP/FTA
Prm Plan)
Feb. 13; 2009
Program Page: None Specified
Application Type: Electronic
Supp. Agreement?: No
Debt. Delinq. Details:
Urbanized Areas
UZA ID UZA Name
481660 PORT ARTHUR, TX
Congressio_.nal Districts
State ID District Code District Ofrcial
48 9 AI Green
Project Details_
Section 5307 FY 2D08/2009 funds. The funding ratio for Rolling Stock is 83117 - ADA purchased vehicles.
This project will use funds allocated to the City of Port Arthur through the Governor's Apportionment (GA). The funds
were allocated from multiple years. An attached spreadsheet shows the actual allocations and available balances totaling
$4,722,975. The City of Port Arthur will request a total of $618,177 from the FY 2009 GA. Of the avialable GA the City
will program $4,414,777 leaving a balance of $308,198, which will be used for operating assistance for FSY 2010. These
funds and the $618,177 from FSY 2009 GA will be programed at a later date.
file://C:\Documents and Settingslplanning_dirlLocal SettingslTemporary Internet Files10LK3E\TX... 4/3/2009
Earmarks
No_ infomtation sound.
Security
No - We will not expend at least I% of the 5307 funds in this grant application for security purposes.
3.Other, please describe below.
Explanation
The City will program $20,000 for a camera system at the storage facility. Security is provided by the City
police dept.
Part 3: Budget
Proiect Bu_ diet
Quantity FTA Amount Tot. Elig: Cost
SCOPE
114-00 BUS: SUPPORT EQUIP AND
FACILITIES 1 $300,000.00 $375,000:00
ACTIVITY
11.42.11 ACQUIRE -SUPPORT
VEHICLES 1 $36,000.00 $45,000.00
11.44.03 REHAB/RENOVATE -
ADMIN/MAINT FACILITY 0 $248,000.00 $310,000.00
11.42.06 ACQUIRE -SHOP
EQUIPMENT 0 $16,000.00 $20,000.00
SCOPE
300-00 OPERATING ASSISTANCE 0 $1,026,177.00 $2,052,354.00
ACTIVITY
30.09.01 UP TO 50% FEDERAL
SHARE 0 $1,026,177.00 $2,052,354.00
SCOPE
111-00 BUS -ROLLING STOCK 18 $2,672,600.00 $3,220,000.00
ACTIVITY
11.12.04 BUY REPLACEMENT <30
FT BUS 6 $622,500.00 $750,000.00
11.13.15 BUY VAN FOR SVC
EXPANSION 2 $58,100.00 $70,000.00
11.12.03 BUY REPLACEMENT 30-FT
BUS 10 $1,992,000.00 $2,400,000.00
SCOPE
113-00 BUS - 0 $416,000.00 $520,000.00
file://C:1Documents and Settings\planning_dir\Local Settings\Temporary Internet Files\OLK3E\TX... 4/3/2009
STATION/STOPS/TERM INALS
ACTIVITY
11.34.01 REHAB/RENOVATE -BUS
TERMINAL 0 $80,000.00 $100,000.00
11.32.07 ACQUIRE -
SURVEIL/SECURITY EQUIP 0 $16,000.00 $20,000.00
11.33.20 CONSTRUCT - MISC BUS
STATION EQUIPMENT 0 $320,000.00 $400,000.00
Estimated Total Eligible Cost: 56,167,354.00
Federal Share: 54,414,777.00
Local Share: E7,752,577A0
OTHER jScopes_and Activities not included in Project Budget Total
Quanti FTA Amount Tot. Elig. Cost
SCOPE
572-00 SECURITY 0' $16,000.00 $20,000.00
ACTIVITY
57.10.10 SECURITY EXPENDITURES 0 $16,000.00 $20,000.00
No Amendment_Fundina Source informs 'on is available for the selected rp oiect
Alternative Fuel Codes
11.42.11 ACQUIRE -SUPPORT VEHICLES Gasoline
11.12.04 BUY REPLACEMENT <30 FT BUS Diesel Fuel
11.13.15 BUY VAN FOR SVC EXPANSION Diesel Fuel
11.12.03 BUY REPLACEMENT 30-FT BUS Diesel Fuel
Extended Budget Descriptions
11.42.11 ACQUIRE -SUPPORT VEHICLES 1 536,000.00 $45,000.00
Vehicle will be used by shop staff to support transit fleet maintenance.
11.44.03 REHAB/RENOVATE - ADMINIMAINT FACILITY 0 $248,000.00 $310,000.00
renovating adminlmaint faciliv to include HVAC. fixtures, floors, reStrooms, etc.
file://C:1Documents and Settingslplanning_dir\Local Settings\Temporary Internet Files\OLK3E\1'X... 4/3/2009
$10K will be used to replace the vehicle exhaust system in the maintenance facility.
This project will be a Category B project until a CE is approved.
11.42.06 ACQUIRE -SHOP EQUIPMENT 0 $16,000.00 $20,000.00
The city will purchase bus scaffolding equip.
30.09.01. UP TO 50% FEDERAL SHARE 0 $1,026,177.00 $2,052,354.00
The operating expenditures shown will provide funds for 2009 and 2010.
11.12.04 BUY REPLACEMENT <30 FT BUS 6 $622,500.00 $750,000.00
Paratransit vehicles
11.34.01 REHAB/RENOVATE -BUS TERMINAL 0 $80,000.00 $100,000.00
upgrade windows, restrooms, Floors, etc.
This project will be a Category 6 project until a CE is approved.
11.32.07 ACQUIRE - SURVEILISECURITY EQUIP 0 $16,000.00 $20,000.00
The city will buy security cameras to install and monitor passenger shelters and facilities.
This project will be a Category B project until a CE is approved.
11.33.20 CONSTRUCT - MISC BUS STATION EQUIPMENT 0 $320,000.00 $400,000.00
The city is constructing a propane fueling station on city owned land.
This project will be a Category B project until a CE is approved.
572-00 SECURITY 0 $16,000.00 $20,000.00
The police will monitor these camera activities by internet and other modem equipment to apprend those connected with
the criminal acts
57.10.10 SECURITY EXPENDITURES 0 $16,000.0 0 $20,000.00
rn~e ~~ r~~ security camerae and lights as one unit The oolice will monitor these camera activities by internet and
file://C:\Documents and Settings\planning_dir\Local Settings\Temporary Internet Files\OLK3E\TX... 4/3!2009
modems
Changes since the Prior Budget
Unable to find chance amoun information.
Part 4. Milestones
11.42.11 ACQUIRE -SUPPORT VEHICLES
1 $36,000 $45,000
Milestone Description Esk Com~_D.at_e.
1. RFPIIFB Issued Jun. 01, 2009
This is for spick-up truck to cargo loads such as engine parts and other
equipment not readily placed in a enclosed vehicle.
2. Contract Award Aug. 01, 2009
3. ConVact Complete Jun. 02, 2010
11.44.03 REHAB/RENOVATE-ADMIN/MAINT
FACILITY
0 $248,OOD $310-,000
Milestone Description Est. Cow. Date
1. RFPIIFB Issued May. 01, 2009
The building as gone thorough 2 stones, no updates in over a decade and
does all the mechanical repair that causes airboume grease, dust and other
fumes that influence the state of the facility. A HVAC system for fume exhaust
wilt also be brought the cost is average based on specifications and estimates
obtained
2. Contract Award _ _ _ -Aug. 01, 2009
3. Contract Complete Sep. 15, 2009
11.42.06 ACQUIRE -SHOP EQUIPMENT
0 $16,000 $20,000
Milestone Description Est__Comp. Date
1. RFPIIFB Issued Apr. 15, 2009
Aerial platforms are essential to service the bus exhaust and fuel system that
is on the top back- section of the bus
OSHA safety guidelines and safety of staff will be ensured with the proper
use of this equipment
2. Contract Award May. 01, 2009
3. Contract Complete Jul. 02, 2009
File://L:\Documents and Settings\planning_dir\Local Settings\Temporary Internet Files\OLK3E\TX... 4/3/2009
30.09.01 UP TO 50% FEDERAL SHARE
0 $1,026,177 $2,052,354
Milestone_Description Est. Com_~_Date
1. Final Expenditure Sep. 30, 2009
These funds is for operation and maintenance task not gvered by capital
expenditures for equipment and construction. The rule is a 50/50 match.
Hence, the Ciry will match the FTA amount
11.12.04 BUY REPLACEMENT <30 FT BUS
6 $622,500 $750,000
Milestone
Descri~fion Est. Comp. Date
_
1. CONTRACT COMPLETE Dec. 31, 2008
The paratransit life is by size and mileage or years: In this case it is mileage
that exceeds 100,000. Therefore, sinc emost of the fleet (6) is 200,000 to
400,000 miles in status the depreciation is 200-400% and the entire fleet will
be replaced
2. RFPIIFB OUT FOR BID May. 01, 2009
Goshen -Ford and some others will be viewed and ane will see if a joint effort
bid with other TA (transit authority) can be done
3. CONTRACT AWARDED May. 01, 2009
4. FIRST VEHICLE DELIVERED Aug. 02, 2009
This will be based on availability of specificed vehicles and bid process.
5. ALL VEHICLES DELIVERED Dec. 02, 2009
11.13.15 BUY VAN FOR SVC EXPANSION
2 $58,100 $70,000
Milestone Description Est.C_omp• Date
~.
RFPIIFB OUT FOR BID Ma 15, 2009
Y
Econoline passenger vans will be purchased. One 12 and another 15
passenger is proposed for accessory pick -ups as no new stand-by vehicle
exist and sometime the stand-by vehicle is in use
2. CONTRACT AWARDED Jun. 15, 2009
3. FIRST VEHICLE DELIVERED Sep. 02, 2009
4. ALL VEHICLES DELIVERED Nov. 15, 2009
5. CONTRACT COMPLETE Dec. 15, 2009
11.12.03 BUY REPLACEMENT 30-FT BUS
10 $1,992,000 $2,400,000
Milestone Description Est. Coma, Date
1. RFPIIFB OUT FOR BID May. 30, 2009
Since the entire fleet was brought with CMAO money, the City has to be
file://C:1Documents and Settings\planning_dir\Local Settings\Temporary Internet Files\OLK3E\TX... 4/3/2009
repaired to replace these vehicles as they go off line. They were all
puirchased and one time and this may be how they are replaced;
nevertheless, future purchase will be costly and not at 100%
2. CONTRACT AWARDED Jun. 20, 2009
3. FIRST VEHICLE DELIVERED Sep. 01, 2009
4. ALL VEHICLES DELIVERED Dec. 15, 2009
5. CONTRACT COMPLETE Dec. 16, 2009
11.34.01 REHABIRENOVATE -BUS TERMINAL
$80,000 $100,000
Milestone Description Est. Com~Date
1. RFP/IFB Issued May. 02, 2009
The terminal facility has not being entirely renovated in over a decade. This
facility is used during cold and rainy weather, but also for large transit
meetings on some weekends as it can house all the staff comfortably.
2. Contract Award Jun. 15, 2009
3. Contract Complete Nov. 15, 2009
11.32.07 ACQUIRE -SURVEIL/SECURITY EQUIP
$16,000 $20,000
Milestone Description Est. Comp. Date
1. RFP/IFB Issued May. 02, 2009
The City is acquiring some security cameras for areas by the bus shelters
and this should also suvey surrounding sectors of the neighborhood. The
police will note tapes and report findings. It is hope we will catch vandals in
the act as well as see our drivers in real time that often start early morning
and late evenings as well as during evaucation proceedings
_ _ _ _ 2. Contract Award _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Jun_~0, 2009
3. Contract Complete Nov. 30, 2009
11.33.20 CONSTRUCT - MISC BUS STATION
EQUIPMENT
$320,000 $400,000
Milestone Description Est. Comp_Date
1. RFPIIFB Issued May. 30, 2009
This facility will house the propane station. Borings have been done, a plat is
being processed and an environmental exclusion form will be filed with
TXDOT prior to construction. This is being processed
2. Contract Award Jun. 20, 2009
3. Contract Complete Nov. 15, 2009
file:/1C:\Documents and Settingslplanning_dir\Local Settings\Temporary Internet Files\OLK3E\TX... 4/3/2009
Part 5. Environmental Findings
30000 OPERATING ASSISTANCE 0 $1,026,177 $2,052,354
Finding No. _1 -Class Inc)
C16 -Program Admin. 8 Operating Assistance
Program administration, technical assistance activities, and operating assistance to transit authorities to continue
existing service or increase service to meet routine changes in demand.
300901 UP TO 50% FEDERAL SHARE 0 $1,026,177 $2,052,354
Finding Flo,. 1 -Class Inc)
C16 -Program Admin. & Operating Assistance
Program administration, technical assistance activities, and operating assistance to transit authorities to continue
existing service or increase service to meet routine changes in demand.
114211 ACQUIRE -SUPPORT VEHICLES 1 $36,000 $45,000
Finding No= 1 -_Class Inc)
C17 -Purchase of vehicles
The purchase of vehicles by the applicant where the use of these vehicles can be accommodated by existing
facilities or by new facilities which themselves are within a CE.
111204 BUY REPLACEMENT <30 FT BUS 6 $622,500 $750,000
Finding No_1.- Class Iljc)
C17 -Purchase of vehicles
The purchase of vehicles by the applicant where the use of these vehicles ran be accommodated by existing
facilities or by new facilities which themselves are within a CE.
111315 BUY VAN FOR SVC EXPANSION 2 $56,100 $70,000
FindingN_o, 1 - Class Il~c)
C17 -Purchase of vehicles
The purchase of vehicles by the applicant where the use of these vehicles can be accommodated by existing
file://C:\Documents and Settings\planning_dir\Local Settings\Temporary Internet Files\OLK3E\TX... 4/3/2009
facilities or by new facilities which themselves are within a CE.
113401 REHABIRENOVATE -BUS
TERMINAL 0 $80,000 $100,000
Finding. No. 1__-Class Ind)
D09 -Reconstruction of rail 8 bus buildings
Rehabilitation or reconstruction ofexisting rail and bus buildings and ancillary facilities where only minor amounts of
additional land are required and there is not a substantial increase in the number of users.
114403 REHAB/RENOVATE - p $248,000 $310,000
ADMIN/MAINT FACILITY
Finding N_o_, 1_-,Class II(cj
C17 -Purchase of vehicles
The purchase of vehicles by the applicant where Ne use of these vehicles can be accommodated by existing
facilities or by new facilities which themselves are within a CE.
114206 ACQUIRE -SHOP EQUIPMENT 0 $16,000 $20,000
Finding No. _1 -Class Inc)
C17 -Purchase of vehicles
The purchase of vehicles by the applicant where the use of these vehicles can be accommodated by existing
facilities or by new facilities which themselves are within a-CE:
113320 CONSTRUCT - MISC BUS
STATION EQUIPMENT
Finding No: 1_-Class lac)
$320,000 $400,000
C08 -Install Shelters, fencing, 8 Amenities
Installation of fencing, signs, pavement markings, small passenger shelters, traffic signals, and railroad warning
devices where no substantial land acquisition or traffic disruption will occur.
113207 ACQUIRE - SURVEIVSECURITY
EQUIP
$16,000 $20,000
file://C:\Documents and Settings\planning_dir\Local Settings\Temporary Internet Files\OLK3E\TX... 4/3/2009
Finding No. 1_-.Class_Ljc~
C19 -Install purchase maintenance equipment
Purchase and installation of operating or maintenance equipment to be located within the transit facility and with no
significant impacts off the site.
111203 BUY REPLACEMENT 30-FT BUS 10 $1,992,000 $2,400,000
Finding-No,_1_-Gass Il~c)
C17 -Purchase of vehicles
The purchase of vehicles by the applicant where the use of these vehicles can be accommodated by existing
facilities or by new facilities which themselves are within a CE.
Part 6: Fleet Status
Fixed Route
Before Change After
I. Active Fleet
A. Peak Requirement 5 0 5
B. Spares 5 0 5
C. Total (A+g) 10 0 10
D. Spare Ratio (B!A) 100.00% 0.00% 100.00%
II. Inactive Fleet
A. Other 0 0 0
B. Pending Disposal 0 0 0
C. Total (A+g) 0 0 0
III. Total (I.C and II.C) 10 0 10
Paratransit
Before Chan a After
1. Active Fleet
A. Peak Requirement 4 0 4
B. Spares 2 0 2
C. Total (A+g) 6 0 6
D. Spare Ratio (B/A) 50.00% 0.00% 50.00%
II. Inactive Fleet
file://C:\Documents and Settings\planning_dir\Local Settings\Temporary Internet Files\OLK3E\TX... 4/3/2009
A. Other 0 0 0
B. Pending Disposal 0 0 0
C. Total (A+B) 0 0 0
III. Total (I.C and II.C) 6 0 6
Part 7. FTA Comments
General Review
Comment Title: New Comment
Comment By: William Jones
Date Created: Mar. 30, 2009
Date Updated: None Specified
Ref Section: Unknown
Comment: I have reviewed th eCivil Rights requirements and concur with this portion of the project
application
Comment Title: Review Comment
Comment By: Pearlie Tiggs
Date Created: Mar. 06, 2009
Date Updated: Mar. 11, 2009
Ref Section: Project Overview
Comment: This grant application is now-under review.
If there are reveiw comments, all comments must be addressed before a project number
is assign.
" Review Comments:
-The grantee has addressed all emailed comments, as of 31612009. AddRional Comment:
- For justification of funding, all ALIs in the grant budget must be reflected in the
"Extended Budget Description", with justifying informati~n-
- All ALTS in the grant budget must have milestones reflected with completion dates,
included.
Comments_to DOL
Comment Title: Comment to DOL
Comment By: Pearlie Tiggs
Date Created: Mar. 11, 2009
Date Updated: Mar. 11, 2009
Ref Section: Project Overview
Comment:
The FTA share, in the amount of $4,414,777 is for capital and operating assistance.
Based upon the timeline in the December 7, 1995 DOL guidelines, please advise the FTA
of the 49 U.S.C. Section 5333(b) terms and conditions for inclusion in the grant contract.
"FTA Contact: Pearlie Tiggs, 817.978.0567
`Grantee Contact: Colleen Russell, 409.983.8138....Email: