HomeMy WebLinkAboutPR 22923: NEED FOR EMERGENCY REPAIRS TO THE PORT ACRES INFLUENT LIFT STATION j.
9��N�K
T-✓
n1-1 Yl/11[l'
xas
INTEROFFICE MEMORANDUM
Date: November 23, 2022
To: The Honorable Mayor and City Council
Through: Ronald Burton, City Manager
From: Calvin Matthews, P.E., Water Utilities Director
RE: PR 22923 —A Resolution of Notification Regarding the Need for Emergency
Repairs to the Port Acres Influent Lift Station
Introduction:
The intent of this Agenda Item is to notify City Council of repairs at the Port Acres Influent
Lift Station (ILS). On November 16, 2022, the No. P-104 pump at the Port Acres ILS has
failed and flooded the dry well, which took the lift station out of service. This caused a
potential hazard to public health and safety and a risk to the environment. The emergency
repairs to the lift station includes the pump repair and the temporary bypass pumping, and are
being performed by ALLCO, Inc. of Beaumont, Texas with a projected budgetary impact of
$500,000.00. Funds are available in Water Utilities Capital Improvement Fund Account No.
405-40-000-8516-00-00-000, Water Utility Systems, Project No. WS0005-CON.
Background:
On November 16, 2022, the No. P-104 pump at the Port Acres ILS has failed and flooded the
dry well, which took the lift station out of service. This caused a potential hazard to public
health and safety and a risk to the environment. The emergency repairs to the lift station are
being performed by ALLCO, Inc. of Beaumont, Texas.
Budget Impact:
The emergency repairs have a projected budgetary impact of$500,000.00. Funds are available
in Water Utilities Capital Improvement Fund Account No. 405-40-000-8516-00-00-000, Water
Utility Systems, Project No. WS0005-CON.
"Remember, we are here to serve the Citizens of Port Arthur"
(1t1 of - % ar'
nrt rthu �
Tr r[!S
Recommendation:
It is recommended that City Council approve PR 22923, accepting notice of the repairs to the
Port Acres Influent Lift Station as discussed/outlined above. Staff will continue to provide
updates to the City Council regarding the status of a repair. A subsequent resolution will be
provided for the City Council approval ratifying the final expenditure.
"Remember,we are here to serve the Citizens of Port Arthur"
PR 22923
11/23/22 bw
Page 1 of 3
RESOLUTION NO.
A RESOLUTION NOTIFYING CITY COUNCIL OF THE
IMMEDIATE NEED FOR REPAIRS AT THE PORT
ACRES INFLUENT LIFT STATION BY ALLCO, INC. OF
BEAUMONT, TEXAS WITH A TOTAL BUDGETARY
IMPACT OF $500,000.00; FUNDS ARE AVAILABLE IN
WATER UTILITIES CAPITAL IMPROVEMENT FUND
ACCOUNT NO. 405-40-000-8516-00-00-000, WATER
UTILITY SYSTEMS,PROJECT NO. WS0005-CON.
WHEREAS, on November 16, 2022, the No. P-104 pump at the Port Acres ILS failed,
flooding the dry well and taking the lift station out of service; and,
WHEREAS, the occurrence caused a potential hazard to public health and safety and a
risk to the environment; and,
WHEREAS, the Port Acres Influent Lift Station is being repaired by ALLCO, Inc. of
Beaumont, Texas, under emergency conditions authorized by the City Manager; and,
WHEREAS,the repairs have a projected budgetary impact of$500,000.00 (Exhibit"A");
and,
WHEREAS, pursuant to Section 252.022(a)(1) this expenditure is authorized because it
was a public calamity that required the immediate appropriation of money to preserve the property
of the municipality's residents or to preserve the property of the municipality; and,
WHEREAS, it is further authorized pursuant to Section 252.022(a)(2) a procurement
necessary to preserve or protect the public health or safety of the municipality' s residents; and,
WHEREAS, it is further authorized pursuant to Section 252.022(a)(3) because of
unforeseen damage to public machinery, equipment, or other property.
NOW THEREFORE,BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY
OF PORT ARTHUR:
THAT,the facts and opinions in the preamble are true and correct; and,
PR 22923
11/23/22 bw
Page 2 of 3
THAT, in order to protect the health and safety of our citizens,the City Council is hereby
notified of the repairs to Port Acres Influent Lift Station with a budgetary impact of$500,000.00;
and,
THAT, a subsequent resolution will be presented ratifying the emergency repairs, with a
detail of all costs associated with the project; and,
THAT, a copy of the caption of this resolution be spread upon the minutes of the City
Council.
READ, ADOPTED, AND APPROVED THIS day of
2022 at a Regular Meeting of the City Council of the City of Port Arthur, Texas, by the following
vote:
AYES: Mayor
Councilmembers:
NOES:
Thurman Bill Bartie
Mayor
PR 22923
11/23/22 bw
Page 3 of 3
ATTEST: APPROVED AS TO FORM:
71/1te
Sherri Bellard Valecia Tizeno
City Secretary City Attorney
APPROVED FOR ADMINISTRATION: APPROVED AS TO AVAILABILITY
OF FUNDS:
Ronald Burton Kandy Daniel
City Manager Interim Finance Director
4
Calvin Matthews, P.E. Clifton Williams, CPPB
Water Utilities Director Purchasing Manager
EXHIBIT "A"
(Emergency Approval Letter)
i'-
7r..r.r
INTEROFFICE MEMORANDUM
WATER UTILITIES DEPARTMENT-WATER ADMINISTRATION
Date: November 18, 2022
To: Ms. Pamela Langford, Assistant City Manager-Operations (in place of C/M)
From: Calvin Matthews, P.E., Director of Water Utilities
RE: Port Acres Lift Station Emergency Repair
The Port Acres Wastewater Treatment Plant Influent Lift Station (ILS) is in critical need of rehabilitation. The
Water Utilities Department filed for a five million dollar ($5,000,000) Federal Grant to rehabilitate the ILS.
The grant determination is expected in late December 2022 or January 2023. In order to be ready in case of
a failure prior to receiving the grant and starting the work, Water Utilities staff designed a bypass pump
header system and received bids for the associated materials. P.R. No. 22812 on the November 22, 2022
Agenda is for the purchase of the bypass pump header materials. Unfortunately, before the bypass pump
header could be installed, the Port Acres ILS failed at approximately 2:00 a.m. on Wednesday, November
16 and sewage began filling the lift station.
Water Utilities staff met on site with the Contractor, Allco, Inc. as well as with the Engineer Arceneaux,
Wilson & Cole, LLC (AWC), in order to coordinate a solution between the Engineer and the Contractor.
Bypass pumping started immediately to prevent sanitary sewer from discharging outside the ILS and out of
the manholes in the collection system. The preliminary estimated projected budgetary impact to bypass
pump and make the necessary repairs to bring the ILS to standard operating conditions is five hundred
thousand dollars ($500,000).
Funding is available in the Water Utilities Capital Improvement Fund Account. No. 405-40-000-8516-00-00-
000.
I, Pamela Langford, Assistant City Manager-Operations, approve the repair and engineering necessary to
restore the Port Acres Influent Lift Station.
/ c„if
Signed: Pamela Langford (in pladei of Ronald Burton, C/M) Date
cc: Ronald Burton