HomeMy WebLinkAboutPR 22821: AUSTIN AVENUE PARKING LOT DRAINAGE INSTALLATION PROJECT'S CiN q1 iiinrt www.PortArth u rTx.gov INTEROFFICE MEMORANDUM Date: December 29,2022 To: The Honorable Mayor and City Council Through: Ron Burton; City Manager From: John Cannatella, PE, City Engineer RE: PR 22821:Austin Avenue Parking Lot Drainage Installation Project's completion and acceptance of Close Out documents and Release of Retainage from Preferred Facilities Group,USA,LLC. Project No. DT0001-CON. Introduction: The intent of this agenda item is to authorize the City Manager to accept the Close Out Documents, and release retainage in the amount of $5,989.83 for the Austin Avenue Parking Lot Drainage Installation constructed by Preferred Facilities Group USA, LLC, of Beaumont,Texas formerly dba as SETEX Facilities &Maintenance. Background: The Austin Avenue Parking Lot is located adjacent to the north side of the Economic Development Corporation (EDC) Enterprise Building (Press Building) along the alleyway. That area has experienced drainage problems that has resulted in water entering the building. Pursuant to Resolution 21-111, Port Arthur City Council approved entering into a contract with Preferred Facilities Group USA-LLC of Beaumont, Texas formerly dba as SETEX Facilities & Maintenance to install a drainage system. It was determined that lowering the elevation of the parking lot and installing a new drainage system would eliminate potential flooding along the north edge of the Press Building. Public Works Engineering has also received Close Out Documents from Preferred Facilities Group USA, LLC, of Beaumont, Texas formerly dba as SETEX Facilities&Maintenance that includes the Certificate of Substantial Completion establishing completion as May 9,2021,the Contractor's Certificate and Release,the Contractor's Certificate of Warranty,and the Contractor's Certificate of Debts Paid. Additionally,Preferred Facilities Group USA-LLC of Beaumont,Texas formerly dba as SETEX Facilities&Maintenance is asking for release of retainage in the amount of$5,989.83. Budget Impact: Funds are available in the Capital Improvement Account No. 307-21-053-8517-00-10-000. Project No. DT0001-CON Recommendation: It is recommended that the City of Port Arthur City Council approve PR 22821 with Preferred Facilities Group USA, LLC, of Beaumont,Texas formerly dba as SETEX Facilities&Maintenance authorizing the City Manager to accept the Close Out documents and release retainage in the amount of$5,989.83. "Remember,we are here to serve the Citizens of Port Arthur" 444 4th Street X Port Arthur,Texas 77641-1089 X 409.983.8182 X FAX 409.983.8294 PR22821 12/28/2022 mje Page 1 of 4 RESOLUTION NO. A RESOLUTION AUTHORIZING THE CITY MANAGER TO ACCEPT THE CERTIFICATE OF COMPLETION, CONTRACTOR'S CERTIFICATE AND RELEASE, CONTRACTOR'S CERTIFICATE OF WARRANTY, CONTRACTOR'S CERTIFICATE OF DEBTS PAID ON THE CONTRACT BETWEEN THE CITY OF PORT ARTHUR AND PREFERRED FACILITIES GROUP USA, LLC, OF BEAUMONT, TEXAS FOR THE AUSTIN AVENUE DRAINAGE INSTALLATION PROJECT AND APPROVAL OF THE RELEASE OF RETAINAGE IN THE AMOUNT OF $5,989.83 FROM THE CAPITAL IMPROVEMENTS STREET MAINTENANCE ACCOUNT NO. 307-21-053-8517-00-10-000. PROJECT NO. DT0001-CON. WHEREAS, the parking lot adjacent to the Economic Development Corporation's (EDC) Press Building experienced drainage problems that led to high water elevations and water entering the north side of the building; and, WHEREAS, pursuant to Resolution 21-111, the City entered into a contract with Preferred Facilities Group USA, LLC, of Beaumont, Texas formerly dba as SETEX Facilities and Maintenance for the lowering of a portion of the Austin Avenue Parking Lot and the installation of a new drainage system along the north end of the Press Building; and, WHEREAS, Preferred Facilities Group USA, LLC, of Beaumont, Texas formerly dba as SETEX Facilities and Maintenance has submitted the Certificate of Completion establishing substantial completion as of May 9, 2021 and the work to which the Certificate applies has been inspected, authorized, and declared to be complete in accordance with the contract documents and made a part of herein as Exhibit A; together with the Contractor's Certificate and Release (Exhibit B), the Contractor's Certificate of Warranty (Exhibit C), and the Contractor's Certificate of Debts Paid (Exhibit D); and, PR22821 12/28/2022 mje Page 2 of 4 WHEREAS, the retainage for the project is 5% of the work completed and billed, the Release of Retainage has been submitted by Preferred Facilities Group USA, LLC, of Beaumont, Texas formerly dba as SETEX Facilities and Maintenance for the amount of $5,989.83, see Exhibit E; and, WHEREAS, Preferred Facilities Group USA, LLC, of Beaumont, Texas formerly dba as SETEX Facilities and Maintenance has completed the contracted project to the satisfaction of the Public Works Director and the City Engineering staff, see Exhibit F; and, WHEREAS, the acceptance of the Close Out Documents, and Release of Retainage is herein deemed an appropriate action; now, therefore, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PORT ARTHUR: THAT, the facts and opinions in the preamble are true and correct; and, THAT, Council hereby accepts the Certificate of Completion dated May 9, 2021 (Exhibit A); together with the Contractor's Certificate and Release (Exhibit B), the Contractor's Certificate of Warranty (Exhibit C), and the Contractor's Certificate of Debts Paid (Exhibit D); and, THAT, the City Manager of the City of Port Arthur is hereby authorized to execute on behalf of the City of Port Arthur a Certificate of Acceptance (Exhibit G) for the completion of the Austin Avenue Drainage Installation; and, THAT, the Release of Retainage be paid to Preferred Facilities Group USA, LLC, of Beaumont, Texas formerly dba as SETEX Facilities and Maintenance in the amount of $5,989.83; and, PR22821 12/28/2022 mje Page 3 of 4 THAT, a copy of the caption of this Resolution No. be spread upon the Minutes of the City Council. READ, ADOPTED AND APPROVED this the day of A.D. 2023 at a meeting of the City of Port Arthur, Texas by the following vote: Ayes: Mayor: Council members: Noes: Thurman "Bill" Bartle Mayor Attest: City Secretary Sherri Bellard PR22821 12/21/2022 mje Page 4 of 4 APPROVED AS TO FORM: APPROVED FOR ADMINISTRATION: V �n Valecia izeno Ron Burton City Attorney City Manager APPROVED AS FOR AVAILABILITY OF FUNDS: Kandy K. Daniel Director of Finance Floze le . oberts MEng, MBA Direct°(o Public ks John Cann e , PE City Engineer L'a Clift Williams, CPPB Purchasing Manager EXHIBIT A CERTIFICATE OF SUBSTANTIAL COMPLETION Purchase Order No.: 223286 Project Name: COPA Austin Ave Parking Lot Contractor: SETEX Facilities & Maintenance Description of Work: Lower the elevation and installation of drainage system The work performed under this contract has been reviewed and found to be substantially complete. The date of substantial completion is hereby established as S - 1 - 21 KNOW ALL MEN BY THESE PRESENTS: 1.) The stage of construction where,in the opinion of the City of Port Arthur, all items of the work necessary to enable the assets to be utilized without restrictions for the purpose for which the asset was constructed have been completed; and 2.) All pay items are complete and all necessary testing as required by the Laws and Regulations and/or Contract Documents have all been completed. Punch List All list of items to be completed or corrected,prepared by the CONTRACTOR and verified and amended by the ENGINEER, is attached hereto. The failure to include any items on such list does not alter the responsibility of the CONTRACTOR to complete all work in accordance with the contract documents. The CONTRACTOR shall complete or correct the work on the list of items attached hereto within in 60 days from the above date of substantial completion. The responsibilities shall be as set out in the Contract Documents or on the attached hereto. If not specified in and an attachment or in the C tract Documents the CONTRACTOR is responsible for maintenance,utilities and insurance. SETEX Facilities & Maintenance It 114• 1 2022 CONTRACTOR NAME SIGNATURE DATE RECOMMENDED FOR JACCEPTANCE J0A LG e0,1 )/ o /2 Z ENGINEER NAME ATURE DATE The City of Port Arthur accepts the work as Substantially Complete. City of Port Arthur,Department of Public Works. PROJECT MANAGER SIGNATURE DATE Nl•An 4el w3e 1 k l> CITY ENGINEER T DATE l v PUBLIC WORKS DIRECT R E DA E EXHIBIT B CONTRACTOR'S CERTIFICATE AND RELEASE FROM: SETEX Facilities&Maintenance (Name of Contractor) TO: City of Port Arthur (Owner) REFERENCE CONTRACT NO.: 21-111 CONTRACT ENTERED INTO THE 25th DAY OF March 2021 BETWEEN THE CITY OF PORT ARTHUR AND SETEX Facilities & Maintenance OF $119, 796.68 FOR THE PROJECT COPA Austin Ave Parking Lot KNOW ALL MEN BY THESE PRESENTS: 1.) The undersigned hereby certifies that there is due from,and payable by,the Owner to the Contractor under the contract and duly approve Change Orders and modification the balance of $ N/A 2.) The undersigned further certifies that in addition to the amount set forth in Paragraph 1, there are outstanding and unsettled the following items which he claims are just and due and owing by the Owner to the Contractor: a. N/A b. c. d. (Itemize claims and amounts due,if none,so state) 3.) The undersigned further certifies that all work required under this contract, including work required under Change Order(s)numbered N/A ,has been performed in accordance with the terms thereof,and that there are no unpaid claims for materials, supplies,or equipment and no claims of laborers or mechanics for unpaid wages arising out of the performance of this contract,and that the wage rates paid by the contractor were in conformity with the contract provisions relating to said wage rates. 4.) Except for the amounts stated under Paragraphs 1 and 2 hereof,the undersigned has received from the Owner all sums of money payable to the undersigned under,or pursuant to,the above-mentioned contract or any modifications or changes thereof. 5.) That in consideration of the payment of the amount stated in Paragraph I hereof,the undersigned does hereby release the Owner and Operator from any all claims arising under or by virtue of this contract, except the amount listed in Paragraph 2 hereof due from the owner,provided however,that if any reason the Owner does not pay the full amount stated in Paragraph 1 hereof,said deduction shall not affect the validity of this release, but the amount so deducted shall be automatically included under Paragraph 2 as an amount which the Contractor has not released but will release upon payment thereof. The Contractor further certifies that upon the payment of the amount listed in Paragraph 2 hereof,and of an amount which may be deducted from Paragraph 1 hereof,he will release the Owner and Operator from any and all claims of any nature whatsoever arising out of paid contract modification thereof,and will execute such further releases or assurances of the Owner and Operator may request. 1 IN WITNESS WHEREOF,the undersigned has signed and sealed this instrument this day of November ,2022. SETEX Facilities &Maintenance {SEAL} (Contractor) BY: (Signature) Nathan Rivers. President (Printed Name/Title of Officer) Nathan Rivers ,being first duly sworn on oath, deposes and says, First,that,he/she is the (Affiant) President of SETEX Facilities &Maintenance (Title) (Name of Company) Second,that he/she has read the foregoing certificate by him/her subscribed as President (Title) of SETEX Facilities &Maintenance . (Name of Company) Affiant further states that the matters and things stated herein are true. Nathan Rivers (Affiant) Subscribed and sworn to before me this 1 L+}l day of November ,2022. My commission expires ) )-1 1- a3 Ityr1 NOTARY �""",, LYNIDA CLIFTON �sY • 2; •�;:Notary Public,State of Texas Comm.Expires 11-17-2023 �'?;F `�.` Notary ID 11799700 2 EXHIBIT C CONTRACTOR'S CERTIFICATE OF WARRANTY FROM: SETEX Facilities &Maintenance (Name of Contractor) TO: City of Port Arthur (Owner) REFERENCE CONTRACT NO.: 21-111 CONTRACT ENTERED INTO THE 25th DAY OF March 2021 BETWEEN THE CITY OF PORT ARTHUR AND SETEX Facilities &Maintenance OF $119,796.68 FOR THE PROJECT COPA Austin Ave Parking Lot KNOW ALL MEN BY THESE PRESENTS: 1.) SETEX Facilities &Maintenance does hereby guarantee all of the work done under the (Name of Contractor) above referenced contract to be free from faulty materials in every particular,and free from improper workmanship,and against injury from proper and usual wear; and agrees to replace or re-execute without cost to the Owner and Operator such work as may be found to be improper or imperfect,and to make good all damage caused to other work or materials due to such required replacement or re-execution. 2.) This guarantee shall cover a period of one(1)year from the date of acceptance of all work under this contract by Owner, as evidenced by the Contractor's Certificate of Completion. 3.) This Certificate is given in connection with the final payment under the contract between the Owner and SETEX Facilities &Maintenance ,and with the knowledge that it will be relied upon in (Name of Contractor) Making such payment and that such payment would not be made except upon the truth of the matter contained in this affidavit. IN WITNESS WHEREOF,the undersigned has signed and sealed this instrument this 10o1 day of November ,2022. SETEX Facilities & Maintenance {SEAL} (Contractor) BY: (Signature) Nathan Rivers,President (Printed Name/Title of Officer) 1-Warranty Nathan Rivers ,being first duly sworn on oath, deposes and says, First,that,he/she is the (Affiant) President of SETEX Facilities & Maintenance , (Title) (Name of Company) Second,that he/she has read the foregoing certificate by him/her subscribed as President (Title) of SETEX Facilities & Maintenance . (Name of Company) Affiant further states that the matters and things stated herein are true. • Nathan Rivers (Affiant) Subscribed and sworn to before me this I erth day of November ,2022. My commission expires 1 I-1'1- 1. ,%AJ;L UlAtto-1 NOTARY ,�,F.':.;4,'. LYNIDA CLIFTON , :a°;' ;;' Notary Public,State of Texas ��: .'� Comm.Expires 11-17-2023 -4,g;''''' Notary ID 11799700 4 2-Warranty EXHIBIT D CONTRACTOR'S CERTIFICATE OF DEBTS PAID PROJECT: COPA Austin Ave Parking Lot LOCATION: Port Arthur,Texas OWNER: City of Port Arthur STATE OF TEXAS; COUNTY OF JEFFERSON; The undersigned hereby certifies that, except as listed below,payment has been made in full and all obligations have otherwise been satisfied for all materials and equipment furnished for all work, labor, and services preformed and for all known indebtedness and claims against the Contractor for damages arising in any manner in connection with the performance of the Contract referenced above for which the Owner's property might in a way be held responsible or encumbered. Exceptions: N/A Contractor: S Facilities & Maintenance , Texas Signature: C Printed Name: Nathan Rivers Date: 11- lto- a3 Subscribed and sworn to before me this )6+6 day of November , 2022 My commission expires: J I—11 - A-6 leA •ctian Uet.-S0r, NOTARY �.�`P�',''�1,, LYNIDA CLIFTON '3,;�";,:Notary Public.State of Texas _.`• �= Comm.Expires 11-17-2023 ;%f `�. Notary ID 11799700 EXHIBIT E n Ji, .\ Z xo m1 3� m 0 " !o m � rn Q m cn a w n) 0 0 p 0 2 ' n m m 00 0 m O --ZI p1 3 O r O m o"c� Z C O 1 O A D �{ D $ yogi G7 z A N rD4Dcm SIR Roo D Z O ,�1 Z r Z 3 3= m Cfl m-T 5 c c g- r A n m C) m a ?y 0 a "' F S m m W a n g S = onn n m D 0 0 D D p N ?o 0 v+0 Vm,5 AZ2r. m0 p-Mgi i m n O 7o O -o<-2 m z <�S .os1 .N mg) .r- c ' z 4 mmm mmo Z t o ?a 0 g2 ton 2 m- 8a ='3o Or/n 3 m' I n a W� 2 S $ . C -�_.m Ntno ° na �p 00 m ° � D ° • o M a'2 O$A owam note .ya apO O m " � n>a v n 0 3 r m�T amta g.g, ry * d.yi 11 n C r ➢v0°'i°m' -1°0° m --I W O =D ➢_. gm CO nO m m n m4. )., o0 -< z 2 - Za� ` m m `� D " c, A i -1 a m �1 rn �° vT memo$ �v Q 0 O o' C) q O V MO z a 1 A O T 7. < m c 2 D D m Z D O o 3 p _+ m $ o o D G S S S 12 Z c C 0 s 0 Z 0 S 8 0 m -I O m ti m 0 0 0 C) vi w Qom i° so S $ $ 0 0 g * O SV 8 o m o$0 ON S Z o co . . '0)> o m a.0 eno W o 0 oo o N >g p N X a m ; WA N g 2 3 .057,0oi D z c 0 O msa a-1 n V 'Al `aff c� n cu c. 0 .5¢§.30-aaQ C) O a' w m pEI 2 3n3om 0 0 '_' _�J o$ "--a^ n 33R x ? ow4r3.m -1re. 3 c cr - A aSrm^o ','n m IO - �l, cm a `L - 3!fiag a a.'m A D m o m F C) ♦ n m O 2$ mQ >> o % 1 w zgo z i O cmomg C) q • O ow�_� r� 9 n n sum ? Zn y�o C) 73 • .. 6 3x053 y O 2 2 Cc�_ m o8 ^^.m C) 0 V Og. m% 2k;35 d T - g off.*o % PI) � D 1 7 3Om om 1�T0Qa n I • . m Og-�xm 1 i O n v $ � ' m(D�sgo D J m8a T ! ! ! - 5.?m 1 O~ n o n �, ID T �m m VTh mWO5s Z O of >o ; n •ga gm rv�p°(�pa yxz er5vg m " 0 w a 3 NRUj g i H g Oa =mC yoo m yw�y$, O D00 K a5 ,y A 77 C, 42 p ?i HIll m N m 7 ;1H -, a; ;- N 'i , '. o 6 m r S cg^n ^ iw m . H mm2 . z • Rg u n aQ m < m c B sovg \IL g 1 m nV. N y n • d Cr yA I D ! Or -1 YJ 4P . 1 A W NJp CID CO J O) cm A W NJ2 Cl) n 3 y 0 0 c cc 6) C o N O o CO(D 0 1a W 0 C -1 o m ] v g. E 3 c g 3 3 v l= . C °. v o 0 0 0 w O f0 Z1(D a N O' K O 0 -0 CO n T O g y x o o O N p 8 a 3- O O D co N v N O O Z O. co co 'O DOc <. = O Cl) ;a O W 0 2 3 I 91 m alo 8• ' y 0 PT C Ei — c1 [) 50 -• CT_CO CO A J CM -OD OD NJN �I O O1 co A O (0 O O) 0 Co Qo cn lo Di o_ f0 0 0 O O O O O J O O W W j N C O O) 000 --PO 0 0 Cn 00 NJ CO J CO in 0 O 0 00 0 0 0 0 0 0 0 0 0 C m 2 T t0 —, Cn co co- A v O - f0 O N13 no O O Q) A O N O O) -co co O co O ry O) CD C. CD CD CD C) J 0 o W W N C)0 0 J 0 0 0 al 0 0 NJ NJ J 0 W O O O O O 0 0 0 0 0 Co CD NOD =O c 0 0 0 0 0 0 0 0 0 0 0 0 0 W to Co -4 = 0 m R 13 n -a o m ] a' 3 I. � V V • OZ g 0 (] O -n g N N a m Q, 0 u) d o - c0 -+cn O O . A v O) -co O N O 0 0 + a o m 000000con °J) 004w -,NJ + o -o > m o -u 0) O O 0 4 0 O 0 0 0 0 N N J in o O O O O O Ov O OO OOOOOo o. S o C C 1 v n m i 1 1 -11 Q O o _ Cl) Z Z 0 0 o 0 0 0 0 0 0 0 0 0 O o o '� c A Co > O 0 0 0 0 0 0 0 0 0 0 0 0 o O o 0 0 w m 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O o +• Z▪ N 0 T CO9 m N G) o g N N N a O W 7 (D N _ C C) co co EXHIBIT F Cats of Iit ort rtlitt www.PortArthurTx.gov CERTIFICATE OF COMPLETION Date: December 21, 2022 Project: Austin Avenue Drainage Installation Project - Close Out and Release of Retainage. To: All Concerned I HEREBY CERTIFY THAT this project was completed on May 9, 2021 and that the work was under periodic inspection during construction by Public Works Engineering, City Inspector. That to the best of my knowledge, the project was constructed substantially in accordance with the plans and specifications, and that record documents were received and are on file in Public Works Engineering. Submitted by: o S / 4110, A r/ 9ri�.�. ozelle °oberts, 'IT MEng' BA Direct. , Publi •rks "Remember,we are here to serve the Citizens of Port Arthur" P.O.Box 1089 X Port Arthur,Texas 77641-1089 X 409.983.8101 X FAX 409.982.6743 EXHIBIT G CITY OF PORT ARTHUR, TEXAS DEPARTMENT OF PUBLIC WORKS CERTIFICATE OF ACCEPTANCE FOR... AUSTIN AVENUE DRAINAGE INSTALLATION PROJECT To: Preferred Facilities Group USA, LLC, of Beaumont, Texas formerly dba as SETEX Facilities and Maintenance This document is to certify that the City of Port Arthur,Texas accepts the completion of the Austin Avenue Drainage Installation Project on the basis of the recommendation of the City of Port Arthur's Public Works' Engineering Department and receipt of the Certificate of Completion, Contractor's Certificate of Debts Paid Debts Paid, Contractor's Certificate of Release, and the Contractor's Certificate of Warranty as executed by Preferred Facilities Group USA, LLC, of Beaumont, Texas formerly dba as SETEX Facilities and Maintenance. Ron Burton Date City Manager Sherri Bellard Date City Secretary