Loading...
HomeMy WebLinkAboutPR 22994: PURCHASE OF A NATURAL GAS GENERATOR FOR THE HEALTH FACILITY \ � 1, Ciry of nr[ rthu www.PortArthurTx.gov INTEROFFICE MEMORANDUM Date: January 20, 2023 To: The Honorable Mayor and City Council Through: Ronald "Ron" Burton, City Manager From: Pamela D. Langford, Director of Planning & Development Services RE: P.R. NO. 22994— Purchase of a natural gas generator for Port Arthur Health Facility, located at 5860 9th Avenue Introduction: This Agenda Item intends to seek the City Council's approval of P.R. NO. 22994, authorizing the City Manager to execute an agreement with Waukesha-Pearce Industries, Inc. for the purchase, delivery, and installation of a 750KW Natural Gas Generator for the Port Arthur Health Facility, located at 5860 9th Avenue, Port Arthur, Texas. Background: Pursuant to Resolution No. 22-413, City Council authorized the City Manager to execute a construction contract with N&T Construction, Co., Inc. of Beaumont, Texas, for the renovation of the City of Port Arthur's Health Facility, located at 5860 9th Avenue, Port Arthur, Texas. As part of this agreement, City Officials, Construction Manager, and the Contractor have conducted several meetings to discuss value engineering that would provide cost savings to the City while prioritizing and ensuring the department's needs are met. In evaluating the cost estimate provided for the building's purchase and installation of generator power, it was realized that the City could offer cost savings by purchasing the generator through its cooperative contract with BuyBoard. This will provide fora Change Order which will reflect the savings and include other findings discovered during the project's demolition phase. It is vital that the Health Department be provided with a backup power source for several reasons. Some of those reasons include the storage of medications that require refrigeration, access to vital medical records and files, and the need to keep the facility chilled to combat against the spread of bacteria and viruses and provide services, such as testing, vaccinations, and other essential services. The City of Port Arthur's Health Department also plays a crucial role in achieving national health security by preparing the community for disasters, responding to emergencies, and lending support through recovery. As part of the BuyBoard Cooperative Purchasing Program, the City received a quote from Waukesha-Pearce Industries, Inc. for purchasing, delivering, and installing a 750KW Natural Gas Generator to help facilitate activities for the Department of Health Services during natural disasters that result in power outages. Nick Newell, the sales representative with Waukesha-Pearce, provided a BuyBoard quote on January 9, 2023. Budget Impact: The generator will be purchased through BuyBoard pricing for $694,302.00. Funding available in Capital Account: 307-21-049-8512-00-10-000; Project No. B00006 OTH. Recommendation: It is recommended that City Council approve P.R. NO. 22994, authorizing the City Manager to execute an agreement with Waukesha-Pearce Industries, Inc. for the purchase, delivery, and installation of a 750KW Natural Gas Generator for the Port Arthur Health Facility, located at 5860 9th Avenue, Port Arthur, Texas. "Remember,we are here to serve the Citizens of Port Arthur" P.O.Box 1089 X Port Arthur,Texas 77641-1089 X 409.983.8101 . FAX 409.982.6743 P.R. NO. 22994 01/20/2023 pdl PAGE 1 OF 13 RESOLUTION NO. A RESOLUTION AUTHORIZING THE CITY MANAGER TO EXECUTE AN AGREEMENT WITH WAUKESHA-PEARCE INDUSTRIES, INC. FOR THE PURCHASE, DELIVERY, AND INSTALLATION OF A GENERAC SG0750 750KW NATURAL GAS GENERATOR FOR THE HEALTH DEPARTMENT FACILITY LOCATED AT 5860 9TH AVENUE THROUGH THE BUYBOARD COOPERATIVE PURCHASING PROGRAM, CONTRACT NO. 657- 21, WITH THE PROJECTED BUDGETARY AMOUNT OF $694,302.00; FUNDING AVAILABLE IN CAPITAL IMPROVEMENTS ACCOUNT NO. 307-21-049-8512-00-10-000; PROJECT NO. B00006 OTH. WHEREAS, a commercial generator is a valuable continuity tool that is vital for keeping the City operational in the event of power outages, including during an emergency, and provides convenience and peace of mind in the event of a power loss; and WHEREAS, natural disasters, aging electrical infrastructure, and accidents attributed to human error are all significant contributors to the loss of power to municipalities, residents, and industry; and WHEREAS, it is vital that the Health Department be provided with a backup power source for several reasons, including not limited to the storage of medications that require refrigeration, access to vital medical records and files, and the need to keep the facility chilled to combat against the spread of bacteria and viruses; and WHEREAS, the need for power will be essential in providing all tools (i.e., computers, telephone system, printers, copiers, and charging stations) necessary for the proper functioning of the facility; and WHEREAS, Texas largely relies on natural gas, especially during times of high demand, to power the state; and P.R. NO. 22994 01/20/2023 pdl PAGE 2 OF 13 WHEREAS, natural gas is about half the cost of diesel and provides economical run times, and gas utility infrastructure is reliable as an emergency fuel source; and WHEREAS, the Health Department is recommending that the City Council authorize the purchase, delivery, and installation of a Generac SG0750 750KW Natural Gas Generator for the Health Department Facility, located at 5860 9th Avenue, Port Arthur, Texas, from Waukesha-Pearce Industries, Inc., through BuyBoard Purchase with the projected budgetary amount of $694,302.00, as delineated in Exhibit "A"; and WHEREAS, Chapter 271 of the Local Government Code allows a city, by Resolution of its governing body, to participate in cooperative purchasing programs, such as BuyBoard, a purchasing cooperative, as an alternative to a formal bid process; and WHEREAS, pursuant to Resolution No. 02-341, the City of Port Arthur entered into an interlocal agreement for cooperative purchasing with Texas BuyBoard; and WHEREAS, Waukesha-Pearce Industries, Inc. is an approved vendor through BuyBoard; and, WHEREAS, funding is available in Capital Improvements Account No. 307-21- 049-8512-00-10-000; Project No. B00006 OTH; now, therefore, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PORT ARTHUR: THAT, the facts and opinions in the preamble are true and correct; and, THAT, the City Manager is hereby authorized to execute an agreement with Waukesha-Pearce Industries, Inc. for the purchase, delivery, and installation of a Generac SG0750 750KW Natural Gas Generator for the Health Department Facility, located at 5860 9th Avenue, Port Arthur, Texas, through BuyBoard Cooperative Purchasing Program, Contract No. 685-22, in the projected budgetary amount of MP P.R. NO. 22994 01/20/2023 pdl PAGE 3 OF 13 $694,302.00; Funding available in Capital Improvements Account No. 307-21-049-8512- 00-10-000; Project No. B00006 OTH. THAT, a copy of the caption of this Resolution be spread upon the Minutes of the City Council. READ, ADOPTED, AND APPROVED this the day of January, A.D. 2023 at a Regular Meeting of the City Council of the City of Port Arthur, Texas, by the following vote: AYES: Mayor: Council members: Noes: Thurman Bill Bartle, Mayor ATTEST: Sherri Bellard, TMRC, City Secretary APPROVED AS TO F RAM: Valecia " al i no, Cit tt ney P.R. NO. 22994 01/20/2023 pol PAGE 4 OF 13 APPROVED FOR ADMINISTRATION: Q�vn t L jJ . an7C0 Ronald "Ron" Burton, City Manager Pamela D. Langford, Assiant City Manager - Operations APPROVED AS TO AVAILABILITY OF FUNDS: (1.) Kandy Daniel, Interim Finance Director 4,4 Clift.n Williams, CPPB, Purchasing Manager P.R. NO. 22994 01/20/2023 pdl PAGE 5 OF 13 EXHIBIT "A" P.R. NO. 22994 01/20/2023 pdl PAGE 6 OF 13 Board e Texas Association of School Boards • • Cooperative Purchasing BUYBOARD Quotation Quote Date I January 9,2023 I I WPI Quote Number 00722-001 NN Contract No. 657-21 Quotation To Vendor ID 837 Buying Agency City of Port Arthur I Waukesha-Pearce Industries Inc. Contact Clifton Williams ' Generator Division Phone 409-983-8162 Contact Nick Newell Fax Phone 832-350-9168 Email c I on.wi iamsaportarthurTX.goy, Fax Email nick.newell(a7wpi.com Pricing Based On Maunufacturer's Price List Dated: 12/01/21 Contract Discount 33.0% Factor 67.0% A. Base Unit: Brand Model No. Description List Price Net Price Generac SG0750 750KW Natural Gas $ 588,461.00 $ 394,268.87 Includes All Standard equipment&attachments as listed in attached brochures and delivery to your facility. B. Factory options and attachments Sales Code Description List Price Net Price 2 ATS-1600-3 $ 29,792.00 $ 19,960.64 2 ATS $ 7,284.00 $ 4,880.28 Sub Total $ 24,840.92 C. Non-Factory options and attachments Sales Code Description Net Price 32 Installation and Final Electrical Termination $ 272,510.00 Sub Total $ 272,510.00 D. Other applicable charges. Allowances, Trade-Ins, Special Discounts, etc. Description Net Price WPI Terms and Conditions apply to this quote Freight to and startup to job site $ 8,636.00 All Fuel by others Additional Discount $ (5,953.79) Sub Total $ 2,682.21 TOTAL PURCHASE PRICE: $ 694,302.00 Delivery:I Equipment est. -36-38 weeks ARO Pricing valid for thirty(30)days from this date. Orders after that period must be re-quoted. Transmit copy of quotation with purchase order issued to WPI to: Texas Association of School Boards,BuyBoard,PO Box 400,Austin, TX 78764-0400 email: buyboard@tasb.org P.R. NO. 22994 01/20/2023 pdl PAGE 7 OF 13 Waukesha-Pearce Industries 12320 South Main Street, Houston, TX 77035 Phone: 713-723-1050 — Fax: 713-551-0799 POWERED 3Y SOLUTIONS Date: September 29, 2022 Company: City of Port Arthur Attention: Clifton Williams Quote Number: 070722-001 NN Reference: Thank you for considering WPI for your Power Generation needs.We are pleased to offer the following bill of material based on your recent request and the above referenced project. Port Arthur Public Health Bill of Material Quantity 1 - Generac Industrial gaseous engine-driven generator, turbocharged/aftercooled 12 cylinder 33.9L engine, consisting of the following features and accessories: • Stationary Emergency-Standby rated • 750 kW Rating, wired for 277/480 VAC three phase, 60 Hz • Permanent Magnet Excitation • Standard Weather Protective Enclosure, Steel • Industrial Grey Baked-On Powder Coat Finish • UL2200 • EPA Certified • Power Zone Digital Control Panel for Single or MPS Generators o Meets NFPA 99 and 110 requirements o Temp Range -40 to 70 degrees C o Humidity 2—95% (Non Condensing) o UL6200 o C-ETL-US o CE o FCC o IEC801 (Radiated Emissions, Susceptibility, and Surge Immunity) O 7" Resistive Color Touchscreen • Built-in Wi-Fi, Bluetooth, and Webserver • IP65 (front) • Auto/Manual/Off key switch, Alarm Indication, Not in Auto Indication, audible alarm, emergency stop switch Dual Core Digital Microprocessor • RS485, Ethernet and CANbus ports o All engine sensors are 4-20ma for minimal interference • Sensors: Oil Pressure, optional Oil Temp, Coolant Temp and Level, Fuel Level/Pressure (where applicable), Engine Speed, DC Battery Page 1 of 7 POWERED BY SOLUTIONS Rev.05/20/2018 P.R. NO. 22994 01/20/2023 pdl PAGE 8 OF 13 Waukesha-Pearce Industries 12320 South Main Street, Houston, TX 77035 Air Phone: 713-723-1050 -- Fax: 713-551-0799 POWERED BY SOLUTIONS Voltage, Run-time Hours, Generator Voltages, Amps, Frequency, Power, Power Factor • Alarm Status: Low or High AC Voltage, Low or High Battery Voltage, Low or High Frequency, Pre-low or Low Oil Pressure, Pre- high or High Oil Temp (optional), Low Water Level and Temp, Pre- high or High Engine Temp, High, Low, and Critical-low Fuel Level/Pressure (where applicable), Overcrank, Over and Under Speed, Unit Not in Automatic • Programmable I/O • Built-in PLC for special applications o Engine function monitoring and control: • Full range standby operation; programmable auto crank, Emergency Stop, Auto-Off-Manual switch • Isochronous Governor • 0.25% digital frequency regulation with: soft-start ramping - adjustable, gain - adjustable, overshoot limit- adjustable • 3 Phase RMS Voltage Sensing • +/-0.5% digital voltage regulation with: soft-start voltage ramping - adjustable, loss of sensing protection -adjustable, negative power limit - adjustable, Hi/Lo voltage limit - adjustable, V/F slope and gain - adjustable, fault protection o Service reminders, trending, fault history (alarm log) O 12T function for full generator protection o Selectable low-speed exercise 2-wire start controls for any 2-wire transfer switch • 21 Light Annunciator- Surface • Remote Emergency Stop Switch, Break-Glass, shipped loose • Natural Gas fuel system • Battery Charger, 20 Amp, NFPA 110 compliant, installed • Block heater 6000W 480V 3PH • Spring Vibration Isolators • Enclosure 120VAC Light Package • Std set of 3 Manuals • 120V GFCI and 240V Outlet • 24 Position 1 PH Load Center • Alternator Strip Heater • Flex Fuel Hose, shipped loose • Flush Mount Annunciator Kit • Oil Temp Sender • MLCB, 100% rated Electronic, Adjustable 1600 Amp • Secondary MLCB, 100% rated Electronic, Adjustable Page 2 of 7 POWERED BY SOLUTIONS Rev.±L5/28/2018 P.R. NO. 22994 01/20/2023 pdl PAGE 9 OF 13 Waukesha-Pearce Industries 12320 South Main Street, Houston, TX 77035 Phone: 713-723-1050 Fax: 713-551-0799 PG WERED BY SOLUTIONS 150 Amp • 5-Year Comprehensive Warranty • SG0750KG02339N18PPYYE Quantity 1 - G33.9L GAS 5C 5 YR P/LIT Quantity 1 — 1600A SER ATS • NEMA 3R • Service Entrance Rated • 4 Pole • 480VAC • Integrated Docking Station and Distrobution Load Center Quantity 1 — 150A ASCO ATS • 300 Series • Nema1 • Non SER • 4 Pole • 480VAC Quantity 1 — Turn Key Installation Quantity 1 —WPI Standard Factory Start-Up &Warranty Registration FOB Shipping Point Project Clarifications: • Quotation based on one-line only. No other information was provided for consideration in this proposal. Compliance with any other specification section(s) or drawing(s) is specifically excluded including those incorporated by reference. • ATS upsized per manufacturer's availability. • Exclusion on of Turn Key Installation (Plumbing, Concrete Removal, Fencing and Bonding) Standard Clarifications: • All purchase orders are to be submitted to PowerGenPOawpi.com and (your email address). • New cancellation policy included in WPI Terms and Conditions. • Sales Tax is NOT Included. Page 3 of 7 POWERED BY SOLUTIONS Rev.05/2 8/2018 P.R. NO. 22994 01/20/2023 pdl PAGE 10 OF 13 Waukesha-Pearce Industries 12320 South Main Street, Houston, TX 77035 Ai Phone: 713-723-1050 Fax: 713-551-0799 POWERED BY SOLUTIONS • All gas train accessories by others. • Any Factory witness test expenses by others. • Offering manufacturers standard materials of construction. • Offering manufacturers'standard field testing, Startup&Warranty Registration unless specifically noted above only. • Quotation is limited to the quantity and description listed above. • External plumbing& required Primary Gas Pressure Reducing Regulator by others • Recommended gas supply guidelines available at www.enerciv.wpi.com. • All Fuel to be provided by others. • Startup/commissioning must be done within 1 year of factory shipment. • Responsibility of freight claims to be done by others. • Jobsite Offloading/Setting is to be done by others. • Installation & External Wiring is to be done by others. • Assumes that all work will be done during Normal Business Hours (M-F 8-5) • Manufacturers'standard literature available upon request. • This quotation is subject to WPI Terms and Conditions. • Roof curbs and all roof accessories by others. • Quotation is valid for 30 days. Taxable customers are subject to a 1.5% Diesel Surcharge Tax on all units 50Hp and up. Current estimated lead time is 30-36 weeks from release to order and approved credit by WPI Credit department. All lead times are updated periodically and are subject to change. Best Regards, Nick Newell New Unit Sales Waukesha-Pearce Industries Phone: (832) 350-9168 Email: Nick Newell@wpi.com www.woi.com Page 4 of 7 POWERED BY SOLUTIONS Rev.05/28/Z01S P.R. NO. 22994 01/20/2023 pdl PAGE 11 OF 13 Waukesha-Pearce Industries �r 12320 South Main Street, Houston, TX 77035 S® Phone: 713-723-1050 Fax: 713-551-0799 POWERED BY SOLUTIONS Other services available include Paralleling,Turnkey Services,Remote Monitoring Systems,Preventative Maintenance Agreements,Fuel Maintenance Services,Annual Load Testing,Multi-Purpose Docking Stations and other Power Generation Needs. Page 5 of 7 POWERED BY SOLUTIONS Rev.05/2 8/2018 P.R. NO. 22994 01/20/2023 pdl PAGE 12 OF 13 Waukesha-Pearce Industries,Inc.(WPI) Standard Terms and Conditions of Sale 1.Acceptance All quotations offered by WPI are subject to acceptance within thirty(30)days from the quoted date. 2.Payment Terms Subject to WPI Credit Department approval,WPI's payment terms are Net-30 Days from date of invoice. WPI does NOT allow for the buyer to withhold"Retainage"from final payment.In the event that WPI requires progress payments the following milestone achievements are: 50%upon submittal approval and release of order to the factory 50%upon completion of equipment,shipment from the factory and prior to delivery to customer site 3.Cancellation or Termination The Buyer,only upon payment of reasonable cancellation charges related to expenses already incurred andlor commitments made by WPI, may cancel any order placed with WPI. Cancellation charges for Generac Power Systems equipment purchases are subject to the following charges: For Orders<S100.000 in Total Price: 20 weeks prior to ship date 10%of Selling Price • 18 weeks prior to ship date 20%of Selling Price 16 weeks prior to ship date 30%of Selling Price - 15 weeks prior to the ship date or less 40%of Selling Price - Discontinued Product(Engine)No Cancellations Accepted Non-Standard Tanks - Special Engineering(Upon Generac SEQ Approval)Incremental 10%of Selling Price For Orders>S100,000 in Total Price: - 20 Weeks Prior to Ship Date 10%of Selling Price - 18 Weeks Prior to Ship Date 15%of Selling Price 16 Weeks Prior to Ship Date 20%of Selling Price - 14 Weeks Prior to Ship Date 30%of Selling Price - 13 Weeks Prior to Ship Date 40%of Selling Price - 12 Weeks Prior to Ship Date 50%of Selling Price - 10 weeks prior to the ship date or less 60%of Selling Price - Discontinued Product(Engine)No Cancellations Accepted - Special Engineering(Upon Generac SEQ Approval)10%of Selling Price Cancellation For PSTS Transfer Switch Orders: PSTS Products<1000 Amps: - >18 Weeks Prior to Ship Date 0%of Selling Price - 14-18 Weeks Prior to Slip Date 25%of Selling Price - Less than 14 Weeks Prior to Ship Date 100%of Selling Price PSTS Products>1000 Amps: - 13 Weeks Prior to Ship Date 0%of Selling Price - 12-13 Weeks Prior to Ship Date 25%of Selling Price - Less than 12 Weeks Prior to Ship Date 100%of Selling Price Residential Products: Cancellation of stock item products is permitted provided the cancellation request is executed by Generac sales and order entry prior to shipment. Cancellations are subject to the following fees: - 2-4 Weeks Prior to Ship Date 2%of Selling Price - 1 Day-2 Weeks Prior to Ship Date 5%of Selling Price Product purchased with special engineering requirements or discontinued engines are subject to 100%cancellation charge. 4.Change Orders No alterations in specifications,either for total quantity,delivery,mechanical,electrical or other details may be made without written consent of WPI and readjustment of price and estimated delivery. Change order requests are subject to the following fees and based on factory shipping windows: • 4.6 weeks prior to ship date......... A% • 2.3 weeks prior to ship date 6% • Less than 2 weeks................._ No Changes Accepted Depending on the nature and timing of the changes requested.it may be necessary to reschedule production to a later date. 5.Taxes In addition to the prices stated in the quote,Buyer shall reimburse WPI for any excise,sales,diesel fuel surcharge or use tax incident to this transaction for which WPI may be liable or compelled to collect. 6.Shiooino Dates Any shipment date provided in the quote is approximate and is estimated based on the advised lead-times provided by the manufacturer(s) of the equipment quoted. Upon receipt of a Purchase Order from Buyer,along with complete specifications and drawings approval,if required, and after receipt of WPI's Purchase Order to the manufacturer the estimated delivery will again be advised by the manufacturer to WPI and WPI will update Buyer on the new estimated delivery. WPI shall not be liable for any loss or damage for delay or non-delivery due to the acts of civil or military authority,acts of the Buyer or by reason of Force Majeure,which shall be deemed to mean all other causes whatsoever not reasonably within the control of WPI,including,but not limited to Acts of God,war,riots or insurrection,blockades,embargoes,sabotage, Page 6 of 7 POWERED BY SOLUTIONS Rev.05/28/2018 P.R. NO. 22994 01/20/2023 pdl PAGE 13 OF 13 Waukesha-Pearce Industries,lnc.(WPI) Standard Terms and Conditions of Sale epidemics,fires,strikes,lockouts or other industrial disturbances,delays of carriers,the inability to secure materials,labor shortages or manufacturing delays. Arty delay resulting from any such cause shall extend shipping dates correspondingly.WPI shall in no event be liable for any special,direct or indirect or consequential damages arising from delay(s)irrespective of the reason. 7.Shipping and Delivery Acceptance tt is the responsibility of the buyer or the buyer's representative to inspect all equipment at time of delivery for visible or concealed freight damage. Apparent and concealed damage must be noted on the driver's delivery ticket and subsequent freight claims must be completed and filed directly with the drayage company by the Buyer. In most cases,buyer has up to 30 days to file freight claims when damage is noted with the freight carrier at time of delivery. In most cases,buyer has up to 5 days to file freight claims on damage found after equipment is delivered but not noted at time of delivery. WPI is NOT responsible for damages incurred to equipment during shipment nor is responsible for filing freight claims on damaged equipment incurred in shipment. 8.Equipment Storage It is hereby understood and agreed that the customer will accept delivery of all purchased equipment within 30 days of fabrication completion. WPI may,at the customers written request,store or stage all or part of,the customers purchased equipment at one of our strategic facilities provided the customer submits an acceptable`Bill&Hold"letter to WPI Inventory Control Department.Buyer hereby agrees to pay WPI in full for all stored equipment within the terms of the contract(Net 30)otherwise the order will subject to incur storage fees of 3%of the contracted sales price per month. 9.Indemnity Buyer agrees that it will indemnify and hold harmless WPI,its officers,agents and employees,from and against any and Al claims,losses. damages,causes of action,suits and liabilities of every kind,including all expenses of litigation court costs and attorneys fees,forfeiture of an oil,gas or mineral lease.damage to a producing reservoir or lease operations of lost production,denied certificate of occupancy or"Green Tag"from the local"AHJ",arising out of,or in any way connected with the failure of,or the operation of the equipment sold by WPI.unless WPI is proven in court to be 100%solely negligent in its responsibilities. 10.Consequential Damages and Other Charges WPI will not be responsible or liable for any special,direct,indirect or consequential damages or for any operational interruptions or delays, production loss, or other damages or claims of whatever kind caused by or arising out of the fabrication, manufacture, sale,delivery, installation use,breakage or performance of equipment sold or any part thereof,except only to the extent and in the manner set out in Item 12 below having to do with warranty. 11.Performance Guarantee Performance is subject to manufacturer's guarantees for horsepower and capacities and is subject to de-rating for actual site conditions. 12.Comments and Exceptions When Buyer's specifications are attached to or referenced in an invitation to quote.WPI makes a thorough and sincere effort to review these and provide a quote based on WPI's interpretation of the Buyer's specification. WPI's quote will clearly state what is included and what our interpretation is of Buyer's requirements. It is the Buyer's responsibility to review WPI's quote carefully and advise WPI of any discrepancies between Buyer's specification and WPI's quote.WPI's quote constitutes WPI's total offer and only those items;procedures,scope and content clearly stated in the quote are included and WPI makes no guarantee that the products quoted will meet the Buyer's specifications. 13.Warranty WPI warrants that the equipment of its own fabrication shall be free from defects in design.material,workmanship and title.under normal use,service,and operating conditions,for the period of one(1)year from date of start-up or commissioning or eighteen(18)months from date of shipment.WPI's exclusive remedy for breach of this warranty shall be repair or replacement of any defective parts packaged by WPI. F.O.B.Houston,Texas. Accessories or equipment furnished by WPI,but manufactured by others,shall carry that manufacturer's warranty. which will be passed-on to Buyer. WPI shall not be liable for any repairs,replacements,or adjustments to the equipment or any costs of labor performed by the Buyer or others without WPI's prior written approval. WPI will serve the Buyer by acting as Buyer's representative in regard to warranty claims for items not manufactured by WPI. However warranty in all cases is limited to the manufacturers'warranty. Any part(s) found to be defective will be replaced at no charge subject to each manufacturers'respective warranty policy,which WPI will administer.Any parts)replaced that are not subsequently found to be defective by the manufacturer will be charged to the Buyer. Warranty labor for replacement or repair is on site only.Buyer is responsible for travel time,transportation and expenses to and from the closest WPI location, to the location of the subjected equipment. Should WPI travel to the location and find that the cause is not warrantable,all expenses incurred by WPI,to include travel and labor.will be billed to the Buyer at WPI's posted rates. WPI will not be responsible for crane.barge,or special transportation charges associated with warranty repairs. 14.Literature WPI will provide upon request,the manufacturers standard literature.This includes Spec Sheets.Bill of Materials.Drawings,Operation and Maintenance Manuals and/or Factory Test Reports.WPI takes exception to all specification requirements&requests for non-standard factory literature. 15.Hours of Operation This bid assumes all work will be done during normal business hours.Normal hours of operation for WPI are 8 am-5 pm Monday-Friday.Any work performed outside of the normal operating hours will be billed at 1.5 times our current labor rate. 16.Start-Up When factory start-up services and field testing are included as part of a quoted package it is understood that the equipment will be made available by the buyer for WPI to perform the factory services within six(6)months of shipment.Additional charges may be required for factory services performed beyond the six(6) month window. Customer has one year(365 days)from the initial ship date of a Generac generator to be started up/commissioned and filed oriine via GENservice. Registration will then activate the warranty start date. If the product is not started up/commissioned within the first year of the ship date,the warranty start date will revert back to the initial ship date. In addition, any product not started up in the first year must have the Long Term Preservation and Storage Procedure performed and the form completed. Forms must be submitted BEFORE the first year after the initial ship date has expired. Page 7 of 7 POWERED BY SOL