Loading...
HomeMy WebLinkAboutPR 22965: DESIGN OF PORT ARTHUR TRANSIT'S TERMINAL BUILDING EXPANSION City of Port Arthur Transit Department Memorandum To: Ron Burton,City Manager From: Ivan Mitchell,Transit Director Date: February 28,2023 Re: P.R.22965—Design of Port Arthur Transit's Terminal Building Expansion Nature of Request:Authorize the City Manager to execute a contract with the Solco Group, LLC.,for the engineering and design of Port Arthur Transit's(PAT)terminal building expansion in the amount not to exceed$64,540.00. Background: PAT operates its administrative and operations divisions from a 4,353 square foot building located at 344 Procter Street. Approximately,25 employees are employed in both divisions. Recent service expansions have created the need for additional office space due to new employee hirings. Currently,PAT has a terminal building located at 322 Procter Street that has adjacent land to expand. PAT has secured funds to construct an expansion of the terminal which would provide the increased operational and administrative space for employees. PAT issued a Request for Qualifications(RFQ)from engineering firms for engineering and design services. Pursuant to Resolution No.22-251,the City Manager was authorized to negotiate a contract with the Solco Group,LLC. The City Manager and PAT have negotiated a contract in the amount not to exceed$64,540.00. Recommendation: It is recommended the City Council approve proposed P.R.22965 for engineering and design services of Port Arthur Transit's(PAT)terminal building expansion with the Solco Group, LLC.in the amount not to exceed$64,540.00. Budgetary/Fiscal Effect: Funding to pay for the engineering and design services is available in account 401-70-530-8512-00-60-000.Project TR1416. P.R. 22965 2/28/2023 IM RESOLUTION NO. A RESOLUTION AUTHORIZING THE CITY MANAGER TO EXECUTE A CONTRACT WITH THE SOLCO GROUP, LLC OF PORT ARTHUR, TEXAS FOR ENGINEERING AND DESIGN SERVICES FOR PORT ARTHUR TRANSIT'S (PAT) TERMINAL BUILDING EXPANSION LOCATED AT 322 PROCTER STREET, PORT ARTHUR, TEXAS IN THE AMOUNT NOT TO EXCEED $64,540.00. FUNDING IS AVAILABLE IN ACCOUNT 401-70-530-8512-00-60-000. PROJECT TR1416 WHEREAS, Port Arthur Transit(PAT)has received funding from the FTA to design and construct an expansion to the terminal building at 322 Procter Street, Port Arthur, TX; and, WHEREAS, PAT issued a Request for Qualifications (RFQ) from engineering firms for engineering and design services for the expansion; and, WHEREAS, five (5) qualification packages were received, and have been evaluated by Purchasing, Engineering and PAT; and, WHEREAS,the Solco Group, LLC was selected based on the evaluation of the qualification packages; and, WHEREAS,pursuant to Resolution No. 22-251,the City Manager was authorized to negotiate a contract with the Solco Group, LLC; and, WHEREAS,the City Manager and PAT have negotiated a contract in the amount not to exceed $64,540.00, a copy of the contract is attached hereto as Exhibit"A". NOW,THEREFORE,BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PORT ARTHUR: THAT,the facts and opinions in the preamble are true and correct. THAT,the City Manager is hereby authorized to enter into a contract with the Solco Group, LLC of Beaumont, TX for engineering and design services to design PAT's terminal building expansion in the amount not to exceed$64,540.00, in substantially the same for as attached hereto as Exhibit"A". THAT, a copy of the caption of this Resolution be spread upon the minutes of the City Council. READ, ADOPTED AND APPROVED this day of March,2023 at a Regular Meeting of the City of Port Arthur, Texas by the following vote: AYES: P.R. 229 5 2/28/2023 IM Mayor: Councilmembers: NOES: Thurman "Bill" Bartie, Mayor ATTEST: Sherri Bellard, City Secretary AP ROVED AS TO FORM: U `A-P eC4- h Eut al Tizeno, ity Attorney APPROVED FOR ADMINISTRATION: APPROVED AS TO AVAILABILITY OF FUNDS: 401-70-530-8512-00-60-000 PROJECT TR1416 Ronald Burton Kandy Daniel City Manager Director of Finance e4e4L LAMA Clifton illiams, CPPB Ivan M tchell Purchasing Manger Transit Director P.R. 22965 2/28/2023 IM Exhibit "A" THE SOLCO GROUP, LLC TRANSPORTATION PLANNING,ENGINEERING,RESEARCH,AND CONSULTING February 19, 2023 Mr. Ivan Mitchell City of Port Arthur Transit Department 344 Procter Street P.O. Box 1089 Port Arthur, TX 77640 Subject: PAT Revised proposed scope of work for architectural and engineering services for the expansion and new addition of the Transit Terminal Building at the Port Arthur Transit Station—TSG Project No. 2022-06-1105 Dear Mr. Mitchell (Ivan), The Solco Group, LLC (TSG) appreciates the opportunity to offer this proposal for professional project planning, architectural / engineering design, civil site design, geotechnical coordination, surveying coordination, and program management to develop construction ready plans and specifications for the expansion of the Port Arthur Transit Department Terminal Building. 1.0 Scope of Services This will be a collaborative team design effort with our partner firm, Smith & Company Architects, of Stafford, Texas. The Solco Group, LLC (TSG) team will provide the following tasks and deliverables: • Pre-Design deliverables—Review of the requirements, existing condition drawing(s), • Schematic Design deliverables—preliminary site and floor plans, preliminary interior/exterior concepts, • Design Development deliverables—drawing set and outline specification document, and • Construction Documents deliverables—construction-ready project plans and specifications. The TSG team will provide the aforementioned design services and project management in accordance with the City of Port Arthur codes and ordinances. The proposed cost and fees for this service is$64,540.00. We will continue to provide, as a minimum, design phase services to include detailed architectural / engineering project plans and specifications for construction of the recommended project. Our design efforts will be phased to include all necessary architectural / engineering services that will allow the project to be successfully solicited for competitive bids in the near future. We will also provide professional recommendations for the award of a construction contract, bidding services support, and potential Request for Information (RFI)requests. •TSG,LLC 549 4th St.,Suite 209A,Port Arthur,Texas 77640 • Office: 409-237-0200• THE SOLCO GROUP, LLC TRANSPORTATION PLANNING,ENGINEERING,RESEARCH,AND CONSULTING The TSG design team will work closely with the PAT Management and PAT staff on all phases of this project from the initial coordination to project completion. The final design plans and specifications(100%)will be completed on or before April 28, 2023. The rates in this proposal for services rendered by TSG or TSG affiliates are guaranteed for one year. It is also understood that services rendered by TSG can be accomplished with typical offices supplies and basic mobile technologies such a laptop computer and cell phone. All other necessary equipment and technology needed will be provided by your organization(if applicable). 2.0 Performance of Work TSG and its subconsultants will perform 100% of the work under this proposal for this specific project. Occasionally we may consult with other affiliates if necessary to provide the necessary services for this specific project. At the conclusion of the project, we will deliver USB flash drives to the PAT Manager and PAT maintenance staff members that can be used to retain and archive all project documents. The TSG team will provide services to PAT via telephone or in person in PAT offices and with either you or your designated representative for this specific project. TSG travel to PAT offices or travel on your behalf to other designated meetings (if applicable) will originate from the Beaumont/Port Arthur(Southeast Texas)metropolitan area. All other applicable services and agreements are explained in THE SOLCO GROUP, LLC ADVISORY / CONSULTING AGREEMENT enclosed with this letter. Thank you for your consideration. Respectfully Submitted, Kelvin L. Solco, P.E. MBA President/CEO Enclosures: Contract Pricing Schedules The Solco Group, LLC Consulting Agreement •TSG,LLC 549 4th St.,Suite 209A,Port Arthur,Texas 77640 •Office:409-237-02000 THE SOLCO GROUP, LLC TRANSPORTATION PLANNING,ENGINEERING,RESEARCH,AND CONSULTING Contract Pricing Schedule TSG Billable Fee Schedule - Proposal No.2022-06-1105 BASIC SERVICES COSTS/EXPENSES/FEES Schematic Design Phase(SD) Administration/Coordination/Meetings/Data Gathering/Quality S 1,500.00 Control Architecture-Design/Specifications/Drafting/Cost Estimating $4,000.00 Mechanical-Design/Specifications/Drafting/Cost Estimating $2,200.00 Electrical-Design/Specifications/Drafting/Cost Estimating $2,800.00 Structural-Design/Specifications/Drafting/Cost Estimating $2,800.00 Civil-Design/Specifications/Drafting/Cost Estimating $2,800.00 Reimbursables(travel,phone,mail,printing,etc.) $ 180.00 Schematic Design Phase(SD)Total= $16,280.00 Design Development Phase(DD)or Preliminary Design Phase(PD) Administration/Coordination/Meetings/Data Gathering/Quality $ 1,500.00 Control Architecture-Design/Specifications/Drafting/Cost Estimating $4,500.00 Mechanical-Design/Specifications/Drafting/Cost Estimating $2,200.00 Electrical-Design/Specifications/Drafting/Cost Estimating $2,400.00 Structural-Design/Specifications/Drafting/Cost Estimating $2,400.00 Civil-Design/Specifications/Drafting/Cost Estimating $2,500.00 Reimbursables(travel,phone,mail,printing,etc.) $ 180.00 Design Development Phase(DD)or Preliminary Design(PD)Total= $15,680.00 Construction Document Phase(CD) Administration/Coordination/Meetings/Data Gathering/Quality $ 1,500.00 Control Architecture-Design/Specifications/Drafting/Cost Estimating $6,500.00 Mechanical-Design/Specifications/Drafting/Cost Estimating $4,000.00 Electrical-Design/Specifications/Drafting/Cost Estimating $5,600.00 Structural-Design/Specifications/Drafting/Cost Estimating $2,800.00 Civil-Design/Specifications/Drafting/Cost Estimating $2,500.00 Reimbursables(travel,phone,mail,printing,etc.) $ 180.00 Construction Documents Phase(CD)Total= $23,080.00 Program management and utility companies'coordination(Entergy, $6,500.00 TCEQ,Texas Gas,AT&T,etc.) Geotechnical Investigation $3,000.00 TOTAL FEE $64,540.00 Notes: 1. (*)Recommended minimum Not-to-exceed contract amount. 2. (**)Hourly rates for work in excess of 40 hours per week including weekends or nights per the terms of the Advisory/Consulting Agreement. 3. Additional fees for TSG affiliates may be added(if necessary)at rates to be determined. 4. Payment term will be Net(30)Thirty from the date of the invoice. •TSG,LLC 549 4th St.,Suite 209A,Port Arthur,Texas 77640 •Office:409-237-02000 THE SOLCO GROUP, LLC TRANSPORTATION PLANNING,ENGINEERING,RESEARCH,AND CONSULTING THE SOLCO GROUP,LLC TRANSPORTATION PROFESSIONAL SERVICES/ CONSULTING AGREEMENT THE SOLCO GROUP, LLC appreciates the opportunity to work with you and provide professional advice regarding your specific project. To ensure a mutual understanding, we set forth the following pertinent information about our services. THE SOLCO GROUP, LLC (hereafter referred to as TSG), and the City of Port Arthur Transit Department(CLIENT)acknowledge and agree to the following. 1. CLIENT CONTACT - The CLIENT is free to contact TSG to discuss the specific project immediately after the execution of this agreement. 2. TO BE PROVIDED BY THE SOLCO GROUP, LLC — TSG agrees to provide the following: a. The services of all professional and technical personnel required for the performance of the services described under Scope of Work. b. Up to three physical copies and one electronic file copy of the construction plans and specifications for the project. c. Project consultation throughout the project from initiation to project closeout. 3. ACCESSIBILITY - The CLIENT acknowledges all work performed by TSG or affiliates will occur within the standard business hours of 7:00 AM to 7:00 PM Monday through Saturday. TSG has limited accessibility on Sundays and accessibility will need to be scheduled in advance. If scheduling conflicts occur on any day of the week TSG will return the CLIENT's phone calls as soon as possible and attend meetings as soon as mutual schedules permit. 4. TO BE PROVIDED BY PORT ARTHUR TRANSIT (CLIENT) — The CLIENT agrees to provide the following: a. All available pertinent information that it may have in its possession or to which it may have access. b. A representative to whom Engineer will report and from whom Engineer shall receive instruction and authorization. c. Right of access to all properties as required during the execution of the work. d. All necessary resident engineering services. e. Services of an independent testing laboratory to perform all materials testing necessary for control of the project during the construction phase. f. Documentation and property description information work necessary for easement or property boundaries description. •TSG,LLC 549 4th St.,Suite 209A,Port Arthur,Texas 77640 •Office:409-237-02000 THE SOLCO GROUP, LLC TRANSPORTATION PLANNING,ENGINEERING, RESEARCH,AND CONSULTING 5. TIME OF PERFORMANCE - The services of The Solco Group, LLC are to commence upon the signing of the contract. a. The estimated project duration for the design services will be completed by April 28, 2023, subject to change upon the CLIENT request or mutual agreement(s). b. The final contract plans, and documents will be available and ready per the agreed project schedule. 6. OWNERSHIP OF DOCUMENTS - All drawings, specifications, records, photographs, videos, and other project related documents prepared by TSG, its employees, subcontractors, and agents in the performance of this Agreement shall be the property of Port Arthur Transit. These items will be delivered to the CLIENT upon the completion and/or termination of this Agreement. TSG reserves the right to retain copies of the documents, photographs, and other records for filing purposes, TSG archives, and for historical reference. 7. COMMUNICATIONS - All communication and information between the CLIENT and TSG are considered privileged and confidential if desired and requested. TSG will provide disclosure to others only when authorized by the CLIENT in writing. CLIENT authorization may be needed when TSG needs to assign work to its affiliates. However, TSG may use the name, logo, or authorized image of the CLIENT in TSG marketing materials. 8. PAYMENTS AND COMPENSATION - Payments to TSG shall be made promptly and shall not be contingent upon funding anticipated by the CLIENT. The CLIENT understands that TSG will invoice immediately upon the execution of this agreement, and then monthly, or more frequently if requested. The CLIENT understands the TSG invoice terms are due upon receipt.All fees shall be paid promptly. Invoices will be faxed or sent by e-mail unless the original is requested. Once TSG submits an invoice for services provided, Port Arthur Transit and the City of Port Arthur agrees to pay such invoices within thirty (30) days after the date of the applicable invoice Any balance outstanding for more than thirty (30) days of the invoice shall be deemed delinquent and subject to delinquent payment fees, penalty fees, and/or interest charges. a. The Port Arthur Transit and the City of Port Arthur will compensate The Solco Group, LLC for all work and services described in the Scope of Services. The CLIENT also agrees to the following: i. The scope and cost of said services will be reviewed and approved by the Port Arthur Transit and the Port Arthur City Council prior to any authorization to proceed. ii. This cost shall constitute complete compensation for all direct •TSG,LLC 549 4th St.,Suite 209A,Port Arthur,Texas 77640 •Office:409-237-0200• THE SOLCO GROUP LLC TRANSPORTATION PLANNING,ENGINEERING,RESEARCH,AND CONSULTING iii. labor, payroll burden, general and administrative overhead, profit, travel, equipment, and materials necessary to complete the tasks as set forth in the Scope of Work. T is esponsible for iv. METHOD OF PAYMENT as stipulatedrin this agreement.payment of services renderedagreement. All payments to The Solco Group, LLC for services under this Scope of Work will be made monthly the percentage in every case,obe rk completed during the preceding month and supported by a suitable invoice. v. BRANDING AND IMAGES -The CLIENT acknowledges the use of a The Solco Group, LLC name, branding, and images in any manner is not authorized unless this signed agreement is returned NT to TSG, subject to privacy the Port ArthurE will Solco Group, LLC to useTransit and City of Port Arthur name, branding, logos, or similar images for use in developing the project plans and specifications and for TSG marketing purposes. vi. TERMINATION - If, through circumstances of unforeseen cause, TSG fails to fulfill in a timely and proper manner the obligations under this Agreement, the City of Port Arthur shall thereupon have the right to terminate this Contract by giving written notice to the Engineer of such termination and specifying the effective date thereof, at least fourteen (14) days before the effective date of such termination. In such event, all finished or unfinished doc mennd ts, data, studies, surveys, drawings, maps, models, photographs, reports prepared by TSG under this Contract shall become the property of TSG and TSG shall be entitled to receive just and equitable compensation for any work satisfactorily completed hereunder. The City of Port Arthur may terminate this Agreement at any time by giving at least twenty-one (21) days- notice in writing to the TSG. If the Agreement is terminated by the City of Port Arthur as provided herein, then TSG will be paid for the time provided and expenses incurred up to the actual termination date. vii. CHANGES - The CLIENT may, from time to time, request changes in the scope of the services of TSG to be performed hereunder. Such changes, including any increase or decrease in the amount of the TSG's compensation, which are mutually agreed upon by and between the City and the TSG, shall be incorporated in written amendments to this Agreement. •TSG,LLC 549 4th St.,Suite 209A,Port Arthur,Texas 77640 •Office:409-237-0200• THE SOLCO GROUP, LLC TRANSPORTATION PLANNING,ENGINEERING, RESEARCH,AND CONSULTING viii. CIVIL RIGHTS ACT OF 1964 -Under Title VI of the Civil Rights Act of 1964, no person shall, on the grounds of race, color, or national origin, be excluded from participation in, be denied the benefits of, or be subjected to discrimination under any program or activity receiving Federal financial assistance. ix. LIMITATION OF LIABILITY - Except for TSG's confidentiality and indemnity obligations, respectively, and except for actions or claims arising from gross negligence or intentional or willful misconduct, TSG's total liability to the City of Port Arthur shall not exceed the greater of(1) the total TSG compensation value or (2) the amount of recoverable insurance, regardless of whether any action or claim is based upon contract, warranty, tort (including negligence)or strict liability. x. ACCURACY OF INFORMATION - The CLIENT agrees that TSG will rely on information provided by the City of Port Arthur in order to complete the tasks associated with this agreement. The accuracy of research and the outcome of the project deliverables provided by TSG will rely on the accuracy and the availability of information provided by the CLIENT. TSG is not responsible for nor liable for incorrect or incomplete information provided by the CLIENT. xi. INSURANCE — The Solco Group, LLC will maintain the following insurance coverages for the duration of this project. a. Commercial General Liability of $1,000,000 each occurrence and$2,000,000 aggregate b. Professional Liability (Errors and Omissions) of $1,000,000 each occurrence and $1,000,000 aggregate. •TSG,LLC 549 4th St.,Suite 209A, Port Arthur,Texas 77640 •Office:409-237-0200• THE SOLCO GROUP, LLC TRANSPORTATION PLANNING,ENGINEERING, RESEARCH,AND CONSULTING SPECIAL CONDITIONS: Anticipated Start Date: This agreement is acceptable to The Solco Group, LLC, as indicated by the authorized representative signature(s)below: (TSG Representative)Print Name: Kelvin L. Solco (TSG Representative) Signature: (TSG Representative) Title: President/CEO (Attest for TSG): •TSG,LLC 549 4th St.,Suite 209A,Port Arthur,Texas 77640 •Office:409-237-02000 THE SOLCO GROUP, LLC TRANSPORTATION PLANNING,ENGINEERING,RESEARCH,AND CONSULTING ACCEPTANCE - If this contract meets with the approval of Port Arthur Transit and the City of Port Arthur, please indicate CLIENT acceptance by signing this proposal and returning one signed copy to The Solco Group, LLC PO Box 22001 Beaumont, Texas 77720. Agreed to this day of , 2023 By(Client): (Client)Print Name: (Client) Signature: (Client)Title: (Attest for Client): Thank you for allowing us to serve you. •TSG,LLC 549 4`h St., Suite 209A, Port Arthur,Texas 77640 • Office: 409-237-0200•