Introduction:
The intent of this Agenda Item is to seek City Council's approval for City Manager to purchase
hardware and pay monthly data fees to Data Flow Systems, Inc. of Melbourne, Florida. Data
Flow Systems will provide network hardware and data for the SCADA (Supervisory Control and
Data Acquisition) system that that the City currently uses. The projected budgetary impact for
the hardware is $61,123.00, with an annual subscription payment amount of $1,716.00 for a 5
year period.
Background:
The Water Utilities Department needs SCADA services to monitor the lift stations and Gulf
Storage Tank that supplies water to Sabine Pass. Data Flow Systems, Inc. offers complete
SCADA solutions (software + hardware + services) that are customizable based on the City
Utility's specific requirements.
Budget Impact:
Funding is available in the necessary Water Utilities Account Nos. $31,284.00 will be charged to
410-40-215-5240-00-00-000, Minor Equipment; $29,839.00 will be charged to 410-40-220-
5240-00-00-000, Minor Equipment; and $1,716.00 will be paid annually from 410-40-220-5482-
00-00-000, Communication.
Recommendation:
It is recommended that City Council approve PR 23021, authorizing the City Manager to enter
into a contract with Data Flow Systems, Inc. as described/outlined above.
"Remember,we are here to serve the Citizens of Port Arthur"
PR No. 23021
3/3/22 bw
Page 1 of 3
RESOLUTION NO.
A RESOLUTION AUTHORIZING THE CITY MANAGER
TO PURCHASE VARIOUS SUPERVISORY CONTROL
AND DATA ACQUISITION (SCADA) SYSTEM
PRODUCTS AND SUBSCRIPTION FROM DATA FLOW
SYSTEMS, INC. OF MELBOURNE, FLORIDA FOR THE
WATER UTILITIES DEPARTMENT WITH A
PROJECTED BUDGETARY IMPACT OF $61,123.00 AND
AN ANNUAL SUBSCRIPTION PAYMENT AMOUNT OF
$1,716.00 FOR A FIVE YEAR PERIOD; FUNDS ARE
AVAILABLE IN WATER UTILITIES ACCOUNT NOS.;
$31,284.00 WILL BE CHARGED TO 410-40-215-5240-00-
00-000, MINOR EQUIPMENT; $29,839.00 WILL BE
CHARGED TO 410-40-220-5240-00-00-000, MINOR
EQUIPMENT;AND$1,716.00 WILL BE PAID ANNUALLY
FROM 410-40-220-5482-00-00-000,COMMUNICATION.
WHEREAS, the Water Utilities Department needs SCADA (Supervisory Control and
Data Acquisition) services to monitor the lift stations, Gulf Storage Tank that supplies water to
Sabine Pass and the Golf Ball Elevated Storage Tank; and,
WHEREAS, Data Flow Systems, Inc. of Melbourne, Florida offers complete SCADA
solutions (software, hardware, and services) that are customizable based on the City Utility's
specific requirements; and
WHEREAS, it is in the best interest of the City to enter into an agreement for equipment
and monthly data subscription from Data Flow Systems, Inc., with a total projected budgetary
impact for the hardware of$61,123.00,with an annual subscription payment amount of$1,716.00
for a 5 year period; and,
WHEREAS,this purchase is authorized by Procurement Policies and Procedures Section
3-105 Sole Source Procurement, b) Compatibility—The product must match an existing brand of
equipment for compatibility and is available from only one supplier; and,
WHEREAS, this procurement is exempt from the bid process under Texas Local
Government Code Section 252.022, General Exemptions (a) (7) (D), captive replacement parts or
components for equipment; and,
PR No. 23021
3/3/22 bw
Page 2 of 3
WHEREAS, the sole source letter provided by Data Flow Systems, Inc. is attached as
Exhibit "A"; and,
WHEREAS,the quotation is attached as Exhibit"B".
NOW THEREFORE,BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY
OF PORT ARTHUR:
THAT,City Manager of City of Port Arthur is hereby authorized and directed to enter into
an agreement with Data Flow Systems, Inc. of Melbourne, Florida with a projected budgetary
impact for the hardware is $61,123.00 and an annual total of $1,716.00 for five years with a
projected budgetary impact of$8,580.00; and,
THAT, funding for this material is to be charged to 410-40-215-5240-00-00-000, Minor
Equipment, 410-40-220-5240-00-00-000, Minor Equipment; and $1,716.00 will be paid annually
from 410-40-220-5482-00-00-000, Communication; and,
THAT,a copy of the caption of this resolution be spread upon the minutes of City Council.
READ,ADOPTED,AND APPROVED THIS day of ,2023,
at a Regular Meeting of City Council of City of Port Arthur, Texas,by the following vote:
AYES: Mayor ;
Councilmembers:
NOES:
Thurman Bill Bartie
Mayor
PR No. 23021
3/3/22 bw
Page 3 of 3
ATTEST: AP'ROVED AS TO FORM:
Sherri Bellard Valecia T. eno
City Secretary City Attorney
APPROVED FOR ADMINISTRATION:
Ronald Burton Calvin Matthews, P.E.
City Manager Water Utilities Director
APPROVED AS TO THE AVAILABILITY
OF FUNDS:
Kandy Daniel Clifton illiams, CPPB
Finance Director Purchasing Manager
EXHIBIT "A"
1 jip 41144
Data `/o w Eiis tems
March 3, 2023
City of Port Arthur
Purchasing Department
444 4th Street
Port Arthur,TX 77640
RE: TAC II SCADA System
Sole Source Status
Please consider this document official confirmation that Data Flow Systems, Inc. (DFS),of Melbourne, Florida,
is the sole source provider for the TAC II SCADA System and associated Remote Terminal Units(RTUs),
Telemetry Control Units(TCUs),TAC Pack TCU RTUs, Hyper SCADA Servers(HSS), and DFS HTX SCADA Software
as currently utilized by the City of Port Arthur,TX. DFS is also the sole source provider for all associated repairs,
service and training.
DFS is responsible for the design, manufacture, and service of the entire TAC II SCADA System product line.
There are no other manufacturers, dealers,distributors or service organizations that offer these products and
associated services in the State of Texas.The TAC II SCADA System is Made in the USA.
Should you have any questions or require additional information, please contact me at 321-259-5009.
Sincerely,
CaS‘02--
Data Flow Systems, Inc.
Regional Operations Manager
SCADA SOLUTIONS SINCE 1981 - www.dataflowsys.com - MADE IN THE USA WITH PRIDE
Data Flow Systems,Inc. • 605 John Rodes Blvd. • Melbourne, Florida 32934 • PH 321 259 5009
EXHIBIT "B"
Page l of 3
Illgeig1,144
Data Flow Systems
DFS QUOTATION 230221-01-DWRD
"LEASE WITH OPTION TO BUY"
CELLULAR RTU FOR TECQ COMPLIANCE(HIGH LEVEL/POWER FAIL)
CITY OF PORT ARTHUR
FEBRUARY 21,2023
This purchase priced quotation also offers the hardware purchase under our LEASE WITH OPTION TO BUY
agreement. Cellular data is a separate fee and will remain payable to DFS after the hardware purchase is
complete.The standard DFS warranty applies. DFS onsite installation services are also offered as a one-time
purchase.
The proposed RDP180-TECQ Cellular RTU provides a simple,effective and low-cost solution for alarm
notification (warnings) as required by the Texas Administrative Code. DFS is an authorized Verizon Wireless
Partner.Secure(private tunnel) cellular networks provided by Verizon are utilized to deliver the monitored
data to the Hyper SCADA Server(HSS)via a Network Cellular Router Module(NCM001).
High Level and Power Fail Alarm events will be reported immediately.
This quotation offers the following items:
ITEM#1—CELLULAR ROUTER MODULE FOR HYPER SCADA SERVER(HSS)
The Network Cell-Router Module (NCM001) provides communications direct to the Cellular RTUs,eliminating
the need for a dedicated Internet connection.The NCM001 will be installed in the Utility's existing HSS.The
NCM001 includes a small paddle-style antenna and requires reasonably good 4G LTE Verizon signal strength at
the HSS enclosure.The antenna will be mounted directly on top of the HSS enclosure.
This item includes the following:
QTY DESCRIPTION: DFS PART NO. HARDWARE CELLULAR
PURCHASE DATA FEE
1 Network Cell-Router Module(NCM001) NCM001 $975.00 $23.00/PER
Also includes an HSS enclosure-mounted antenna and MONTH
data plan. The data plan will accommodate up to 12
RDP180-TECQ RTUs with single DI and two alarm points
each.An increase beyond 12 will require an increase in
this fee.
ITEM#2—RDP180-TECQ CELLULAR RTU
The RDP180-TECQ Cellular RTU is preconfigured to monitor one(1) discrete input(DI) listed below. Each DI
requires a 115VAC signal.The RDP180-TECQ Cellular RTU is intended to be mounted on an existing panel rack
and incorporates an enclosure-mounted low-profile cylinder antenna for use at locations with reasonably good
4G LTE Verizon signal strength.The reporting parameters are configured to operate within the provided data
plan.
SCADA SOLUTIONS SINCE 1981 - www.dataflowsys.com - MADE IN THE USA WITH PRIDE
Data Flow Systems,Inc. • 605 John Rodes Blvd. • Melbourne, Florida 32934 • PH 321.259.5009 • FAX 321.259.4006
Page 2 of 3
This item includes the following:
QTY DESCRIPTION: DFS PART NO. HARDWARE CELLULAR
PURCHASE DATA FEE
1 RDP180-TECQ CELLULAR HI LEVEL, POWER FAIL RTU, RDP180-TECQ $2,290.00 $10.00/PER
INCLUDES: MONTH
(1)NEMA 4X, 14"x12"x8', White Fiberglass Enclosure
(1)OCS RDP180 C X 12 SITES= X 12 SITES=
(1)Cellular Modem $27,480.00 $120.00/PER
(1)Mean well DR15-15, 12VDC Power Supply MONTH
(1)10 Amp Breaker
(1) Wago Relay w/Base(115VAC for RTU Power)
(1) Wago Relay w/Base(115VAC for Digital Input)
(1)1.2 Ah Back-up Battery
(1)Phantom Antenna(Laird)w/Pigtail
(1)RDP180 Cellular Data Plan
DIGITAL INPUTS(HARDWIRED) ALARM NOTIFICATION LIST:
1. High Well Float 1. High Well Float Alarm
2. RTU Power Failure Alarm
ITEM#3—DFS INSTALLATION SERVICE CHARGE(THIS ITEM IS PURCHASED)
This item offers DFS installation services and related material for the HSS NCM and all seven (7) Cellular RTUs,
as per the following DFS Installation Scope of Work.
o DFS will mount the RTU to the existing panel rack.Any modifications to the panel rack that may be
necessary to accommodate the RTU mounting will be the responsibility of the Utility.
o All conduit provided and installed by DFS will be PVC flex and is limited to 10 feet.Any conduit that
requires rigid, digging, or trenching is not included and will be the responsibility of the Utility.
o DFS will provide and install 16 AWG-stranded wire for RTU power and input signals.
o DES will utilize the existing 120 VAC power at each site.Any necessary improvements to the quality of
120 VAC will be the responsibility of the Utility.
This item includes the following:
QTY DESCRIPTION: DFS PART NO. PRICE EACH TOTAL
1 Onsite Installation&Related Material(flex conduit,wire) N/A $698.00 $8,376.00
for(12) RDP180-TECQ HI LEVEL/POWER FAIL RTUs.
1 Onsite Installation labor&Related Material(Coax, N/A $686.00 $686.00
connectors,tie wraps)for NCM and extension of cellular
antenna for Central Server Site.
PRICING &TERMS:
Charges and Fees are as stated above.Shipping charges will be added only if the DES Installation Service is not
purchased. Lead time is approximately 6 weeks ARO. Please review the quotation notes below.This quotation
will be honored for 90 days.Should you have any questions or require additional information, please don't
hesitate to contact Robert Durham at 903-330-1548.
SCADA SOLUTIONS SINCE 1981 - www.dataflowsys.com - MADE IN THE USA WITH PRIDE
Data Flow Systems.Inc. • 605 John Rodes Blvd. • Melbourne, Florida 32934 • PH: 321 259 5009 • FAX 321.259.4006
Page 3 of 3
HARDWARE LEASE WITH OPTION TO BUY IN 12,24,OR 36 MONTHS:
The hardware purchase pricing totals$28,455.00 and includes the NCM001 and twelve (12) RDP180 RTUs per
above.The following prices represent the Lease with option to buy in 12, 24, or 36 months.
$673.00 per month(Monthly Payment),plus$143 per month for Cellular Data Plans
o Buyout after 12 months of payments is$23,295.00.
o Buyout after 24 months of payments is$15,219.00.
o Buyout after 36 months of payments is$7,142.00.
o Term Duration(12,24,or 36 months)must be specified at purchase. Buyout payment is due with
final monthly payment.
NOTE:The$143 per month charge for cellular data is separate and will continue after a Buyout.
QUOTATION NOTES:
1. The Lease fees and Cellular Data fees will begin at the time of installation or product shipment (whichever
applies).The fees are payable to DFS quarterly or annually and in advance of service.
2. The standard DFS warranty applies to this quotation.
3. DFS is not responsible for changes in Verizon's service area coverage or for changes made to your
facility/equipment that adversely affect the cellular signal strength.
4. Only those items and services specifically listed above are included in this quotation.
5. Please note that lead times may be affected by product/material availability.
6. All applicable taxes must be added to the quotation total.
7. Pricing is based on DFS's General Terms&Conditions Governing Quotations and Performance.These
Terms and conditions may be viewed by visiting our website at https://www.dataflowsys.com/wp-
content/uploads/2022/03/DFS-G EN ERAL-TERMS-CONDITIONS.pdf
8. DFS imposes a surcharge of 3.5% (which is not greater than our cost of acceptance) on the transaction
amount on all invoices for which payment is remitted via MasterCard and/or Visa credit card products.
9. This quotation does not include bonding, any required permitting, sealed drawings, or associated fees.
10. This quotation stipulates that DFS' existing insurance provider(s) and policy coverage are acceptable to the
Purchaser. DFS insurance information can be downloaded at https://www.dataflowsys.com/wp-
content/u ploads/2022/04/ACORD-Form-COI-th ru-3-31-2023.pdf
SCADA SOLUTIONS SINCE 1981 - www.dataflowsys.com - MADE IN THE USA 1MTH PRIDE
Data Flow Systems.Inc. • 605 John Rodes Blvd. • Melbourne, Florida 32934 • PH. 321.259.5009 • FAX. 321.259.4006
Page 1 of 6
4 11D::&164
Data Flow S stes,s
QUOTE NO. 230227-02-RD
GULF PS ADD VFD AUTOMATION &CONTROLS TO EXISTING RTU
CITY OF PORT ARTHUR,TX
FEBRUARY 27,2023
SUMMARY OF SCOPE
DFS will provide or modify one RTU as described below to control and/or monitor processes and associated
equipment, as identified in this proposal. Materials, automation and field services included in this proposal are
listed per RTU below.The original project for this upgrade is DFS 08836-VOSE RT0002.
SITE DETAILS
GULF PS ADDING VFD AUTOMATION &CONTROLS TO-RT0002($14,755.00)
Enclosure: None
Finish: Existing
Mounting location: Existing
System ID:PORART
Communications: Radio (Existing freq: 217.925 MHz )
PLC:Yes
Panel Mount OIT: No
UL-508A: No
Control Panel Materials:
Qty Item
1 Programmable Logic Controller(800)
1 Analog Monitor Module
1 Analog Control Module
3 Analog Isolator,1 Channel
8 Signal Surge Protector,1 Channel
Provided Field Instrumentation:
Qty Item
None
Miscellaneous
Qty Item
1 Electrical Specialties Inc.Subcontract Scope to include Labor and
Materials as required.
Hardwired 10 Summary:
Digital Inputs(DI) Digital Outputs(DO) Analog Inputs(Al) Analog Outputs(AO)
Wired 3 0 3 3
Spare 2 0 1 1
Hardwired 10 List:
Digital Inputs
VFD1 HOA AUTO VFD2 HOA AUTO VFD3 HOA AUTO
Digital Outputs
EXISTING
SCADA SOLUTIONS SINCE 1981 - www.dataflowsys.com - MADE IN USA WITH PRIDE
Data Flow Systems.Inc. • 605 John Rodes Blvd. • Melbourne, Florida 32934 • PH. 321.259.5009 • FAX 321.259.4006
Page 2 of 6
Analog Inputs
VFD1 FB VFD2 FB VFD3 FB
Analog Outputs
VFD1 SP VFD2 SP VFD3 SP
Process:Automated VFD Control to maintain system pressure
Instruments: Local System Pressure (PV) & Remote Sabine Pass Standpipe Level (PV)
Devices:VFD x 3
Automation:
Automate Control of Existing VFDs to pump to the Sabine Pass Stand Pipe Level (PV)while maintaining
system pressure at operator setpoint (typically 82psi) and monitoring system pressure to prevent over-
pressure exceeding operator setpoint (typically 85psi)at any time. Station has three VFDs, however
only two pumps shall be made available to the process or be in operation during any pump cycle.
Provide Operator Min/Max Setpoints, and Manual Override of the Automated Process. Include pump
alternation and indexing based on Operator input Maximum Run Hours using DFS standard methods
and practices. Cycle the last pump running based on target PV being met, or based on Maximum Cycle
Run Hours operator input setpoint. Current Operation indicates that the VFDs typically operate
between 47 and 48 Hertz.
PUMP CALLS BASED ON REVMOTE LEVEL(SABINE PASS STANDPIPE)as PV, with PLC Monitoring of
Local SYSTEM PRESSURE at Gulf Pump Station.
Call VFDs to run in a Lead, Lag fashion to achieve target operator input setpoint for the remote PV
level. Ramp VFDs up/down, or drop calls as required to achieve target operator input setpoint. Include
a minimum speed setpoint for operator input.
ALTERNATION
Index pump at the end of each cycle, or based on Maximum Run Time operator setpoint. Include
AUTO/MANUAL selection for each pump Include manual index button on screen. Use DFS Standard
pump controls for HMI development.
PUMP ROTATION(maximum of two pumps running at any given time).
Provide for pump rotation every"x" hours per operator setpoint. Utility has been rotating pumps on a
weekly basis. Allow for three-digit Maximum Run Hours setpoint.
Lockouts&Alarms:
LAG2 LOCKOUT
Due to concern over damage to the system piping,the program must lockout the Lag2 call at all time.
Only the Lead and Lag calls should be made. Any available pump can be included in the alternation
index up to a maximum of two.
ONLY ONE PUMP AVAILABLE ALARM
In the event that only one pump is available to the automatic process, create an alarm to notify the
operator that only One Pump Is Available.
LOW LEVEL LOCKOUT
Include lockout of VFDs if GST Level is below Operator input setpoint. Provide an automatic LLLO
Reset and necessary operator input setpoint on screen.
SCADA SOLUTIONS SINCE 1981 www.dataflowsys.com - MADE IN USA WITH PRIDE
Data Flow Systems,Inc. • 605 John Rodes Blvd. • Melbourne. Florida 32934 • PH. 321.259.5009 • FAX 321.259.4006
Page 3 of 6
HIGH PRESSURE LOCKOUT
Typical operating pressure is 82PSI. Maximum Operating Pressure is 85PSI. Process shall reduce VFD
speed as needed to maintain a local system pressure of 82PSI. Use screen tools to limit operator input.
Additional Site Details:
RT0002 was fabricated under Project 08836-VOSE. Currently configured with PLC Bypass card, PSM,
RIM, DCM003-2,AMM002. Third party Electrical Contractor shall bring VFD Field wiring to DFS RTU for
termination. EC to be responsible for all VFD control programming in the pump panel. DFS shall
terminate wiring to add three analog outputs to VFDs for speed setpoint and to include three analog
inputs for VFD Speed feedback signals in RTU.
Field Services:
Type
Wire Term,Automation, Commissioning&
Training.
Punchlist Resolution
PROJECT DETAILS
DFS Scope of Work:
DFS will assemble, program, and or modify control panels and or automation programming and custom
screens as described above and then test them in our facility. After testing is complete, DFS will ship above
described RTUs and or RTU upgrades to the location designated by the customer.Any listed antenna system
will be installed by DFS unless otherwise indicated above.
Panel construction and or modifications will maintain standard DFS materials and wiring practices unless noted
otherwise.
Any conduit provided by DFS will be flex or rigid PVC, unless otherwise noted.
DFS will complete all configurations at the central site and provide on-site start-up services and operator
training unless otherwise indicated above.
This quote includes(3) copies of the Submittal, and (3)copies of the O&M Manual for each RTU.Additional
copies are available at$35.00 each.When no submittals are included,this quotation shall be used in lieu of a
submittal. Please feel free to contact DFS with any questions concerning this project or changes in your
telemetry system.
Subcontracted Electrical Scope of Work:
Electrical Specialties Inc.shall provide all pump panel wiring interconnections as required for three VFD Speed
Commands,Speed Reference(feedback)and VFD Faults,as well as HOA Auto Status between Pump Panel(s)
and DFS SCADA RTU. Includes materials as required.
Trip Schedule:($3,222.00)
The following trips are provided to perform the associated Field Services:
Type Trips
Wire Term,Automation, Commissioning& 1
Training.
Punchlist Resolution 1
SCADA SOLUTIONS SINCE 1981 - www.dataflowsys.com - MADE IN USA WITH PRIDE
Data Flow Systems.Inc. • 605 John Rodes Blvd. • Melbourne. Florida 32934 • PH. 321 259 5009 • FAX 321.259.4006
r'
Page 4 of 6
Site Readiness
It is the responsibility of others to ensure that site(s)are ready for scheduled work and to coordinate
the presence of technical personnel or specialists required for support to be on site or readily available.
Additional trips and/or site-services resulting from the lack of site readiness may be billed on a time and
material basis.
Standard System Operation Methodologies:
DFS standard methodologies employed throughout the utility's current control system will be used to maintain
operational continuity.
Each device controlled will be done so using software device controllers.Software device controllers have
operator defined Min, Max,and Manual Control set points as well as a Current status in addition to the device
controller basic and operational criteria.The Min and Max set points define in percent the range the devices
are permitted to operate during the automatic process.The Manual Control set point defines the device
operation when called to operate in manual.The Manual Control set point is overridden when the device is
made available to the automatic process.
When applicable, rate or speed of a device will be governed using the process controller in the process
description.
When the process variable instrument registers a value to operate a device based on the Start operation set
point, in excess of 10 seconds,the assigned device will be called to operate.The device will continue to
operate until a Stop operation set point value had been obtained in excess of 10 seconds. When multiple
devices are required to operate,each device will function in a similar manner.
Device controllers with automatic algorithms will maintain the following basic and operational criteria. Each
device will be monitored for Local/Remote(HOA in Auto equals "Remote") and Run Status if available. If a
controlled device is not equipped with a HOA switch it will always be considered in Remote. If a controlled
device is not equipped with a Run Status it will always be considered as operating correctly.The controls for
each device will include a Manual/Auto and either a Stop/Start,Open/Close or other appropriate control.The
digital input from the device's HOA determines its availability for control by the SCADA system, "Remote"
being the permissive signal for SCADA control.The software Manual/Auto control dictates whether the device
will be controlled manually or automatically via SCADA.A device is considered available to the automatic
process when it is in "Remote" and "Auto" and the device has not failed. A device is deemed "failed" when it
has been called to operate by the automatic process and the device status indication has not operated as
expected in excess of 30 seconds.To clear a device fail condition,simply place the device back into"Manual"
or"Local" until the condition has cleared.
All set points residing in the PLC will have default factory values when shipped.The set points can then be
modified by an operator via SCADA or available HMIs as needed. New set point values will be retained in the
PLC in the event of a power cycle.
GRAPHICAL DISPLAYS
Custom graphical displays of telemetry/project data can take many forms.The graphical displays, if applicable,
provided for under this proposal are P&ID type in nature.The screen/displays will show basic process flow and
instrumentation placement relative to this flow. Device control will also be provided using a standardized set
of control objects employed by DFS. Control operators are color coded and used consistently across all DES
customer platforms.Other forms of graphical displays that more closely represent a pictorial view or a physical
representation of the site are available, in addition to the P&ID type displays,for order.
SCADA SOLUTIONS SINCE 1981 - www.dataflowsys.com - MADE IN USA WITH PRIDE
Data Flow Systems.Inc. • 605 John Rodes Blvd. • Melbourne, Florida 32934 • PH: 321.259.5009 • FAX 321.259.4006
Page 5 of 6
HMI screens are developed during the programming phase of the project.A copy of the HMI screens will be
submitted for review upon completion. If the utility has adopted a graphical standard other than DFS, contact
the DFS project coordinator to provide examples.
HSS-BASED CONTROL PROGRAMMING&COMMUNICATIONS
Hyper SCADA Server(HSS) based programming to control an RTU requires operational communications at all
times. Should communications between the HSS and RTU become lost or interrupted,the automation will not
function or control the RTU. DFS strongly recommends coupling HSS based programming with disseminated
control logic located at the RTU for full control protection.
This project does not contain the recommended protection.
As most data in this project requires data to be exchanged between RTU a full back up control system with
disseminated control logic to make up for any loss of communication cannot be installed,so any offline
condition needs to be evaluated promptly when it occurs.
Additional Details
Hardwired I/O Requirements:
a. All digital inputs to the DFS RTU will be of a dry contact type,terminal connections to be provided by
the MCC manufacture/contractor/customer.
b. DFS digital inputs utilize a 24 VDC battery backed bias. In cases where voltage drop from long wire runs
makes 24 VDC impractical or where existing monitoring of contacts is done with 120 VAC, 120 VAC will
be used.
c. Mixing of multiple sources of power will not be permitted.
d. All digital outputs from DFS RTU will be dry contacts and provide for 120VAC at 10amp capacity.
e. All analog inputs signals will be 4-20mA(preferred) or 0-5VDC, and use Shielded Cable.
f. 4-20 mA signals at minimum to provide 500-ohm impedance drive.
g. All pulse inputs to be dry contact,and mechanically operated.
h. All penetrations must be made to the bottom of the enclosure unless coordinated with DFS prior to
submittal completion.
i. The field terminal blocks in the DFS RTU provide for stranded wire with a maximum size of 12AWG.
Utility Submittal Involvement
A submittal copy will be issued to the utility for review during the submittal phase. Inputs from the
utility are expected to be included with submittal comments and/or approval.
Work to be Performed by Utility/Others:
a. Ensure 120 VAC power is near the location of the DFS RTU for connection to power.
b. Make site and personnel available to operate system as needed when work is scheduled.
c. All required instrumentation devices either exist or shall be provided and installed by others.
d. All required underground locate information must be provided before DFS installation services can be
scheduled. DFS will provide an underground locate information form.The Utility will be the
underground locate Point of Contact.The Utility must provide a contact name and phone number for
use by locate services should they need to gain access to a secured area or are unable to find the site
based on locate info provided by Utility.
SCADA SOLUTIONS SINCE 1981 - www.dataflowsys.com - MADE IN USA WITH PRIDE
Data Flow Systems,Inc. • 605 John Rodes Blvd. • Melbourne, Florida 32934 • PH. 321.259.5009 • FAX 321.259.4006
Page 6 of 6
Spare Parts: ($0.00)
Qty Item
None
Lead Time
Submittal: 60 days,after acceptance of order and any required documentation.
Equipment: 150 days,after receipt of approved submittal.
Pricing&Terms:
This quotation totals$17,977.00. Pricing assumes credit approval by DFS and is based on DFS's general
terms&conditions governing quotations and performance.This proposal will be honored for 90 days. DES
will submit an invoice for each activity and payment schedule is as follows:
25% Mobilization (upon submittal approval)
55% Delivery of Product
15%Start Up
5%Completion of Punch List items
QUOTATION NOTES:
1. Only those items and services specifically listed above are included in this quotation.
2. Please note that lead times may be affected by product/material availability.
3. All applicable taxes must be added to the quotation total.All prices are subject to increases by the amount
of any sales,excise,or other tax levied or charged by any governmental agency and are subject to price
adjustment in the amount expended by DFS in compliance with any governmental action.
4. Pricing assumes credit approval of the purchaser by DFS and is based on DFS's General Terms&Conditions
Governing Quotations and Performance.These Terms and conditions may be viewed by visiting our
website at https://www.dataflowsys.com/wp-content/uploads/2022/03/DFS-GENERAL-TERMS-
CONDITIONS.pdf
5. While DFS is willing to consider the Purchasers' requests for alternate terms and conditions,the adoption
of such terms and conditions will be at the sole discretion of DFS and will make necessary a commensurate
adjustment in quoted price.
6. Worksite(s) must be accessible by DFS vehicles and DFS crews must have access to work site(s)to perform
work during all daylight hours,seven (7) days a week excluding holidays.
7. All items shipped will be billed at the time of shipment. Shipping charges are included.
8. DFS imposes a surcharge of 3.5% (which is not greater than our cost of acceptance)on the transaction
amount on all invoices for which payment is remitted via MasterCard and/or Visa credit card products.
9. This quotation does not include bonding, any required permitting,sealed drawings, or associated fees.
10. This quotation stipulates that DES'existing insurance provider(s) and policy coverage are acceptable to the
Purchaser. DES insurance information can be downloaded at https://www.dataflowsys.com/wp-
content/uploads/2022/04/ACORD-Form-COI-thru-3-31-2023.pdf
This quotation is formatted and priced for direct purchase from the Utility. If this scope is to be purchased by
others,a revised quote is required to cover additional project administration charges.These additional charges
cover routine contractor/developer requirements such as contract management,submittal preparation,
project coordination,owner notices,etc.
SCADA SOLUTIONS SINCE 1981 - www.dataflowsys.com - MADE IN USA WITH PRIDE
Data Flow Systems.Inc. • 605 John Rodes Blvd. • Melbourne, Florida 32934 • PH 321 259 5009 • FAX. 321.259.4006
Page 1of3
IID:&11%
Data Flow$yste1s
QUOTE NO. 230303-01-RD
PLEASURE ISLAND LS REHABILITATION PROPOSAL
CITY OF PORT ARTHUR
MARC 3, 2023
Thank you for this opportunity to offer our products and services to the City of Port Arthur.All products
offered are compatible with the City's existing TAC II SCADA system.A site survey was conducted by DFS on
February 9, 2023 the required materials and scope of work for establishing SCADA controls,to include
automated control by level transmitter to include pump cycle alternation, phase monitoring,and backup float
control at the referenced site. Below please find the recommended remediation.This quotation includes,and
is limited to,the following bill of material and services. Should you have any questions or require additional
information, please contact me at 903.330.1548.
Sincerely,
QS‘
c
Robert Durham
Regional Director of Business Development
BILL OF MATERIAL&SERVICES:
1. PLEASURE ISLAND LS
Visual indications and evidence provided by Utility representative reveal the SCADA equipment at this
location is in place, but the Pump Controls wiring are not available to the DFS RTU. The commissioning of
the DFS SCADA Pump Controller(TCU001)will require electrical work. DFS will subcontract the required
electrical scope of work to Electrical Specialties Inc.
This item offers the following:
(0) Fiberglass Enclosure- 14"h X 12"w X 8"d Exists
(0)Aluminum Inner Panel 18x16 (custom for TCU enclosure) - Exists
(0)TAC Pack TCU (TCU001 w/radio) -Exists
(0)Snap-in Installation Kit w/Wire Harness- Exists
(1) RF pigtail -Existing to be replaced
(1)Analog Surge Protection (DRS-036) -(1) exists needs quantity of 2 to include EST Level
(1) RTU Surge Protection Kit -Existing to be replaced
(1) 120 VAC,Single Phase Surge protector-Existing to be replaced
(1) 240 VAC,3-Phase Surge Protector Kit-Existing to be replaced
(1) Polyphaser Coaxial Surge Protector-Existing to be replaced
(1) 7.2 Ah Backup Battery-none existing-furnish new battery
(1) RTC400 Coax&Connectors w/Heat Shrink-Existing to be replaced
(1) Onsite Installation Services - 1 trip, up to 8 hours on-site.
SCADA SOLUTIONS SINCE 1981 - www.dataflowsys.com - MADE IN THE USA WITH PRIDE
Data Flow Systems, Inc. • 605 John Rodes Blvd. • Melbourne. Florida 32934 • PH'321.259.5009 • FAX: 321.259.4006
Page 2 of 3
WORK TO BE PERFORMED BY DFS: (Labor and Materials) $4,204.00
1. Correct deficiencies in the existing antenna orientation.
2. Install new coax and connectors between the antenna and the DFS TC0001 RTU to remove splice in the
coax run, Polyphaser surge protection and pigtail to radio.
3. Replace the defective surge protection devices a to the TC0001.
4. Replace defective battery with new 7.2aH battery.
5. Test and record,VSWR, Earth Ground Resistance, Fade Margin (radio communications)Antenna azimuth
adjusted and recorded. Power wattage of existing radio (and recommend action if required)
6. Update central site configuration and HMI screen changes as required.
Note:The existing antenna appears to be in good operational condition and can be reused with minor
adjustments mentioned above.
WORK TO BE PERFORMED BY THE ELECTRICAL SUBCONTRACTOR: (Labor and Materials) $12,325.00
1. Provide Dedicated 120V 20amp Circuit Breaker to DFS RTU.
2. Furnish and install conduit,wire as required to provide necessary interconnection for monitoring and
control of two existing across the line pumps/motors.
3. Existing BLTech Panel will be repurposed to house required isolation relays between the motor starters
and the DFS RTU. Unused items in BLTech Panel will be removed and returned to the Utility.
4. Bring existing A, B, C phases to the DFS SCADA RTU for phase monitoring and pump protection.
5. Furnish and install (Mercoid Dwyer PBLT2) pressure/level transmitter(0-15psi)to provide primary level
control process variable for DFS TC0001 automation and operation of the existing pumps.
6. Furnish and install four(Off, Lead, Lag, and High)floats for backup control operation of the station should
the primary level instrument fail.
7. Improve the station grounding,with required goal of not more than 5 ohms and expectation of achieving
less than 1 ohms resistance to earth.
EXCLUDED WORK:
1. No Scope of Work is included for Pleasure Island Golf Ball EST
2. Golf Ball EST Instrumentation is by others.
PRICING &TERMS:
This quotation totals$16,529.00. Pricing is based on NET 30 payment terms. Lead time is typically 8-12 weeks
after receipt of order unless special arrangements are made. Please review the Quotation Notes listed below.
This quotation will be honored for 90 days.
QUOTATION NOTES:
1. Only those items and services specifically listed above are included in this quotation.
2. Please note that lead times may be affected by product/material availability.
3. Lead time for submittal, if required, is 30 days after receipt of the order.
4. All applicable taxes must be added to the quotation total.All prices are subject to increases by the amount
of any sales, excise,or other tax levied or charged by any governmental agency and are subject to price
adjustment in the amount expended by DFS in compliance with any governmental action.
SCADA SOLUTIONS SINCE 1981 - www.dataflowsys.com - MADE IN THE USA WITH PRIDE
Data Flow Systems. Inc. • 605 John Rodes Blvd. • Melbourne. Florida 32934 • PH: 321.259.5009 • FAX. 321.259.4006
Page 3 of 3
5. Pricing assumes credit approval of the purchaser by DFS and is based on DFS's General Terms&Conditions
Governing Quotations and Performance.These Terms and conditions may be viewed by visiting our
website at https://www.dataflowsys.com/wp-content/uploads/2022/03/DFS-GENERAL-TERMS-
CONDITIONS.pdf
6. While DFS is willing to consider the Purchasers' requests for alternate terms and conditions,the adoption
of such terms and conditions will be at the sole discretion of DFS and will make necessary a commensurate
adjustment in quoted price.
7. Worksite(s) must be accessible by DFS vehicles and DFS crews must have access to work site(s)to perform
work during all daylight hours,seven (7)days a week excluding holidays.
8. All items shipped will be billed at the time of shipment. Shipping is included
9. DFS imposes a surcharge of 3.5% (which is not greater than our cost of acceptance)on the transaction
amount on all invoices for which payment is remitted via MasterCard and/or Visa credit card products.
10. This quotation does not include bonding, any required permitting,sealed drawings, or associated fees.
11. This quotation stipulates that DFS' existing insurance provider(s)and policy coverage are acceptable to the
Purchaser. DFS insurance information can be downloaded at https://www.dataflowsys.com/wp-
content/uploads/2022/04/ACORD-Form-COI-thru-3-31_2023.pdf
12. This quotation is formatted and priced for direct purchase from the Utility. If this scope is to be purchased
by others,a revised quote is required to cover additional project administration charges.These additional
charges cover routine contractor/developer requirements such as contract management,submittal
preparation, project coordination, owner notices, etc.
SCADA SOLUTIONS SINCE 1981 - www.dataflowsys.com - MADE IN THE USA WITH PRIDE
Data Flow Systems.Inc. • 605 John Rodes Blvd. • Melbourne.Florida 32934 • PH: 321.259.5009 • FAX:321.259.4006