INTEROFFICE MEMORANDUM
Date: March 14, 2023
To: The Honorable Mayor and City Council
Through: Ron Burton, City Manager
From: Greg Benson, Fire Chief
RE: PR 23070 Interior Repairs to Fire Station#6
Introduction:
The intent of this agenda item is to seek the City Council's approval of Proposed Resolution
23070 authorizing the City Manager to enter a contract with Preferred Facilities Group-USA,
LLC of Beaumont, Texas, for additional repair, mold assessment and remediation protocol
development at Fire Station #6 in the not to exceed the amount of$20,618.45. This amount is
based on BuyBoard Contract 581-19 pricing.
Background:
Interior walls of Fire Station #6 require additional repair, mold assessment and remediation
protocol development due to water damage. Walls at Fire Station No. 6 have been damaged by
repetitive rain. Mold can be unhealthy for personnel to breathe. The permeable exterior walls
were waterproofed to prevent damage reoccurrence.
Budget Impact:
This item has a budgetary impact of$20,618.45, which is available in Fire Department
Building Maintenance Account No. 001-19-047-5312-00-30-000.
Recommendation:
The Fire Department recommends approval of this resolution
"Remember,we are here to serve the Citizens of Port Arthur"
P.O.Box 1089 X Port Arthur,Texas 77641-1089 X 409.983.8101 X FAX 409.982.6743
P.R. No. 23070
3/14/23 gsb
RESOLUTION NO.
A RESOLUTION AUTHORIZING THE CITY MANAGER TO ENTER
INTO A CONTRACT WITH PREFERRED FACILITIES GROUP-USA,
LLC OF BEAUMONT, TEXAS THROUGH BUYBOARD COOPERATIVE
PURCHASING PROGRAM (CONTRACT NO. 581-19) FOR THE MOLD
ASSESSMENT AND INTERIOR REPAIRS OF THE INTERIOR OF
STATION #6 IN THE NOT TO EXCEED AMOUNT OF $20 , 618 . 45;
FUNDING AVAILABLE IN FIRE DEPARTMENT BUILDING
MAINTENANCE ACCOUNT NO. 001-19-047-5312-00-30-000
WHEREAS, the Port Arthur Fire Department' s Station #6 (4448
9th Avenue) requires additional interior repairs, mold assessment
and development of a remediation protocol due to water damage;
and
WHEREAS, Chapter 271 of the Texas Government Code allows a
city, by resolution of its governing body, to participate in
cooperative purchasing programs, such as BuyBoard Cooperative
Purchasing Program, as an alternative to formal bid process; and
WHEREAS, pursuant to Res. 02-341, the City of Port Arthur
entered into an interlocal agreement for cooperative purchasing
with BuyBoard Cooperative Purchasing Program; and
WHEREAS, Preferred Facilities Group-USA has provided a
quote for the interior repairs to Station #6 with BuyBoard
Contract 581-19 pricing (see quote attached hereto as Exhibit
"A") ; and
WHEREAS, funds were budgeted and are available for this
project in Fire Department Building Maintenance Account 001-19-
047-5312-00-30-000; and
P.R. No. 23070
3/14/23 gsb
WHEREAS, a copy of the quote for work is attached as
Exhibit "A" .
NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE
CITY OF PORT ARTHUR:
Section 1 . That the facts and opinions in the preamble are
true and correct .
Section 2 . That the City Manager is hereby authorized and
directed to execute on behalf of the City of Port Arthur a
contract with Preferred Facilities Group-USA of Beaumont, Texas,
in the not to exceed amount of $20, 618 . 45, in substantially the
same form as Exhibit "A" .
Section 3 . That a copy of the caption of this resolution
shall be spread upon the Minutes of the City Council.
READ, ADOPTED AND APPROVED on this day of
, 2023, at a Regular Meeting of the City Council of
the City of Port Arthur, Texas, by the following vote: AYES
Mayor:
Councilmember:
NOES:
Thurman Bill Bartie, Mayor
P.R. No. 23070
03/14/23 gsb
APPROVED AS TO FORM:
Cktel-41-
/a/111:-;
ty Attorney
APPROVED FOR ADMINISTRATION:
Ron Burton
City Manager
APPROVED AS TO AVAILABILITY OF FUNDS :
cX0, D
Kandy Dan el
Finance Director
� e
Clift'bn Wil iams, CPPB
Purchasing Manager
Greg Benso , Fire Chief
P.R. No. 23070
3/14/23 gsb
EXHIBIT "A"
01,101,00047% PREFERRED
Exhibit A
FACILITIES GROUP - USA
Mailing Address:
PO Box 20658 3/10/23
Beaumont, TX 77720-
0658 Ricard Bodin
0 (409)842 8181 COPA Fire Department
44 (409)842-2274 4448 9t"Ave
® pfg@pfg usa.com Port Arthur,Texas 77630
pfg-usa.com
Project: "Station aarS
Job Order Contracting Subject: "Interior Water Damage CO al"
Co-Op Purchasing Dear Mr.Bodin
Agreements
We are pleased to submit our proposal utilizing our 581-19 Buy Board Texas
Contract based on local CCI and coefficient of.89.
Indefinite Delivery,
Indefinite Quantity-10IQ Proposal Recap:
Multiple Award • Build deacon chamber inside zipper door.Once built used
Construction Contracts- during demo of contained area.
MACC
• Put area under pressure with one Negative Air machine
Task Order Contracts exhausting too exterior.
TOC
• Appropriate personal protective equipment issued prior to
work in contained area to ensure safe working conditions.
Construction
Management-Agent or • Remove exterior drywall and Insulation 57x8 corner to
At Risk
corner.
Design Build • Discard all contaminated materials in 6mii poly bags taped
closed and placed in provided dumpster.
Government
• HEPA vac all surfaces inside containment area. Once clean
apply antimicrobial disinfectant.
Commercial
• Encapsulate exposed and plywood Inside containment.
Education
• Run air scrubber for 24hrs set to scrub.
Industrial • Remove all equipment and start back on construction.
Infrastructure • A Mold Remediation Protocol will be generated due to
identified mold growth greater than twenty-five (25)
contiguous square feet per Texas Department of
Communications Licensing and Registration Mold Rules.
Corporate/Retail • Mold Remediation Protocol will be designed by a TDLR
Licensed Mold Assessment Consultant providing a
scope of work for the remediation contractor.
Assembly
Southeast Texas Deep East Texas Central Texas Texas Gulf Coast
PREFERRED
FACILITIES GROUP - USA
• HES will participate in a pre-bid
walkthrough with remediation contractors.
Mailing Address:
PO Box 20658 • On-site Project Manager throughout remediation
Beaumont, TX 77720-
0658 activities documenting progress.
(409)B42-8181 • Collection of spore trap air, bulk and/or tape lift samples
[409)842-2274 for mold inside remediation areas.
pfggpfg-usa.com
pfg-usa.com • Delivery of samples to a TDLR licensed laboratory for
analysis by light microscopy. Normal laboratory sample
Job Order Contracting turnaround time for mold analysis is 24 Hours plus
overnight delivery.
Co-Op Purchasing • TDLR Licensed Mold Assessment Consultant to provide
Agreements as needed project management including site visits,
meetings, and conference calls.
Indefinite Delivery,
Indefinite Quantity-IDIQ • Preparation of a written report describing the sampling
and results, once all samples have been analyzed and
reviewed.
Multiple Award
Construction Contracts-
MACC • Remove A/C grills and clean along with duct system by
professional company. Seal around sheetrock and
Task Order Contracts ductwork to stop heat transfer that is causing the
TOC mildew to grow around vents.
Construction • Treat and clean dirty areas on drywall around ducts in
Management-Agent or sleeping quarters
At-Risk
• Prime and paint any affected areas from cleaning mold
Design Build
Government
Total Price $20,518.45
Commercial
Education
Industrial
Infrastructure
Communications
Corporate/Retail
Assembly
Southeast Texas Deep East Texas Central Texas Texas Gulf Coast
PREFERRED
FACILITIES GROUP - USA
Mailing Address:
PO Box 20658
Beaumont, TX 77720-
0658
ES [409)842-B181 Exclusions:
I (409)842-2274
pfgi_7a p(g-usa,com Unforeseen items beyond specified scope listed above, overtime, and liquidated
pfg-usa.com damages,
Job Order Contracting We estimate approximately Ten (10) working days to complete upon material
delivery,
Co-Op Purchasing This pricing Is based on recommended work hours of Monday thru Friday 7:00 am
Agreements to 5:00 pm, Once accepted this proposal turns into a lump sum contract. Please
contact us at 409-842-B293 at your convenience to discuss this estimate.
Indefinite Delivery,
Indefinite Quantity-!DIP Respectfully submitted,
Preferred Facilities Group-USA
Multiple Award
Construction Contracts- -•- �-�
MACE
Brian Shipp
General Superintendent
Task Order Contracts
TOC cc: PFG/ffle
22.0164
Construction
Management-Agent or
At-Risk
Design Build
Government
Commercial
Education
Industrial
Infrastructure
Communications
Corporate/Retail
Assembly
Southeast Texas Deep East Texas Central Texas Texas Gulf Coast