HomeMy WebLinkAboutPR 23088: REPAIR OF 15V CABLES ON MAIN SUB SWITCH GEAR AT WATER PURIFICATION PLANT „rt rtlru�_ INTEROFFICE MEMORANDUM Date: March 31, 2023 To: The Honorable Mayor and City Council Through: Ronald Burton, City Manager From: Calvin Matthews, P.E., Water Utilities Director RE: PR 23088 —Ratification of Repair to 15kv Cables on Main Sub Switch Gear at Water Purification Plant Introduction: The intent of this Agenda Item is for the City Council to ratify the City Manager's decision to approve the repair to 15kv cables. Water Purification Plant 15kv cables that were damaged due to an electrical arc from B side to A side, which caused the plant to temporarily shut down until transfer to generator power. Background: The Water Purification Plant 15kv cables that were damaged due to an electrical arc from B side to A side, which caused the plant to temporarily shut down until transfer to generator power. On January 25, 2023, the City Manager signed an emergency memo, authorizing the repair. The original estimate for the repairs was $20,000.00, but due to the amount of damage found when the high voltage panels were opened, additional work was required, which increased the cost. Electrical Specialties, Inc. was called to diagnose and make repairs, while the plant ran on generator power. Budget Impact: The total budgetary impact is $75,856.68 and funding is available in Account No. 410-40-210- 5318-00-00-000, Equipment Maintenance. Recommendation: It is recommended that City Council approve Proposed Resolution No. 23088, ratifying the City Manager's approval to repair the equipment as described/outlined above. "Remember, we are here to serve the Citizens of Port Arthur” PR No. 23088 3/31/23 bw Page 1 of 3 RESOLUTION NO. A RESOLUTION RATIFYING THE CITY MANAGER'S DECISION TO AUTHORIZE EMERGENCY REPAIR TO THE 15 KILOVOLT CABLES AT THE WATER PURIFICATION PLANT, FOR THE TOTAL NOT TO EXCEED AMOUNT OF $75,856.68 FROM WATER UTILITIES ACCOUNT NO. 410-40-210-5318-00-00-000, EQUIPMENT MAINTENANCE. WHEREAS, 15 kilovolt cables sitpply power to the Water Purification Plant were damaged due to an electrical arc from B side to A side; and, WHEREAS, the plant was able to switch to generator power; however; the occurrence created an urgent response for the restoration of power to the plant; and, WHEREAS, on January 25, 2023, the City Manager signed an emergency memo, authorizing the repair to the damaged cables; and, WHEREAS, the original estimate for the repairs was $20,000.00, but due to the amount of damage found when the high voltage panels were opened, additional work was required, which increased the cost; and, WHEREAS, pursuant to Section 252.022(a)(2) this purchase is authorized because of a public calamity that requires the immediate appropriation of money to relieve the necessity of the municipality's residents or to preserve the property of the municipality; and, WHEREAS, it is authorized pursuant to Section 252.022(a)(3) of the local government code because of the unforeseen damage to public machinery, equipment, or other property. NOW THEREFORE,BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PORT ARTHUR: THAT, the facts and opinions in the preamble are true and correct; and, PR No. 23088 3/31/23 bw Page 2 of 3 THAT, City Council hereby ratifies the City Manager's decision to authorize the emergency repairs (Exhibit "A") with a budgetary impact of$75,856.68 from Account No. 410- 40-210-5318-00-00-000, Equipment Maintenance; and, THAT, a copy of the caption of this Resolution shall be spread upon the Minutes of the Meeting of the City Council. READ, ADOPTED, AND APPROVED this day of , 2023 at a Regular Meeting of the City Council of the City of Port Arthur, Texas by the following vote: AYES: Mayor Councilmembers: NOES: Thurman Bill Bartie Mayor ATTEST: Sherri Bellard City Secretary APPROVED AS TO FORM: L1 Jukiti‘ di) Valecia Tiz City Attorney PR No. 23088 3/31/23 bw Page 3 of 3 APPROVED FOR ADMINISTRATION: Ronald Burton Calvin Matthews, . . City Manager Water Utilities Director APPROVED AS TO THE AVAILABILITY OF FUNDS: cAzNA AA Kandy Daniel rY. Chile Williams, CPPB Finance Director Purchasing Manager Exhibit "A" n j - INTEROFFICE MEMORANDUM WATER UTILITIES DEPARTMENT-WATER ADMINISTRATION Date: January 25, 2023 To: Mr. Ronald Burton, City Manager From: Calvin Matthews, P.E.;Water Utilities Director RE: Water Purification Plant Transfer Switch The transfer switch to transition the plant to generator power is not working. Any interruption from Entergy will shut down water production.To prevent the potential for any disruptions to water production,the transfer switch should be repaired as soon as possible. Water Utilities staff met Electrical Specialties on site in order to coordinate a solution and they will repair the transfer switch. The preliminary estimated projected budgetary impact to make the repairs is$20,000.00. Funding is available in the Water Purification Fund Account. No. 410-40-210-5312-00-00-000 Building Maintenance. I, Ronald Burton, City Manager, approve the repair of the transfer switch. ; cl 3 Ronald Burton Date City Manager "Remember, we are here to serve the citizens of Port Arthur." Exhibit "B" '›zL<- Electrical Specialties Inc Invoice 1550 Langham Road RECEIVED Beaumont,TX 77707 Date Invoice# (409)860-5211 * Fax (409)860-5851 MAR 6 2023 TECL# 17109 2/28/2023 26025-SB Bill To ACCOUNTING City of Port Arthur PO Box 1089 Port Arthur, Texas 77641 P.O. No. Terms Description Amount Port Arthur Waste Water Treatment Plant H.O. Mills Rd. Emergency repair on the 15kv cables on the main sub switch gear. Labor& Materials 75,856.68 Regulated by The Texas Department of Licensing and Regulations, PO box 12157 Austin, Texas 78711, 800-803-9202 or 512-463-6599 Subtotal $75,856.68 CREDIT CARD PAYMENTS EXCEEDING $500.00 WILL BE Sales Tax (8.25%) $0.00 CHARGED AN ADDITIONAL 2.5% FEE. Total $75,856.68 Payments/Credits $0.00 Balance Due $75,856.68