Loading...
HomeMy WebLinkAboutPR 23112: RENEWAL OF ARMY LICENSE NO. DACW65-3-18-0076 FOR THE WATERLINE CROSSING THE INTERCOASTAL CANAL ort rtltt'- — r INTEROFFICE MEMORANDUM —WATER UTILITIES DEPARTMENT-- Date: April 12, 2023 To: The Honorable Mayor and City Council Through: Ronald Burton, City Manager From: Calvin Matthews, P.E., Water Utilities Director RE: PR 23112—Renewal of Army License No. DACW64-3-18-0076 for the Waterline Crossing the Intercoastal Canal Introduction: The intent of this Agenda Item is to seek City Council's approval for the City Manager to renew Army License No. DACW64-3-18-0076 for the waterline crossing the Intercoastal Canal. Background: The City of Port Arthur entered into a 5 year license agreement with the Department of the Army, per Res. 09-328. In 2018, the Secretary of the Army granted the City a license renewal No. DACW64-3-18-0076 for the construction, operation, and maintenance of the 24-inch water pipeline and its 30-inch casing, over and across, in and up certain Tracts located within the Sabine-Neches Waterway, Neches Canal and Port Arthur Canal Projects. This resolution is intended to renew that agreement. Budget Impact: No budgetary impact. Recommendation: It is recommended that City Council approve PR 23112, pertaining to the Department of the Army License No. DACW64-3-18-0076 as described/outlined above. "Remember,we are here to serve the Citizens of Port Arthur" PR No. 23112 4/12/23 bw Page 1 of 3 RESOLUTION NO. A RESOLUTION APPROVING THE DEPARTMENT OF THE ARMY LICENSE RENEWAL NO. DACW64-3-18-0076 PERTAINING TO THE SABINE NECHES WATERWAY PROJECT, SABINE NECHES CANAL. WHEREAS,in July 25, 1912,virtue of House Document 773, 61st Congress.2nd session. the Congress of the United States made appropriations for a 26-foot channel through Sabine Pass, Port Arthur Canal and Port Arthur turning basin; and a 26-foot turning basin at Port Arthur by, known as the Sabine Neches Waterway Project; and, WHEREAS, the United States acquired fee simple interest in Tract No. 3 by virtue of Deed filed for record March 2, 1907, and an easement to construct a ship canal and deposit spoil and other excavated material from said channel in Tract Nos. 11 and 27, by virtue of Deed dated October 10, 1941 for said project; and, WHEREAS, in 2014, the City of Port Arthur submitted a request to construct, operate, and maintain a 24-inch Water Pipeline and its 30-inch Casing,over, across,in and upon said Tracts Nos. 3, 11 and 27 for the purposes of serving the general public; and, WHEREAS,the Department of the Army,under authority of Title 10,United States Code, Section 2668, granted the City of Port Arthur License No. DACW64-3-14-0053 to construct said pipeline project; and, WHEREAS, the project was completed in 2018 and the Department of the Army hereby requested to replace License No. DACW64-3-14-0053 with License No. DAC64-3-18-0076 to operate and maintain the pipeline; and, WHEREAS,Resolution No. 18-512, approved by Council on December 4, 2018,renewed License No. DAC64-3-18-0076 for five (5) years; and, WHEREAS,the City wishes to renew License No. DAC64-3-18-0076 for another five (5) years. PR No.23112 4/12/23 bw • Page 2 of 3 NOW THEREFORE, BE IT RESOLVED BY CITY COUNCIL OF CITY OF PORT ARTHUR: THAT, the facts in the preamble are true and correct; and, THAT, the City Manager of the City of Port Arthur is hereby authorized and directed to execute, on behalf of the City of Port Arthur, in substantially the same form attached hereto as Exhibit "A", License No. DAC64-3-18-0076 for the purposes of maintaining said pipeline on Tracts 3, 11 and 27 of the property of the United States; and, THAT, a copy of the caption of this resolution be spread upon the minutes of City Council. READ, ADOPTED, AND APPROVED THIS day of 2023 at a Regular Meeting of City Council of the City of Port Arthur, Texas, by the following vote: AYES: Mayor ; Councilmembers: NOES: Thurman Bill Bartie • Mayor ATTEST: Sherri Bellard City Secretary PR No. 23112 4/12/23 bw Page 3 of 3 APPROVED AS TO FORM: APPROVED FOR ADMINISTRATION: ()A/W tdtg alecia Ti no Ronald Burton City Attorney City Manager alvin Matthews,P.E. Water Utilities Director APPROVED AS TO THE AVAILABILITY OF FUNDS: Kandy Daniel 3 Finance Director O Cl. on Williams, CPPB Purchasing Manager EXHIBIT A (Department of the Army Document) tiK OF\, DEPARTMENT OF THE ARMY U.S.ARMY CORPS OF ENGINEERS,GALVESTON DISTRICT i 1z, 2000 FORT POINT RD (al GALVESTON,TEXAS 77550 a l c �� ,Arts V4>' SUBJECT: Expiration of Real Estate Instrument; DACW64-3-18-0076 Ron Burton City Manager City of Port Arthur 444 Fourth Street Port Arthur, Texas 77642 Dear Mr. Burton: You are receiving this letter because our records indicate the above instrument will soon expire. Enclosed is the instrument which was issued for a maximum term of 5 years will expire on December 17, 2023. Please advise this office, in writing, if there is a continued requirement to renew or terminate this instrument. To initiate procedures to renew this instrument please complete the enclosed Form SWG- RE 701i to update the signatory and certifying officer. In the remarks section of the form, please reference DACW64-3-18-0076 all other changes in instrument and email to SWG-RE@usace.army.mil. If your organization no longer requires the activity stated in the instrument, please provide name of organization, point of contact and phone number for the current owner. Please respond within 30 days of receipt of this letter of your intention. If you need further assistance, please contact Realty Specialist Dana Schirato (409) 766-3871 or email Dana.M.Schirato@usace.army.mil. Sincerely, NELSON.TIMOTH Digitally signed by NE LSON.TI MOTHY.1.1230372922 Y.J.1230372922 Date:2023.03.29 10:01:32-05'00' Timothy J. Nelson Contracting Officer, Real Estate Division Galveston District U.S. Army Corps of Engineers Enclosure Real Estate Application NO. DACW64-3-18-0076 REPLACES DACW64-3-14-0053 DEPARTMENT OF THE ARMY LICENSE SABINE-NECHES WATERWAY SABINE-NECHES CANAL PROJECT AND PORT ARTHUR CANAL PROJECT JEFFERSON COUNTY, TEXAS THE SECRETARY OF THE ARMY, hereinafter referred to as the "Secretary," under authority of Title 10, United States Code, Section 2668, hereby grants to the City of Port Arthur, (hereafter referred to as "Grantee"), a license to operate and maintain a 24-inch Water Pipeline and its 30-inch Casing, herein collectively referred to as the "Pipeline", over and across, in and upon Tracts No. 3, 11, and 27 (hereinafter collectively the "Premises"), as depicted in Exhibit A ; (as-built drawings) attached hereto and incorporated herein, located within the Sabine- Neches Waterway, Neches Canal and Port Arthur Canal Projects; provided said Pipeline is constructed in accordance with the terms and conditions set forth herein. THIS LICENSE is granted subject to the following conditions: 1. TERM This license is granted for a term of(5) five years, beginning from the date this license is fully executed but revocable at will by the Secretary. 2. CONSIDERATION The consideration for this license shall be the construction, operation, and maintenance of the Pipeline within the Premises for the benefit of serving the general public in accordance with the terms herein after set forth. 3. NOTICES All notices and correspondence to be given pursuant to this license shall be addressed: If to the Grantee: The City of Port Arthur, 444 Fourth Street, Port Arthur, Texas, 77642 and if to the Government: District Engineer, Galveston District, 2000 Fort Point Road, P.O. Box 1229, Galveston, Texas 77550 or as may from time to time otherwise be directed by the parties. Notice shall be deemed to have been duly given if and when enclosed in a properly sealed envelope addressed as aforesaid, and deposited, postage prepaid, in a post office regularly maintained by the United States Postal Service. 4. AUTHORIZED REPRESENTATIVES Except as otherwise specifically provided, any reference herein to "Secretary", "Real Estate Contracting Officer", or"said officer"shall include their duly authorized representatives. Any reference to "Grantee" shall include any duly authorized representatives. 5. SUPERVISION BY THE REAL ESTATE CONTRACTING OFFICER The use and occupation of the premises shall be subject to the general supervision and approval of the Real Estate Contracting Officer, U.S.A.C.E, Galveston District, hereinafter 1 � �� DEPARTMENT OF THE ARMY is �'y GALVESTON DISTRICT,CORPS OF ENGINEERS W ' `°` '^ P.O.BOX 1229 L GALVESTON,TEXAS 77553-1229 �vP DEC 18 2018 SUBJECT: Sabine-Neches Waterway: Jefferson County, Texas; REIN-13-0043; License DACW64-3-18-0076 Mr. Harvey Robinson Interim City Manager The City of Port Arthur 444 Fourth Street Port Arthur, Texas 77642 Dear Mr. Robinson: Enclosed please find an original executed License (DACW64-3-18-0076). The original is for your records. You are now authorized to proceed under the terms and conditions of these documents. If you have any further questions, please contact Elizabeth Blake at (409) 766-3034 or elizabeth.a.blake@usace.army.mil. Sincerely, mot yJ. eso Chief, R I Estate Division Galveston District U.S. Army Corps of Engineers Enclosure NO. DACW64-3-18-0076 REPLACES DACW64-3-14-0053 referred to as said officer, and to such rules and regulations as may be prescribed from time to time by said officer. 6. APPLICABLE LAWS AND REGULATIONS The Grantee shall comply with all applicable Federal, state, county and municipal laws, ordinances and regulations wherein the premises are located. 7. CONDITIONAL USE BY GRANTEE The exercise of the privileges herein granted shall be: (1) without cost or expense to the United States; (2) subject to the right of the United States to improve, use or maintain the premises; (3) subject to other out grants of the United States on the premises; (4) personal to the Grantee, and this license, or any interest therein, may not be transferred or assigned; (5) subject to the right of the United States to collect amounts necessary to cover administrative expenses associated with the processing, issuance and management of this License under the authority of 10 U.S.C. 2695. 8. CONDITION OF PREMISES The Grantee acknowledges that it has inspected the Premises, knows its condition, and understands that the same is granted without any representations or warranties whatsoever and without any obligation on the part of the United States. 9. COST OF UTILITIES Not applicable 10. PROTECTION OF PROPERTY The Grantee shall keep the Premises in good order and in a clean, safe condition by and at the expense of the Grantee. The Grantee shall be responsible for any damage that may be caused to property of the United States by the activities of the Grantee under this license, and shall exercise due diligence in the protection of all property. Any property of the United States damaged or destroyed by the Grantee incident to the exercise of the privileges herein granted shall be promptly repaired or replaced by the Grantee to a condition satisfactory to said officer, or at the election of said officer, reimbursement made therefor by the Grantee in an amount necessary to restore or replace the property to a condition satisfactory to said officer. 11. INDEMNITY T-19-e-United--State-s-s49e44-not-be-Pen.pe42i-sie4-fer-el-afflages-te-pFepeFty-or-iFifurie-s-te-eerserie damagoc to tho proporty of the Crane, or for damagoc to-tho proporty or injurioc to tho porcon 2 NO. DACW64-3-18-0076 REPLACES DACW64-3-14-0053 invitation or tho invitation of any ono of thorn, and the-Crantoo shall hold tho--United Statec 12. RESTORATION On or before the expiration of this license or its termination by the Grantee, the Grantee shall vacate the premises, remove the property of the Grantee, and restore the premises to a condition satisfactory to said officer. If, however, this license is revoked, the Grantee shall vacate the premises, remove said property and restore the premises to the aforesaid condition within such time as the Real Estate Contracting Officer may designate. In either event, if the Grantee shall fail or neglect to remove said property and restore the premises, then, at the option of said officer, the property shall either become the property of the United States without compensation therefor, or said officer may cause the property to be removed and no claim for damages against the United States or its officers or agents shall be created by or made on account of such removal and restoration work. The Grantee shall also pay the United States on demand any sum which may be expended by the United States after the expiration, revocation, or termination of this license in restoring the premises. 13. NON-DISCRIMINATION The Grantee shall not discriminate against any person or persons or exclude them from participation in the Grantee's operations, programs or activities because of race, color, religion, sex, age, handicap or national origin in the conduct of operations on the premises. The Grantee will comply with the Americans with Disabilities Act and attendant Americans with Disabilities Act Accessibility Guidelines (ADAAG) published by the Architectural and Transportation Barriers Compliance Board. 14.TERMINATION This license may be terminated by the Grantee at any time by giving the Real Estate Contracting Officer at least ten (30) days' notice in writing to the fore mentioned address. 15. ENVIRONMENTAL PROTECTION a. Within the limits of their respective legal powers, the parties to this license shall protect the premises against pollution of its air, ground and water. The Grantee shall comply with any laws, regulations, conditions, or instructions affecting the activity hereby authorized if and when issued by the Environmental Protection Agency, or any Federal, state, interstate or local governmental agency having jurisdiction to abate or prevent pollution. The disposal of any toxic or hazardous materials within the premises is specifically prohibited. Such regulations, conditions, or instructions in effect or prescribed by said Environmental Protection Agency, or any Federal, state, interstate or local governmental agency are hereby made a condition of this license. The Grantee shall not discharge waste or effluent from the premises in such a manner that the discharge will contaminate streams or other bodies of water or otherwise become a public nuisance. 3 NO. DACW64-3-18-0076 REPLACES DACW64-3-14-0053 b. The Grantee will use all reasonable means available to protect the environment and natural resources, and where damage nonetheless occurs from the Grantee's activities, the Grantee shall be liable to restore the damaged resources. c. The Grantee must obtain approval in writing from said officer before any pesticides or herbicides are applied to the premises. 16. HISTORIC PRESERVATION The Grantee shall not remove or disturb, or cause or permit to be removed or disturbed, any historical, archeological, architectural or other cultural artifacts, relics, remains or objects of antiquity. In the event such items are discovered on the premises, the Grantee shall immediately notify said officer and protect the site and the material from further disturbance until said officer gives clearance to proceed. 17. DISCLAIMER This license is effective only insofar as the rights of the United States in the premises are concerned; and the Grantee shall obtain any permit or license which may be require by Federal, state, or local statute in connection with the use of the premises. It is understood that the granting of this license does not preclude the necessity of obtaining a Department of the Army permit for activities which involve the discharge of dredge or fill material or the placement of fixed structures in the waters of the United States, pursuant to the provisions of Section 10 of the Rivers and Harbors Act of 3 March 1899(33 USC 403), and Section 404 of the Clean Waters Act(33 USC 1344). 18. SITE SPECIFIC CONDITIONS The following site specific recommendation are made as limitations, restrictions, safety issues, clearances for power and communication lines over reservoirs(sag height) or conditions to be included in the outgrant to make the proposed use compatible with the operation of the project: a. Any USACE work or maintenance work will take precedence over the private activities authorized herein. b. The Grantee shall properly maintain and operate their constructed facility in a consistently satisfactory condition towards continuously providing a safe facility. c. Grantee has obtained and complied with all regulatory permit requirements including, but not limited to: Regulatory Permit Number SWG-1998-02413, the requirements of which are incorporated herein by this reference. d. Grantee must keep and maintain a file copy of the approved as-built drawings of the installed pipeline. e. The USACE reserves the right to inspect the facility, operation, and maintenance procedures for at any time during the term of this license provided reasonable notice is given to Grantee. 4 , . NO. DACW64-3-18-0076 REPLACES DACW64-3-14-0053 f. Incident or Accident reports: Grantee will notify USACE in writing at the earliest practicable moment, but not later than 30 days from the date of a reportable incident or accident. Reportable events are further defined in 49 CFR 195 Grantee will mail all written correspondence to the address listed in paragraph 3 of this license. Grantee's written notification will include the following information: (1) Name, address and identification number of the operator. (2) Name and telephone number of the reporter. (3)The location of the failure. (4)The time of the failure. (5)The fatalities and personal injuries, if any. (6) Initial estimate of amount of product released. g. Abandonment or deactivation: Grantee will notify USACE in writing within 60 days prior to abandoning or deactivating said pipeline. Grantee's written notification will include the following information: (1) Name, physical address, phone number and email address for pipeline owner. (2) Date of abandonment (3) Diameter of all pipelines abandoned (4) Method of abandonment (5) written certification that said pipeline was abandoned in accordance with applicable laws and regulations. h. Transfer of Ownership: If a change in ownership is contemplated, Elizabeth Blake, Realty Specialist (409-766-3034) and Frank Garcia, Land Use Coordinator(409-766-3111) Grantee shall be notified in writing 60 days prior to transferring ownership of said pipeline. Grantee's written notification will include the following information: (1) Name, physical address, phone number and email address for pipeline purchaser. (2) Forecasted date of transfer of ownership (3) Grantee will provide USACE a copy of the Texas Railroad Commission T-4B form in addition to a written notification. i. During the operation and maintenance of said pipeline grantee will ensure, no 5 NO. DACW64-3-18-0076 REPLACES DACW64-3-14-0053 structures or fill will be allowed to obstruct any navigation channels or impact any Federal interests beyond the activities authorized herein. Coordination to include, but not limited to, scheduling pre-work, and post-work onsite inspection. j. Prior to commencement of any work, Grantee shall notify and coordinate with the Corps of Engineers, Area Engineer, Ralph Steiner, at(409) 766-3071; Mr. Frank Garcia, Operations Land Use Coordinator, (409) 766-3111. k. All pipeline crossing signs shall be satisfactorily maintained, repaired and or replaced as needed to provide continuous signage of the project. THIS LICENSE is not subject to Title 10, United States Code, Section 2662, as amended. PRIOR TO the execution of this license Condition 11, INDEMNITY, was deleted. IN WITNESS WHEREOF, I hay.q hereu o set my hand by authority of the Secretary of the Army, this -� day of-4) , 2018. imothy J. s Contractin Officer, Real Estate Division Galvesto District U.S. Army Corps of Engineers n(� THIS LICENSE is also executed by the Grantee this lift day of 1ala iiH, ' L , 2018 Ha ey Robinson Interim City Manager The City of Port Arthur 6 NO. DACW64-3-18-0076 REPLACES DACW64-3-14-0053 CERTIFICATE OF AUTHORITY I, Val Tizeno, do hereby certify that I am the City Attorney for the City of Port Arthur(the "Grantee"), and that Mr. Harvey Robinson, who signed the foregoing instrument on behalf of the Grantee, was then the Interim City Manager for the Grantee. I further certify that the said officer was acting within the scope of powers delegated to this governing body of the Grantee in executing said instrument. IN WINS WHEREOF, I have made and executed this certification this Iffy` day of 0.ie , 2018. VaL 4Za) Val Tizeno City Attorney The City of Port Arthur 7 NO. DACW64-3-18-0076 REPLACES DACW64-3-14-0053 ;I ,{ _d., sYKdl'MNnoo Nosa3U3r'anHlWlaod .7--1 iF ai+winiaz —v.,.��.:,, ?did 1o3alo AYMa31YM S3H33N 3NBYS °1S1°r J� Qi t F4' 77 i°� afHl�YtlalOt'N1io0Al1O r' F 31'II' V�// I 3NIla31VM3dOH `,,7•V'' iF w /1TimEld°N3ov . . a . ! i 4 4 ! k '. '; s 1 !I v11 t I 11 1 1 lit . . I �I1tii!Jii1Ji 111 ji tl lif I Ili I ,.s y= . t ! sty TO ���' ; 4 _ r �4 r �ti I I�!! ti rY9���Id hi I I 1.!, T `.+w _, —1,_'....,:t F rl I , I.1 —t • .:, a ! ! ! c f Ix 7 ! WOO .1 -•-.•-, , ;_i. f \ »� t ,►,= g yyI '! , ,, 01 I ill!! Iii i i 1.11 i ' ; - !11 .I Ili ° r i +,; r ,„,.. .,i, fill of D it I,4 I`,, • Ill. ., ,:.�a (i, 41, Ii d it it 1I g 01s F,4t I IT fit a 101 it II � r uI !,1 F i i,'i F j '_, , U f Igii' iii . 11. i r r 111 li t..4 ....tattrA"`"'1 I i 1111 0 1 r ilt .1R ow iEa iI1 .�; "i Ft I • FCO a�'i..s,� V I 2 U ,..y am _ -._....a:..w"i_-u l I l.a 3 i r i f �� 11 �. !!S' / 1. !F i3 III ,,1 1I N. + ,, i ;;>,y 77IIIfLt11L 9 1 . ...,1__rM l!p t __.- • R:,..o.zrr i i ill, ;' 1 i _- e. . I' I i— 1 1 11 1 !i [ :. . • ttt ! , , : ! ! ! It Illiiiiiiiiiii ill ` ;t h ! if ti : l; i �11 i . . _1.. !1 ''--i3 I i I`3I. il iiF ��tli -ip: _ Exhibit A 8 1 . _ _. . i I CAS_,R I I 4s H I g[ I ;" r11 --———� el�; I 1 Gt t i I _ N� I ..7`� I I aW x. 12 I I ... I I " ay € 1 I-Pk,' Ii 3 I I es €g pia=:� ��r I I I v-, a:a z jldd I I a. o i t l y` lift! Al '�6i,; tat gt I n 1 -0Si , ,, a S EE tilt. ,�.., ,,}l•; a 111\7'1 y 3R�.� ;i ga.1:,.pis�, 1 I{ 1 III y {l i d MIA t Y itt1lnl. —IVY/ a L ICI I { ��: I ilZ`iritti;i� �Q�1 l E��I 0 —J L 1.'tR' ' 'l li�i� hie 1 Ilea �—awo,r vNoi tmum ton. jCOW i};1�+�i;�` ! ;'k --I r`-1=ao:--'''— 1 r -. 1; 2.0 F; `i}artii 1 I I \ ►. }.t {zlly t1111{l4 I I I �_ I I I ie 1 q :It:ei l''11:1,14 61!g' t y t���'{� ' ' 1 I '1 'N `iij t`fc;`1ii,`t},if"��4 I �i� p :tit •Yr,„i ,. It{ctjit { 1 1 I j 'fro t tk 'YR! ll ii'. . El L1,1` I \ , ,4 CCE1 40•��31ji€;fit. ,}}ll`,11`t, : i \\ } iii, r t 4 i ..l {� ifi i1, I \\ �. 3 I i` i I 11tC{RS'I t •ial,1 ,1,t y' t, I*, I \ '63 V i}'i�•4 4 I /..,:ilzu.1.4.�IP' $lk il � is ? lt i ru}>� I �� I t �t 1 I\\\ • i 1 1 �ltti li:j�'�{1`� i 't1�•ll�}1i1 I 4;i, tq:tlr 1 `tt i4 ;'{,i 1{ 11 lt`sO.iltt tt \ \? �Isis{`I�{ iri n}ii 1 , 4t-ITO, .k,"\ N1 Ava‘ , ilt 1i s \ fi i11 1 \ 0 \ \Iii ii1,1' 1111`1 \\\ \I 11 i. 1 i! 9i5a" a. £7 e4'fi \1,{t ii t .lA� `. t ` \ \ i i . i i t .E ` 1,F E a l Ali 1 tk`��{( �' R 'Ali. `6 i } 1 1j \ \ \ I 9 1 ef, 5? g.-5- FI $1 •" \ttia' ; t,"i`i l�ii }}111}}°tk \ \\ II ; _ sg �� �� � �?; aal� a \ ,0 'it til }1l• \ ll I► CI s- . NA6 z• sis iJ D.gr-R \\1}k li tl'j�.0 ,,t \ ! ill► Way Re is `z'=l IIi ipi PWq .;\ AW i ) 6`�Ilk i't {. \ 4 illl �� F #E eb ?e E£ �' 6� E"_ at"y Ie i i i i ? i }. \ in mill 3 i Yosme 19 Lip `f=$Jz �i \ �{}�} ° t1{{ ' tlI \ Ili Hui 1'a i$ is titii 41t .fa 111;1! ., \ t, 1'1}:`'` ,' - - lAA \ - iIEIII `.. si glal: ' 2-s� :-a li \ ;1t i1 tt'tl \ It' _ 4 " E� SE .i$ 5._�, rc 51' r,1 ii j•r�•;iisi.l�1'\iti `iRN 1; f I W $ f 5e 3iE^ a _$� \ s1,0ilf° 1 :1':i lt1iOW \ .11 j,1 s u ;5 ¢° O •.n 9� o 0 1 i ?vit'}til'11' t it {• \IIIL :.. .3� uaF mR� Wa t 11 1;10 ,4lI1 l`{ t•i1� . mea ;' E ��f'`g �i� 1:I11:AI,Ii.,,•�,t,li{ tl1i11 \ . I m �a��a� E a: s�= �� \ Its �' ,II ti. lt�t;{i:1,,. \ Illiki ``It t �h �}, 1{,t \ i! 1�1 r *DO NOT LEAVE SECTIONS BLANK OR APPLICATION WILL NOT BE PROCESSED* REAL ESTATE APPLICATION For use of this form, see SWG-RE 701 i ` 1 tot� I tI fm�nn5dd�aa e RealtySpecialist on anychanges of POCs *SIGNATORY WILL SILi PART I - BUSINESS/COMPANY APPLICANT INFORMATION la. BUSINESS/COMPANY NAME lb. LAST NAME (SIGNATORY FOR APPLICANT) FIRST NAME M.I. 1c. TITLE 1d. E-MAIL le. PHONE lf. PHYSICAL ADDRESS 1g. CITY lh. STATE 1i. ZIP CODE 1j. MAILING ADDRESS 1k. CITY 11. STATE lm. ZIP CODE PART II - AGENT INFORMATION (IF APPLICABLE) 2a. BUSINESS/COMPANY NAME 2b. LAST NAME(AGENT) FIRST NAME M.I. 2c. TITLE 2d. E-MAIL 2e. PHONE 2f.ADDRESS 2g. CITY 2h STATE 2i. ZIP CODE PART III - LEGAL OFFICER / CERTIFYING OFFICER INFORMATION *Will Sign Certificate of Authority* (For dredging must be an attorney,for all others must be corporate officer) *Cannot be same as Signatory* 3a. LAST NAME FIRST NAME M.I. 3b. TITLE 3c. E-MAIL 3d. PHONE 3e.ADDRESS 3f. CITY 3g. STATE 3h. ZIP CODE *Needed for Refund of$* PART IV- FINANCIAL CONTACT *Submit W9 and AOI* 4a. LAST NAME FIRST NAME M.I. 4b.TITLE 4c. E-MAIL 4d. PHONE 4e.ADDRESS 4f. CITY 4g. STATE 4h.ZIP CODE *W9 and AOI Must Match Business/Company Name in 1a.* PART V - PERMITTING 5a. Do you hold a current authorizing Regulatory document(i.e., Section 404, Section 10, Nationwide Yes No Permit(s)or Letter of Permission)for the requested activity? If"Yes", ATTACH COPIES of all permits and amendments. 5b. Have you applied for a regulatory permit for this action? Yes No 5c. SWG- - If"Yes"include permit#in box 5c *Regulatory Permit Number Entered Above*A us Army Corps saof Engineers SWG-RE Form 701 i August 2021 1 • *Must Submit Shapefiles, unless previously submitted* PART VI - PROJECT DESCRIPTION 6a. TYPE 6b. DREDGING 6c. PIPELINE 6d. DIGITAL MAPPING DATA Dredging New work n New works Specify the type of mapping data Pipeline Maintenances Replacement ❑ Yes No included: Construct Estimated Cubic Yards Crossing federal channel? El Google Earth Other GIS(.shp) (.kmz) ®these 6f. PREVIOUS OUTGRANT NUMBER(if applicable) PROPOSED START DATE: DACW64- - - ESTIMATED END DATE: 6g. Is this request related to a Federal project, such as deepening and widening a channel? If so,which one? What is the latitude and longitude(NAD 83 DMS)for both sides of the channel? Latitude: Lonsitude: Latitude: Lon.itude: 6h. SUMMARY OF PROJECT (Describe the project in its entirety. Do not limit the project summary to the area described in the regulatory permit. Include the placement areas that will be used, if applicable. Include all ingress, egress and temporary lay down areas.) *READ BELOW* PART VII REQUIRED DOCUMENTS Please include: IRS Form W9,Articles of Incorporation and GIS shapefiles.The TxRRC Form T-4 listing the name of the pipeline OWNER is required for all applicable pipelines.The IRS Form W9 and Articles of Incorporation must match the applicant information listed in Section la above. All required documents must be submitted electronically to our mailbox, SWGRE rausace.armv.mil. PART VIII - CERTIFICATION I HEREBY CERTIFY that I am of legal age and authorized to do business in the State of Texas. I have personally examined the information contained in this application and believe that the information submitted is correct to the best of my knowledge. NAME SIGNATURE DATE us Army Corps of Engineers. SWG-RE Form 701i August 2021 2 Part Ill - Legal Officer / Certifying I n st r u ct i o n s Officer Information SWG-RE Form 701 i For Legal Officer and Certifying Officer Part I - Business/Company Applicant requirements refer to notes which are Information applicable to your type of entity. la - The "Applicant" is the entity in whose Notes on Partnerships favor the transactional documents will be The signer will be required to furnish, for issued. Agent information should be entered filing with the outgrant, extracts from the in Part 2 of the form.The applicant may be as Partnership agreement, which indicates the follows: names of the general partners. In order to expedite the application, please include this • An Individual. Provide the legal name with the initial submission. In lieu of this of the individual. evidence, the signer may furnish a • An Individual Trading as a Firm or Doing Partnership Certificate, certifying that the Business Under a Firm or Trade Name. signer has authority to bind the partnership as follows: • A Partnership. The name of all the partners or the name of the partnership by I, (Partner X) certify that I am a General one partner who signs as one of the firm. Partner in the Partnership named as Grantee (see notes on Partnerships) the attached outgrant, I certify further that (Partner Y), who signed said outgrant on • A Corporation or Association. The name behalf of the Partnership, is also a General of the corporation and the name of the officer Partner and has the authority to bind the with official capacity signing on its behalf; Partnership by virtue of the powers vested in • State or local governmental entities. The him/her in the Partnership agreement. name of the entity and the name of the officer Notes on Corporations or Associations with official capacity signing on its behalf. The corporation seal will be affixed on the For pipeline applications the OWNER final outgrant documents prior to execution by should be placed in Part I, if there is no USACE. The signer will furnish, for filing additional agent the operator may be place with the outgrant, extracts from the articles of in Part II, (please note "operator" after incorporation (also known as Formation business name in block 2a). In cases where documents),the by-laws,or the minutes of the there is an agent and operator; please board of directors, duly certified by the provide operator information within the custodian of such records,under the corporate Summary of Project section(6f). seal (if there is one), which properly vest the Part II — Agent Information signer with authority to bind the corporation. In lieu of this evidence the grantee may furnish The agent of an Applicant cannot sign on a certificate signed by an appropriate corporate behalf of the Applicant. A signatory is officer, other than the person executing the typically a corporate officer. Funds outgrant, as follows: for payment of administrative fees or consideration will only be accepted from the Applicant. Agents may not make paymenton behalf of an Applicant. US Army caps of Engineers. SWG-RE Form 7011 August 2021 1 CORPORATE CERTIFICATE Part V - Regulatory Permits I(Name) certify that I am the (Secretary) of Regulatory Permits control the activities of the , Inc., that who signed the Applicant to be performed in the Waters of the foregoing instrument on behalf of the United States,including Wetlands,pursuant to corporation was then of the corporation. I applicable laws and regulations, such as further certify that the said officer was acting Section 10 of the Rivers and Harbor Act of within the scope of powers delegated to this 1899 and Section 404 of the Clean officer by the governing body of the corporation in executing said instrument. Water Act. The Real Estate Division cannot issue an outgrant without the applicant first Corporate Secretary or Appropriate Officer obtaining the proper regulatory permit. (AFFIX CORPORATE SEAL) Part VI- Project Description Notes on State or Local Governmental The project description is the most critical Entities part of the application. For a multi-faceted The signer will furnish, for filing with the project, please check all required activities outgrant, an extract from the minutes of the box 5a and complete boxes for corresponding activities. Provide a detailed entity indicating that the outgrant was approved by the governing body of the of description of the project and include GIS theentity and authorizing a named individual and/or CADD files with the application (see Cadastral Data and Format Requirements). to execute the outgrant on its behalf. In lieu The following sections detail additional of the minutes, the grantee may furnish a requirements for Dredging and Pipeline certificate signed by an appropriate official, activities: other than the person executing the outgrant, as follows: Dredging CERTIFICATE OF AUTHORITY Please provide complete scope of work along with maps showing the area to be dredged, I(Name) certify that I am the_(Clerk)_ of placement areas to be used and location or that who signed the foregoing alignment of temporary dredge pipelines. A instrument on behalf of the grantee was then hydrographic survey showing the area to be of . I further certify that the said dredged must also be submitted. officer was acting within the scope of powers 'List placement areas identified in Regulatory delegated to this governing body of the Permit in order of preference. grantee in executing said instrument. Part IV— Financial Contact •If both new and maintenance dredging are required please select new in the form and The financial contact is an individual who discuss maintenance portion within the project works for the same business/company as the description. applicant that will be handling the payment .Include detailed timelines for as well as and financial inquires for the administration completing line 6e of form. fee to process the outgrant. The financial POC should be able to answer questions Sediment Testing Requirement: Approval of regarding debtor/vendor information, Tax sediment testing plans and reports prior to ID or W9 issues, and address confirmation issuance of a Real Estate clearance is required of return payments. for all Applicants. Contact the Operations Division to obtain information on sediment testing requirements. Email: SWG- NB@usace.army.mil:phone: 409-766-3973. us Army Caps o[Engineers. SWG-RE Form 7011 August 2021 2 Pipelines than the site of the proposed action? Please provide a complete narrative of the Additionally,please address the following: project. The narrative should include the pipeline starting and ending points, route, • Are there any cultural resources known to channel crossings, tie-ins, valve stations, exist in the area?If so,what? access roads, ingress, egress, ROW needed, • Describe other reasonable alternative routes etc., for the pipeline. or locations considered and reasons not If available please submit: selected Note: Pipelines 24-inches in diameter or larger,which impact fee simple land owned • Railroad Commission of Texas Form by the United States require Congressional T-4 which identifies the pipeline OWNER. approval.Applicants should anticipant a delay in processing such outgrants. • Railroad commission of Texas PS-8000A Form Administrative Fees& Consideration • Geotechnical study Two types of funds are collected from applicants; administrative fees and If a pipeline crosses a Federal Channel, consideration. Administrative fees are paid Placement Area(s)or Placement Area Levee, in advance. Consideration is paid at the time Hurricane Levee, or Tributary waters of the the transactional documents are executed. United States, the Applicant must provide cross section diagrams depicting depth and Administrative fees. Title 10 U.S.C. 2695 entry and exit points for each crossing. authorizes the collection of the Applicants must also provide any and all administrative fees to cover the costs to the standoff distances between the pipeline and Government for processing requests for the any of the features listed above, including use of Government controlled property. other pipelines. Identify diameter of each These costs include but are not limited to pipeline, type of fuel or product being payment for work products such as transported, and pipeline configuration for environmental, cultural and historical each bundle. If there will be ground assessments, contract preparation, disturbance (e.g. trenching, excavation) determinations of value, and preparation of please address the following land surveys,maps, and legal descriptions. • What are the dimensions (i.e., length, After initial screening, the Realty Specialist width, depth) of each type of ground assigned to the application performs a scope disturbance (e.g., trench, fence post hole, of work analysis for the purpose of developing leveling, etc.)? an administrative fee cost estimate. Once a cost estimate is established an administrative • Will more than an acre of ground surface fee letter will be sent to the Applicant be disturbed?How much? requesting payment of administrative fees. • What kind of equipment will be used? Payment of administrative fees is required How will the work be done? before further work can occur. • Will access across Government controlled Upon notification, applicants are required to property in addition to the area identified for pay administrative fees within 45 days to the requested activity be required for avoid having their application cancelled for equipment?If so,where? lack of response. • Will there be a staging and/or storage areas required? If so, where are they located and what are their dimensions? Will staging/storage areas be at locations different us Army corps Bei of Engineers - SWG-RE Form 7011 August 2021 3 If a GIS shape file is provided, again the same Administrative fees must be remitted using applies about assigning a proper name either Electronic Funds Transfer (EFT) or sequence to describe that specific feature or it Automated Clearing House (ACH). Checks can also bedefined in the spatial data within the are no longer accepted as a form of shape file. payment. To help keep file sizes to the minimum If the actual administrative costs for imagery and USGS Quads do not need to be processing the application are greater than provided. the initial request the Applicant will be notified and required to pay the additional PERFERED PROJECTED amount for processing of the application to COORDINATE SYS 11,M continue. If excess funds exist at the time processing of the application is complete,the balance will be refunded to the Applicant. Datum:North American 1983 (SurveyFeet) Cadastral Data&Format Requirements Projection: State Plane Applicants must submit their GIS data in Zone: Use the appropriate zone either the equivalent or lesser version of the location of the project. following: AutoCAD 2020 (.dwg) or ESRI ArcMap 10.8.1 (.shp) file to help us in this Example: (Texas South Central Zone) endeavor. Upon receiving a design CADD or a GIS file we will better determined the location of projects interest and limits. We If you have any questions pertaining to ask that you please include the Regulatory cadastral requirements please contact Carlos Permit Tracking Number or Application Hidalgo at(409) 766-3169. Number and also indicate the coordinate system and datum that the drawing is currently in. The design data should consist of simple lines and polygons indicating the limits of the completed project. If a CADD drawing is provided, please ensure that all layers are properly named to describe that specific feature. If the layers are named using acronyms we would need a legend or shoe boxes with leader lines, identifying each feature class within the drawing. All areas must be created in real- world (model space) with an assigned coordinate system. Please do not send drawings with XREFs or reference files, simply insert all needed files or feature layers into one design file. Cut-sheet or plate layouts in CADD are not needed however, PDF's of proposed project plans and/or as- built would be greatly appreciated for further review. US Engi Armneersy Carps of SWG-RE Form 701 i August 2021 4