HomeMy WebLinkAboutPR 23128: SANITARY SEWER SYSTEM REHAB City of tifiort rt Texas INTEROFFICE MEMORANDUM WATER UTILITIES DEPARTMENT-ADMINISTRATION Date: April 27, 2023 To: The Honorable Mayor and City Council Through: Ronald Burton, City Manager From: Calvin Matthews, P.E., Water Utilities Director RE: PR No. 23128 — Sanitary Sewer System Rehabilitation Contract No. 1 Introduction: The intent of this Agenda Item is to seek Council's approval for the City Manager to execute a contract with King Solutions, Inc. of Houston, Texas for the pipebursting of sanitary sewer mains in Port Arthur. King Solutions submitted the lowest bid with a total projected budgetary impact of$1,419,884.00. Backjround: The wastewater collection system in Port Arthur is in need of rehabilitation and the Water Utilities Department wishes to enter into a contract with King Solutions, Inc. of Houston, Texas for the pipebursting of sanitary sewer mains. Budget Considerations: This project will be funded through Water Utilities Capital Improvement Fund and charged to Account No. 405-40-000-8516-00-00-000, Project No. WS-0016-CON. Recommendation: I recommend that City Council approve Proposed Resolution No. 23128 authorizing the execution of a contract with King Solutions, Inc. of Houston, Texas as described/outlined above. PR No. 23128 4/27/23 bw Page 1 of 3 RESOLUTION NO. A RESOLUTION AUTHORIZING THE CITY MANAGER TO EXECUTE A CONTRACT WITH KING SOLUTIONS OF HOUSTON, TEXAS, FOR THE PIPEBURSTING OF SANITARY SEWER MAINS IN PORT ARTHUR, TEXAS WITH A TOTAL PROJECTED BUDGETARY AMOUNT OF $1,419,884.00; FUNDING AVAILABLE IN ACCOUNT NO. 405-40-000-8516-00-00-000,PROJECT NO. WS0016-CON. WHEREAS, the City's sanitary sewer system needs rehabilitation and staff has recommended that the work be perform by contractors through competitive sealed bids; and, WHEREAS, pursuant to the Texas Local Government Code Chapter 252.043, (d-1), a contract for construction of a project described by Subsection (d) that requires an expenditure of $1.5 million or less may be awarded using the competitive sealed proposal procedure prescribed by Subchapter D, Chapter 2269, Government Code; and, WHEREAS, on March 11, 2023 and March 18, 2023, the Purchasing Division of the Finance Department advertised for bids for the sanitary sewer system rehabilitation and a total of three bids were received on April 14, 2023 (Exhibit"A"); and, WHEREAS, the Water Utilities Dept. reviewed the bids, and recommends awarding the contract to King Solutions of Houston, Texas who submitted the lowest responsive bid. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PORT ARTHUR: THAT,the facts and opinions in the preamble are true and correct; and, THAT,the City Manager of the City of Port Arthur is hereby authorized and directed to execute a contract with King Solutions, Inc. of Houston, Texas in substantially the same form attached hereto as Exhibit "B", for the sanitary sewer mains in Port Arthur, Texas with a total projected budgetary amount of$1,419,884.00; and, PR No. 23128 4/27/23 bw Page 2 of 2 THAT, said funding for this contract is being provided through Water Utilities Capital Improvement Fund 405-40-000-8516-00-00-000, Project No. WS0016-CON; and, THAT, a copy of the caption of this Resolution be spread upon the Minutes of the City Council. READ,ADOPTED AND APPROVED THIS day of , 2023 at a Regular Meeting of the City Council of the City of Port Arthur, Texas, by the following vote: AYES: Mayor ; Councilmembers ; NOES: Thurman Bill Bartie Mayor ATTEST: APPROVED AS TO FORM: Sherri Bellard Valecia Tizeno City Secretary City Attorney APPROVED FOR ADMINISTRATION: APPROVED FOR FUNDING: *CA.J\_ 00kA"----4 Ronald Burton Kandy Dan' 1 City Manage Finance Director ' `Ct CCQCA.1 - l Calvin Matthews, P.E. Clio on Williams, CPPB Water Utilities Director Purchasing Manager EXHIBIT "A" BID TABULATION WITH DESCRIPTIONS OF ITEMS) BID TABULATION SANITARY SEWER SYSTEM REHABILITATION CONTRACT NO.1 BID OPENING DATE:Thursday April 14,2023 @ 3:15 PM The Bid Proposals submitted have been reviewed and to the best of my knowledge this is an accurate tabu tion of the bids received. By: � - Dr.Hani Tohme,Golden Triangle Consulting Engineers Date:4/27/23 Horseshoe Construction,Inc. King Solutions Global Drilling ITEM NO. QTY DESCRIPTION La Porte,Texas Houston,Texas Winnie,Texas James Holt Mario Jaimes Baker Mohammad UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL Mobilization costs,including payment bond, performance bond,insurance,moving equipment ITEM NO.1 1 to project,and project sign,all in strict accordance $ 60,000.00 $ 60,000.00 $ 25,000.00 $ 25,000.00 $ 25,000.00 $ 25,000.00 with the plans and specifications;NOT TO EXCEED 4%of total project cost,for Rehabilitate 8"Diameter Sanitary Sewer Pipe by Pipe Bursting Using 8"SDR-17 HDPE Pipe, complete in place,all depths,including liner pipe, ITEM NO.2 5,884 connection to manholes,bypass pumping, $ 65.00 $ 382,460.00 $ 40.00 $ 235,360.00 $ 72.00 $ 423,648.00 cleaning,well points,surface restoration,testing and necessary appurtenances,all in strict accordance with plans and specifications for Rehabilitate 10"Diameter Sanitary Sewer Pipe by Pipe Bursting Using 10"SDR-17 HDPE Pipe, complete in place,all depths,including liner pipe, ITEM NO.3 4,580 connection to manholes,bypass pumping, $ 75.00 $ 343,500.00 $ 46.00 $ 210,680.00 $ 88.00 $ 403,040.00 cleaning,well points,surface restoration,testing and necessary appurtenances,all in strict accordance with plans and specifications for Rehabilitate 12"Diameter Sanitary Sewer Pipe by Pipe Bursting Using 12"SDR-17 HDPE Pipe, complete in place,all depths,including liner pipe, ITEM NO.4 1,474 connection to manholes,bypass pumping, $ 100.00 $ 147,400.00 $ 60.00 $ 88,440.00 $ 112.00 $ 165,088.00 cleaning,well points,surface restoration,testing and necessary appurtenances,all in strict accordance with plans and specifications for Rehabilitate 27"Diameter Sanitary Sewer Pipe by Pipe Bursting Using 30"SDR-17 HDPE Pipe, complete in place,all depths,including liner pipe, ITEM NO.5 915 connection to manholes,bypass pumping, $ 400.00 $ 366,000.00 $ 305.00 $ 279,075.00 $ 254.00 $ 232,410.00 cleaning,well points,surface restoration,testing and necessary appurtenances,all in strict accordance with plans and specifications for Furnish and Install 4"Sanitary Sewer Service Line (Short Side),to include tap on proposed sanitary sewer pipe,concrete cleanout box,cleanout, ITEM NO.6 341 connection to existing sanitary sewer service line, $ 1,000.00 $ 341,000.00 $ 720.00 $ 245,520.00 $ 1,700.00 $ 579,700.00 complete in place including tapping saddle, embedment,excavation,backfill,surface restoration and testing all in strict accordance with the plans and specifications for Fumish and Install 4"Sanitary Sewer Service Line (Long Side)to include tap on proposed sanitary sewer pipe,concrete cleanout box,cleanout, ITEM NO.7 15 connection to existing sanitary sewer service line, $ 1,500.00 $ 22,500.00 $ 1,050.00 $ 15,750.00 $ 1,800.00 $ 27,000.00 complete in place including tapping saddle, embedment,excavation,backfill,surface restoration and testing all in strict accordance with the plans and specifications for Post-Installation TV Inspection including all labor, ITEM NO.8 12,853 materials and equipment,all in strict accordance $ 2.00 $ 25,706.00 $ 3.00 $ 38,559.00 $ 7.00 $ 89,971.00 with the plans and specifications for Remove the Exiting Sanitary Manholes and Replace with reinforced Concrete Sanitary Sewer Manhole as Per Plans,complete in place, including excavation,cement stabilized sand ITEM NO.9 30 backfill,compaction,surface restoration, $ 8,000.00 $ 240,000.00 $ 8,900.00 $ 267,000.00 $ 7,200.00 $ 216,000.00 SuperCoverTM manhole ring and cover(or approved equal),water-tight connection of existing and proposed sanitary sewer lines,and testing,all in strict accordance with the plans and specifications for Furnish and Install end of Line Cleanout,complete in place,including excavation,cement stabilized ITEM NO.10 4 sand backfill,compaction,surface restoration, $ 2,200.00 $ 8,800.00 $ 1,500.00 $ 6,000.00 $ 2,800.00 $ 11,200.00 water-tight connection of proposed sanitary sewer lines,all in strict accordance with the plans and specifications for Provide a Trench Safety Plan and a Trench Safety ITEM NO.11 1 System,all in strict accordance with the plans and $ 10,000.00 $ 10,000.00 $ 8,500.00 $ 8,500.00 $ 5,200.00 $ 5,200.00 specifications for TOTAL $1,947,366.00 $1,419,884.00 $2,178,257.00 EXHIBIT "B" WILL BE PRESENTED AT OR BEFORE THE COUNCIL MEETING