HomeMy WebLinkAboutPR 15479: HAULING OF SOILS CONTRACTPUBLIC WORKS DEPARTMENT
COUNCIL ACTION MEMO
TO Stephen B. Fitzgibbons, City Manager
FROM .Ross E. Blackketter, P.E., Director of Public Works
SUBJECT P.R. #15479 -Providing and Hauling of Soils Contract
DATE Ol September 2009
RECOMMENDATION:
It is recommended that the City Council approve Proposed Resolution No. 15479,
authorizing an annual contract for the hauling of Hot-Mix Asphaltic Concrete (HMAC) to J.
M. Kaufman of Port Arthur, Texas. This service will be provided on an AS-NEEDED
BASIS.
BACKGROUND:
This is an annual contract for the hauling of materials for the Public Works Department and
other City departments. Historically, the City landfill, the Streets Division, and Parks
Department have been the major users of this service.
The Purchasing Division advertised on this contract in the Port Arthur News on July 5 and
July 12, 2009. Bids were opened on July 22, 2009 with four (4) eligible bids being received
(see attached bid tabulation). The bid from 1. M. Kaufman was found to be the lowest and
most responsive for hauling HMAC, as follows:
J. M. Kaufman of Port Arthur. Texas
ITEM
NO. ITEM UNIT UNIT
COST Contractor
Soils Delivered Within
the Ci of Port Arthur
1 Fill sand CY 4.40 Redwine
2 60/40 CY 4.40 Redwine
3 Ga CY $3.72 Redwine
4 To soil CY $6.00 Mid Coun
Soils Picked Up by City
of Port Arthur Trucks
1 Fill sand CY $1.85 Redwine
2 60/40 CY $1.85 Redwine
3 Cla CY $1.50 Redwine
4 To soil CY 3.00 Mid Coun
Haulin of Materials Full Partial
1 Limestone TON $4.25 Neg. Carla's Transport
2 HMAC T e Mat TON #5.50 $8.00 ]. M. Kaufman
3 Cement-stabilized Sand TON $4.25 Neg. Carla's Transport
4 Concrete Debris TON $4.50 Neg. Carla's Transport
30-min Wart Time HR $55.00 ]. M. Kaufman
Z:\engineer\Documer~\Contrads\Soils and Hauling\Kaufrnan CAM-04.doc
* NOTE: Previously, this contract was awarded to a single contractor. Due to the
number and variety of bids, these contracts will be awarded to different contractors in
different resolutions.
These bids were reviewed by the Public Works staff and Purchasing Manager, and are
considered to be the fair market value for this service and in line with past costs. The
contractor is not guaranteed any minimum amount of work under this contract.
BUDGETARY/FISCAL EFFECT:
Funds are provided in the Public Works Budget and other departmental budgets.
EMPLOYEE/STAFF EFFECT:
Acceptance of this recommendation will have no effect on staffing levels at this time.
SUMMARY
It is recommended that the City Council approve Proposed Resolution No. 15479,
authorizing an annual contract for the hauling of materials (HMAC) to J. M. Kaufman of Port
Arthur, Texas. This service will be provided on an AS-NEEDED BASIS.
~=t1~~
Ross E. Blackketter, P.E.
Director of Public Works
REB/reb
Z:\engineer\Documents\Contracts\Sals and Hauling\Kaufman CAM-09.doc 2
P.R. No. 15479
08/28/09 reb
RESOLUTION NO.
A RESOLUTION AUTHORIZING THE MAYOR AND CITY MANAGER
TO EXECUTE THE FIRST YEAR OF A CONTRACT WITH J. M.
KAUFMAN OF PORT ARTHUR, TEXAS FOR THE HAULING OF
MATERIALS WITH THE OPTION OF RENEWAL FOR TWO
ADDITIONAL YEARS WITH PRICES BEING ADJUSTED
ACCORDING TO THE TRANSPORTATION CONSUMER PRICE
INDEX. FUNDING IS AVAILABLE IN VARIOUS PUBLIC WORKS
ACCOUNTS.
WHEREAS, the City advertised for bids for hauling of materials on July 5, 2009 and July
12, 2009 ;and,
WHEREAS, four (4) bids were received; and,
WHEREAS, ]. M. Kaufman was the lowest responsive bidder for hauling of Hot-Mix
Asphaltic Concrete (HMAC), see attached exhibit °A"; now, therefore,
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PORT ARTHUR:
THAT, the City Manager is hereby authorized to execute the first year of a contract
attached hereto as Exhibit °B" for the hauling of materials (HMAC) with the option of renewal
for two additional years with J. M. Kaufman of Port Arthur, Texas with each subsequent year's
price adjusted according to the transportation Consumer Price Index; and,
THAT, funding is available in the FY2009/2010 Public Works Budget,and,
THAT, James Kaufman of J. M. Kaufman shall sign this resolution agreeing to the terms
thereof; and,
THAT a copy of the caption of this Resolution be spread upon the Minutes of the City
Council.
P.R. No. 15479
Page 2
READ, ADOPTED AND APPROVED this the day of
2009 at a
Ayes: Mayor:
A.D.
meeting of the City of Port Arthur, Texas by the following vote:
Attest:
City Secretary
APPROVED AS TO FORM:
rzwi ,
CIty Attorney
APPROVED FOR ADMINISTRATION:
Stephen B. Ftrgibbons
City Manager
®--~ ~~.
Ross E. Blackketter, P.E.
Director of Public Works
AGREED T0:
James Kaufman
J. M. Kaufman
Mayor
APPROVED AS TO AVAILABILITY OF
FUNDS:
Deborah Echols, CPA
Director of Fnance
Shawna Tubbs
Purchasing Manager
Z:\engineer\Documents\Contracts\Soils and Hauling\PR15479.doc
EXHIBIT A
City of
f CITY OF PORT ARTI3UR TEXAS
re=as Bid Tabulation
EXCAVATING AND HAULING OF MATERIALS
B"a o
~ emn Date: Jul 22, 2009
Names of Bidders
Mid County
Item #
UOM
Descri lio Carla's Transport Materials and Redwine
n
Delivered within the City of Port Arthur Services Inc. Construction J.M. Kaufman Enter rises
A. incluain Sabine Pass
1. C Fill Sand $8.50 $6.25 $S.SO $4
40
2. C 60/40 $8.50 $6.00 $S.SO .
$4
40
3. C Cla $8.50 $5.40 $S.2S .
$3
72
4. C To Soil $12.00 $6.00 $13.00 .
$9.90
B. Picked U At Plant Location
I. C Fill Sand $3.50 $3.50 $3.00 $1
85
2. C 60/40 $3.50 $3.00 $3.00 .
$1.85
3. C Cla $3.50 $2.75 $2.80 $1.50
4. C To Soil $6.50 $3.00: $10.00 $7.00
Res onse to load material re uest
3 Hours
30 minutes or 1 Hour
24 Hours Same Day if
Possible
Hwy 36S & 8700 Industrial Circle
Location of Prima Borrnw Pit West Port Arthur Road FM 365, PA FI 69 Hw 69 DD7
Hwy 365,4.3 miles N.
Location of Seconda Borrow Pit - of I-10, Fannett Hw 73 Pattilo Koad
Location Port Arthur, TX Nederland, TX Port Arthur, TX Port Arthur, TX
Page 1 oft
CITY OF PORT ARTHUR TEXAS
Bid Tabulation
EXCAVATING AND HAULING OF MATERIALS
Bid Opening Date: July 22, 2009
Names of Bidders
Mid County
Item Carla's Transport Materials and. Redwine
# UOM Descri tion Services Inc. Construction J.M. Kaufman F,nter rises
C.
Haulin of Materials
Full Load Partial
.Load
Full Load Partial
Load
Eull Load. Partial
Load
Full Load. Partial
Load
L C Limestone $4.25 Ne otiable $ti.25 $8.75 $5.50 $8.00. $7.48 -
2. C HMAC e material $6.75 Ne otiable $6.75 $9.25 $5.50 $8.00. $8.18 -
3. C Cement Stabilized Sand $4.25 Ne otiable $6.75 _
$9.25. $5.50 $8.00. $7.48 -
4. C Concrete Debris $4.50 Ne otiable $6.25 $8.75 $7.00 $10.00 ' $8.1 R -
Equipment and drivers/operators will
be made available 12 hours or 1 da 2 hours - _
Hourly charge for waiting time for
D. ick-u or delive $55 er/hr $60 er/hr $55 er/hr $68 er/hr
8700 bidustrial 3100 Commerce
Location of haulin a ui ment Beaumont/Port Arthur Circle Port Arthur Port Arthur
TX -
,
Shawna T urchasing Manager
~~~~[~
Date
Page 2 of 2
EXHIBIT B
CONTRACT FOR HAULING OF MATERIALS
THIS AGREEMENT, made this 08"' day of Seiotember , 2009, by
and between the City of Port Arthur, a municipal corporation organized under the
laws of the State of Texas, hereinafter called "OWNER" or "CITY" and
J. M. Kaufman a(n) Individual herein acting
Individual, firm, partner~ip, or corporation
by and through James Kaufman hereinafter called "CONTRACTOR".
WITNESSETI-I: That, for and in consideration of, the payment terms, conditions,
and agreements set forth herein, OWNER and CONTRACTOR agree as follows:
1. The term of this Contract shall be from 08 September 2009 to 08 September
2010. It shall be renewable by mutual agreement for two (2) additional one-
year periods. Prices quoted for the first year of the contrect shall be firm, and
shall be indexed for the next two (2) years using the Consumer Price Index
category "Transportation". Each subsequent yearly contract renewal shall
require approval of the City Council.
2. During the term of this Contract, the CONTRACTOR will furnish at his own
expense all of the materials, supplies, tools, equipment, labor, and other services
necessary to connection therewith, excepting those supplies specifically not
required of CONTRACTOR in the Specifications.
3. The CONTRACTOR agrees to perform all the work described in the
Specifications and contract documents and comply with the terms therein for unit
prices as stated below:
HAULING OF MATERIALS
Item Unit Cost
Full Partial
HMAC $ 5.50/TON $ 8.00/TON
Z:\engineer\Documents\Soils and Hauling\Kaufman Hauling Contract-09.doc
WAIT TIME (greater than 30 minutes)
Item
30 minute wait
Unit Cost
$ 55.00/HR
(wait time shall be paid in 15-minute increments after the first 30
minutes)
4. The term "Contract Documents" means and included the following:
(A) Agreement
(B) Advertisement for Bids
(C) General Information
(D) Specifications
(E) Bid
(F) Bidder's Information Sheet
5. This Agreement shall be binding upon all parties hereto and their respective
heirs, executors, administrators, successors, and assigns.
6. IN WITNESS WHEREOF, the parties hereto have executed, or caused to be
executed by their duly authorized officials, the Agreement in two (2) copies, each
of which shall be deemed_an_original on the date first above written.
OWNER
BY:
CONTRACTOR
BY:
City Manager
Stephen B. Fitrgibbons
Printed Name
James Kaufman
Printed Name
Z:\engineer\Documents\Soils and Hauling\Kaufman Hauling Contract-09.doc
DELORIS "BOBBIE^ PRIIVCE, MAYOR
ELIZABETH "LIZ" SEGLER, MAYOR PRO TEM
COUNCIL MEMBERS:
JACK CHATMAN, JR.
MORRIS ALBRIGHT, III
MARTIN FLOOD
JOHN BEARD, JR
ROBERT E. WII.LiAMSON
D. KAY W[SE
THOMAS J.HENDERSON
July 6, 2009
Ciry of
,../~ gnlr\ /~
ort~rthn
Texas
INVITATION TO BID
EXCAVATING AND HAULING OF MATERIALS
TERRI HANKS
CTTY SECRETARY
MARK T. SOKOLOW
CTTY ATTOILNEY
DEADLINE: Sealed Bid submittals must be received and time stamped by 3:00 P.M., Central
Standard Time, Wednesday, July 22, 2009. (The clock located in the City Secretary's office
will be the official time.) All qualifications received will be read aloud at 3:15 P.M. on
Wednesday, July 22, 2009 in the City Council Chambers, City Hail, 5"' Floor, Port Arthur, TX.
MARK ENVELOPE: EXCAVATING
DELIVERY ADDRESS: Please submit two (2) complete copies of your bid to:
CITY OF PORT ARTHUR
CITY SECRETARY
-°~- P.O. BOX 1089
PORT ARTHUR, TEXAS 77641
POINTS OF CONTACT:
CTTY OF PORT ARTHUR
CTfY SECRETARY
444 4TH STREET, 4a' Floor
PORT ARTHUR, TEXAS 77640
Questions concerning the Invitation to Bid should be directed to:
City of Port Arthur, TX
Shawna Tubbs, Purchasing Manager
P.O. Box 1089
Port Arthur, TX 77641
409.983.8160
ShawnaCa~,portarthur.net
Questions concerning the Scone of Work should be directed to:
City of Port Arthur, TX
Ross Blackketter, Director of Public Works
P.O. Box 1089
Port Arthur, TX 77641
409.983.8180
rblackketter(cr~,nortarthur.net
STEPHEN FITZGII3BON5
CITY MANAGER
Page 1 of 15
The enclosed INVITATION TO BID (ITB) and accompanying GENERAL INSTRUCTIONS,
CONDITIONS SPECIFICATIONS, are for your convenience in submitting bids for the enclosed
referenced services for the City of Port Arthur.
Bids must be signed by a person having authority to bind the firm in a contract. Bids shall be
placed in a sealed envelope, with the Vendor's name and address in the upper left-hand corner of
the envelope.
ALL BIDS MUST BE RECENED IN THE CITY SECRETARY'S OFFICE BEFORE
OPENING DATE AND TIME. It is the sole responsibility of the firm to ensure that the sealed
ITB submittal azrives at the above location by specified deadline regazdless of delivery method
chosen by the firm. Faxed or electronically transmitted ITB submittals will not be accepted
Shawna Tubbs
Purchasing Manager
Page 2 of 15
CITY OF PORT ARTHUR
GENERAL INFORMATION:
NOTE: It is extremely important that the Vendor, Bidder, and/or Contractor furnish the
City of Port Arthur the required information specified in Bid or Proposal Specifications
listed in this Bid Package.
The intent of this INVITATION TO BID (ITB) is to provide bidders with sufficient information
to prepare SEALED BIDS IN DUPLICATE for famishing: EXCAVATING AND HAULING
OF MATERIALS
Bids must be in a sealed envelope addressed to the City Secretary, City of Port Arthur, P.O. Box
1089, Port Arthur, Texas 77641. Bids shall be received no later than 3:00 P.M..Wednesday, July
22, 2009. Bids received after the closing time specified will be returned to the bidder unopened
and claims of mail delays will not constitute an exception. Bid proposal MUST BE SIGNED
BY BIDDER
All bids meeting the intent of this request for bid will be considered for awazd. BIDDERS
TAKING EXCEPTION TO THE SPECIFICATIONS, OR OFFERING SUBSTITUTIONS,
SHALL STATE THESE EXCEPTIONS BY ATTACHMENT AS PART OF THE BID. The
absence of such a list shall indicate that the bidder has not taken exceptions and the City shall
hold the bidder responsible to perform in strict accordance with the specifications of the
invitation. The City reserves the right to accept any and all or none of the
exception(s)/substitutions(s) deemed to be in the best interest of the City of Port Arthur.
Bids cannot be altered or amended after submission deadline. Any interlineations, alteration, or
erasure made before opening time must be initialed by the signer of the bid, guazanteeing
authenticity.
The City reserves the right to:
1. Reject any and all bids and to make no awazd if it deems such action to be in
its best interest.
2. Awazd bids on the lump sum or unit price basis, whichever is in the best
interest of the City.
3. Reject any or all bids and to waive informalities or defects in bids or to accept
such bids as it shall deem to be in the best interests of the City.
4. Awazd bids to bidders whose principal place of business is in the City of Port
Arthur and whose bid is within 5% of the lowest bid price.
The awazd shall be made to the responsible vendor(s) whose bid is determined to be lowest offer,
taking into consideration the relative importance of price, conformance to specifications and
capability and experience of the contractor.
Page 3 of 15
TERMINOLOGY: "Bid" vs. "Proposal"--For the purpose of this ITB, the terms "Bid" and
Proposal" shall be equivalent.
Bidders aze cautioned to read the information contained in this ITB carefully and to submit a
complete response to all requirements and questions as directed.
CONFLICT OF INTEREST: No public official shall have interest in this contract, in
accordance with Vernon's Texas Code Annotated, Local Government Code Title 5, Subtitle C,
Chapter 171.
ETHICS: The bidder shall not offer or accept gifts or anything of value nor enter into any
business arrangement with any employee, official or agent of the City of Port Arthur.
MINIMUM STANDARDS FOR RESPONSIIiLE PROSPECTIVE BH)DERS: A
prospective bidder must affirmatively demonstrate bidder's responsibility. A prospective bidder
must meet the following requirements:
1. Be able to comply with the required or proposed delivery schedule.
2. Have a satisfactory record of performance.
3. Have a satisfactory record of integrity and ethics.
4. Be otherwise qualified and eligible to receive an awazd.
5. Be engaged in a full time business and can assume liabilities for any performance or
warranty service required.
6. The City Council shall not awazd a contract to a company that is in arrears in its
obligations to the City.
7. No payments shall be made to any person of public moneys under any contract by
the City with such person until such person has paid all obligations and debts
owed to the City, or has made satisfactory arrangements to pay the same.
Any interpretations, corrections or changes to the ITB and Specifications will be made by
addenda. Sole issuing authority of addenda shall be vested in the City of Port Arthur Purchasing
Manager. Addenda will be mailed to all who are known to have received a copy of the ITB.
Offeror's shall acknowledge receipt of all addenda.
riuive:ireu. YLAC:E OF BUSINESS: The official business address (office location and office
personnel) shall be a Port Arthur address, the principal storage place or facility for the equipment
shall be in Port Arthur and/or the place of domicile for the principal business owner(s) shall be in
Port Arthur or such other definition or interpretation as is provided by state law.
PRICES: The bidder should show in the proposal both the unit price and total amount, where
required, of each item listed. In the event of error or discrepancy in the mathemafics, the unit
price shall prevail.
PURCHASE ORDER: A purchase order(s) shall be generated by the City of Port Arthur to the
successful bidder. The purchase order number must appear on all itemized invoices.
Page 4 of 15
INVOICES: All invoices shall be mailed directly to the City of Port Arthur, Attn.: Public
Works, P. O. Box 1089, Port Arthur, Texas 77641.
PAYMENT: Payment will be made upon receipt of the original invoice and the acceptance of
the goods or services by the City of Port Arthur.
SALES TAX: The City of Port Arthur is exempt by law from payment of Texas Sales Tax and
Federal Excise Tax; therefore the proposal shall not include Sales Tax.
VENUE: This agreement will be governed and construed according to the laws of the State of
Texas. This agreement is performable in Port Arthur, Texas, Jefferson County.
COMPLIANCE WITH LAWS: The Contractor shall comply with all applicable laws,
ordinances, rules, orders, regulations and codes of the federal, state and local governments
relating to performance of work herein.
INTEREST OF MEMBERS OF CITY: No member of the governing body of the City, and no
other officer, employee or agent of the City who exercises any functions or responsibilities in
connection with the planning and cazrying out of the program, shall have any personal financial
interest, direct or indirect, in this Contract; and, the Contractor shall take appropriate steps to
assure compliance.
DELINQUENT PAYMENTS DUE CITY: The City of Port Arthur Code of Ordinances
prohibits the City from granting any license, privilege or paying money to any-one owing
delinquent taxes, paving assessments or any money to the City until such debts are paid or until
satisfactory arrangements for payment has been made. Bidders must complete and sign the
AFFIDAVIT included as part of this ITB.
CONTRACT: The following will comprise the contract between the City and the successful
bidder:
1. Agreement
2. Advertisement for Bids
3. Addenda
4. GeneralInfom~ation
5. Specifications
6. Bid
7. Notice of Awazd
8. Notice to Proceed
QUANTTTIES: Quantities shown aze estimated, based on projected use. It is specifically
understood and agreed that these quantities are approximate and any additional quantities will be
paid for at the quoted price. It is further understood that the contractor shall not have any claim
against the City of Part Arthur for quantities less than the estimated amount.
All bids will remain in effect for one year.
Page 5 of 15
SHIPPING INFORMATION: All bids aze to be F.O.B., City of Port Arthur, Port Arthur,
Texas 77640.
INCORPORATION OF PROVISIONS REQUIRED BY LAW: Each provision and clause
required by law to be inserted into the Contract shall be deemed to be enacted herein and the
Contract shall be read and enforced as though each were included herein. If, through mistake or
otherwise, any such provision is not inserted or is not correctly inserted the Contract shall be
amended to make such insertion on application by either party.
CONTRACTOR'S OBLIGATIONS: The Contractor shall and will, in good workmanlike
manner, perform all work and famish all supplies and materials, machinery, equipment, facilities
and means, except as herein otherwise expressly specified, necessary or proper to perform and
complete all the work required by this Contract, in accordance with the provisions of this
Contract and said specifications.
The appazent silence of these specifications as to any detail or to the appazent omission from it of
a detailed description concerning any point shall be regazded as meaning that only the best
commercial practices aze to prevail.
While the purpose of the specifications is to indicate minimum requirements in the way of
capability, performance, construction, and other details, its use is not intended to deprive the City
of Port Arthur the option of selecting goods which may be considered more suitable for the
purpose involved.
In the event of conflicts between the written bid proposal and information obtained verbally, the
vendor is specifically advised that the written bid proposal will prevail in the determination of
the successful bidder.
Uader the Title VI of the Civil Rights Act of 1964, no person shall, on the grounds of race, color,
or national origin, be excluded from participation in, be denied the benefits of, or be subjected to
discrimination under any program or activity receiving Federal financial assistance.
TERMINATION FOR CAUSE: If, through any cause, the Contractor shall fail to fulfill in a
timely and proper manner his obligations under this contract, or if the Contractor shall violate
any of the covenants, agreements or stipulations of this contract, the City shall thereupon have
the right to terminate this contract by giving written notice to the Contractor of such termination
and specifying the effective date thereof, at least fifteen (15) days before the effective date of
such termination. Notwithstanding the above, the Contractor shall not be relieved of liability to
the City for damages sustained by the City by virtue of any breach of the contract by the
Contractor, and the City may withhold any payments to the Contractor for the purpose of set-off
until such time as the exact amount of damages due the City from the Contractor is determined.
TERMINATION FOR CONVENIENCE: The City may terminate this contract at any time
giving at least thirty (30) days notice in writing to the Contractor. If the Contract is terminated
by the City as provided herein, the Contractor will be paid for the service that it has performed
Page 6 of IS
up to the termination date. If this contract is terminated due to fault of the Contractor, the
previous paragraph hereof relative to termination shall apply.
EXPERIENCE & CAPABILITY: Bidder shall include the following information to describe
the experience and capability factors of the company:
1. Number of years in operation.
2. Largest project currently in effect with a business.
3. Number of employees currently employed, their job titles, and their job descriptions.
4. Equipment currently owned or leased by your company.
5. Be otherwise qualified and eligible to receive an award.
6. Other wmpanies that you contracted with.
7. If a company wants to receive the award for more than one group, the company must show
that it has the equipment and employees to handle more than one group.
RELEASES AND RECEIPTS: The City of Port Arthur before making payments may require
the Contractor to famish releases or receipts for any or all persons performing work and
supplying material or service to the Contractor, or any sub-contractors for work under this
contract, if this is deemed necessary to protect its interests.
CARE OF WORK: The Contractor shall be responsible for all damages to person or property
that occurs as a result of his fault or negligence in connection with the work perfonned until
completion and final acceptance by the City.
SUB-CONTRACTS: The Contractor shall not execute an agreement with any sub-contractor or
permit any sub-contractor to perform any work included in this Contract until he has received
from the City of Port Arthur written approval of such agreement.
INSURANCE: All insurance must be written by an insurer licensed to conduct business in the
State of Texas, unless otherwise permitted by Owner. The Contract shall, at his own expense,
purchase, maintain and keep in force insurance that will protect against injury and/or damages
which may arise out of or result from operations under this contract, whether the operations be
by himself or by any subcontractor or by anyone directly or indirectly employed by any of them,
or by anyone for whose acts any of them maybe liable, of the following types and limits
Commercial General Liability oceusence type insurance City of Port Arthur, its
officers, agents, and employees must be named as an additional insured):
a. Bodily injury $500,000 single limit per occurrence or $500,000 each
person/$500,000 per occurrence for contracts of $100,000 or less; or
Bodily injury $1,000,000 single limit ger occurrence or $500,000 each
person /$1,000,000 per occuaence for contracts in excess of $100,000; and,
b. Property Damage $100,000 per occurrence regardless of contract amount; and,
Page 7 of 15
c. Minimum aggregate policy yeaz limit of $1,000,000 for contracts of
$100,000 or less; or, Minimum aggregate policy year limit of $2,000,000
for contracts in excess of $100,000.
z• Commercial Automobile Liability Insurance (including owned, non-owned and
hired vehicles coverage's).
a. Minimum combined single limit of $500,000 per occurrence, for bodily
injury and property damage.
b. If individual limits aze provided, minimum limits aze $300,000 per person,
$500,000 per occurrence for bodily injury and $100,000 per occurrence for
property damage.
Contractor shall cause Contractor's insurance company or insurance agent to fill in all
information required (including names of insurance agency, contractor and insurance companies,
and policy numbers, effective dates and expiration dates} and to date and sign and do all other
things necessary to complete and make into valid certificates of insurance and pertaining to the
above listed items, and before commencing any of the work and within the time otherwise
specified, Contractor shall file wmpleted certificates of insurance with the Owner.
None of the provisions in said certificate of insurance should be altered or modified in any
respect except as herein expressly authorized. Said CERTIFICATE OF INSURANCE Form
should contain a provision that coverage afforded under the policies will not be altered, modified
or canceled unless at least fifteen (15) days prior written notice has been given to the City of Port
Arthur. Contractor shall also file with the City of Port Arthur valid CERTIFICATE OF
INSURANCE on like form from or for all Subcontractors and showing the Subcontractor (s) as
the Insured. Said completed CERTIFICATE OF INSURANCE Form (s) shall in any event be
Sled with the City of Port Arthur not more than ten (10) days after execution of this Contract.
NOTICE TO PROCEED: Notice to Proceed shall be issued within ten (10) days of the
execution of the Contract by OWNER. Should there be any reasons why Notice to Proceed
cannot be issued within such period, the time may be extended by mutual agreement between
OWNER and CONTRACTOR.
CELL PHONE OR PAGER: The Contractor must have a working cell phone or pager
available Monday through Friday from 8:00 a.m. to 5:00 p.m. so that the City will be able to
contact the contractor.
Page 8 of IS
GENERAL CONDITIONS
(AS APPLICABLE)
SUCCESSFUL BIDDE OR BIDDERS must agree to enter into a contract with the City of
Port Arthur. This Contract will terminate approximately one (1) year from date of execution.
There aze two (2) additional one (1) yeaz renewal periods. prices quoted for the first year of the
contract shall be firm, and shall be indexed for the next two (2) years using the Consumer Price
Index category "Transportation". It will be necessary for the City to secure a letter fi-om the
vendor agreeing to renew the awazd for each additional yeaz.
Successful bidder shall agree to provide the City with material safety data sheets (MSDS) for
hazazdous chemical containing products or a statement of exemption.
All material shall be able to pass Texas Department of Transportation Material Specification
Laboratory test and successful bidder must provide test verification on request to the City.
Measurement of material shall be by applicable units per various items as set out in the bid
schedule.
Payment of material shall be by applicable bid price per unit and any additional change as set out
in the bid schedule.
All items shall meet the Texas Department of Transportation standazd specifications for
Construction of Highways, Streets, and Bridges, Item S20 "Weighing and Measuring
Equipment".
Delivery shall be in the most economical manner to job sites or the City's stockpile in Port
Arthur. The City's Operation Center on Highway 73 is considered the City stockpile area. All
delivery chazges shall be included in bid price.
City reserves the right to change vendor for any delay or down-time associated with delivery of
material.
All vendors shall be able to supply and deliver all materials ordered as laid out by these
specifications.
Page 9 of 1S
CITY OF PORT ARTHUR TEXAS
SPECIFICATIONS FOR EXCAVATING AND HAULING OF MATERIALS
Bidder shall provide services to the City on an AS-NEEDED basis at the rates bid.
2. Bidder shall supply all necessary equipment complete with operators, and inclusive of all
fuel, maintenance and other usual chazges.
3• If the contracted vendor is unable to meet the City's required delivery schedule,
depending on urgency of need, the City reserves the right to use an alternate vendor.
4. The City reserves the right to use its own trucks for hauling from Bidder's source of soils
and to haul other materials as may be advantageous to the City.
5. Dump trucks provided by Bidder shall not be less than 12 cubic yard capacity nor more
than 14 cubic yazd capacity.
6• Excavation of soils by Bidder may take place in the Drainage District No. 7's (DD #7)
borrow pit west of Highway 69 and south of Jimmy Johnson Boulevazd. Excavation
from this pit will be done at DD#7's schedule of borrow pit operation. Road to borrow
pit will be maintained by City or DD#7. Bidder must be in possession of an Excavation
Permit from DD#7 and have the required insurance that names DD#7 and the City as
additional insured. PROOF OF SUCH PERMIT AND INSURANCE MUST BE
SUBMTI°TED WITH BH).
7• Clay material from DD#Ts pit will usually be hauled to the City's landfill on Highway
73 west of Taylor's Bayou or occasionally to other City project job sites. 60/40 sand and
top-soil shall be hauled to various City project sites, including those in the Sabine Pass
azea. No up-chazge will be accepted for hauling to Sabine Pass
8• Limestone, hot mix asphaltic concrete type material, cement-stabilized sand, shall be
hauled from other Vendor's point of supply in the Golden Triangle area to various City
project job sites, including those in the Sabine Pass area. No up-charge will be accepted
for hauling to or from Sabine Pass.
9• Concrete debris such as concrete curb and gutter sections shall be hauled from City
project job sites to Pleasure Island and dumped in azeas along the canal bank adjacent to
T. B. Ellison Pazkway from the Martin Luther King Bridge to Pleasure Pier Boulevazd, or
along 25'" Street at the Motiva fresh water reservoir.
Page 10 of 15
CITY OF PORT ARTHUR, TEXAS
BID PROPOSAL PAGE
BID OPENING DATE: JULY 22.2009
PROPOSAL FOR FURNISHING: EXCAVATING AND HAULING OF MATERIALS
The undersigned
City/Town of doing business in the
General Instruction, Conditions, and Specifications, the fol owing p oposal for~o~ry with the
OUTLINE OF BID DATA:
A.
ITEM # DESC_ gI_
I Fill Sand
2 60/40
3 Clay
4 Top Soil
B• PICKED UP AT PLANT LOCATION:
ITEM # DES_-
I Fill Sand
2 60/40
3 Clay
4 Top Soil
$_
Stock-pile material shall be available on those days borrow pit in inaccessible.
Vendor will respond to load material request within
minutes or hours.
LOCATION OF PRIMARY BORROW PIT:
LOCATION OR SECONDARY BORROW PIT:
BID AMOUNT
CY
$ CY
CY
$ CY
BID AMOUNT
CY
CY
$~_ CY
CY
Page I1 of IS
C. HAULING OF MATERIALS FULL LOAD PARTIAL LOAD
1 Limestone
2 HMAC type material
3 Cement Stabilized Sand
4 Concrete Debris
TON $
TON $
TON $
TON
TON
TON
TON
Equipment and drivers/operators will be made available
of request for hauling services. hours or _ days after receipt
D. HOURLY CHARGE FOR WAITING TIME FOR PICK-UP OR DELIVERY
First 30 minutes after arrival will be at no chazge if truck is loaded or unloaded within that time
period. If the truck is not loaded or unloaded within the fast 30 minutes of arrival at plant or .
jobsite, waiting will be paid from time of arrival, the fast 30 minutes waiting time being chazged
at $ /hr. and waiting time thereafter being chazged at the same rate in 15 minute
increments.
LOCATION OF HAULING EQUIPMENT;
The City reserves the right to awazd the bid by class of work, or the entire bid to one (1)
responsible bidder. Bids shall be good for sixty (60) days from date of bid opening.
Receipt of addenda is acknowledged:
Number Dated Received
COMPANY NAME STREET ADDRESS
SIGNATURE OF BIDDER P. O. BOX
(PRINT OR TYPE NAME) CTTy
TITLE AREA CODE
$ TON
STATE ZIP
TELEPHONE NO.
Page ]2 of 15
BID OPENING DATE: Jaly 22.2009
CITY OF PORT ARTHUR
INSTRUCTIONS TO BIDDER
Bidders are requested to furnish their complete REMIT TO ADDRESS and
TAX IDENTIFICATION NUMBER as indicated below:
REiVIIT PAYMENT TO•
COMPANY
ADDRESS
CITY/STATE/ZIP
SEND PURCHASE ORDER TO•
COMPANY
ADDRESS
CITY/STATE/ZIP
TAX IDENTIFICATION NUMBER
Page 13 of 15
AFFIDAVIT
All pages in the offeror's bid proposal containing statements, letters, etc.
shall be signed by a duly authorized officer of the company, whose
signature is binding on the bid proposal.
The undersigned offers and agrees to one of the following:
I hereby certify that I do not have outstanding debts with the
City of Port Arthur. Further, I agree to pay succeeding debts
as they become due during this agreement.
I hereby certify that I do have outstanding debts with the
City of Port Arthur and agree to pay said debts prior to
execution of this agreement. I further agee to pay succeeding debts
as they become due.
I hereby certify that I do have outstanding debts with the
City of Port Arthur and agree to enter into an agreement for
the payment of said debts. I further agree to pay succeeding
debts as they become due.
NAME OF OFFEROR:
TITLE
ADDRESS
CTTY/STATE/ZIP
TELEPHONE NUMBER
SIGNATURE
STATE
COUNTY
SUBSCRIBED AND SWORN to before me by the above named
on this the
day of 20
Notary Public
RETURN THIS AFFIDAVIT AS PART OF THE BID PROPOSAL
Page 14 of 15
CONFLICT OF INTEREST QUESTIONNAIRE
CIQ
For Vendor or other person doing business with local govemmentat entity
changes made to
Leg.,
FORM
This questionnaire is being filed in accordance with Chapter 176, Local Government Code by a person who has a business
relationship as defined by Section 176.001 (1-a) with a local governmental entity and the person meets requirements under
Section 176.006 (a).
By law this questionnare must be 51ed with the records administrator of the local governmental entity not later than the 7'" busi
after the date the person bewmes awaze of facts that require the statement to be filed See Section 176.006, Local Government
A person wmmits an offense if the person knowingly violates Section 176.006, Local Government Code. An offense under this
is a Class C misdemeanor.
1. Name of person who has a business relationship with local governmental entity.
2 ^ Check thts box tf you are filing an update to a prenously filed queshonnatra
(The law requires that you file an updated completed questionnaire with the appropriate filing authority not later than 7'"
day after the date the originally filed questionnaire becomes incomplete or inaccurate.)
3. Name of local a government officer wtth whom filer has employment or
Name of Officer
This section (item 3 including subparts A, B, C, & D) must be completed for each officer with whom the filer has an employment
or outer business relationship as defined by Section 176.001 (1-a), Local Government Code. Attach additional pages to this Form
CIQ as necessary.
A. Is the local government officer named in this section receiving or likely to receive taxable income, other than investment
income, from the filer of the questionnaire?
Yes ~ No
B. Is the filer of the questionnare receiving or likely to receive taxable income, other than investment income, from the Sler
quesdonnave?
Yes ~ No
C. Is the filer of this questionnaire employed by a corporafion or other
^ ~'es ^ No
D. Describe each employment or business relationship with the local government officer named in this section.
Page 15 of 15
Gn„j ~' CITY OF PORT ARTHUR, TEXAS
~! ..
ra:~
ADDENDUM NO.ONE (I)
DATE: JULY 20, 2009
PUBLIC WORKS DEPARTMENT
Bid Proposal For: Excavating & Hauling of Materials
The following clarifications, amendments, deletions, additions, revision and/or
modifications aze made a part of the contract documents and change the original
documents only in the manner and to the extent hereinafter stated and shall be
incorporated in the contract documents.
Provisions of this addendum shall take precedence over requirements of the original
wntract documents and all BIDDERS ARE REQUESTED TO ACKNOWLEDGE
SAID PROVISIONS IN THE SUBMISSION OF THEII2 BID.
On page 10 number 5 should read as follows:
Dump trucks provided by Bidder shall be at a minimum of 12 cubic yard capacity
(there shall be no maximum).
Notes:
• Should you have any questions please feel free to contact Ross Blackketter,
Public Works Director at (409)-983-8]80.
7
Shawna Tubbs, Purchasing Manager
4..
CITY OF PORT ARTHUR, TEXAS
BH) PROPOSAL PAGE
BID OPENING DATE: JULY 22, 2009
PROPOSAL FOR FURNISHING: EXCAVATING AND HAULING OF MATERIALS
The undersigned ..-~ Vim- T~ +~'~}'J"~~- doing business in the
City/Town of a.-~ ~1,: l'e rt-e submits, herewith, in conformity with the
Ge/nleral Ins(truction,rConditions, and Specifications, the following proposal for L yc jw,ai ,„,.~ '
OUTLINE OF BID DATA:
A. DELIVERED WITHIN THE CITY OF PORT ARTHUR (includine Sabine Passl
ITEM # DESCRIPTION. BID AMOUNT
5 5~
1 Fill Sand $~~Cy
2 60/40 $ 5 o'~CY
,5 z
3 Clay $ {n-~/~~`Cy .
4 Top Soil $ ~ 3= GO CY
B. PICKED UP AT PLANT LOCATION:
ITEM # DESCRIPTION
1 Fill Sand
2 60/40
3 Clay
4 Top Soii
BH) AMOUNT
$ 3.Op CY
$ 3. t7 o CY
$ Z. o~ CY
$ f~= oa CY
Stock-pile material shall be available on those days borrow pit in inaccessible.
Vendor will respond to load material request within minutes or ~ hours.
LOCATION OF PRIMARY BORROW PIT: ~ w ~/ (~ q
LOCATION OR SECONDARY BORROW PIT: N ~ ~ 73
Page 11 of 15
S
C. HAULING OF MATERIALS
1 Limestone
2 HMAC type material
3 Cement Stabilized Sand
PARTIAL LOAD
$ g °- TON
$~'_ TON
$ ~ '` TON
4 Concrete Debris $ ~] e~ TON $ ~ O TON
Equipment and drivers/operators will be made available hours or _ days after receipt
of request for hauling services.
D. HOURLY CHARGE FOR WAITING TIME FOR PICK-UP OR DELIVERY
First 30 minutes after arrival will be of no chazge if truck is loaded or unloaded within that time
period. If the truck is not loaded or unloaded within the first 30 minutes of arrival at plant or .
jobsite, waiting will be paid from time of arrival, the first 30 minutes waiting time being chazged
at $ ~~ /hr. and waiting time thereafter being chazged at the same rate in 15 minute
increments.
LOCATION OF HAULING EQUIPMENT: ~ F O C~ C o M~ e r c e ~P~. l x 776~z
The City reserves the right to awazd the bid by class of work, o; the entire bid to one (1)
responsible bidder. Bids shall be good for sixty (60) days from date of bid opening.
Receipt of addenda is acknowledged:
Number
COMPANY NAME
'NATURE OF BIDD
(PRINT OR TYPE NAME)
FULL LOAD
$ ~ ~d TON
$ ~ ~' TON
~ TON
Received
_~.~o ~~ rev
STREET ADDRESS
~.T /'t r/Vita-~ ~~-~ 77~P~'Z
CITY STATE ZIP
~(,c9YV~~" 4th ~/~S ~-~d~
TITLE AREA CODE TELEPHONE N0.
Page 12 of IS
BID OPENING DATE: Julv 22, 2009
CITY OF PORT ARTHUR
INSTRUCTIONS TO BIDDER
Bidders are requested to furnish their complete REMIT TO ADDRESS and
TAX IDENTIFICATION NUMBER as indicated below:
RENIIT PAYMENT TO: r
COMPANY .-~ ~ ~~~TM A-~~
ADDRESS 7 ~ ~ ~ ~ ~ ~ C
CITY/STATE/ZIP O~-'t t"~L~~U^ 1 -2~e4~ `~7 (~ c~ `~
SEND PURCHASE ORDEpR TO: J
COMPANY ,-/ ,[>~ , `1 ~EL;~`~ yV} /tw
ADDRESS _ 7 ~C7 ~~ ~. U ~
CITY/STATE/ZIP ~ ~ J-{ti 1 v~-~'"' ~~~C ~
7~~ ~
TAX IDENTIFICATION NUMBER ~Z (~v - 7' (S ~ ~~5~
Page 13 of 15
AFFIDAVIT
All pages in the offeror's bid proposal containing statements, letters, etc.
shall be signed by a duly authorized officer of the company, whose
signature is binding on the bid proposal.
The undersigted offers and agrees to one of the following:-
~ I hereby certify that I do not have outstanding debts with the
City of Port Arthur. Further, I agree to pay succeeding debts
as they become due during this agreement.
I hereby certify that I do have outstanding debts with the
City of Port Arthur. and agree to pay said debts prior to
execution of this ageement. I further agree to pay succeeding debts
as they become due.
I hereby certify that I do have outstanding debts with the
City of Port Arthur and agree to enter into an agreement for
the payment of said debts. I further agree to pay succeeding
debts as they become due. , j
NAME OF OFFEROR: ~ {~,-vu.ES' fG ~_
TITLE t~ W F~f 1~
ADDRESS ~]`ZUji-°`" (~,il L~
CITY/STATE/ZIP ' P¢?., ~- ~-e.-~~lv-- f~ ~C~d:S '~''~ c~ `Z
TELEPHONE NUMBER ~/ ~/~s - ¢~ p(p
SIGNATU
STATE
COUNTY
S BSCRIBED AND SWORN to before me by the a ove n~ned Ja~~
~~ on this the Rd
day of , 20~.
~°
Notary Public
RETURN THIS AFFIDAVIT AS PART OF THE BID PROPOSAL
ntCeon c Cotter
*®* Nougi Rtlo
Page 14 of 15 EfAk ~ lt]GE
~a~ ~tomnF.~.Ja1t20R
CONFLICT OF INTEREST QUESTIONNAIRE FORivI
CIQ
For Vendor or other person doing business with local governmental entity
This questionnaire reflects changes made to the law by H.B. 1491, 80 Leg., Regular Session. -
This questionnaire is being filed in accordance with Chapter 176, Local Govemment Cade by a person who has a business
relationship as defined by Section 176.001 (I-a) with a local governmental entity and the person meets requirements under
Section 176.006 (a).
By law this questioanaire must be filed with the records administrator of the local governmental entity not later than the T" busines
after the date the person becomes awaze of facts that require the statement to be filed. See Section 176.006, Local Government Cod
A person commits an offense if the person knowingly violates Section 176.006. Local Government Code. An offense under this sec
is a Class C misdemeanor. -
1. Name of person who has a business relationship with local governmental entity.
2. ^ Check this box if you are filing an update to a previously filed questionnaire.
(The law requires that you file an updated completed questionnaire with the appropriate filing authority not later than T°
day after the date the originally filed questionnaire becomes incomplete or inaccurate.)
3. Name of local a government officer with whom filer Las employment or business relaflonship.
Name of Officer
This section (item 3 including subparts A, B, C, & D) must be completed for each officer with whom the filer has an employment
or other business relationship as defined by Section 176.001 (1-a), Local Government Code. Attach additional pages to this Form
CIQ as necessary.
A. Is the local government officer named in this section receiving or likely to receive taxable income, other than investment
income, from the filer of the questioanaue?
Yes ~ No
B. Is the filer of the questionnaire receiving or likely to receive taxable income, other than investment income, from the filer
questionnaire?
Yes ~ No
C. Is the filer of this questionnaire employed by a corporation or other
^ Yes ^ No
D. Describe each employment or business relationship with the local government officer named in this section.
Page IS of 15