HomeMy WebLinkAboutPR 23005: RATIFICATION OF SEWER MAIN EMERGENCY REPAIR ON ORANGE AVE. AT GULFWAY DR. nrt rthuur
INTEROFFICE MEMORANDUM
Date: May 9, 2023
To: The Honorable Mayor and City Council
Through: Ronald Burton, City Manager
From: Calvin Matthews, P.E., Water Utilities Director
RE: PR 23005 —Ratification of Sewer Main Emergency Repair on Orange Avenue
at Gulfway Drive
Introduction:
The intent of this Agenda Item is for the City Council to ratify the emergency repair of the 12"
sewer main on Orange Avenue at Gulfway Drive (State Highway 87). The condition of the
sewer pipe created a situation that would cause damage to the highway and present a danger to
the citizens if not taken care of.
Background:
The 12" sewer main on Orange Avenue which crosses Gulfway Drive (State Highway 87) was
in need of urgent repair, to prevent the situation from worsening, causing sanitary sewer
backup in residences and damage to the highway. On February 23, 2023, the City Manager
signed an emergency memo, authorizing the repair. The original estimate for the repairs was
$50,000.00, but due to the complications found after excavating, additional work was required.
Global Drilling, Inc. of Winnie, Texas was called to make the repairs.
Budget Impact:
The total budgetary impact is $186,700.00 and funding is available in Account No. 405-40-
000-8516-00-00-000, Project No. WS0016-CON.
Recommendation:
It is recommended that City Council approve Proposed Resolution No. 23005, ratifying the
emergency repair of the 12" sewer main as described/outlined above.
"Remember, we are here to serve the Citizens of Port Arthur"
PR No. 23005
5/9/23 bw
Page 1 of 3
RESOLUTION NO.
A RESOLUTION RATIFYING THE CITY MANAGER'S
DECISION TO AUTHORIZE THE EMERGENCY REPAIR
TO THE SEWER MAIN ON ORANGE AVENUE AT
GULFWAY DRIVE (STATE HIGHWAY 87), FOR THE
TOTAL NOT TO EXCEED AMOUNT OF $186,700.00
FROM WATER UTILITIES ACCOUNT NO. 405-40-000-
8516-00-00-000, PROJECT NO. WS0016-CON.
WHEREAS,the sewer main on Orange Avenue at Gulfway Drive(State Highway 87)was
in need of urgent repair, to prevent the situation from worsening, causing sanitary sewer backup
in residences and damage to the highway; and,
WHEREAS,on February 23,2023,the City Manager signed an emergency memo(Exhibit
"A"), authorizing the repair by Global Drilling, Inc. of Winnie, Texas; and,
WHEREAS, the original estimate for the repairs was $50,000.00, but due to the
complications found after excavating, additional work was required; and,
WHEREAS,pursuant to Section 252.022(a)(1),this procurement is necessary to
preserve or protect the public health or safety of the municipality's residents; and,
WHEREAS, it is authorized pursuant to Section 252.022(a)(3) of the local government
code because of the unforeseen damage to public machinery, equipment, or other property.
NOW THEREFORE,BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY
OF PORT ARTHUR:
THAT, the facts and opinions in the preamble are true and correct; and,
THAT, City Council hereby ratifies the City Manager's decision to authorize the
emergency repairs for the total not to exceed amount of$186,700.00 (Invoice attached as Exhibit
"B") from Account No. 405-40-000-8516-00-00-000,Project No. WS0016-CON; and,
PR No. 23005
5/9/23 bw
Page 2 of 3
THAT, a copy of the caption of this Resolution shall be spread upon the Minutes of the
Meeting of the City Council.
READ, ADOPTED, AND APPROVED this day of , 2023
at a Regular Meeting of the City Council of the City of Port Arthur, Texas by the following vote:
AYES: Mayor
Councilmembers:
NOES:
Thurman Bill Bartie
Mayor
ATTEST:
Sherri Bellard
City Secretary
APPROVED AS TO FORM:
Valecia Tizeno
City Attorney
II
I
PR No. 23005
5/9/23 bw
Page 3 of 3
APPROVED FOR ADMINISTRATION:
Ronald Burton Calvin Matthews, P.E.
City Manager Water Utilities Director
APPROVED AS TO THE AVAILABILITY
OF FUNDS:
4CAlN.4),,. loei(lre
Kandy Daniel C fton Williams, CPPB "
Finance Director Purchasing Manager
Exhibit "A"
Girt of
1i
on rtltu —
Tt't�lc
INTEROFFICE MEMORANDUM
Date: February 23, 2023
To: Ronald Burton, City Manager
From: Calvin Matthews, P.E., Water Utilities Director
RE: Approval for Emergency Repair to Sewer Main under Gulfway at Orange Ave.
A sewer main under Gulfway near Orange Avenue is in need of immediate repair to prevent
damage to the highway and sanitary sewer backup in residential homes.
Emergency approval is requested of the City Manager to hire a contractor to assist in repairs of
12" sanitary sewer line and approve the purchase of materials for this repair.
A labor cost of$36,000 is estimated for the installation of City-supplied materials. The City-
supplied materials that need to be purchased total approximately $14,000.00. A proposed
resolution will be presented to City Council for ratification.
I, Ronald Burton, hereby approve the emergency repair of the sewer main under Gulfway at
Orange Ave.
t1iPtli
Ronal• :urton
City Manager
,
"Remember, we are here to serve the Citizens of Port Arthur"
Exhibit "B"
■ ,yr�^� GLOBAL DRILLING,INC.
GL■ t0,B A L 44994 Interstate 10 Winnie,Texas 77665,USA
i`./J T:+1 800 956 8720;E:info@globaldrillingequipment.com,
ORR LING, INC. w:www.alobaldrillinaequipment.com
INVOICE
Date:
Attn: ACCOUNTING May 8,2023
Port Arthur. TX 77641
Ref.No. :
Project Location:Orange Avenue Intersecting Gulfway Drive, Port Arthur Texas PA2022-006
COMPLETED WORK
ITEM
TOTAL
NO. DESCRIPTION UNIT _ _ _ __.... _ UNIT PRICE TOTAL PRICE REMARKS
Or( TOTAL TO
% PREVIOUS
DATE
I REHABILITATION OF 12"SEWER PIPES 1 LS 100.0096 1 186,700.00 186,700.00
1 -Mobilization of manpower,equipment,project signs ■
2 -Conducted Horizontal Directional Drilling works
2.1 Cleaning the blocked existing line from Manhole# _______________________________________________________________________________________
2 to#3
-Cleaning the existing line from manhole to#2 ■■'■--
Replacement/Installation of 12"Sewer pipes
-Furnish and Install 4-units of Concrete Sewer
Manholes including excavation,concrete liners,
dewatering,shoring,backfilling,compaction,surface
restoration,Manhole Rings and Covers111
4 -
Connection of existing/completed sewer lines to new . ■Manholes ---
5 -Installation of 2-units of 6"Gate Valves _---
6 -
All other necessary works associated to complete the ■ ■works ----
.............
TOTAL DUE:
186,700.00
Terms and Conditions:
AS PER SUBCONTRACT NO.22-300
Amount in Words(US Dollars):One Hundred Eighty Six Thousand Seven Hundred Only
For:
GLOBAL DRILLING,INC.
Mr.BAKER MOHAMMAD
Page I of I
Daily Site Report
Project: Rehabilitate 8"Diameter Sanitary Sewer Pipe by Date: March 22,2023(Wednesday)
Pipe Bursting Using 8"SDR-17 HDPE Pipe Weather: Cloudy/Fair
Location: Sabine Pass.Port Arthur Texas 77655
Description of Work Completed: Start Finish Comment
[Time] [Time]
••
Mobilized in new location in Port Arthur 3:00AM 10:00AM
2 Fusion machine and Bobcat Excavtor were delivered on site 10:00AM 10:30AM
3 Fuse the 12"HDPE pipes-240' 10:30AM 7:00PM
DRILLING DETAILS:
Crossing Reference No.: TODAY(Feet) PREVIOUS(Feet) TOTAL(Feet)
-Orange Avenue intersecting Gulfway
Drive
MATERIALS PERSONNEL.
CONSUMABLES Name From: Tc Total No of Hours
FUEL(L) Daniel Cuellar 3:00AM
OIL(L) Vicente Zecca 8:00AM 7:00PM
PIPE(Type)-(Ft) 240'-12"HDPE
Others
EQUIPMENT:
TYPE Hire Date Hours Used COMMENTS:
Fusion Machine 22-Mar 7.5
Bobcat E26 Excavator 22-Mar
SITE SUPERVISOR DANIEL CUELLAR
Comments:
NOTED BY:
03-22-Daily Site Report-Port Arthur
Daily Site Report GLOBAL
DRILLING.INC-
Project:
Project: Rehabilitate 8"Diameter Sanitary Sewer Pipe by Date: March 23,2023(Thursday)
Pipe Bursting Using 8"SDR-17 HDPE Pipe Weather: Cloudy/Fair
Location. Sabine Pass,Port Arthur Texas 77655
Description of Work Completed: Start Finish Comment
[Time] [Time]
1 Fuse 200'of 12"HDPE Pipe 8:00AM 5:00PM Short of 1-Pipe.Will deliver tomorrow.March
24
2 • Locate Existing Lines:water fiber optic and gas lines 10:00AM 10:30AM
3 CAT 315 Rubber Crawler Excavator and Traffic Control Sign Boards were delivered on site 12:00PM 1:00PM
4
DRILLING DETAILS:
Crossing Reference No.: TODAY(Feet) PREVIOUS(Feet) TOTAL(Feet)
-Orange Avenue intersecting Gultway
Once
MATERIALS• PERSONNEL•
CONSUMABLES Name: From. To: Total No of Hours
FUEL(L) Daniel Cuellar 7:30AM 5:30PM
OIL(L) Vicente Zecca 7:30AM 5:30PM
PIPE(Type)-(Ft) 200'-12"HDPE Jesse Martinez 7:30AM 5:30PM
Others
EQUIPMENT
TYPE Hire Date Hours Used COMMENTS:
Fusion Machine 22-Mar 15.5
Bobcat E26 Excavator 22-Mar
CAT 315 Crawler Excavator 23-Mar
SITE SUPERVISOR: DANIEL CUELLAR
Comments:
NOTED BY
03-23-Daily Site Report-Port Arthur
.' ' .''.. ,''''..., . ..i. ',-7, '....,......„....
a rry x
•
y�ss
N.
tn� /
� l
.
f
..a
41111
--z'.e ii.
03-23-Daily Site Report-Port Arthur
Daily Site Report CLBAL
GRILLING.INC
Project: Rehabilitate 8"Diameter Sanitary Sewer Pipe by Date: March 24,2023(Friday)
Pipe Bursting Using 8"SDR-17 HDPE Pipe Weather: Sunny/Fair
Location: Sabine Pass.Port Arthur Texas 77655
Description of Work Completed: Start Finish Comment
[Time] [Time]
1 2 Loads of Caliche Sand were delivered on site 8:OOAM 10:00AM
2 Fuse additional 20'of 12'HDPE Pipe(Port Arthur delivered last night) 7:30AM 10:00AM
3 Excavation for Dnving and Receiving Pits 10:00PM 5:30PM
4
5
DRILLING DETAILS:
Crossing Reference No.: TODAY(Feet) PREVIOUS(Feet) TOTAL(Feet)
-Orange Avenue intersecting Gulfway
Drive
MATERIALS PERSONNEL
CONSUMABLES Name: From. To: Total No of Hours
FUEL(L) Daniel Cuellar 7:30AM 5:30PM
OIL(L) Jesse Martinez 7:30AM 5:30PM
PIPE(Type)-(Ft) 20'-12"HDPE Gabriel 7.30AM 5:30PM
Others
EQUIPMENT
TYPE Hire Date Hours Used COMMENTS:
Fusion Machine 22-Mar
Bobcat E26 Excavator 22-Mar
CAT 315 Crawler Excavator 23-Mar
Vermeer D24x40 HDD Machine 24-Mar
SITE SUPERVISOR DAME_CiELL-+v
Comments:
NOTED BY
03-24-Daily Site Report-Port Arthur
Daily Site Report GL ,BAL
DRILLING.INC.
Project: Rehabilitate 8"Diameter Sanitary Sewer Pipe by Date: March 25,2023(Saturday)
Pipe Bursting Using 8"SDR-17 HDPE Pipe Weather: Sunny/Fair
Location: Sabine Pass,Port Arthur Texas 77655
Description of Work Completed: [StartTime] Fi[Tnish
Comment
Excavation for Driving and Receiving Pits 8:00AM 1:00AM While Excavating in Orange Street,the
Operator hit the Gas Line that was not Marked
Texas Gas came on site and fix the gas line 1:30PM 3:00PM
3 Fruc Truck came to pump the sewer line 11:00AM 3:00PM
Surveyor came on-site 11:00AM 2:00PM
Finished 380'by Horizontal Directional Drilling 1:00PM 5:00PM
Installation of Reamer in Hirectional Drilling Machine 5:00PM 6:30PM
DRILLING DETAILS:
Crossing Reference No.: TODAY(Feet) PREVIOUS(Feet) TOTAL(Feet)
-Orange Avenue intersecting Guifwav
Drive
MATERIALS: PERSONNEL:
CONSUMABLES Name From: To Total No of Hours
FUEL(L) Daniel Cuellar 6:30AM 6:30PM
OIL(L) Jesse Martinez 6:30AM 6:30PM
PIPE(Type)-(Ft) Gabriel 6:30AM 6:30PM
Others HDD Machine Operator 6:30AM 6:30PM
Plus 5 Labours/Helpers 6:30AM 6:30PM
EQUIPMENT
TYPE Hire Date Hours Used COMMENTS:
Fusion Machine 22-Mar
Bobcat E26 Excavator 22-Mar
CAT 315 Crawler Excavator 23-Mar
Vermeer D24x40 HDD Machine 24-Mar
Fruc Truck 25-Mar
Trailer 25-Mar
SITE SUPERVISOR: DANIEL CUELLAR
Comments:
NOTED BY
03-25-Daily Site Report-Port Arthur
S
kt
Illk
of ## a•;
n _
.s
z
a
,
s� a
_
, . P:' . , .. .
r
r
...� +... y+ .r.. .,' s=rrt b
03-25-Daily Site Report-Port Arthur
Daily Site Report GL Q BAL
fRI[LING_INC
Project: Rehabilitate 8"Diameter Sanitary Sewer Pipe by Date: March 26,2023(Sunday)
Pipe Bursting Using 8"SDR•17 HDPE Pipe Weather: Cloudy i Fair
Location. Sabine Pass.Port Arthur Texas 77655
Description of Work Completed: Start Finish Comment
[Time] [Time]
Completed installing the 380'of 12"HDPE Pipe 7:00AM 1:00AM
Backfilling of ramps made for Directional Drilling Machine 3:00PM 6:30PM
3 Excavation for new manholes 1 00AM 6:30PM
DRILLING DETAILS:
Crossing Reference No.: TODAY(Feet) PREVIOUS(Feet) TOTAL(Feet)
-Orange Avenue intersecting Gulfway 380 Drive
MATERIALS: PERSONNEL
CONSUMABLES Name From: To: Total No of Hours
FUEL(L) Daniel Cuellar 7:00AM 6:30PM
OIL(L) Jesse Martinez 7:00AM 6:30PM
PIPE(Type)-(Ft) 380'HDPE HDD Machine Operator 7:00AM 6:30PM
Others Plus 5 Labours Helpers 7:00AM 6:30PM
EQUIPMENT:
TYPE Hire Date Hours Used COMMENTS:
Fusion Machine 22-Mar
Bobcat E26 Excavator 22-Mar
CAT 315 Crawler Excavator 23-Mar
Vermeer D24x40 HDD Machine 24-Mar
Fruc Truck 25-Mar
Water Truck 25-Mar
Trailer 25-Mar
SITE SUPERVISOR: DANIEL CUELLAR
Comments:
NOTED BY:
03-26-Daily Site Report-Port Arthur
-Ati .:-',------...--'-•:, •.---;-..L------- ' -*1ST:, --e*.i.--1- ,. .:,..,. .,,
•.'..e4r14\ctI"' '''' • •'.',-._.•.-.,,..,'„, ,. r7='; ---: . -- •.„:-. -:.-'s---.. ...
- -- -• • • .-, .,Ir.,7-.,-;..-:...... .:- - .' . .-..-.'-.•'''''-. -. ..... , .„..,..._ „
„IS* --'•:7'.--,=,..-'4.14..,,..;?....,....,,,!--e,'. , -,,, .1,- ' - --ri - •-•-'-
,........•
, -
,-.-.::-.;' -.. --.., ----,-,-',_;._.•-, „.-• :- - -. .i,..-_. ' --• --------------• • - ,
........,-,....... . „.. .
. ,.....„
, -- -
,. •,
, i .4, • '
-.,,,- .„: A---,- . -' - , .,••. . . .
• - --k, 4' - ti - !' - - . - .4.,
- - .
•
., .,
, .
... . . - -• '
, .
_ ..
,..... ,..
. .. ,...,-... , ..,
. . ,
.,_...„,. .......
.,.... _ . . „.
' ',•_.--,--•-7-4-',,,- - ._ . _ . ., _ •, .-- •- ...- -s.. ,.s„, :.,,••-•,-,--, ,t•-•-is.-- -•-- ••'-i- ' .-..-±7,_:-.,-.1,.....,..„. , i . • - - -s---•-•4'
. .,,..,
. ,
. ..
' -:•,...4-...444_•. •,-" ;„:.'el* ."-'17--•,- * -I-- ,',..a,:.-",i1-‘,4; - . •'-'- -
1 '''6-6,-•-------:=,i4.'''?„-.--.1,7;_4 ,..*' • •°*--- ,-!• .,•-•,. . . ' ."-Ir-'-' 44=-.1•--;!-;f--.5-',';•-•4; ----', -`""'.
L .. ..„ ,; ,.. ;._._ ,4-..',.•-•-ii•-*:4-,..--,.---";--,...
S--; *' - - - • . , ., . , .
- ° - - •=.4.,
-- :;'•-' 44 , : .- ' *-- - •=- • kia :- ---4;- .-•-../#47,4 : - -,•-'4:''''..1,- : - 'f* ... ...'.;•t.:-.'44.,„-- ." . - .;!..".. •=4,- ,..... .... .......„ . , .. .„/ • . - . - -
.. i,.•: ..
- .
• - ....; '-'.P;'-:*• -'!•- -. --' t -4-' '.-- '.k ''''' '%' * .-'.52-4:: •-•-4, - • '• :44 -'
- -‘...-
• . ' . .
-..-
. - -
„.•'-.,„.--- -4 . -,. - .‘ '. 4 :-,„...4...ff...7, ,,--.-- •\,,,,.. s s .
-..,,... ,_. .. ......... .
--..---,-.--.-: . :-.-..•''.' `•••
e* -.4,-,, ' .,:,--••• -f,' • -_,,;.v, • I. 2:',„--- ..-- ,--, .. .
. •
, . .
*
. •
'.k
"- . . .
'* *-- ,! ,-,'-'1,....!
...:-..
. , .--. ..„.
- -
. ..1-
. .*,-r--'-;',:vre...$,--i'..•-„,,o,Pe-..-;-76--e.--...-..z:;,..R...-1-.1„0,--.,--,,-i., -........__ .- - . , .. ,
- ,
.- - .......,... ,
.,-
, . . .
03-26-Daily Site Report-Port Arthur
Daily Site Report CL 8AL
DRILLING.INC,
Project: Rehabilitate 8"Diameter Sanitary Sewer Pipe by Date: March 27,2023(Monday)
Pipe Bursting Using 8"SDR-17 HDPE Pipe Weather: Cloudy i Fair
Location: Sabine Pass,Port Arthur Texas 77655
Description of Work Completed. Start Finish Comment
[Time] [Time]
Receive the Steel Plate 1-00PM 1:00PM
Clean the mud on the road 1:00PM 4:30PM
3
DRILLING DETAILS:
Crossing Reference No.: TODAY(Feet) PREVIOUS(Feet) TOTAL(Feet)
-Orange Avenue intersecting Gulfway
Drive
MATERIALS: PERSONNEL:
CONSUMABLES Name: From To Total No of Hours
FUEL(L) Daniel Cuellar __ _ _°(I
OIL(L)
PIPE(Type)-(Ft)
Others
EQUIPMENT:
TYPE Hire Date Hours Used COMMENTS:
Bobcat E26 Excavator 22-Mar
CAT 315 Crawler Excavator 23-Mar
SITE SUPERVISOR DANIEL CUELLAR
Comments:
NOTED BY
03-27-Daily Site Report-Port Arthur
Project: Rehabilitate 8"Diameter Sanitary Sewer Pipe by Date: March 29,2023(Wednesday)
Pipe Bursting Using 8"SDR-17 HDPE Pipe Weather: Cloudy then Raining
Location:Orange Avenue Intersecting Gulfway Drive
Start Finish
Description of Work Completed: Comment
[Time] [Time]
1 Vacummed Manhole#1 8:00AM 12:00PM
2 -Then started raining all day
3
4
5
DRILLING DETAILS:
Crossing Reference No.: TODAY(Feet) PREVIOUS(Feet) TOTAL(Feet)
-Orange Avenue intersecting Gulfway
Drive
MATERIALS: PERSONNEL:
CONSUMABLES Name: From: To: Total No of Hours
FUEL(L) Daniel Cuellar 8:00AM 6:00PM
OIL(L) Troy Cuellar 8:00AM 6:00PM
PIPE(Type)-(Ft) Jesse Martinez 8:00AM 6:00PM
Others
EQUIPMENT:
TYPE Hire Date Hours Used COMMENTS:
Bobcat E26 Excavator 22-Mar
CAT 315 Crawler Excavator 23-Mar
4pcs-ROAD PLATE,8X10',1" 27-Mar
8pcs-1.5'52"-88"HYDRAULIC 27-Mar
SHORE
8pcs-VERTICAL SHORE 24" 27-Mar
CYLINDER E
5 GAL.PLASTIC HAND PUMP 27-Mar
48"RELEASE TOOL 27-Mar
SITE SUPERVISOR: DANIEL CUELLAR
Comments:
NOTED BY:
03-29-Daily Site Report-Port Arthur
GLeBAL
IR]LwillG INC
Project: Rehabilitate 8"Diameter Sanitary Sewer Pipe by Date: March 30,2023(Thursday)
Pipe Bursting Using 8"SDR-17 HDPE Pipe Weather: Cloudy/Clear
Location:Orange Avenue Intersecting Gulfway Drive
Description of Work Completed: Start Finish Comment
[Time] [Time]
1 Undugged Manhole#1 to Manhole#2 7:30AM 7:00PM
2
3
4
5
DRILLING DETAILS:
Crossing Reference No.: TODAY(Feet) PREVIOUS(Feet) TOTAL(Feet)
-Orange Avenue intersecting Gulfway
Drive
MATERIALS: PERSONNEL:
CONSUMABLES Name: From: To: Total No of Hours
FUEL(L) Daniel Cuellar 7:30AM 7:00PM
OIL(L) Tor Cuellar 7:30AM 7:00PM
PIPE(Type)-(Ft) Jesse Martinez 7:30AM 7:00PM
Others
EQUIPMENT:
TYPE Hire Date Hours Used COMMENTS:
Bobcat E26 Excavator 22-Mar
CAT 315 Crawler Excavator 23-Mar
4pcs-ROAD PLATE,8X10',1" 27-Mar
8pcs-1.5'52"-88"HYDRAULIC 27-Mar
SHORE
8pcs-VERTICAL SHORE 24" 27-Mar
CYLINDER E
5 GAL.PLASTIC HAND PUMP 27-Mar
48"RELEASE TOOL 27-Mar
SITE SUPERVISOR: DANIEL CUELLAR
Comments:
NOTED BY:
03-30-Daily Site Report-Port Arthur
Project: Rehabilitate 8"Diameter Sanitary Sewer Pipe by Date: April 4,2023(Tuesday)
Pipe Bursting Using 8"SDR-17 HDPE Pipe Weather: Cloudy/Clear
Location:Orange Avenue Intersecting Gulfway Drive
Description of Work Completed: Start Finish Comment
[Time] [Time]
1 Installed Manhole#2,its fiberglass manual cut into elevation 7:00AM 7:OOPM
2 Backfilling for Manhole#2
3
4
5
DRILLING DETAILS:
Crossing Reference No.: TODAY(Feet) PREVIOUS(Feet) TOTAL(Feet)
Orange Avenue intersecting Gulfway
Drive
MATERIALS: PERSONNEL:
CONSUMABLES Name: From: To: Total No of Hours
FUEL(L) Daniel Cuellar 7:00AM 7:00PM
OIL(L) Troy Cuellar 7:00AM 7:00PM
PIPE(Type)-(Ft) Jesse Martinez 7:00AM 7:00PM
Others
EQUIPMENT:
TYPE Hire Date Hours Used COMMENTS:
Bobcat E26 Excavator 22-Mar
CAT 315 Crawler Excavator 23-Mar
4pcs-ROAD PLATE,8X10',1" 27-Mar
8pcs-1.5'52"-88"HYDRAULIC 27-Mar
SHORE
8pcs-VERTICAL SHORE 24" 27-Mar
CYLINDER E
5 GAL.PLASTIC HAND PUMP 27-Mar
48"RELEASE TOOL 27-Mar
4"VAC ASSIST(75 HP) 31-Mar
Test Ball Plug,Rope and Gauge 31-Mar
SITE SUPERVISOR: DANIEL CUELLAR
Comments:
NOTED BY:
04-03-Daily Site Report-Port Arthur
GL AL
DIG$1
Project: Rehabilitate 8"Diameter Sanitary Sewer Pipe by Date: April 4,2023(Tuesday)
Pipe Bursting Using 8"SDR-17 HDPE Pipe Weather: Cloudy/Clear
Location:Orange Avenue Intersecting Gulfway Drive
Description of Work Completed: Start Finish Comment
[Time] [Time]
1 Installed Manhole#2,its fiberglass manual cut into elevation 7:00AM 7:00PM
2 Backfilling for Manhole#2
3
4
5
DRILLING DETAILS:
Crossing Reference No.: TODAY(Feet) PREVIOUS(Feet) TOTAL(Feet)
-Orange Avenue intersecting Gulfway
Drive
MATERIALS: PERSONNEL:
CONSUMABLES Name: From: To: Total No of Hours
FUEL(L) Daniel Cuellar 7:00AM 7:00PM
OIL(L) Troy Cuellar 7:00AM 7:00PM
PIPE(Type)-(Ft) Jesse Martinez 7:00AM 7:00PM
Others
EQUIPMENT:
TYPE Hire Date Hours Used COMMENTS:
Bobcat E26 Excavator 22-Mar
CAT 315 Crawler Excavator 23-Mar
4pcs-ROAD PLATE,8X10',1" 27-Mar
8pcs-1.5'52"-88"HYDRAULIC 27-Mar
SHORE
8pcs-VERTICAL SHORE 24"
CYLINDER E 27-Mar
5 GAL.PLASTIC HAND PUMP 27-Mar
48"RELEASE TOOL 27-Mar
4"VAC ASSIST(75 HP) 31-Mar
Test Ball Plug,Rope and Gauge 31-Mar
SITE SUPERVISOR: DANIEL CUELLAR
Comments:
NOTED BY:
04-04-Daily Site Report-Port Arthur
Daily Site Report GLOBAL
HIRING.INC.
Project: Rehabilitate 8"Diameter Sanitary Sewer Pipe by Date: Aprils,2023(Wednesday)
Pipe Bursting Using 8"SDR-17 HDPE Pipe Weather: Cloudy/Scattered Rain
Location: Sabine Pass.Port Arthur Texas 77655
Description of Work Completed: Start Finish Comment
[Time] [Time]
1 Made the Flow from Manhole 2.pour concrete(2-Yards)
2
3
4
DRILLING DETAILS:
Crossing Reference No.: TODAY(Feet) PREVIOUS(Feet) TOTAL(Feet)
-Orange Avenue intersecting Gulfwav
Drive
•
MATERIALS: PERSONNEL
CONSUMABLES Name: From. To: Total No of Hours
FUEL(L) Daniel Cuellar 8.00AM 7:00PM
OIL(L) Troy Cuellar 8:00AM 7:00PM
PIPE(Type)-(Ft)
Others Jesse Martinez 8:00AM 7:00PM
2-Labours 8:00AM 7:00PM
EQUIPMENT•
TYPE Hire Date Hours Used COMMENTS:
Bobcat E26 Excavator 22-Mar
CAT 315 Crawler Excavator 23-Mar
4pcs-ROAD PLATE.8X10',1" 27-Mar
8pcs-1.5'52"-88"HYDRAULIC 27-Mar
SHORE
8pcs-VERTICAL SHORE 24"
CYLINDER E 27-Mar
5 GAL.PLASTIC HAND PUMP 27-Mar
48"RELEASE TOOL 27-Mar
4"VAC ASSIST(75 HP) 31-Mar
SITE SUPERVISOR: DANIEL CUELLAR
Comments:
NOTED BY
04-05-Daily Site Report-Port Arthur
Daily Site Report GLOBAL
DRILLING.INC.
Project: Rehabilitate 8"Diameter Sanitary Sewer Pipe by Date: April 6,2023(Thursday)
Pipe Bursting Using 8"SDR-17 HDPE Pipe Weather: Scattered Rain
Location: Sabine Pass.Port Arthur Texas 77655
Description of Work Completed. Start Finish Comment
[Time] [Time]
Set 1 Manhole
Pumping the water Slow down because of the rain
3 Cleaning and preparing
Open new line,the HDPE.to let sewerage flow from Manhole 1 to Manhole 2
Delivered the risers for all the manholes
DRILLING DETAILS:
Crossing Reference No.: TODAY(Feet) PREVIOUS(Feet) TOTAL(Feet)
-Orange Avenue intersecting Gutfway
Drive
MATERIALS PERSONNEL.
CONSUMABLES Name From: To. Total No of Hours
FUEL(L) Daniel Cuellar 6:30AM 5:00PM
OIL(L) Jesse Martinez 6:30AM 5:00PM
PIPE(Type)-(Ft(
Others Troy Cuellar 6:30AM 5:00PM
2-Labours 6:30AM 5:00PM
EQUIPMENT:
TYPE Hire Date Hours Used COMMENTS:
Bobcat E26 Excavator 22-Mar
CAT 315 Crawler Excavator 23-Mar
4pcs-ROAD PLATE,8X10'.1" 27-Mar
8pcs-1.5'52"-88"HYDRAULIC 27-Mar
SHORE
8pcs-VERTICAL SHORE 24" 27-Mar
CYLINDER E
5 GAL.PLASTIC HAND PUMP 27-Mar
48"RELEASE TOOL 27-Mar
4"VAC ASSIST(75 HP) 31-Mar
SITE SUPERVISOR: DANIEL CUELLAR
Comments:
NOTED BY
04-06-Daily Site Report-Port Arthur
Daily Site Report CL BAL
Project: Rehabilitate 8"Diameter Sanitary Sewer Pipe by Date: April 7,2023(Friday)
Pipe Bursting Using 8"SDR-17 HDPE Pipe Weather: Raining
Location: Sabine Pass.Port Arthur Texas 77655
Description of Work Completed: Start Finish Comment
[Time] [Time]
1 "-Manholes are FULL OF WATER
2
3
4
5
•
DRILLING DETAILS:
Crossing Reference No.: TODAY(Feet) PREVIOUS(Feet) TOTAL(Feet)
Orange Avenue intersecting Gulfwav
Drive
MATERIALS: PERSONNEL:
CONSUMABLES Name: From. To. Total No of Hours
FUEL(L) Daniel Cuellar
OIL(L) Jesse Martinez
PIPE(Type)-(Ft)
Others Troy Cuellar
2-Labours
EQUIPMENT:
TYPE Hire Date Hours Used COMMENTS:
Bobcat E26 Excavator 22-Mar
CAT 315 Crawler Excavator 23-Mar
4pcs-ROAD PLATE.8X10',1" 27-Mar
8pcs-1.5'52"-88"HYDRAULIC
SHORE 27-Mar
8pcs-VERTICAL SHORE 24"
CYLINDER E 27-Mar
5 GAL.PLASTIC HAND PUMP 27-Mar
48"RELEASE TOOL 27-Mar
4"VAC ASSIST(75 HP) 31-Mar
SITE SUPERVISOR: DANIEL CUELLAR
Comments:
NOTED BY
04-07-Daily Site Report-Port Arthur
.,--' -1111116-74111,v ,...:tl:—.•:'"'t:•471::7-77---:-: .41.::177til:4::11IL':41.;-:'1::1'-:''..::----'.'
• .._*,:'.
_
'1.14, . `..•-'kc;
T4
3.
e
33'..‘-'.-,' '3..3"'
. .
. •'',. ,
y . •
''' 1 ::1,, - .., ,i:.;;'.'t;..::'''`', ''','•-''
• y
y . .''''''''''' ' '''''.:.':';',' .•1 '''I 1•
-'' :•.':,;. ' 1- f-
1-.,*,,,, - . 110111.-.;' .f,r -.74.-. ..f.P .. ..•-t1....3-:---31 3. '
*,..-.-s--
---4•'--.-,k':'-. , ,, , -- -,'-.: .:*-.:--;. - - ,•
1. ' .------"- .-%--'- ',-;:-.7-7:' ...,--'r''-;-*;77*-:::'''?4 ;:-,,,-,'-'-':- -.:f7' . '
‘... -t -,--- .-•-zIr,47,-----'.
- . .;,.....,:i.t.: z ::--- - ...-......=..,----..- -- .,,.,,,,,t:
'-'::...' .i'--i.-:".•.,.;,;--.' -• .', -;-_-_-_,,,,,-;4,''A.-,-.,* -,144,'. i ''' -1-4'''':N...' `• *':Ir:'...
,...... ....,....::::.. -,,,,,.: ,,....:....„....„*'‘.-.,_,;.-, .-,.:,„_ '-----.. .,. -_
::
-
---
. • ,...,, -,-----,--:----..*„..,-,7t---,
, .,-.3.f-,----i'' i:''-
.. ..-...„,
'`3.--
. .. .
;--444:(- .- .• *
''.',.
, -";11....-, .:,;'1!...• ;:.4...,,,•,'„,.,,„tt-i..- -7,e'r:r/11/4„...".'..,; . '';..
, ''..., ,„, -_,_,.., _. , ,s.,,,,,,,I,,__- 1- -.7-•--,,'-;;:4--*5.P.Ak-0. 4' ' '''',*. -- . ;..v...
. ...... -A • .
,,f.--
e '"',- '
04-07-Daily Site Report-Port Arthur
Daily Site Report GLOBAL
DRILLING.INC.
Project: Rehabilitate 8"Diameter Sanitary Sewer Pipe by Date: April 8,2023(Saturday)
Pipe Bursting Using 8"SDR-17 HDPE Pipe Weather: Cloudy/Scattered rain
Location. Sabine Pass.Port Arthur Texas 77655
Description of Work Completed: Start Finish Comment
[Time] [Time]
'`Manholes are FULL OF WATER
Installed Gate valve and Water Line
3
DRILLING DETAILS:
Crossing Reference No.: TODAY(Feet) PREVIOUS(Feet) TOTAL(Feet)
Orange Avenue intersecting Guffwav
Drive
MATERIALS: PERSONNEL:
CONSUMABLES Name: From: To Total No of Hours
FUEL(L) Daniel Cuellar
OIL(L) Jesse Martinez
PIPE(Type)-(Ft)
Others Troy Cuellar
2-Labours
EQUIPMENT
TYPE Hire Date Hours Used COMMENTS:
Bobcat E26 Excavator 22-Mar
CAT 315 Crawler Excavator 23-Mar
4pcs-ROAD PLATE.8X10'.1" 27-Mar
8pcs-1.5'52"-88"HYDRAULIC 27-Mar
SHORE
8pcs-VERTICAL SHORE 24"
CYLINDER E 27-Mar
5 GAL.PLASTIC HAND PUMP 27-Mar
48"RELEASE TOOL 27-Mar
4"VAC ASSIST(75 HP) 31-Mar
SITE SUPERVISOR: DANIEL CUELLAR
Comments:
NOTED BY
04-08-Daily Site Report-Port Arthur
X41040.,
,%
wa
x
� �. � !.
fiF
�.. 5
..i
f
i
- -
•
xt4 "
,.--,R. .:4:.. , - ,-.,„,:::::-.,1-!',.-
V
f
' x+i
04-08-Daily Site Report-Port Arthur
o
s" '.
f
aw
t
`" "§ ' a •,
vw ,�
a
by l� s . r2r
z � u�
_ 5... '
;`„#`. 'ram :'
f. d'_
04-08-Daily Site Report-Port Arthur