Loading...
HomeMy WebLinkAboutPR 23172: CIVIC CENTER HVAC ROOFTOP UNIT Memorandum City of Port Arthur, Texas Robert A. "Bob"Bowers Civic Center To: The Honorable Mayor and City Council Through: Ron Burton, City Manager From: Adam J Saunders, Civic Center Dir RE: Proposed Resolution No. 23172 The Civic Center needs to replace HVAC Rooftop Unit (RTU) #6. It is determined the current unit, which cools and heats half of Hall A, needs replacement. Industrial and Commercial Mechanical (ICM) of Beaumont, TX can do this work for $123,911.00 out of account number 001-15-043-5312-00-20-000-. ANALYSIS/CONSIDERATION: The current HVAC RTU #6 needs replacement. It will take about 35 weeks for the unit to be delivered, then installation will follow. Because of this, the total cost of this work will come out of the Civic Center budget for Fiscal `23/'24. ICM of Beaumont, TX has provided a price for this work under the Buyboard cooperative contract# 638-21 in the amount of$123,911.00 out of account number 001-15-043-5312-00-20-000-. RECOMMENDATION A resolution authorizing the City Manager to enter into an agreement with Industrial and Commercial Mechanical of Beaumont, TX to replace the current HVAC RTU#6 of the Civic Center in the amount of$123,911.00. Funds available in account number 001-15-043-5312-00- 20-000-. BUDGETARY AND FISCAL EFFECT Funds are available in account#001-15-043-5312-00-20-000-. STAFFING EFFECT None P.R. No. 23172 5/15/23 AJS PAGE 1 of 3 RESOLUTION NO. A RESOLUTION AUTHORIZING THE CITY MANAGER TO ENTER INTO AN AGREEMENT WITH INDUSTRIAL AND COMMERCIAL MECHANICAL OF BEAUMONT, TX TO REPLACE THE CURRENT HVAC ROOFTOP UNIT #6 OF THE CIVIC CENTER IN THE AMOUNT OF $123,911.00. FUNDS AVAILABLE IN ACCOUNT NUMBER 001-15- 043-5312-00-20-000-. WHEREAS, The Civic Center is in need of a new HVAC Rooftop Unit#6 to replace the current unit for the cooling and heating of half of Hall A; and WHEREAS, Industrial and Commercial Mechanical of Beaumont, TX can do this work for $123,911.00; and WHEREAS, Industrial and Commercial Mechanical of Beaumont, TX has a cooperative contract with Buyboard 638-21; and, WHEREAS, Chapter 271 of the Local Government Code allows a city, by resolution of its governing body,to participate in cooperative purchasing programs, such as Buyboard, a purchasing cooperative, as an alternative to a formal bid process; and WHEREAS, per Resolution No. 02-341, the City entered into an interlocal agreement for cooperative purchasing with the Buyboard Cooperative Purchasing Program ("Buyboard").now, therefore, NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PORT ARTHUR: THAT,the facts and opinions in the preamble are true and correct. THAT,the City Manager is hereby authorized to execute an agreement with Industrial and Commercial Mechanical of Beaumont, TX to replace the current HVAC Rooftop Unit#6 at the Civic Center in the amount of$123,911.00, in substantially the same form as attached hereto as Exhibit"A"; and. THAT a copy of the caption of this Resolution be spread upon the Minutes of the City Council. 5/15/23 AJS PAGE 2 of 3 READ, ADOPTED, AND APPROVED, this day of June 2023 AD, at a Regular Meeting of the City Council of the City of Port Arthur, Texas by the following Vote: AYES: Mayor: Councilmembers: • NOES: Thurman"Bill" Bartie, Mayor ATTEST: Sherri Bellard, City Secretary APP OVE AS TO FORM: alecia • , Ci Attorney APPROVED FO ADMINISTRATION: Ronald Burton, City Manager APPROVED AS TO FUND AVAILABILITY: Kandy Daniel, hrEe€in Director of Finance Clifton Williams, CPPB, Purchasing Manger EXHIBIT "A" CITY OF PORT ARTHUR—CIVIC CENTER—ROOFTOP UNIT 6-ICM PROPOSAL TO INSTALL A NEW GREENSPEED CARRIER 40 TON ROOFTOP PACKAGE UNIT WITH GAS HEATING Industrial and Commercial Mechanical TACLA23943C 4445 Westpark Avenue Beaumont,TX 77705 Phone(409)842-3737 Fax (409)842-3738 April 24,2023 CITY OF PORT ARTHUR TEXAS 444 4"STREET I PORT ARTHUR,TX 177640 ATTN: Mr.Adam Saunders—Bob Bowers Civic Center-MANAGER Subject: BOB BOWER CIVIC CENTER— TOP T NUMBER 6—ICM PROPOSAL TO INSTALL NEW CARRIER 40 TON—GREENSPEED-ROOFTOP PACKAGE AC WITH GAS HEATING Industrial Commercial Mechanical is pleased to offer the following proposal as listed below for your Review includes; Item QTY Description 1. 1 CARRIER MODEL 48P6D0406500009VNJ Gas Heat Packaged Rooftop Unit,40 Ton,460-3-60 UNIT INCLUDES THE FOLLOWING ITEMS LISTED BELOW: 2Greenspeed Intelligence 2R410a Refrigerant 25taged Air Volume(SAV) 2ComfortLink Controls &Low Gas Heat &Economizer with Barometric Relief 2Vertical Supply&Return &Scroll Compressors [Row Sound Condenser Fans &MicroChannel Condenser Coils with/E-Coating 22"Filters 210 Hp Indoor Fan Motor &Supply Fan VFD &Forward Curved(FC)Supply Fan uractory Startup with Carrier ist Year Parts&Labor Warranty. • INCLUDES CARRr4 r1CTORY—5-YEARS PARTS ONLY—EXTENDED WARRANTY. Field Installed Accessories &Curb Adapter—Proposal includes Field verification of Adapter,by Curb manufacturer. 2 1 PROPOSAL INCLUDES CHAPMAN INDUSTRIES SUB-CONTRACT—SHEETMETAL DUCTWORK AND GAS PIPING Clarifications below 1.Chapman Ind to remove existing A/C duct and gas pipe then assist ICM to remove and set new A/C unit into place on the roof 2.Measure,fabricate and install new metal A/C as required for unit hook up 3.Fabricate and install gals.gas pipe as required for hook up 4.New A/C duct to be fabricated from gals metal with 1 1/2"fiberglass liner on the inside 5.Duct fabrication to take 1 to 2 weeks and install to take 2 to 3 days an site 6.Unit,controls,wiring,dampers and crane to be furnished by others 7.All existing material to be disposed of on site,in a Dumpster,furnished by customer. 3 1 PROPOSAL INCLUDES TNT CRANE SERVICE-SUBCONTRACT:WITH 130 TON Ai 1RUCK CRANE,FOR LIFTING UNIT. TACLA 23943C—Regulated by the Texas Department of licensing and Regulation PO Box 12157 Austin.TX 78711 1-800-803-9202.512-463-6599 CITY OF PORT ARTHUR—CIVIC CENTER—ROOFTOP UNIT 6-ICM PROPOSAL TO INSTALL A NEW nREENSPEED CARRIER 40 TON ROOFTOP PACKAGE UNIT WITH GAS HEATING PAGE 2—PROPOSAL CONTINUED Item QTY Description 4 1 GULF COAST ELECTRIC SUB-CONTP —FOR ELECTRICAL WIRING DEMO AND EQUIPMENT RECONNECTIONS. 5 2 ICM HVAC TECHNICIANS,PROVIDING LABOR&MATERIALS TO REMOVE OLD PACKAGE ROOFTOP UNIT,SETTING NEW 40 TON CARRIER ROOFTOP UNIT,RECONNECTION OF CONTROLS,PROVIDE START-UP,IN CONJUNCTION WITH CARRIER FACTORY REPRESENTATIVE,AND TEST UNIT FOR PROPER OPERATIONS. 6 1 "rM PROPOSAL!NCLUDE MOVAL-HAULING AND PROP1 PA DISPOSAL,OF OLD ROOFTOP DIAKIN PKG UNIT. ITEMS NOT INCLUDED IN PROPOSAL ➢ Any Changes or Modifications,other than specified as part of proposal,or proposed scope of work. ➢ Any Changes or Work delays;due to problems beyond our control. ➢ Warranty of any items not furnished and installed by ICM 'rn11 PRICE TO PERFORM 71.1 PROPOSED INSTALLATION WORK Labor $ 6,120.00 Materials $ 117,790.92 TOTAL $ 123,910.92 Sales Tax is Not Includec THIS PROPOSAL IS VALID FOR 30 DAYS-FROM THE DATE OF PROPOSAL CARRIER FACTORY EQUIPMENT LEAD TIME—APROXIMATELY 35 WEEKS iivUUS I RiML tL uuadtviERLiAL MECHANICAL IS AN AWARDED VENDOR FOR BUYBOARD CONTRACT#638-21. Thank you for your request for this proposal. We would appreciate the opportunity to provide these services.Please let me know if you would like to proceed with the proposed service repair,and what purchase order number we will utilize,for our billing for services. As always,we thank you for your business and the opportunity to provide our services. Regards, Jerry F. Johnson TACLA 23943C—Regulated by the Texas Department of Licensing and Regulation PO Box 12157 Austin.TX 78711 1-800-803-9202.512-463-6599