INTEROFFICE MEMORANDUM
Date: June 26, 2023
To: The Honorable Mayor and City Council
Through: Ron Burton, City Manager
From: Flozelle C.Roberts,EIT,MEng,MBA
RE: PR23228: 2023 Street Rehabilitation P ct—District 1: Change Order No. 2, Widening
of 7th Avenue and Excavation on 8th Avenue.
Introduction:
The intent of this Agenda Item is to authorize the City Manager to execute Change Order No. 2 for the 2023
Street Rehabilitation Project—District 1 for the widening of 7th Avenue from Procter Street to 5th Street and
excavation of sidewalks, driveways and roadway on 8th Avenue.
Background:
The City of Port Arthur Purchasing Division advertised for bids to rehabilitate various streets in District
1 under Bid No. P23-011. Allco,LLC, of Beaumont, Texas was the lowest responsible bidder with the
amount of$4,377,370.00. Pursuant to Resolution 23-031, Port Arthur City Council approved entering
into an agreement with Allco, LLC of Beaumont, Texas, for the 2023 Street Rehabilitation Project-
District 1.
Pursuant to Resolution 23-142, City Council approved Change Order No. 1 for the removal of trees and
stumps located on 8th Avenue and 15th Street for the amount of$32,325.00. Change Order No. 1 increased
the original contract amount of$4,377,370.00 to the new contract amount of$4,409,695.00.
Allco, LLC, of Beaumont, Texas has submitted Change Order No. 2 for the widening of 7th Avenue from
Procter Street to 5th Street because the street's width presents hazardous driving condition. Additionally,
drainage infrastructure needed upgrading from ditches to curb and gutter to prevent the area from holding
water.
The excavation and removal of driveways and roadway on 8th Avenue was necessary since the scope
provided for asphalt only and not concrete to replace the existing driveways.Also,while the replacement of
the sidewalks was included in the scope of work the removal of sidewalks was not.
Change Order No. 2 increases the original contract amount of$4,409,695.004 by $522,526.30 to the new
contract amount of$4,932,221.30.
"Remember,we are here to serve the Citizens of Port Arthur"
444 4*Street X Port Arthur,Texas 77641-1089 X 409.983.8182 X FAX 409.983.8294
Budget Impact:
Change Order No. 2 impacts funds in the Street Capital Fund Account No. 307-21-053-8517-00-10-000.
Recommendation:
It is recommended that the City of Port Arthur City Council approve PR23228 with Allco, LLC, of
Beaumont, Texas, authorizing the City Manager to execute Change Order No. 2 for the widening of 7th
Avenue from Procter.Street to 5th Street and the excavation and removal of sidewalks, driveways and
roadway on 8th Avenue for the amount of$522,526.30.
PR No. 23228
6/26/2023 mje
Page 1 of 3
RESOLUTION NO.
A RESOLUTION AUTHORIZING THE CITY MANAGER TO
EXECUTE CHANGE ORDER NO. 2 BETWEEN THE CITY OF PORT
ARTHUR AND ALLCO, LLC, OF BEAUMONT, TEXAS FOR THE
WIDENING OF 7TH AVENUE AND EXCAVATION ON 8TH AVENUE
ON THE 2022-2023 STREET REHABILITATION PROJECT-
DISTRICT 1 FOR THE AMOUNT OF $522,526.30. FUNDS ARE
AVAILABLE IN THE STREET CAPITAL FUND ACCOUNT NO.
307-21-053-8517-00-10-000.
WHEREAS, pursuant to Resolution No. 23-031, the City of Port Arthur City Council
awarded the 2022-2023 Street Rehabilitation Project-District 1 to Allco, LLC, of Beaumont,
Texas for the amount of $4,377,370.00; and,
WHEREAS, pursuant to Resolution 23-142, Port Arthur City Council approved
Change Order No. 1 that was submitted by Allco, LLC, of Beaumont,Texas for the amount
of $32,325.00 to remove the trees/stumps; and,
WHEREAS, Change Order No. 1 increased the original contract amount of
$4,377,370.00 by $32,325.00 to the new contract amount of $4,409,695.00; and,
WHEREAS, Change Order No. 2 is being submitted by Allco, LLC, of Beaumont,
Texas, for the widening of 7th Avenue from Procter Street to 5th Street because the street's
width presents hazardous driving conditions, see Exhibit A; and,
WHEREAS, the excavation and removal of sidewalks, driveways and roadway on
8th Avenue was added since the original scope provided for asphalt and not concrete to
replace the existing driveways; also, while sidewalk replacement was included in the
scope of work, the removal of the sidewalk removal was also not, see Exhibit A; and,
PR No. 23228
6/26/2023 mje
Page 2 of 3
WHEREAS, Change Order No. 2 proposes to increase the original contract amount
of $4,409,695.00 by $522,526.30, to the new contract amount of $4,932,221.30; and,
WHEREAS, approval of Change Order No. 2 submitted by Allco, LLC, of
Beaumont, Texas is herein deemed an appropriate action; now, therefore,
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PORT ARTHUR:
THAT, the facts and opinions in the preamble are true and correct; and,
THAT, Change Order No. 2 is herein approved and the City Manager is authorized
to execute said Change Order No. 2 to the contract between the City of Port Arthur and
Allco, LLC, of Beaumont, Texas for the amount of $522,526.30; and,
THAT, said Change Order No. 2 increases the original contract amount of
$4,409,695.00 by $522,526.30 to the new contract amount of $4,932,221.30; and,
THAT, a copy of the caption of this Resolution be spread upon the Minutes of the
City Council.
READ, ADOPTED AND APPROVED this the day of
A.D. 2023 at a meeting of the City of Port Arthur, Texas by the
following vote: Ayes: Mayor:
Councilmembers:
Noes:
Thurman Bill Bartle
Mayor
PR No.23228
6/26/2023 mje
Page 3 of 3
ATTEST:
Sherri Bellard
City Secretary
APPROVED AS TO FORM: APPROVED FOR ADMINISTRATION:
(Ltdell,b.A14}
>`Valecia Ti eno, Esq. Ron Burton, CPM
City Attorney City Manager
APPROVED AS FOR AVAILABILITY OF
FUNDS:
kc...,\,,,--,,s,4_‘ , i c:-\_."-----/
--)
Kandy Daniel
Director of Finance
Ig///
4_I- ..�,��
' ozel►- . 9 •►- . s, , ng, MI3A
Dir: sr of P 1p Works
rr,.
Clifton Williams, CPPB
Purchasing Manager
I
EXHIBIT A
CITY OF PORT ARTHUR
Public Works Engineering
DATE: JUNE 23,2023
PROJECT: 2023 STREET REHAB DESJ I
OWNER: CITY OF PORT ARTHuR
CONTRACTOR: ALLCO,LLC,OF BEAUMONT,TEXAS
CHANGE ORDER NO.:2
THE FOLLOWING CHANGES IN THE PLANS AND/OR SPECIFICATIONS ARE HEREBY,MADE:
Adjust the Estimated Quantities to reflect the Actual Quantities used in the completion of the project: -''`"
Original Original New Quantity
Item No. Description Unit Quantity Unit Price Amount Added New Amount
7TH AVENUE:PROCTER STREET TO 5TH AVENUE
104.001 REMOVE CURB AND GUTTER LF $ 16.00 46 $ 736.00
104.002 REMOVING CONCRETE DRIVEWAY LF $ 52.00 400 $ 20,800.00
104.003 REMOVE CONCRETE SIDEWALK SY $ 42.00 50 $ 2,100.00
110.001 ROADWAY EXCAVATION LF $ 74.00 49 $ 3,626.00
112.001 SUBGRADE WIDEN STA $ 18.95 654 $ 12,393.30
247.002 FLEX BASE(TY A)(GR 2)(2")(COMPL IN PL) SY $ 19.00 872 $ 16,568.00
292.001 ASPHALT STAB BASE 9GR1)(PG64) TON $ 233.00 135 $ 31,455.00
479.002 ADJUSTING MH(LIDS&COVERS) EA $ 755.00 1 $ 755.00
496.001 REMOVE STR(PIPE) LF $ 16.00 92 $ 1,472.00
529.001 CONCRETE CURB&GUTTER COMBINED(COMPL IN PL)(TYPE II) LF $ 35.00 654 $ 22,890.00
"' TIE IN ALLEY DRAIN $ 5,000.00 1 $ 5,000.00
$ 117,795.30
7TH AVE:5TH ST TO THOMAS BLVD
251.001 REWORKING BASE COURSE(6")(ORD COMP) SY $ 11.00 4908 $ 53,988.00
247.002 FLEX BASE(TY A)(GR 2)(2")(COMPL IN PL) SY $ 19.00 4908 $ 93,252.00
257.002 CEMENT SUPER SLURRY(4%)(DRY WT)(DEL)(COMPL IN PL) TON $ 290.00 80 $ 23,200.00
275.001 CEMENT TREAT(MIX EXST MTL&NW BS)(8")(DC) SY $ 12.00 4908 $ 58,896.00
310.001 PRIME COAT(AE-P) GAL $ 8.00 491 $ 3,928.00
340.001 D-GR HMA TY-D PG64-22(2')(SURFACE COURSE) TON $ 151.00 567 $ 85,617.00
340.002 D-GR HMA TY-D PG64-22(1.5")(TRANSITIONS) TON $ 189.00 60 $ 11,340.00
340.003 D-GR HMA TY-D PG64-22(1.5"-3")(DRWYS( TON $ 230.00 72 $ 16,560.00
479.002 ADJUSTING MH(LIDS&COVERS) EA $ 755.00 4 $ 3,020.00
SY $ 349,801.00 I
8TH AVENUE:Thomas Blvd.to Procter St.-ST5003
104.002 REMOVE CONC(DRIVEWAYS) SY $ 52.00 120 $ 6,240.00
104.003 REMOVE CONC(SIDEWALKS) SY $ 42.00 120 $ 5,040.00
110.001 EXCAVATION(ROADWAY) CY $ 74.00 75 $ 5,550.00
247.023 FLEX BASE(TY A)(GR 2)(8")(COMPL IN PL) SY $ - 0 $ -
496.001 REMOVE STR(PIPE) LF $ 16.00 70 $ 1,120.00
496.... REMOVE HOPE LF $ 16.00 20 $ 320.00
530.002 DRIVEWAYS(CONC)(TYPE 1) SY $ 168.00 120 $ 20,160.00
MISCELLANEOUS
465.001 REMOVE CURB INLETS PARTIAL EA $ 1,100.00 2 $ 2,200.00
465.002 INSTALL NEW CURB INLETS PARTIAL EA $ 7,150.00 2 $ 14,300.00
$ 16,500.00
TOTAL CHANGE ORDER NO.2 $ 522,526.30
NEW
ORIGINAL CONTRACT AMOUNT: $ 4,409,695.00 CONTRACT $ 4,932,221.30
AMOUNT
ORIGINAL CONTRACT AMOUNT: $ 4,377,370.00
CHANGE ORDER NO 1: $ 32,325.00
CHANGE ORDER NO 2: $ 522,526.30
PERCENT OF CHANGE OF 1&2: 12.30%
FINAL CONTRACT AMOUNT: $ 4,932,221.30
NO CALENDAR DAYS HAVE BEEN ADDED TO CHANGE ORDER NO.2
CONTRACT COMPLETION DATE: March 5,2024
0
PREPARED BY: r / QU IES VARIFIED BY:
41g&ii! '1 )\ -,-. ' '.." -..
f.Jennifer d ar.s,BAAS,MPA,CIP Manager gory K.Casmire,Inspector
APPROVED BY: APPROVED BY:
l21 '''‘.-' 1
Brandon Harrison Vice President,ALLCO,LLC Jo n C patella,PE,City Engineer
APPROVED BY: APPROVED BY:
Flozelle C.Roberts,EIT,MEng,MBA,Director of Public Works Clifton Williams,CPPB,Purchasing Manager
APPROVED BY:
"
Ron Burton,City Man2fgW'eI s\Dhan'o'