The intent of this Agenda Item is for City Council to ratify the emergency replacement of the
collapsed 16" sanitary sewer pipe on Vicksburg Avenue at 6th Street by Global Drilling of
Winnie, Texas. This is a main trunk line that conveys sewer from a significant portion of the
City. On June 5, 2023, the City Manager signed an emergency memo, authorizing the
replacement of 400 feet of pipe and 2 manholes by directional drilling method. The estimate for
the replacement was $103,000.00, and the work was completed for$110,000.00, due to adding
a point repair to the scope of work.
Background:
A section of the 16"concrete sanitary sewer pipe on Vicksburg Avenue at 6th Street was in need
of immediate replacement. The collapsed section is approximately 12 feet deep and 400 feet in
length. This is a main trunk line that conveys sewer from a significant portion of the city. An
emergency memo was issued the same day.
Budget Impact:
The total budgetary impact is $110,000.00 and funding is available in Water Utilities Account
No. 405-40-000-8516-00-00-000, Project No. WS0016-CON.
Recommendation:
It is recommended that City Council approve Proposed Resolution No. 23254, ratifying the
emergency replacement of the 16" sanitary sewer pipe as described/outlined above.
"Remember, we are here to serve the Citizens of Port Arthur"
PR No. 23254
7/20/23 bw
Page 1 of 3
RESOLUTION NO.
A RESOLUTION RATIFYING THE CITY MANAGER'S
DECISION TO AUTHORIZE THE EMERGENCY
REPLACEMENT OF THE SANITARY SEWER MAIN ON
VICKSBURG AVENUE AT 6TH STREET,WITH A TOTAL
BUDGETARY IMPACT OF $110,000.00 FROM WATER
UTILITIES ACCOUNT NO. 405-40-000-8516-00-00-000,
PROJECT NO.WS0016-CON.
WHEREAS, the sanitary sewer main on Vicksburg Avenue at 6th Street collapsed; and,
WHEREAS, on June 5, 2023, the City Manager signed an emergency memo (Exhibit
"A"), authorizing the pipe and manhole replacement by Global Drilling, Inc. of Winnie, Texas
because this a main trunk line that conveys sewer from a significant portion of the city; and,
WHEREAS, the original estimate for the replacement of 400 foot of 16" pipe that is 12
feet deep was $103,000.00, but the final cost is $110,000.00, due to adding a point repair to the
scope of work; and,
WHEREAS, pursuant to Section 252.022(a)(1) this purchase is authorized because of a
public calamity that requires the immediate appropriation of money to relieve the necessity of the
municipality's residents or to preserve the property of the municipality; and,
WHEREAS, it is further authorized pursuant to Section 252.022(a)(2) of the local
government code to preserve or protect the public health or safety of the municipality's residents.
NOW THEREFORE,BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY
OF PORT ARTHUR:
THAT,the facts and opinions in the preamble are true and correct; and,
THAT, City Council hereby ratifies the City Manager's decision to authorize the
emergency replacement of the pipe and manholes with a total budgetary impact of$110,000.00
(Invoice attached as Exhibit "B") from Account No. 405-40-000-8516-00-00-000, Project No.
WS0016-CON; and,
PR No. 23254
7/20/23 bw
Page 2 of 3
THAT, a copy of the caption of this Resolution shall be spread upon the Minutes of the
Meeting of the City Council.
READ, ADOPTED, AND APPROVED this day of , 2023
at a Regular Meeting of the City Council of the City of Port Arthur, Texas by the following vote:
AYES: Mayor
Councilmembers:
NOES:
Thurman Bill Bartie
Mayor
ATTEST:
Sherri Bellard
City Secretary
APPROVED AS TO FORM:
Valecia Tizeno
City Attorney
PR No. 23254
7/20/23 bw
Page 3 of 3
APPROVED FOR ADMINISTRATION:
Ronald Burton Calvin Matthews, P.E.
City Manager Water Utilities Director
APPROVED AS TO THE AVAILABILITY
OF FUNDS:
i,) c)
Kandy Daniel) Clift n Williams, CPPB
Finance Director Purchasing Manager
Exhibit "A"
I"
•
City nt ik
ort rthur
Trcuc
INTEROFFICE MEMORANDUM
Date: June 5, 2023
To: Ronald Burton, City Manager
From: Calvin Matthews, P.E., Water Utilities Director e0.44iric7..--
RE: Approval for Emergency Repair to Sanitary Sewer Main on Vicksburg at 6th St.
A sanitary sewer main on Vicksburg at 6th St. is in need of immediate repair. This is a main trunk
line that conveys sewer from a large portion of the city.
Emergency approval is requested of the City Manager to hire Global Drilling to assist in repairs
of 16" sanitary sewer line and approve the purchase of materials for this repair.
A total cost of $103,000 is estimated for the installation of contractor-supplied materials. A
proposed resolution will be presented to City Council for ratification.
I,Ronald Burton,hereby approve the emergency repair of the sanitary sewer main on Vicksburg
at 6th St.
Ronald Burt
City Manager
"Remember, we are here to serve the Citizens of Port Arthur"
Exhibit "B"
■A■ GLOBAL DRILLING,INC.
GL+ B AL 44994 Interstate 10 Winnie,Texas 77665,USA
T +1 800 956 8720;E infoiglobaldrillingequipment.com,
11NILLING.INC W:www.alobaldnllinaeaulomentcom
INVOICE
Date •
Attn : ACCOUNTING July 24,2023
Port Arthur TX 77641
Project Name : EMERGENCY REPAIR TO SANITARY SEWER MAIN ON VICKSBURG AT 6TH ST. Ref. No. •
PA2022-008
Location Vicksourg St. Intersection with 6th St. Port Arthur TX
COMPLETED WORK
INO. T
DESCRIPTION UNIT QTVL TOTAL TO UNIT PRICE TOTAL PRICE REMARKS
PREVIOUS
DATE
1 Repair by Supply of Materials.Replacement and LS 1 00.00% 103,000.00 103,000.00
Installation of 16*Sanitary Sewer Main
Approximately 400 Ft in Length,Installation of
2-New Manholes,including connecting to existing lines
Addition to original scope of works
2 While pulling the pipes nearly halfway,we cannot pull LS 100.00% 7,000.00 7,000.00
the pipes.There's obstruction.We need to excavate to
check what's the problem.We discovered that the
existing pipe is not straight and has wood and plastic.
We removed those obstruction and reconnect the pipes
TOTAL DUE: 110,000.00
Terms and Conditions:
Amount in Words(US Dollars):One Hundred Ten Thousand Only
For.
GLOBAL DRILLING,INC.
JASMIN BERSOBIO
Page 1 of I
Daily Site Report Le BAL
iIWNG.INC
Project: EMERGENCY REPAIR TO SANITARY SEWER MAIN Date: June 8,2023(Thursday)
ON VICKSBURG AT 6TH ST. Weather: Raining
Location: Vicksburg St.Intersection with 6th St,Port Arthur TX
Description of Work Completed: Start Finish Comment
[Time] [Time]
1 Mobilized in new location
2 Delivered the 16"HDPE Pipes
3 -No Fusion machine because it's raining
4
DRILLING DETAILS:
Crossing Reference No.: TODAY(Feet) PREVIOUS(Feet) TOTAL(Feet)
Vicksburg St,Intersection with 6th St,Port
Arthur TX
4
MATERIALS: PERSONNEL:
4 CONSUMABLES Name: From: To: Total No of Hours
FUEL(L) Daniel Cuellar 8:OOAM 12:00PM
OIL(L) Alex 8:00AM 12:00PM
PIPE(Type)-(Ft) Jose 8 OOAM 12:00PM
Others
EQUIPMENT:
TYPE Hire Date Hours Used COMMENTS:
SITE SUPERVISOR: DANIEL CUELLAR
Comments:
NOTED BY:
5a84b6d5120c4723970b4315f0d0533c6320274c2953f82c1621d037a60388f2
Daily Site Report C BAL
Project: EMERGENCY REPAIR TO SANITARY SEWER MAIN Date: June 9,2023(Friday)
ON VICKSBURG AT 6TH ST. Weather: Slight Rain
Location: Vicksburg St,Intersection with 6th St,Port Arthur TX
Start Finish
Description of Work Completed: Comment
[Time] [Time]
1 Delivered the Fusion Machine and Bobcat Excavator
2
4
4
DRILLING DETAILS:
Crossing Reference No.: TODAY(Feet) PREVIOUS(Feet) TOTAL(Feet)
Vicksburg St,Intersection with 6th St,P•
Arthur TX
MATERIALS: PERSONNEL:
CONSUMABLES Name: From: To: Total No of Hours
FUEL(L) Daniel Cuellar 8:00AM • 12:00PM
OIL(L) Alex 8:00AM 12:00PM
PIPE(Type)-(Ft) Jose 8 00AM 12:00PM
Others
EQUIPMENT:
TYPE Hire Date Hours Used COMMENTS:
Bobcat E26 Excavator 9-Jun
Fusion Machine 9-Jun
SITE SUPERVISOR: DANIEL CUELLAR
Comments:
NOTED BY:
8e0b85a1f03d26be6c3ca45c2c5d1417cdf4901c1aed46064e207bf21a95085c
Daily Site Report
Project: EMERGENCY REPAIR TO SANITARY SEWER MAIN Date: June 10,2023(Saturday)
ON VICKSBURG AT 6TH ST. Weather: Fair
Location: Vicksburg St.Intersection with 6th St,Port Arthur TX
Description of Work Completed: Start Finish Comment
[Time] [Time]
1 Started fusing the HDPE Pipes,but delivered wrong fittings
2 -Monday will bring the correct fittings for the fusion machine
4
DRILLING DETAILS:
Crossing Reference No.: TODAY(Feet) PREVIOUS(Feet) TOTAL(Feet)
Vicksburg St,Intersection with 6th St,Port
Arthur TX
MATERIALS: PERSONNEL:
CONSUMABLES Name: From: To: Total No of Hours
FUEL(L) Daniel Cuellar 8 00AM 12:00PM
OIL(L) Alex 8:00AM 12:00PM
PIPE(Type)-(Ft) Jose 8:OOAM 12:00PM
Others
EQUIPMENT:
TYPE Hire Date Hours Used COMMENTS:
Bobcat E26 Excavator 9-Jun
Fusion Machine 9-Jun
SITE SUPERVISOR: DANIEL CUELLAR
Comments:
NOTED BY:
b61231e32fbf4d295ab8c7aba3e5f9c449c555c2b65c975db5d95763bc46d7f6
Daily Site Report )iBAL
s;<ILLING,INC.
Project: EMERGENCY REPAIR TO SANITARY SEWER MAIN Date: June 12,2023(Monday)
ON VICKSBURG AT 6TH ST. Weather: Fair
Location: Vicksburg St.Intersection with 6th St.Port Arthur TX
Description of Work Completed: Start Finish Comment
[Time] [Time]
1 Delivered the correct fittings for Fusion machine
2 Continue fusing the HDPE pipes
3
4
DRILLING DETAILS:
Crossing Reference No.: TODAY(Feet) PREVIOUS(Feet) TOTAL(Feet)
Vicksburg St,Intersection with 6th St,Po
Arthur TX
MATERIALS PERSONNEL,
CONSUMABLES Name: From: To: Total No of Hours
FUEL(L) Daniel Cuellar 8 FOAM 5:00PM
OIL(L) Alex 8:00AM 5:00PM
PIPE(Type)-(Ft) Jose 8:OOAM 5:00PM
Others
EQUIPMENT:
TYPE Hire Date Hours Used COMMENTS:
Bobcat E26 Excavator 9-Jun
Fusion Machine
SITE SUPERVISOR: DANIEL CUELLAR
Comments:
NOTED BY:
a217db999da669ec86edeb364fb44a8e263f63e9a6572db921216baee0049c4f
Daily Site Report AL
t
Project: EMERGENCY REPAIR TO SANITARY SEWER MAIN Date: June 13,2023(Tuesday)
ON VICKSBURG AT 6TH ST. Weather: Fair
Location: Vicksburg St,Intersection with 6th St,Port Arthur TX
Description of Work Completed: Start Finish Comment
[Time] [Time]
1 Continue fusing the HDPE pipes
2 -While Fusing the pipes,the machine starts leaking,Called the Technician to fix the machine
3
4
DRILLING DETAILS:
Crossing Reference No.: TODAY(Feet) PREVIOUS(Feet) TOTAL(Feet)
vicksburg St,Intersection with 6th St,Port
Arthur TX
MATERIALS: PERSONNEL:
CONSUMABLES Name: From: To: Total No of Hours
FUEL(L) Daniel Cuellar 8:00AM 12:00PM
OIL(L) Alex 8:00AM 12:00PM
PIPE(Type)•(Ft) Jose 8:00AM 12:00PM
Others
EQUIPMENT:
TYPE Hire Date Hours Used COMMENTS:
Bobcat E26 Excavator 9-Jun
Fusion Machine
SITE SUPERVISOR: DANIEL CUELLAR
Comments:
NOTED BY:
0c12606814a1e4a21b44f93134d2e5705b12064354048b48342882ae3668b03c
Daily Site Report Cl BAL
DRILLING.INC.
Project: EMERGENCY REPAIR TO SANITARY SEWER MAIN Date: June 14.2023(Wednesday)
ON VICKSBURG AT 6TH ST. Weather: Sunny
Location: Vicksburg St,Intersection with 6th St.Port Arthur TX
Description of Work Completed: Start Finish Comment
[Time] [Time]
1 Technician came to site to fix the leaking fusion machine.But cannot fix on site,has to bring to their
shop
2
3
4
R 5
DRILLING DETAILS:
Crossing Reference No.: TODAY(Feet) PREVIOUS(Feet) TOTAL(Feet)
Vicksburg St,Intersection with 6th St,Port
Arthur TX
MATERIALS: PERSONNEL:
CONSUMABLES Name: From: To: Total No of Hours
FUEL(L) Daniel Cuellar 8:00AM 12:00PM
OIL(L) Alex 8:00AM 12:00PM
PIPE(Type)-(Ft) Jose 8:00AM 12:00PM
Others
EQUIPMENT:
TYPE Hire Date Hours Used COMMENTS:
Bobcat E26 Excavator 9-Jun
Fusion Machine 9-Jun
SITE SUPERVISOR: DANIEL CUELLAR
Comments:
NOTED BY:
c2elb2ba344884ec354bcc04887335e09d3b140c89691e7e27d9515097a0d336
Daily Site Report GLOBAL
ORI )NG INC.
Project: EMERGENCY REPAIR TO SANITARY SEWER MAIN Date: June 16.2023(Friday)
ON VICKSBURG AT 6TH ST. Weather: Fair
Location: Vicksburg St,Intersection with 6th St.Port Arthur TX
Description of Work Completed: Start Finish Comment
[Time] [Time]
1 Delivered new Fusion Machine
2 Finished fusing the HDPE pipes-400Ft
4
DRILLING DETAILS:
Crossing Reference No.: TODAY(Feet) PREVIOUS(Feet) TOTAL(Feet)
MATERIALS: PERSONNEL:
CONSUMABLES Name: From: To: Total No of Hours
FUEL(L) Daniel Cuellar 8:00AM 5:00PM
OIL(L) Julio 8:00AM 5:00PM
PIPE(Type)-(Ft) Troy 8:00AM 5:00PM
Others
EQUIPMENT:
TYPE Hire Date Hours Used COMMENTS:
Bobcat E26 Excavator 9-Jun
Fusion Machine 9-Jun
SITE SUPERVISOR: DANIEL CUELLAR
Comments:
NOTED BY:
3879601001e802465e69b48d9bf8b201b4b226ca1bfa30fd841a7c26b78a50d8
Daily Site Report
Project: EMERGENCY REPAIR TO SANITARY SEWER MAIN Date: June 19.2023(Monday)
ON VICKSBURG AT 6TH ST. Weather: Fair
Location: Vicksburg St.Intersection with 6th St.Port Arthur TX
Description of Work Completed: Start Finish Comment
[Time] [Time]
Delivered the CAT Excavator.Trench Boxes.Test Plugs and vacuum pump and tank
2 Started excavation for Driving and Receiving pits
4
DRILLING DETAILS:
Crossing Reference No.: TODAY(Feet) PREVIOUS(Feet) TOTAL(Feet)
Vicksburg St.Intersection with 6th St,Port
Arthur TX
MATERIALS: PERSONNEL:
CONSUMABLES Name: From: To: Total No of Hours
FUEL(L) Daniel Cuellar 8:00AM 5:00PM
OIL(L) Julio 8:00AM 5:00PM
PIPE(Type)-(Ft) Troy 8:00AM 5:00PM
Others
EQUIPMENT:
TYPE Hire Date Hours Used COMMENTS:
Bobcat E26 Excavator 9-Jun
CAT 315 Crawler Excavator 19-Jun
Test ball Plugs 19-Jun
4"VAC ASSIST(75 HP) 19-Jun
SITE SUPERVISOR: DANIEL CUELLAR
Comments:
NOTED BY:
e30bbde2e3c2aabb33f634c0b342c38d74a160559583b8ac5cb0335051e00b2e
ft I.. ' --.;,: 4itiiimirivait,-,i%
it ' , !i' ' I
116 l ' ''''''''' ..
. . „... -
I :
.....
I I.:
A 11-
I _
. . ,.
i . .
. ,.
. .. ,
, : -ft. •.....
..... ..
I ;
..
....
- ,
., .
h t.
I
• " ' - '-- "--'
..,.
-
--..,-,:-.7:.:..----;,..... .v.. -• ;-:-..';%,..-,-',. -:--- .,'. t ,... ,..,..... . .,,,,r,.,.4.,
..i-
............, , .....,.... .,
. . .. .
...."''. ..--
.... , , ..
-,-,,
.. *,..- . - ....,,,Ri . ... •-***..kiftti ...:-.2....._,' 4.-'.'14.„.7.'"I'.-./ 4*. --';*-..;.,...44.,k,.--.?*kri:44*-
,-:-.4.,*' .„--:-..",,, , • ', - ..,,., "-VP's. lit'''.If.i.*4-...*:*-*-..*44;***.t.‘*- '*** ..
. .
44.
.....
“ * '
4.4.-
. I.--- --.4-
S.
,,,------
.----
_.
„.„--
--...
___ ,,, .
.--
*, S
v.,/ ".4 •
., .
... -
'',.'1.• '''''., '
- ' -
-..,.....-- - .._
r ....,::. .,•- , - --:-'i-----:'.--z:,-- ------- -- ''''.- .
...__,-
-n
_----
'.-.
.,.•,
. , .
--- --- ...„— -
. ,,..-
. .-
..„.
' ,-•**--'' .4*",!,'.-:"".',„..„'..-'1,...-4•-;.*--77--7*--"'**E.'-:::"':7*--:***,*?*7*--Y*-**--
e30bbde2e3c2aabb33f634c0b342c38d74a160559583b8ac5cb0335051e00b2e
Daily Site Report GLOBAL
DRILLING,INC.
Project: EMERGENCY REPAIR TO SANITARY SEWER MAIN Date: June 20,2023(Tuesday)
ON VICKSBURG AT 6TH ST. Weather: Fair
Location: Vicksburg St,Intersection with 6th St.Port Arthur TX
Description of Work Completed: Start Finish Comment
[Time] [Time]
1 Delivered Concrete Risers and Cones for Manhole
2 Continuation of excavation for Driving and Receiving pits
Delivered HDD Machine.Trailers and Mud Mixer
4
DRILLING DETAILS:
Crossing Reference No.: TODAY(Feet) PREVIOUS(Feet) TOTAL(Feet)
MATERIALS: PERSONNEL:
CONSUMABLES Name: From: To: Total No of Hours
FUEL(L) Daniel Cuellar 8:00AM 5:00PM
OIL(L) Julio 8:00AM 5:00PM
PIPE(Type)•(Ft) Troy 8:00AM 5:00PM
Others
EQUIPMENT:
TYPE Hire Date Hours Used COMMENTS
Bobcat E26 Excavator 9-Jun
CAT 315 Crawler Excavator 19-Jun
Test ball Plugs 19-Jun
4"VAC ASSIST(75 HP) 19-Jun
Vermeer D24x40 Machine 20-Jun
Trailer 20-Jun
HDD Mix System 20-Jun
SITE SUPERVISOR: DANIEL CUELLAR
Comments:
NOTED BY:
93dcada28146ec2e7f7feb35e7a1df296b117f590b7598750b1a0bad09bc7d90
7
-*
al
4;
:
. .
. ,: •
:*-••••••' •
4)7 • . A-
• .
•
••
•
•
. _
LL
•
.
VI:4w - 412
"ma ,
`;‘,1titOi
93dcada28146ec2e7f7feb35e7a1df296b117f590b7598750b1a0bad09bc7d90
Daily Site Report GLOBAL
DRILLING,INC.
Project: EMERGENCY REPAIR TO SANITARY SEWER MAIN Date: June 22,2023(Thursday)
ON VICKSBURG AT 6TH ST. Weather: Sunny
Location. Vicksburg St.Intersection with 6th St.Port Arthur TX
Description of Work Completed: Start Finish Comment
[Time] [Time]
1 Installation of 16"HDPE Pipes(Back Reaming i Pulling the HDPE Pipes)
While pulling the pipes nearly halfway.we cannot pull the pipes.We need to excavate to check
2 what's the problem.We discovered there are wood,plastic and the existing pipe is not straight
Then we reconnect the pipes.
3
5
DRILLING DETAILS:
•
Crossing Reference No.: TODAY(Feet) PREVIOUS(Feet) TOTAL(Feet)
Vicksburg St,Intersection with 6th St,Por
Arthur TX
MATERIALS: PERSONNEL
CONSUMABLES Name: From: To Total No of Hours
FUEL(L) Daniel Cuellar 8:00AM 600PM
OIL(L) Julio 8:00AM 6:00PM
PIPE(Type)-(Ft) Troy 8:00AM 6:00PM
Others
HOD Operator 8:00AM 6:00PM
Pius 5 Labours Helpers 8:00AM 6:00PM
EQUIPMENT:
TYPE Hire Date Hours Used COMMENTS
Bobcat E26 Excavator 9-Jun
CAT 315 Crawler Excavator 19-Jun
Test ball Plugs 19-Jun
4"VAC ASSIST(75 HP) 19-Jun
Vermeer D24x40 Machine 20-Jun
Trailer 20-Jun
HDD Mix System 20-Jun
SITE SUPERVISOR: DANIEL CUELLAR
Comments:
NOTED BY'.
06-22-Daily Site Report-Vicksburg St
n, Y
r, s
- -, .
- •
.. . 1:;.
• 'XX
,tea r
m
x—
4,.. y
ram - 4.`_
��' " 4 _f mar..- ' - -
q4
. , -- \ ..:'' ' -
•
v . / . .. ,
06-22-Daily Site Report-Vicksburg St
9" h s got,. ti 4 .
off •
.,t .y „3. ; 1. 4-. T4 ft ,y=
`p - .-"+`r vim'
f
-s a
-• :,.. yP
i^'a 'fit 4 R _ 9 "�`.. ',4 y
a_ 4S I 4'+ • •
r �= 4 . N. I '�.YS. a dr. .
l .1 - —.. rX :
I
e ,a s, r�`� 3'y- ti;� r ysr ,,�ha'4f.
•
4
r
sielroffigiteife
' '-` -ir_ _ .......:. . ' "...7 _,,,;:.;....„:"
-
'p�c .
4} -✓s-, T f i f`.
o-
! ,�! + :Y( J : :, .. {rye
' �'5 � r h
06-22-Daily Site Report-Vicksburg St
Daily Site Report GLOBAL
DRILLING.INC.
Project: EMERGENCY REPAIR TO SANITARY SEWER MAIN Date: June 23.2023(Friday)
ON VICKSBURG AT 6TH ST. Weather: Light Rain
Location. Vicksburg St.Intersection with 6th St.Port Arthur TX
Description of Work Completed: Start Finish Comment
[Time] [Time]
1 Excavation for 1st Connection(1-End)
2 -Set-up Shoring Box
3
4
DRILLING DETAILS
Crossing Reference No.: TODAY(Feet) PREVIOUS(Feet) TOTAL(Feet)
Vicksburg St.Intersection with 6th St.Po,.
Arthur TX
MATERIALS: PERSONNEL:
CONSUMABLES Name: From: To Total No of Hours
FUEL(L) Daniel Cuellar 8:OOAM 5:00PM
OIL(L) Julio 8:00A1v1 500PM
PIPE(Type)-(Ft) Troy 8:00AM 500PM
Others
EQUIPMENT:
TYPE Hire Date Hours Used COMMENTS
Bobcat E26 Excavator 9-Jun
•
CAT 315 Crawler Excavator 19-Jun
Test ball Plugs 19-Jun
4"VAC ASSIST(75 HP) 19-Jun
SITE SUPERVISOR: DANIEL CUELLAR
Comments:
NOTED BY:
06-23-Daily Site Report-Vicksburg St
I '-',-'".-:,.,...„.,,.;•;-•.:_-..k._-_-
--r,--,-..,'•2,-
-:-'.,:,.-„'.,.'-:-,',•',.',,..'
.''-A.,,,,:,A.•..---.9..',.-
,,-.-,,'-,..-44'-1-1-4:.,,''.'1,-,.`"1-Y0A,.-*.-.0-v,;-4 Z-•'---:-4'j'-'w.-'-4 0':-i.--l.;l':-"1'-•.re,.•'....-;:,-,.,.- '..'
-.',''',,..7„..'1,."-r-'_,':'s,,•,-'--i.,-..-'"-,,:"..-."'-""-.-a...7,4.,1?-.,.,1.'0.._.--.-:Z.-7.i'k..
,---1
."-,....
...,1--..-1-."..,."-..:i''_i.m.,_..-'-.,•--'„..,.,--..,'1.-..
.,,''i1.,.:;„_,i,;•,.'.,•-
!.0-.4..,t.-'..•".-.,:'
.,.'f,'-,,•'',_'_,-'"-,_,;-...._1--
',-"4_.•4 L_-!'_.1..'p.,7.r_-,-....-•.:0,':,_.-„:-;.-,:.'.,"1—,:*,.-;"-.,-1tr.,',-o,4c:.—::44i--t—..;'•.,,-f-,f.--•',_...1,
'1•,-.,1,...,',r,7,,,4.A';--.-_•',-':._...-;—,1_.--_—..z7_-I.,_,-''g__-m3„4",..
,.'-r.F.•-"1•'.'.'•_.,
: : L
- '-I r
' „ ,:;—'i,•'•;
i,i-.•s-.:':k,.-fg s--_,.•..,.:7.'..•",
.-'•':
t _
4
-
1.-:1-,•
1.
,..,"".
-.1..,..":.
..
4 L- k , • , ,• - . .. .
„.. ...7-_. 7 .,„4.4•
....,
, ..
„.... ..,- .
, „.
--...., ... ,„
- 041,'-;*% .*„.,..— --- •
---.0- ,
''Y'..S.4.':.ft1,-.-'....2-:.:-- -:-•-e, '- ..--; ..-'-i
-,,,,,.--7--,..,-,,,,-*:,.""-' 4;•„,'-':. -
.:,... . ' t-.
.. -.. ......- . ..:,,
.
--,"' •
• ..,
_, ..
..,
4.4._ jz '''.471:f' 7 -17,--,* ----- -i4-'-' '
- , . • - • ..
.. . . —...4 ,
- ...
'''' t..16 -'“- - '-*-4.. '.' ''-'-'-. .,t-s; '..-.• ', ..'"-,
*' ':''' .. ' ' ,,e.**,...'',.'-•'':•"---'fi..,1:Y. -...:',.:,r,•-=-Z-„„:;, : "-.- _''''-.
, '--- . .,.."-:,. 1.;...:7...;•.''''..i.:.,. .: till. lot.: :''. .:- • '.„:..:4;;'-'7,;
..k- , ',...,"---.4'--:--Y't-Z----':'1 r4;:tio`'' ' ''- . ''''--;'?3:-:--?•-.4"
-.: --_,.. • , .-tr: --:• - _ -tr..4)11,- --,-,*t...
-i-..;-•.,:.. .- ----,Ar..,_
AVR,
44; — ' . 'C'et '+, '-"' '''' *..';'4.44'''‘'N':- •- ,,,,,;-;
06-23-Daily Site Report-Vicksburg St
Daily Site Report CL
Project: EMERGENCY REPAIR TO SANITARY SEWER MAIN Date: June 24,2023(Saturday)
ON VICKSBURG AT 6TH ST. Weather: Lght Rain
Location. Vicksburg St.Intersection with 6th St.Port Arthur TX
Description of Work Completed: Start Finish Comment
[Time] [Time]
Continuation for 1st Connection
2 Finished the 1st Connection
DRILLING DETAILS:
Crossing Reference No.: TODAY(Feetl PREVIOUS(Feet) TOTAL(Feet)
Vicksburg St,Intersection with 6th St,Port
Arthur TX
MATERIALS: PERSONNEL:
CONSUMABLES Name: From: To: Total No of Hours
FUEL(L) Daniel Cuellar 8 OOAM 5 00PM
OIL(L) Julio 8:00AM 6OOPM
PIPE(Type)-(Ft) Troy 8:00AM 5.00PM
Others
EQUIPMENT
TYPE Hire Date Hours Used COMMENTS
Bobcat E26 Excavator 9-Jun
CAT 315 Crawler Excavator 19-Jun
Test ball Plugs 19-Jun
4"VAC ASSIST(75 HP) 19-Jun
SITE SUPERVISOR: DANIEL CUELLAR
Comments:
NOTED BY
06-24-Daily Site Report-Vicksburg St
Daily Site Report CL BAL
Project: EMERGENCY REPAIR TO SANITARY SEWER MAIN Date: June 26,2023(Monday)
ON VICKSBURG AT 6TH ST. Weather: Fair
Location: Vicksburg St,Intersection with 6th St.Port Arthur TX
Description of Work Completed: Start Finish Comment
[Time] [Time]
Excavation for 2nd Connection(Other-End)
2 -Set-up Shoring Box
DRILLING DETAILS
Crossing Reference No.: TODAY(Feet) PREVIOUS FFeet) TOTAL(Feet)
Vicksburg St,Intersection with 6th St.Pr'
Arthur TX
MATERIALS: PERSONNEL:
CONSUMABLES Name: From: To: Total No of Hours
FUEL(L) Daniel Cuellar 8:OOAM 5:00PM
OIL(L) Julio 8:00AM 5•OOPM
PIPE(Type)-(Ft) Troy 8 OOAM 5•00PM
Others
EQUIPMENT
TYPE Hire Date Hours Used COMMENTS
Bobcat E26 Excavator 9-Jun
CAT 315 Crawler Excavator 19-Jun
Test ball Plugs 19-Jun
4"VAC ASSIST(75 HP) 19-Jun
SITE SUPERVISOR: DANIEL CUELLAR
Comments:
NOTED BY
06-26-Daily Site Report-Vicksburg St
d
-'•-4...'''` .-i'A - ; ....--,r(- 1,'''-'1 - 7. 4,',.-”..N.."-= ,.-. , Ati A ,, _- --.---' '- „- i i•-•., - '
M
• _ 8 } 1- ' Ajr 'tl'..T., '. :114.s. .,,..., -.... t. .... A , . ' -,„,. l:- . ' -;:-......-:.7,_,,
pi
„ #
�' "` ""fie w t
i
06-26-Da ay Ste Report- ilckso rg St
Daily Site Report
RILING.INC
Project: EMERGENCY REPAIR TO SANITARY SEWER MAIN Date: June 27,2023(Tuesday)
ON VICKSBURG AT 6TH ST. Weather: Fair
Location. Vicksburg St.Intersection with 6th St.Port Arthur TX
Description of Work Completed: Start Finish Comment
[Time] [Time]
1 1 Continuation for 2nd Connection(Other-End)
2
3
4
DRILLING DETAILS:
Crossing Reference No.: TODAY(Feet) PREVIOUS(Feet) TOTAL(Feet)
Vicksburg St.Intersection with 6th St.Port
Arthur TX
MATERIALS: PERSONNEL.
CONSUMABLES Name: From: To: Total No of Hours
FUEL(L) Daniel Cuellar 8:00AM 5.00PM
OIL(L) Julio 8:00AM 5•00PM
PIPE(Type)-(Ft) Troy 8:OOAM 500PM
Others
EQUIPMENT
TYPE Hire Date Hours Used COMMENTS:
Bobcat E26 Excavator 9-Jun
CAT 315 Crawler Excavator 19-Jun
Test ball Plugs 19-Jun
4"VAC ASSIST(75 HP) 19-Jun
SITE SUPERVISOR: DANIEL CUELLAR
Comments:
NOTED BY:
06-27-Daily Site Report-Vicksburg St
Daily Site Report GL 'BAL
Project: EMERGENCY REPAIR TO SANITARY SEWER MAIN Date: June 28,2023(Wednesday)
ON VICKSBURG AT 6TH ST. Weather: Fair
Location: Vicksburg St.Intersection with 6th St.Port Arthur TX
Description of Work Completed: Start Finish Comment
[Time] [Time]
Finished the 2nd Connection (Other-End)
2
3
4
DRILLING DETAILS
Crossing Reference No.: TODAY(Feet) PREVIOUS t:Feet) TOTAL(Feet)
Vicksburg St,intersection with 6th St,Pc,
Arthur TX
MATERIALS: PERSONNEL:
CONSUMABLES Name: From: To: Total No of Hours
FUEL(L) Daniel Cuellar 8:00AM 5:00PM
OIL(L) Julio 8:00AM 500PM
PIPE(Type)-(Ft) Troy 8:00AM 500PM
Others
EQUIPMENT
TYPE Hire Date Hours Used COMMENTS
Bobcat E26 Excavator 9-Jun
CAT 315 Crawler Excavator 19-Jun
•
Test ball Plugs 19-Jun
4"VAC ASSIST(75 HP) 19-Jun
SITE SUPERVISOR DANIEL CUELLAR
Comments:
NOTED BY:
06-28-Daily Site Report-Vicksburg St
Daily Site Report ..
Project EMERGENCY REPAIR TO SANITARY SEWER MAIN Date: June 29,2023(Thursday
ON VICKSBURG AT 6TH ST. Weather: Sunny
Location: Vicksburg St.Intersection with 6th St.Port Arthur TX
Description of Work Completed. (StartTime) Finnis 1 Comment
1 Starts excavation and installation of manholes
2
3
4
DRILLING DETAILS
Crossing Reference No.: TODAY(Feet) PREVIOUS(Feet) TOTAL(Feet)
Vicksburg St,Intersection with 6th St,Port
Arthur TX
MATERIALS: PERSONNEL:
CONSUMABLES Name: From: To: Total No of Hours
FUEL(L) Daniel Cuellar 8.00AM 5 00PM
OIL(L) Julio 800AM 5.00PM
PIPE(Type)-(Ft) Troy 8'00AM 5•00PM
Others
EQUIPMENT:
TYPE Hire Date Hours Used COMMENTS
Bobcat E26 Excavator 9-Jun
CAT 315 Crawler Excavator 19-Jun
Test ball Plugs 19-Jun
4"VAC ASSIST(75 HP) 19-Jun
SITE SUPERVISOR DANIEL CUELLAR
Comments:
NOTED BY:
06-29-Daily Site Report-Vicksburg St
Daily Site Report GLOBAL
DRlLLINr
Project: EMERGENCY REPAIR TO SANITARY SEWER MAIN Date: June 30,2023(Friday)
ON VICKSBURG AT 6TH ST. Weather: Sunny
Location: Vicksburg St.Intersection with 6th St.Port Arthur TX
Description of Work Completed: Start Finish Comment
[Time] [Time]
1 Continuation of excavation and installation of manholes
2
3
4
DRILLING DETAILS
Crossing Reference No.: TODAY(Feet) PREVIOUS(Feet) TOTAL(Feet)
Vicksburg St,Intersection with 6th St,Port
Arthur TX
•
MATERIALS: PERSONNEL
CONSUMABLES Name: From: To: Total No of Hours
FUEL(L) Care:Cuel,ar 8:00AM 5:00PM
OIL(L) v,:is 8.00AM 5 00PM
PIPE(Type)-(Ft) T.3. 8.00AM 5:00PM
Others
EQUIPMENT:
TYPE Hire Date Hours Used COMMENTS
Bobcat E26 Excavator 9-Jun
CAT 315 Crawler Excavator 19-Jun
Test ball Plugs 19-Jun
4"VAC ASSIST(75 HP) 19-Jun
SITE SUPERVISOR: DANIEL CUELLAR
Comments:
NOTED BY:
06-30-Daily Site Report-Vicksburg St
Daily Site Report GLOBAL
DRILLING.INC.
Project: EMERGENCY REPAIR TO SANITARY SEWER MAIN Date: July 1,2023(Saturday)
ON VICKSBURG AT 6TH ST. Weather: Sunny
Location: Vicksburg St.Intersection with 6th St.Port Arthur TX
Description of Work Completed: Start Finish Comment
[Time] [Time]
Pouring of concrete in base and liner of manholes
2
•
4
DRILLING DETAILS
Crossing Reference No.: TODAY(Feet) PREVIOUS(Feet) TOTAL 1Feet)
Vicksburg St,Intersection with 6th St.Po,_.
Arthur TX
MATERIALS: PERSONNEL:
CONSUMABLES Name: From. To Total No of Hours
FUEL(L) Daniel Cuellar 8:00AM 5:00PM
OIL(L) Julio 8:00AM 5:00PM
PIPE(Type)-(Ft) Troy 8:00AM 5 00PM
Others
EQUIPMENT:
TYPE Hire Date Hours Used COMMENTS
Bobcat E26 Excavator 9-Jun
CAT 315 Crawler Excavator 19-Jun
Test ball Plugs 19-Jun
4"VAC ASSIST(75 HP) 19-Jun
SITE SUPERVISOR: DANIEL CUELLAR
Comments:
NOTED BY:
07-01-Daily Site Report-Vicksburg St
, ,.. $ ......
R
:,,.. . :,, _
,,,,
..
....._,, . .,....t,,,,,,,....
4. -- „.:
t 1 lam''
-: I" ,,,„,,,,,c4, 4'
a ..
1 o-
r,. ° �1 .. -.wri. "fir ';-
A
..A"'
iit
c ;z a,-,,
..;"..-.7,-;+;.--_;.- ,,,,,,44,-: - ;it.; :..---'/,-,-- , _ ,'''
5 '4 •- • . 1. 4 3 ` 'j .Y y�
fi
4 ,',_
t d
s
7 F
{
. s
07-01-Daily Site Report-Vicksburg St
Daily Site Report GLBAL
DRILLING,INC.
Project: EMERGENCY REPAIR TO SANITARY SEWER MAIN Date: July 4,2023(Tuesday)
ON VICKSBURG AT 6TH ST. Weather: Fair
Location: Vicksburg St.Intersection with 6th St.Port Arthur TX
Description of Work Completed Start Finish Comment
[Time] [Time]
1 Completed Installation of Manholes
2
3
4
DRILLING DETAILS:
Crossing Reference No.: TODAY(Feet) PREVIOUS(Feet) TOTAL(Feet)
Vicksburg St,Intersection with 6th St,Port
Arthur TX
MATERIALS: PERSONNEL:
CONSUMABLES Name: From: To: Total No of Hours
FUEL(L) Daniel Cuellar 8.00AM 5:00PM
OIL(L) Julio 8 OOAM 5 OOPM
PIPE(Type)-(Ft) Troy B.00AM 5 OOPM
Others
EQUIPMENT:
TYPE Hire Date Hours Used COMMENTS:
Bobcat E26 Excavator 9-Jun
CAT 315 Crawler Excavator 19-Jun
Test ball Plugs 19-Jun
4"VAC ASSIST(75 HP) 19-Jun
SITE SUPERVISOR: DANIEL CUELLAR
Comments:
NOTED BY
07-04-Daily Site Report-Vicksburg St
'''`,: ::"-'''-"-
, r
.. r -.0.,...to
.,•,;- --,-';,- -!i7 , .=,:.. ,
4
..... .
. 1.,--1,.', ,-,;,-, -ty.' ..t7, -- r , • 41A.,:'.;1\ ' :' - .. :4;
..,•'1', ..::'''..'•'''' 7 '..:-...,:•A ..7...-;"i-..".., .--'-",,, 4%. •-'I' ' . •,,,, -'.. a- 7=...!-'
;''' '' '.fg-.,!-;'----- , '.' ,,, ir:,..' ' ::14*tr---'1.-1--A :''' -:,...•';:- `.-•' . -1 1 T.,.'"' '. 2r.". ' ''. '''' '' : - ',
'• '44'.'"T/I''''''* . - 1%11*,44:4S21,:r-t-e', -**'...,:.•;;.7:--;`'. 0,777:4`;17, ;,a.,.,v'. :„, ', _ 4-i'7''' :'.• '; 't ,'-..74''• -• _ 4;.',..
.:•11 i 1 F:14: '' . ••,'t.' -.. '' =:''' 4i. .Z',„'.:'::!'''- '''''.•''.*'.....': ' ' .';';',r,-'.-1',;',-:.4-ri ''''''';': -:..f.:4` .1:7`''' -. ''''.4:‘,;'.':%;;I-.'-:.' , 4 .,
..
1, ,Ar .,. .- ..- ..,, . - ,. .4....:.... ..,,,e -4, ....---:,... z:.,„...v.J.,..;...-1/2,-,...:,1..,z-,,,•:;::.4.1.......,.;:.. ...4 - -..,,v;,......,,,..:.y • .....
-
---,-,-
40014w, ttauttp
'. .- . ' '•-. .-i.r..,, --. -.... "---t. '— . .1.'jt:‘,,Tt. - , ,-...\-,ti4- -;-,..-..ilr -...-..r-‘..
' '' ...-'-: - t '1•4 -----•. "s'A104- .7 -,, -.*,;.• . ''''' -'; '-'1,. r .. 4,74 ,,-..
.,,. . ......„, „ . ,.. 7,,-; - - , k .,..-. ,,i‘ -• :,..i.-- --
-. ''..""*.it--- ..4.• .-. ''-' .-.! 'i z'.4-. -.,"'.-'-. .,..-„74. .. -. -N. ''. Ihi.... 72- ,... 1*• .". ''
'' - • ' - ' -- ' ''-•4t;,..:;.,;....'.,; le--; ' -
- -
' • '
....,... ,. ,..
., .--; ,.„ -;.••. . ...."--. ii..-.1,...r.,40, „,„:4,-.•4,., ,-,..,'' IF-- k.
- -— " ,,r ....,..,'- ..-:,-- -,,,,,,, ..,,,,,...,x- - •- ,,,,ib..- 4,,,,.„, -
. ''• *.--"; ,. .-.;.*t --- ,'.- ..1. -... ,..- '."--- .-.,--t - .t;•'';..-, .. -;-4
--....) .'-',1 -.:.'..',3,;,..' .-1. 17.. f,:- .,..... , - .1' -. '4;4 1. .- ---.7 'N''Air\-- 3,,.
1, ,..,4" ).—.4.:,1; . •:,, •.-• .,r%.. ; '' ' ' tt,' .44
T.- ". ...' -'''! .1 ,,, ., i',-"'•-„. . ,-,- _ _1.--- , .,:;.':4*.,:'''., A-,. .,
3Ac.k.
.''''-... .3s,-' • .4.; .Ar.:,..k'' tg.iii, ' - ',-.„'.,:, ,*4:tikk.11,-.,„:... .... --../- ,°,, , ' - ,'..i‘- 11 ',,Z..1/4- ' k '.0.. -
--Z.'''•
4--I.
., —
- -.., ..
.-„
, .
,
. .
..,;-
...
, ,,,„,•,.....•-- '
. .....
. ...
. .
•., ' .
r
•i7-
.,..,,
.., , .....'
07-04-Daily Site Report-Vicksburg St
Daily Site Report cLBAL
DRILLING.INC.
Project: EMERGENCY REPAIR TO SANITARY SEWER MAIN Date: July 5.2023(Wednesday)
ON VICKSBURG AT 6TH ST. Weather: Slight Rain:Fair
Location: Vicksburg St.Intersection with 6th St.Port Arthur TX
Description of Work Completed: Start Finish Comment
[Time] [Time]
1 Backfilling and Grading
2
3
4
DRILLING DETAILS.
Crossing Reference No.: TODAY(Feet) PREVIOUS(Feet) TOTAL(Feet)
Vicksburg St.Intersection with 6th St,Po,:.
Arthur TX
MATERIALS: PERSONNEL:
CONSUMABLES Name: From. To: Total No of Hours
FUEL(L) Daniel Cuellar 8:00AM 5:00PM
OIL(L) Julio 8:00AM S OOPM
PIPE(Type)-(Ft) Troy 8:00AM 5.00PM
Others
4
EQUIPMENT
TYPE Hire Date Hours Used COMMENTS
Bobcat E26 Excavator 9-Jun
CAT 315 Crawler Excavator 19-Jun
New Holland Roller 4-Jul
SITE SUPERVISOR: DANIEL CUELLAR
Comments:
NOTED BY:
07-05-Daily Site Report-Vicksburg St
R t. y.: +ek..
t'AYq NA} g4
'w taut
aiRs 1 H ♦
��
f x`
.K. f '�Y F i!wr:..
, \ 410,
:-- ,:Cr:, .,..
w. s
1
s � 3l• � {fi
y
.{i3.g; At- . .
a
t
r
—- --' 401111.11"°-' : ' . " ,,,,t, :.*:',- - '11 : — --1"‘ ' '''N*-- '
c
,
.0 .. . ,4
r
. r,..
ti i,4,-; s
•
& , '" , . is"fir- -
07-05-Daily Site Report-Vicksburg St
Daily Site Report GLOBAL
DRILLING.INC
Project: EMERGENCY REPAIR TO SANITARY SEWER MAIN Date: July6,2023(Thursday)
ON VICKSBURG AT 6TH ST. Weather: Slight Rain;FAIR
Location' Vicksburg St.Intersection with 6th St.Port Arthur TX
Description of Work Completed: Start Finish Comment
[Time] [Time]
1 Continuation of Backfilling and Grading
9 2
3
4
DRILLING DETAILS:
Crossing Reference No.: TODAY(Feet) PREVIOUS(Feet) TOTAL(Feet)
Vicksburg St.Intersection with 6th St,Port
Arthur TX
MATERIALS: PERSONNEL:
CONSUMABLES Name: From: To: Total No of Hours
FUEL(L) Daniel Cuellar 8 00AM S:DOPM
OIL(L) Julio 8:OOAM 5•00PM
PIPE(Type)-(Ft) Troy 8:00AM 5.001PM
Others
EQUIPMENT:
TYPE Hire Date Hours Used COMMENTS
Bobcat E26 Excavator 9-Jun
CAT 315 Crawler Excavator 19-Jun
New Holland Roller 5-Jul
SITE SUPERVISOR: DANIEL CUELLAR
Comments:
NOTED BY:
07-06-Daily Site Report-Vicksburg St
I
-....: ' '';11' ' ' 4111t,'
C- a
a x.
fir, - -tee. t 4`s}`
,� s-
''" i ce,so- •c'tq�- .
+ +, '"� „ sue` .
07-06-Daily Site Report-Vicksburg St
I
Daily Site Report GLtBAL
ONILLING
Project: EMERGENCY REPAIR TO SANITARY SEWER MAIN Date: July 7,2023(Friday)
ON VICKSBURG AT 6TH ST. Weather: Slight Rain/FAIR
Location: Vicksburg St.Intersection with 6th St.Port Arthur TX
Description of Work Completed: Start Finish Comment
[Time] [Time]
1 Finished Backfilling and Grading
2
3
4
• DRILLING DETAILS
•
Crossing Reference No.: TODAY(Feet) PREVIOUS(Feet) TOTAL(Feet)
Vicksburg St,Intersection with 6th St,Por
Arthur TX
MATERIALS PERSONNEL:
CONSUMABLES Name: From' To: Total No of Hours
FUEL(L) Daniel Cuellar 8:00AM 5:00PM
OIL(L) Julio 8:00AM 5 00PM
PIPE(Type)-(Ft) Troy 8:00AM 5:00PM
Others
EQUIPMENT:
TYPE Hire Date Hours Used COMMENTS
Bobcat E26 Excavator 9-Jun
CAT 315 Crawler Excavator 19-Jun
New Holland Roller 5-Jul
SITE SUPERVISOR: DANIEL CUELLAR
Comments:
NOTED BY:
07-07-Daily Site Report-Vicksburg St
\ �a
•
el Js i' �' �
•: ,: ,
N
�"" �,
"'.. t,.::-4.z-:L:t.t *.a't `'t f :.n 4 r .:wa •;
'e ..rx+ s d ".'3 3, .t a f„ ,w fr ,w^.y ,G.- ,1 2<
..++•:
$ az 1 , :-. _e», . s $ 1. c ry.7: -tt : -.
=' ,,, ,,y.t try ' ..s #0 . C .y • r d 4s 4� a :f_',2 a , q; .-
1',.. n' 4'.'.."'fo .yam . ..[ .Y_!^+
xA* 9 wJ. 'l�3 h -- aw 5. 1
' fi r
y
_ . _
14
au
,- ,� `
<: •. 8 _ - .
P
^- — St,t+ 1 �J.
07-07-Daily Site Report-Vicksburg St