HomeMy WebLinkAbout(D 2&3) Council Update 404 Drainage Projects AUGUST 2023City of Port Arthur - Ardurra
FEMA 404 Hazard Mitigation Program
City Council Update – August 2023
1
City of Port Arthur
FEMA 404 Hazard Mitigation Program Overview
Funding formula based on damage from a named event
Mitigate against future damages
Not specific to damages caused by named event
Must meet a Benefit Cost Analysis (BCR = 1+)
Approved by Texas Department of Emergency Management
Approved by FEMA
Cost Share 75% - 25% (Harvey – Senate Bill #7 2020)
2
City of Port Arthur
FEMA 404 Hazard Mitigation Program Process
Selection of Proposed Projects by City
Phase I Application Development
Identify Project Goals, Construction Area, Impact Area
Establish Initial BCA
Submit Application for TDEM/FEMA Review
Phase I Approval
Phase II Project Submission
Confirm Project Scope/Area/Impact Area
Begin Design, Survey, Environmental Review
Update BCA/Cost Estimate
Additional Review by TDEM/FEMA – Defend Project
Phase II Approval
Notice of Award to City
Complete Final Design, Bid, and Construct the Project
3
City of Port Arthur
FEMA 404 Hazard Mitigation Program Project Review
City of Port Arthur Harvey – FEMA 404 Projects
Stonegate Drainage Improvements
($16.9 Million)
El Vista Drainage Improvements
($10.2 Million)
Port Acres Drainage Improvements
($30.5 Million)
4
City of Port Arthur
FEMA 404 Hazard Mitigation Program Project Costs
5
City of Port Arthur
FEMA 404 Hazard Mitigation Program Project Costs
6
City of Port Arthur
FEMA 404 Hazard Mitigation Project Cost Review
7
STONEGATE IMPACT AREA
STONEGATE DRAINAGE IMPROVEMENTS
8
STONEGATE DRAINAGE IMPROVEMENTS
Increased drainage line capacity along 9th Avenue and Jimmy Johnson Blvd. and increased retention capacity in the golf course will reduce street inundation in the project area from a
2 yr. storm impact to a 25 yr. storm impact. Anticipated Start Date: December 2023. Anticipated Completion Date: April 2025.
Impact Area Streets (Black Highlighted are Project Area Streets)
Lake Arthur Dr Pleasant Hill Champions Ct Greenway Point Dr 9th Avenue Oakmont Dr
Roshan Ct Royal Dr Birchwood Dr Jimmy Johnson Blvd Memorial Blvd Golfhill Dr
Greenhill Dr Sugarhill Ct Anchor Dr Regency Dr Turtle Creek Blvd
9
Oakmont Drive
Golfhill Drive
Jimmy Johnson Blv
d
9th Avenue
Lake Arthur Drive
Gre
e
nwa
y
Poin
t
e Drive
STONEGATE PROJECT AREA
JIMMY JOHNSON
9TH AVENUE
LAKE ARTHUR DR
STONEGATE
DRAINAGE IMPROVEMENTS
Project Area
10
EL VISTA DRAINAGE IMPROVEMENTS
Project and Impact Areas
11
EL VISTA DRAINAGE IMPROVEMENTS
By replacing an estimated nearly 2.5 miles of old drainage lines with newer and larger piping street and home inundation will be reduced and storm protection will increase from a 2 yr.
level of protection to a 25 yr. level of protection. Anticipated Start Date: November 2023. Anticipated Completion Date: January 2025.
Impact Area Streets (Black Highlighted are Project Area Streets)
53rd Street Mulberry St Smith St Linn St
60th St Barbara Ln Maple Ave Danny St Golden St Minnie St Roosevelt Ave Sam Ave Grant Ave Wheatley Ave Texas Ave Pine Ave Charles Ave Buckner Dr Daisy Ave Reba
Dr Willow Ave Cherry Ave Phyllis Ave Ellias St
12
PORT ACRES DRAINAGE IMPROVEMENTS
Project and Impact Areas
13
PORT ACRES DRAINAGE IMPROVEMENTS
By replacing 3.5 miles of old and existing box culverts and almost and 3 miles of older and smaller drainage lines, a reduction of house and street inundation will be achieved increasing
the storm protection from a 2 yr. storm level to a 25 yr. storm level. Anticipated Start Date: November 2023. Anticipated Completion Date: June 2025.
Impact Area Streets (Black Highlighted Streets are Project Area Streets)
62nd Street 63rd Street 64th Street W Port Arthur Road Amino Street 65th Street 66th Street 67th Street
Hwy 365 Garnet Ave Susie St Anne St
Bobby St Solomon St Jade Ave Alice Ave
Nick Ave Silver Ave Katy Ave Canal St
Front Ave Acres Ave.
14
City of Port Arthur
FEMA 404 Hazard Mitigation Admin Cost Review