Loading...
HomeMy WebLinkAbout(D 2&3) Council Update 404 Drainage Projects AUGUST 2023City of Port Arthur - Ardurra FEMA 404 Hazard Mitigation Program City Council Update – August 2023 1 City of Port Arthur FEMA 404 Hazard Mitigation Program Overview Funding formula based on damage from a named event Mitigate against future damages Not specific to damages caused by named event Must meet a Benefit Cost Analysis (BCR = 1+) Approved by Texas Department of Emergency Management Approved by FEMA Cost Share 75% - 25% (Harvey – Senate Bill #7 2020) 2 City of Port Arthur FEMA 404 Hazard Mitigation Program Process Selection of Proposed Projects by City Phase I Application Development Identify Project Goals, Construction Area, Impact Area Establish Initial BCA Submit Application for TDEM/FEMA Review Phase I Approval Phase II Project Submission Confirm Project Scope/Area/Impact Area Begin Design, Survey, Environmental Review Update BCA/Cost Estimate Additional Review by TDEM/FEMA – Defend Project Phase II Approval Notice of Award to City Complete Final Design, Bid, and Construct the Project 3 City of Port Arthur FEMA 404 Hazard Mitigation Program Project Review City of Port Arthur Harvey – FEMA 404 Projects Stonegate Drainage Improvements ($16.9 Million) El Vista Drainage Improvements ($10.2 Million) Port Acres Drainage Improvements ($30.5 Million) 4 City of Port Arthur FEMA 404 Hazard Mitigation Program Project Costs 5 City of Port Arthur FEMA 404 Hazard Mitigation Program Project Costs 6 City of Port Arthur FEMA 404 Hazard Mitigation Project Cost Review 7 STONEGATE IMPACT AREA STONEGATE DRAINAGE IMPROVEMENTS 8 STONEGATE DRAINAGE IMPROVEMENTS Increased drainage line capacity along 9th Avenue and Jimmy Johnson Blvd. and increased retention capacity in the golf course will reduce street inundation in the project area from a 2 yr. storm impact to a 25 yr. storm impact. Anticipated Start Date: December 2023. Anticipated Completion Date: April 2025. Impact Area Streets (Black Highlighted are Project Area Streets) Lake Arthur Dr Pleasant Hill Champions Ct Greenway Point Dr 9th Avenue Oakmont Dr Roshan Ct Royal Dr Birchwood Dr Jimmy Johnson Blvd Memorial Blvd Golfhill Dr Greenhill Dr Sugarhill Ct Anchor Dr Regency Dr Turtle Creek Blvd 9 Oakmont Drive Golfhill Drive Jimmy Johnson Blv d 9th Avenue Lake Arthur Drive Gre e nwa y Poin t e Drive STONEGATE PROJECT AREA JIMMY JOHNSON 9TH AVENUE LAKE ARTHUR DR STONEGATE DRAINAGE IMPROVEMENTS Project Area 10 EL VISTA DRAINAGE IMPROVEMENTS Project and Impact Areas 11 EL VISTA DRAINAGE IMPROVEMENTS By replacing an estimated nearly 2.5 miles of old drainage lines with newer and larger piping street and home inundation will be reduced and storm protection will increase from a 2 yr. level of protection to a 25 yr. level of protection. Anticipated Start Date: November 2023. Anticipated Completion Date: January 2025. Impact Area Streets (Black Highlighted are Project Area Streets) 53rd Street Mulberry St Smith St Linn St 60th St Barbara Ln Maple Ave Danny St Golden St Minnie St Roosevelt Ave Sam Ave Grant Ave Wheatley Ave Texas Ave Pine Ave Charles Ave Buckner Dr Daisy Ave Reba Dr Willow Ave Cherry Ave Phyllis Ave Ellias St 12 PORT ACRES DRAINAGE IMPROVEMENTS Project and Impact Areas 13 PORT ACRES DRAINAGE IMPROVEMENTS By replacing 3.5 miles of old and existing box culverts and almost and 3 miles of older and smaller drainage lines, a reduction of house and street inundation will be achieved increasing the storm protection from a 2 yr. storm level to a 25 yr. storm level. Anticipated Start Date: November 2023. Anticipated Completion Date: June 2025. Impact Area Streets (Black Highlighted Streets are Project Area Streets) 62nd Street 63rd Street 64th Street W Port Arthur Road Amino Street 65th Street 66th Street 67th Street Hwy 365 Garnet Ave Susie St Anne St Bobby St Solomon St Jade Ave Alice Ave Nick Ave Silver Ave Katy Ave Canal St Front Ave Acres Ave. 14 City of Port Arthur FEMA 404 Hazard Mitigation Admin Cost Review 15