INTEROFFICE MEMORANDUM
Date: August 18, 2023
To: The Honorable Mayor and City Council
Through: Ronald Burton, CPM, City Manager
From: Flozelle C. Roberts, EIT, MEng, MBA, CPM; Director of Public Works
RE: PR23286: Sabine Pass Boat Ramp: Acceptance of Amendment No. 2 from the Texas
Parks and Wildlife Department(TPWD)that extends the contract completion date from
May 31, 2023 to the new contract completion date of December 31, 2023 for the
reconstruction of the Sabine Pass Boat Ramp. Project No. PR0007-GRA.
Introduction:
The intent of this agenda item is to authorize the City Manager to accept Amendment No. 2 from the
Texas Parks and Wildlife Department (TPWD) that extends the original contract completion date of
May 31, 2023 to the new contract completion date of December 31, 2023 for the reconstruction of the
Sabine Pass Boat Ramp in Sabine Pass, Texas.
Background:
Pursuant to Resolution No. 20-425,City Council agreed to participate in and accept grant funding from
the TPWD for the reconstruction of the Sabine Pass Boat Ramp in Sabine Pass, Texas. The monies
were secured through the Harvey Fisheries Disaster Relief Grant Program.
The Sabine Pass Boat Ramp Rebuild and Area Improvements Project experienced delays in procuring
materials, sheet piling,the installation of offshore protection, and rain prior to the start of construction.
The TPWD has submitted an amendment to the original contract document that extends the project by
seven(7)months. Section IX. TERM OF CONTRACT, is amended to extend the contract completion
date from May 31,2023 to the new contract completion date of December 31, 2023. The contract went
through the Texas Legislature approval process and was deemed an appropriate extension.
Budget Impact:
Funding for this project is not impacted by TPWD Amendment No. 2.
Recommendation:
It is recommended that the City of Port Arthur City Council approve PR23286 that authorizes the City
Manager to accept Amendment No. 2 from the Texas Parks and Wildlife Department that extends the
original contract completion date of May 31,2023 to the new contract completion date of December 31,
2023 for the reconstruction of the Sabine Pass Boat Ramp in Sabine Pass,Texas.
"Remember,we are here to serve the Citizens of Port Arthur"
P.O.Box 1089 X Port Arthur,Texas 77641-1089 X 409.983.8101 X FAX 409.982.6743
S:\Engineering\PUBLIC WORKS\PW-ENGINEERING\C.I.P.PROJECTS\Year 2022\Sabine Pass Boat Ramp\Agenda\Agenda Memo Sabine Pass TPWD Extension 12 31 23.docx
PR23286
8/16/2023 mje
Page 1 of 3
RESOLUTION NO.
A RESOLUTION AUTHORIZING THE CITY MANAGER TO
ACCEPT AMENDMENT NO. 2 TO THE CONTRACT
BETWEEN THE CITY OF PORT ARTHUR AND THE TEXAS
PARKS AND WILDLIFE DEPARTMENT (TPWD) ADDING
7 MONTHS TO THE ORIGINAL CONTRACT COMPLETION
DATE OF MAY 31, 2023 TO THE NEW CONTRACT
COMPLETION DATE OF DECEMBER 31, 2023 FOR THE
SABINE PASS BOAT RAMP REBUILD AND AREA
IMPROVEMENTS PROJECT. FUNDING IS NOT
IMPACTED. PROJECT NO. PR0007-GRA.
WHEREAS, pursuant to Resolution No. 20-425, City Council agreed to
participate and accept the grant funding for the reconstruction of the Sabine Pass Boat
Ramp from the Texas Parks and Wildlife Department (TPWD); and,
WHEREAS, the City of Port Arthur entered into an agreement with the Texas
Parks & Wildlife Department (TPWD), by way of a grant, from the Harvey Fisheries
Disaster Relief Grant Program for the reconstruction of the Sabine Pass Boat Ramp;
and,
WHEREAS, pursuant to Resolution 22-450, the City of Port Arthur entered into
an agreement with Elite Contractors & Equipment, LTD, of Kirbyville, Texas, for the
construction of the Sabine Pass Boat Ramp and Area Improvements Project; and,
WHEREAS, there were significant delays in procuring materials, sheet piling,
installation of offshore protection devices, and rain prior to the start of construction;
and,
PR23286
8/16/2023 mje
Page 2 of 3
WHEREAS, the TPWD, having examined the specifics for the delays, has agreed
that the delays were justified and extended the contract completion by seven (7)
months; and,
WHEREAS, the TPWD has submitted an amendment to Contract No. CA-
0001129, Section IX. TERM OF CONTRACT, that extends the contract from its original
contract completion date of May 31, 2023 to the new contract completion date of
December 31, 2023, see Exhibit A; and,
WHEREAS, approval of PR23286 is herein deemed an appropriate action; now
therefore,
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PORT ARTHUR:
THAT, the facts and opinions in the preamble are true and correct; and,
THAT, the City Manager is authorized to approve TPWD Amendment No. 2 to
extend the original contract completion date of May 31, 2023 to the new contract
completion date of December 31, 2023; and,
THAT, a copy of the caption of this resolution be spread upon the minutes of the
City Council.
READ, ADOPTED AND APPROVED this the day of ,
A.D. 2023 at a meeting of the City of Port Arthur, Texas, by the
following vote: Ayes: Mayor:
Councilmembers:
PR23286
8/16/2023 mje
Page 3 of 3
Noes:
Thurman Bill Bartle
Mayor
ATTEST:
Sherri Bellard
City Secretary
APPROVED AS TO FORM: APPROVED FOR ADMINISTRATION:
1L/A4./ /9.44//
a ecia Tizeno, Esquire Ronald Burton, CPM
City Attorney City Manager
APPROVED AS FOR AVAILABILITY OF
FUNDS:
4<c C ,\_/)
Kandy K. Daidiel
Director of Finance
Ile C. oberts, , MEng, MBA, CPM
Directo of ublic W r
tvill// , ,
Clifton illiams, CPPB
Purchasing Manager
EXHIBIT A
AMENDMENT TO CONTRACT
THE STATE OF TEXAS )(
)( AMENDMENT NO. 2 TO CONTRACT NO. CA-0001129
COUNTY OF TRAVIS )(
It is mutually understood and agreed by and between the undersigned contracting parties of the above
numbered Contract to amend said contract as follows:
In accordance with the terms of the above referenced contract executed March 19, 2021 and
Amendment 1 executed October 31, 2022, TPWD hereby amends the project entitled, "Sabine Pass
Boat Ramp Rebuild and Area Improvement,"as follows:
Section IX.TERM OF CONTRACT, is amended to extend the contract by 7(seven) months. The new
contract termination date is December 31. 2023.
The total reimbursable contract amount remains and shall not exceed$1,382,751 (one million three hundred
eighty-two thousand seven hundred fifty-one dollars) with sources as per the funding breakdown provided
below. Budgeted monies not spent in Fiscal Year(FY) 2023 are eligible to be rolled over to FY 2024.
Table 1. Funding
Funding Source Total TPWD Reimbursable Funding
Federal Grant Funds Hurricane Harvey Disaster $1,257,751
Recovery/CFDA 11.002 NA19NMF0220006
TPWD Donation Funds $125,000
TPWD REIMBURSABLE GRANT TOTAL: $1,382,751
� ------ -----------..___..__-
SECTION N.TIMELINE of Attachment A-1: Revised Proposal and Budget,is replaced and updated
as indicated in bold with the following Schedule of Reporting and Project Completion Dates
below:
• Execute subcontract agreement 04-01-2021
• Begin work 04-01-2021
• Interim Performance Report to TPWD 08-15-2021
• Interim Performance Report to TPWD 11-30-2021
• Interim Performance Report to TPWD 02-28-2022
• Interim Performance Report to TPWD 04-30-2022
• Interim Performance Report to TPWD 07-31-2022
• Interim Performance Report to TPWD 10-31-2022
• Interim Performance Report to TPWD 01-31-2023
• Interim Performance Report to TPWD 04-30-2023
• Interim Performance Report to TPWD 07-31-2023
• Interim Performance Report to TPWD 10-31-2023
• Complete Construction 11-30-2023
• Final Inspection by TPWD 12-31-2023
• Final Performance Report to TPWD 01-31-2024
This Amendment shall become effective upon signature of both parties. All other terms and conditions
not hereby amended are to remain in full force and effect.
RECEIVING AGENCY PERFORMING AGENCY
TEXAS PARKS AND WILDLIFE DEPARTMENT CITY OF PORT ARTHUR
David Ydskowitz, Ph.D. Authorized Si ure
Executive Director
Date: veer l 2,y Date:
SAM SAM
UEID: EVA9NVGH2K85 UEID: EMVNEFYW2KN4