Loading...
HomeMy WebLinkAboutPR 23306: AGREEMENT WITH INDUSTRIAL AND COMMERCIAL MECHANICAL, HVAC REPLACEMENT AT THE CIVIC CENTER Memorandum City of Port Arthur, Texas Robert A. "Bob"Bowers Civic Center To: The Honorable Mayor and City Council Through: Ron Burton, City Manager From: Adam J Saunders, Civic Center Dir RE: Proposed Resolution No. 23306 REQUEST: The Civic Center needs to replace HVAC Rooftop Units (RTU) #3 and#12. It is determined the current units, which cool and heat Halls B and C, needs replacement. Industrial and Commercial Mechanical (ICM) of Beaumont, TX can do this work for $113,236.00 out of account number 307-21-049-8512-00-10-000-. ANALYSIS/CONSIDERATION: The current HVAC RTU #3 and #12 need replacement. It will take about 22 weeks for the units to be delivered, then installation will follow. Because of this, the total cost of this work will come out of the Civic Center budget for Fiscal `23/'24. ICM of Beaumont, TX has provided a price for this work under the Buyboard cooperative contract # 638-21 in the amount of $113,236.00 out of account number 307-21-049-8512-00-10-000-. RECOMMENDATION A resolution authorizing the City Manager to enter into an agreement with Industrial and Commercial Mechanical of Beaumont, TX to replace the current HVAC RTU#3 and#12 of the Civic Center in the amount of$113,236.00. Funds available in account number 307-21-049- 8512-00-10-000-. BUDGETARY AND FISCAL EFFECT Funds are available in account#307-21-049-8512-00-10-000-. STAFFING EFFECT None P.R. No.23306 8/16/23 AJS PAGE 1 of 3 RESOLUTION NO. A RESOLUTION AUTHORIZING THE CITY MANAGER TO ENTER INTO AN AGREEMENT WITH INDUSTRIAL AND COMMERCIAL MECHANICAL OF BEAUMONT, TEXAS THROUGH BUYBOARD CONTRACT NO. 638-21 TO REPLACE THE CURRENT HVAC ROOFTOP UNITS #3 AND #12 OF THE CIVIC CENTER IN THE AMOUNT OF $113,236.00. FUNDS AVAILABLE IN ACCOUNT NUMBER 307-21-049-8512-00-10-000-. WHEREAS,the Civic Center is in need of new HVAC Rooftop Units#3 and #12 to replace the current units for the cooling and heating of Halls B and C; and WHEREAS, Industrial and Commercial Mechanical of Beaumont, TX can do this work for$113,236.00; and WHEREAS,Industrial and Commercial Mechanical of Beaumont, TX has a cooperative contract with Buyboard 638-21; and, WHEREAS, Chapter 271 of the Local Government Code allows a city, by resolution of its governing body,to participate in cooperative purchasing programs, such as Buyboard, a purchasing cooperative, as an alternative to a formal bid process; and WHEREAS,per Resolution No. 02-341,the City entered into an interlocal agreement for cooperative purchasing with the Buyboard Cooperative Purchasing Program("Buyboard"); now,therefore, NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PORT ARTHUR: THAT,the facts and opinions in the preamble are true and correct. THAT,the City Manager is hereby authorized to execute an agreement with Industrial and Commercial Mechanical of Beaumont, Texas through BuyBoard Contract No. 638-21 to replace the current HVAC Rooftop Units#3 and#12 at the Civic Center in the amount of $113,236.00, in substantially the same form as attached hereto as Exhibit"A"; and. THAT a copy of the caption of this Resolution be spread upon the Minutes of the City Council. P.R. No. 23306 8/16/23 AJS PAGE 2 of 3 READ, ADOPTED, AND APPROVED,this day of 2023 AD, at a Regular Meeting of the City Council of the City of Port Arthur, Texas by the following Vote: AYES: Mayor: , Councilmembers: , , NOES: Thurman Bill Bartie, Mayor ATTEST: Sherri Bellard, City Secretary AP OVED AS TO FORM: 62Ceet-e att— ,I9Jziutfi 1 Valecia Tiz no, City Attorney APPROVED FOR ADMINISTRATION: Ronald Burton, City Manager APPROVED AS TO FUND AVAILABILITY: / ,,/ / AA: //t e 1�V Kandy Daniel, rector of Finance Clifton illiams, CPPB, Purchasing Manager EXHIBIT "A" CITY OF PORT ARTHUR--BOB BOWEWRS CIVIC CENTER—RTU 3 AND RTU-12-ICM PROPOSAL TO FURNIS INSTALL 2-NEW CARRIER 25-TON PACKAGE AC UNITS WITH GAS HEATING. Industrial and Commercial Mechanical 4445 Westpark Avenue Beaumont,TX 77705 Phone(409)842-3737 Fax (409)842-3738 August 9,2023 CITY OF PORT ARTHUR TEXAS 444 4T"STREET I PORT ARTHUR,TX 177640 ATTN: Adam Saunders—Bob Bowers-Civic Center MANAGER Subject: BOB BOWER CIVIC CENTER— i U 3 AND RTU12-ICM PROPOSAL TO FURNISH PARTS AND LABOR TO IALLMi itN Or I.-NEIto 25-TON CARRIER ROOFTOP PACKAGE AC UNITS WITH GAS HEATING Industrial Commercial Mechanical is pleased to offer the following proposal as listed below for your Review includes; Item QTY Description 1. FURNISH/INSTALL CARRIER MODEL 48FCDM28AJC6-6F0A0 25 TON ROOFTOP PACKAGE UNITS WITH GAS HEATING, QTY OF 2-NEW CARRIER REPLACEMENT UNITS(FOR RTU#3 AND RTU#12)ROOFTOP PKG UNITS 2. 2 CARRIER—2ND THRU 5'8 YEAR COMPLETE UNIT—PARTS f-FACTORY WARRA. -ARE INCLUDED. 3 2 FURNISH CRANE BY TNT-CRANE,FOR REMOVAL OF OLD AND SETTING NEW ROOFTOP PACKAGE AC UNITS. QTY OF 2-CRANE LIFTS PROVIDED BY TNT CRANE—FOR UNITS#3 AND Unit#12 AC UNITS. 4 2 FURNISHING ELECTRICAL DEMO AND RECONNECTION TO NEW PACKAGE AC UNITS,BY GULF COAST ELECTRIC. 5 2 FURNISH AND INSTALL A NEW DIGITAL HEAT/COOL THERMOSTAT IS INCLUDED IN PROPOSED WORK. 6 2 RECONNECTION OF EXISTING GAS SUPPLY AND DRAIN PIPING,IS INCLUDED IN PROPOSED WORK. 7 2MEN ICM JOURNEYMEN HVAC TECHNICIANS LABOR TO perform INSTALL AND START UP NEW ROOFTOP AC UNITS. 8 2 REMOVAL,TRANSPORTATION AND DISPOSAL OF OLD EQUIPMENT UNITS PROVIDED BY ICM,IS INCLUDED. 9 1 Includes:Chapman Sheetmetal Ind.RTt!- -to remove existing S/A and R/A duct from the unit to the wall,and assist ICM to replace unit,new duct work to be fabricated from galv.metal with 1 1/2"fiberglass on the inside Shop fabrication to take 2 weeks after new unit is set into place and install to take 3 to 4 days after unit is set.(ZTU 12—RECONNECTION TO EXISITNG DUCTWORK,IS INCLUDED.) ITEMS NOT INCLUDED IN PROPOSAL ➢ Any Changes or Modifications,other than specified as part of proposal,or proposed scope of work. ➢ Any Changes or Work delays;due to problems beyond our control. ➢ Warranty of any items not furnished and installed by ICM. ➢ Integration or Connections to Bldg.Fire Safety Systems-is provided by Owner's representative. PRICE TO INSTALL RTU-12 PACKAGE UNIL Labor $ 7,480.00 Materials $105,755.42 Total ~ 113,23c 42 Sales Taw;c 'I- In�( irlor ***Current lead time reported by Carrier is approximately 21 weeks. THIS PROPOSAL IS VALID FOR 30 DAYS-FROM THE DATE PROPOSAL IS PRESENTED. INDUSTRIAL&COMMERCIAL MECHANICAL IS AN AWARDED VENDOR FOR BUYBOARD CONTRACT#638-21. Thank you for your request for this proposal. We would appreciate the opportunity to provide these services.Please let me know if you would like to proceed with the proposed service repair,and what purchase order number we will utilize,for our billing for services. As always,we thank you for your business and the opportunity to provide our services. Regards, Jerry E. Johnson • LA 23943C—Regulated by the Texas Department of Licensing and Regulation PO Box 12157 Austin.TX 78711 1-800-803-9202.512-463-6599