Loading...
HomeMy WebLinkAboutPR 23366: WILLOW LANE TOWNHOMES, H&P ENGINEERING AND CONSTRUCTION, INC. Cm of or! mbar TeACIS www.PortArthurTx.gov INTEROFFICE MEMORANDUM Date: September 29, 2023 To: The Honorable Mayor and City Council Through: Ron Burton, City Manager From: John Cannetella, City Engineer RE: PR23366: Willow Lane Townhomes Acceptance of Close Out Documents submitted from H&P Engineering and Construction, Inc., of Port Arthur, Texas. Introduction: The intent of this Agenda Item is to authorize the City Manager to accept the close out documents from H& P Engineering and Construction, Inc., of Port Arthur, Texas. Background: The City of Port Arthur has received for Willow Lane Townhomes an Engineer's Certificate of Completion, dated December 23, 2022, a Contractor's Certificate and Release, and a Contractor's Certificate of Guarantee, dated December 12, 2022, from H & P Engineering and Construction, Inc., certifying that the public infrastructure improvements have been completed. Budget Impact: Funds are not impacted. Recommendation: It is recommended that the City of Port Arthur City Council approve PR23366 for the acceptance of an Engineer's Certificate of Completion,dated December 23,2022,a Contractor's Certificate and Release, and a Contractor's Certificate of Guarantee, dated December 12, 2022, from H & P Engineering and Construction, Inc., certifying that the public infrastructure improvements have been completed. "Remember,we are here to serve the Citizens of Port Arthur" 444 4th Street X Port Arthur,Texas 77641-1089 X 409.983.8182 X FAX 409.983.8294 PR No.23366 9/29/2023 JCC Page 1 of 3 RESOLUTION NO. A RESOLUTION AUTHORIZING ACCEPTANCE OF THE CONTRACTOR'S CERTIFICATE AND RELEASE, THE CONTRACTOR'S CERTIFICATE OF GUARANTEE FROM H&P ENGINEERING AND CONSTRUCTION, INC. OF PORT ARTHUR, TEXAS FOR WILLOW LANE TOWNHOMES AND AUTHORIZING THE CITY MANAGER TO SIGN THE CERTIFICATE OF ACCEPTANCE ON BEHALF OF THE CITY OF PORT ARTHUR, TEXAS. WHEREAS, the City has received for Willow Lane Townhomes an Engineer's Certificate of Completion, dated December 23, 2022 (attached as Exhibit "A"), a Contractor's Certificate and Release (attached as Exhibit "B"), and a Contractor's Certificate of Guarantee, dated December 12, 2022 (attached as Exhibit "C"), from H&P Engineering and Construction, Inc., of Port Arthur, Texas, certifying that the public infrastructure improvements have been completed; and, WHEREAS, pursuant to Resolution No. 23- , the City accepted a Public Water and Wastewater Utility Easement from H&P Engineering & Construction, Inc. for the Willow Lane Townhomes Development for the purpose of installing, maintaining, operating, and replacing public utilities, under, through, and across a portion of their property in the City of Port Arthur; and, WHEREAS, representatives from the Public Works Department and Utility Operations Department have inspected the completed Rice Farm Road Roadway, and the internal Willow Lane Townhomes drainage, water, and sewer improvements; and, WHEREAS, approval of PR23366 is herein deemed an appropriate action; now, therefore, PR No.23325 9/11/2023 mje Page 2 of 3 BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PORT ARTHUR: THAT, the facts and opinions in the preamble are true and correct; and, THAT, the City Manager is hereby authorized to execute, on behalf of the City of Port Arthur, a Certificate of Acceptance to Willow Lane Townhomes for the public infrastructure improvements associated with Willow Lane Townhomes, attached, and made a part hereof as Exhibit "D"; and, THAT, a copy of the caption of this Resolution be spread upon the Minutes of the City Council. READ, ADOPTED AND APPROVED this the day of , A.D. 2023 at a meeting of the City of Port Arthur, Texas by the following vote: Ayes: Mayor: Councilmembers: Noes: Thurman Bill Bartle Mayor ATTEST: Sherri Bellard City Secretary PR No.23366 9/29/2023 JCC Page 3 of 3 APPROVED AS TO FORM: APPROVED FOR ADMINISTRATION: Valecia Tizeno, Esquire Ron Burton, CPM City Attorney City Manager APPROVED AS FOR AVAILABILITY OF FUNDS: n CA,p Kandy K. Daniel Director of Finance Flozelle C. Roberts, EIT, MEng, MBA, CPM Director of Public Works Clifton Williams, CPPB Purchasing Manager EXHIBIT A ENGINEERS CERTIFICATE OF COMPLETION PROJECT: Single family residential townhomes on approximately 4.658 acres of land located at 7800 Willowwood Lane, Port Arthur, Texas DATE OF ISSUANCE: December 12, 2022 ENGINEER: H&P Engineering&Construction Inc. This Engineers Certificate of Completion certifies that improvements have been made in accordance with his plans and specifications,and/or modifications thereto,as specified in City of Port Arthur Subdivision Ordnance Sec. 9&62 Acceptance. To: . City of Port grthur From: H&P Engineering&Construction Inc. The work for which this Certificate applies, and the Work is hereby declared to be cornplete in keeping with the Contract Documents on: December 12,2022 DATE OF COMPLETION Executed on this 12th day of December 2022 H&P Engineering &Construction Inc, OF T, (// *. a 7Y a '41r % By: • 7 ° / EXHIBIT B CONTRACTOR'S CERTIFICATE AND RELEASE FROM: H & P ENGINEERING &CONSTRUCTION INC (Name of Contractor) TO: CITY OF PORT ARTHUR (Owner) FOR THE DEVELOPMENT PARTICIPATION CONTRACT ENTERED INTO DATED AUGUST 03, 2020 BETWEEN THE CITY OF PORT ARTHUR (Owner) AND H & P ENGINEERING &CONSTRUCTION INC (Name of Contractor) OF 8460 CENTRAL MALL DRIVE SUITE M PORT ARTHUR TEXAS (City and State) FOR THE: 30% OF THE CONTRACT PRICE OF $649,545 OR $194,863.50 FOR THE PUBLIC INPROVEMENT ON 4.658 ACRES TRACT OF LAND LOCATED IN WILLOWOOD LANE IN THE CITY OF PORT ARTHUR TEXAS KNOW ALL MEN BY THESE PRESENTS: 1. The undersigned hereby certifies that there is due from, and payable by, the Owner to the Contractor under the contract and duly approved change orders and modifications the balance of: NONE 2. The undersigned further certifies that, in addition to the amount set forth in Paragraph 1, there are outstanding and unsettled the following items which he claims are just and due and owing by the Owner to the Contractor: NONE 3. The undersigned further certifies that ail work required under this contract, including all Change Orders, has been performed in accordance with the terms thereof, and that there are no unpaid claims for materials, supplies, or equipment and no claims of laborers or mechanics for unpaid wages arising out of the performance of this contract, and that the wage rates paid by the Contractor were in conformity with the contract provisions relating to said wage rates. 4. Except for the amounts stated under Paragraphs 1 and 2 hereof, the undersigned has received from the Owner all sums of money payable to the undersigned under, or pursuant to, the above mentioned contract or any modification or change thereof. 5. That, in consideration of the payment of the amount stated in Paragraph 1 here of, the undersigned does hereby release the Owner and Operator from any and all claims arising under, or by virtue of this contract, except the amount listed in Paragraph 2 hereof due from the Owner; provided, however, that if for any reason, the Owner does not pay in full the amount stated in Paragraph 1 hereof, said deduction shall not affect the validity of this release, but the amount so deducted shall be automatically included under Paragraph 2 as an amount which the Contractor has not released, but will release upon payment thereof. The Contractor further certifies that, 1 of 2 upon the payment of the amount listed in Paragraph 2 hereof, and of any amount which may be deducted from Paragraph 1 hereof, he will release the Owner and Operator from any and all claims of any nature whatsoever arising out of said contract or modification thereof, and will execute such further releases or assurances as the Owner and Operator may request. IN WITNESS WHEREOF, the undersigned has signed and sealed this instrument this day of , 20 H & P ENGINEERING &CONSTRUCTION INC (Contractor) BY: (Hassan Shomalzadeh) , being first duly sworn on oath, deposes and says, first, that he is the President of H &P ENGINEERING &CONSTRUCTION INC (Title) (Name of Contractor) Second, that he has read the foregoing certificate by him subscribed as President (Title) of H & P ENGINEERING & CONSTRUCTION INC (Name of Contractor) Affiant further states that the matters and things stated herein are true. (Hassan Shomalzadeh) Subscribed and sworn to before me this day of , 20 18 . My commission expires (Date) (Notary Public) Seal: 2 of 2 EXHIBIT C CONTRACTOR'S CERTIFICATE OF GUARANTEE FROM: H & P ENGINEERING &CONSTRUC I ION INC (Name of Contractor) TO: CITY OF PORT ARTHUR (Owner) FOR THE DEVELOPMENT PARTICIPATION CONTRACT ENTERED INTO DATED AUGUST 03, 2020 BETWEEN THE CITY OF PORT ARTHUR (Owner) AND H & P ENGINEERING &CONSTRUCTION INC (Name of Contractor) OF 8460 CENTRAL MALL DRIVE SUITE M PORT ARTHUR TEXAS (City and State) FOR THE: 30% OF THE CONTRACT PRICE OF $649,545 OR $194,863.50 FOR THE PUBLIC INPROVEMENT ON 4.658 ACRES TRACT OF LAND LOCATED IN WILLOWOOD LANE IN THE CITY OF PORT ARTHUR TEXAS KNOW ALL MEN BY THESE PRESENTS: 1. The undersigned does hereby guarantee all of the work done under the above referenced contract to be free from improper workmanship and free from faulty materials, and that all work was performed in accordance to the guidance and instructions received from the City of Port Arthur according to the terms of the aforesaid contract. 2. This guarantee shall cover a period of one (1) year from the date of acceptance of all work under this Contract, as evidenced by the action taken by the City Council of the City of Port Arthur accepting this work. 3. This Certificate is given in connection of the one time payment under the contract between the Owner and H & P ENGINEERING & CONSTRUCTION INC and with the knowledge that it will be relied upon in making such payment and that such payment would not be made except upon the truth of the matter concerned in this affidavit. IN WITNESS WHEREOF, the undersigned has signed and sealed this instrument this '2 day of % e4rcvi/ /', 20 .7 Z. H & P ENGINEERING & CONSTRUCTION INC (Contractor) f (44,2 BY: ` 1 z ' assan Shomalzadeh) 1 of 2 , being first duly sworn on oath, deposes and says, first, that he is the President of H & P ENGINEERING &CONSTRUCTION INC (Title) (Name of Contractor) Second, that he has read the foregoing certificate by him subscribed as President (Title) of H & P ENGINEERING &CONSTRUCTION INC . (Name of Contractor) Afflant further states that the matters and t 'Ns stated er • are rue. (Hassan Shomalzadeh) Subscribed and sworn to before me this l day of:bee ell) 6,,K , 20 2 2 My commission expires I /` Z II— 20 2 3 . (Date) 1-...__.._CHARLOTTE SFtAGlUET ilt —...- iit ri � 11' 1A1Y AGBt, Notary Pubiic , 6i ei C V * State of Texas + (Notary Pubiic) mf e4 ID#196861.4 i Z.' '4e tw} My Comm.Expires 11/24/2023 Seal: 2 of 2 EXHIBIT D CERTIFICATE OF ACCEPTANCE FOR Completion of Streets, Drainage, Water, Sewer, and Other Public Infrastructure for Single family residential townhomes on approximately 4.658 acres of land located at 7800 Willowwood Lane, Port Arthur, Texas IN THE CITY OF PORT ARTH U R TO: H&P Engineering & Construction Inc. This is to certify that the City of Port Arthur,Texas, accepts the completion of the streets, drainage system, water lines, sanitary sewer lines, and other public infrastructure for Single family residential townhomes on approximately 4.658 acres of land located at 7800 Willowwood Lane, Port Arthur, Texas, on the basis of the Engineer's Certificate of Completion as executed by M. H. Shomalzadeh, P.E.; and the Contractor's Certiificate of Guarantee and Contractor's Certificate and Release, both as executed by Hassan Shomalzadeh, of H&P Engineering & Construction Inc. Note: Street will remain as a private road and maintained by developer. 4 Ronald Burton, City Manager Attest: City Secretary