Loading...
HomeMy WebLinkAboutPR 23392: RATIFICATION OF EMERGENCY MEMO OF WATER LEAKS REPAIR City of r ort rtftu INTEROFFICE MEMORANDUM Date: October 27, 2023 To: The Honorable Mayor and City Council Through: Ronald Burton, City Manager From: Calvin Matthews, P.E., Water Utilities Director RE: PR 23392 —Ratification of Emergency Memo of Water Leaks Repair Introduction: This Agenda Item is for the City Council to ratify the emergency centrifuge repair in the Water Purification Plant by Centrifuge & Pump Service of Stone Mountain, Georgia. The estimate for the repair was $81,132.32, and the work was completed for$99,173.40. Background: The Water Purification Plant uses a centrifuge to process the waste sludge. On May 9th, 2023 the Centrifuge had become inoperable and was in need of repair. Without the centrifuge, the plant will not be able to treat the drinking water. Centrifuge & Pump Services of Stone Mountain, Georgia provided a quote of$81,132.32 to disassemble, clean, inspect, replace, balance, rebuild, and repair. Budget Impact: The total budgetary impact is $99,173.40 and funding is available in Water Utilities Equipment Maintenance Account No 410-40-210-5318-00-00-000. Recommendation: It is recommended that the City Council approve Proposed Resolution No. 23392, ratifying the emergency Centrifuge No. 2 repair as described/outlined above. PR No. 23392 10/27/23 CS Page 1 of 3 RESOLUTION NO. A RESOLUTION RATIFYING EMERGENCY CENTRIFUGE REPAIRS AT THE WATER PURIFICATION PLANT BY CENTRIFUGE & PUMP SERVICE OF STONE MOUNTAIN, GEORGIA IN THE TOTAL NOT TO EXCEED AMOUNT OF $99,173.40. FUNDING IS AVAILABLE IN WATER UTILITIES EQUIPMENT MAINTENANCE ACCOUNT NO. 410-40- 210-5318-00-00-000. WHEREAS,the centrifuges are one of the treatment processes to treat the waste sludge in the Water Purification Plant; and, WHEREAS,on May 9, 2023, Centrifuge No.2 revealed extreme stresses indicative of the critical condition and need for repair; and WHEREAS,the City Manager signed an emergency memo(Exhibit"A"), authorizing the emergency centrifuge repair for $81,132.32; and, WHEREAS, Centrifuge & Pump Services of Stone Mountain, Georgia completed the repair for$99,173.40 (Exhibit"B"); and, WHEREAS,pursuant to Section 252.022(a)(2) of the Texas Local Government Code the purchase is authorized to preserve or protect the public health or safety of the municipality's residents, and Section 252.022(a)(3) because of the unforeseen damage to public machinery equipment or other property; and, NOW THEREFORE,BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PORT ARTHUR: THAT,the facts and opinions in the preamble are true and correct; and, THAT, City Council hereby ratifies the emergency centrifuge repairs in the total not to exceed amount of$99,173.40 from Water Utility Equipment Maintenance Account No. 410-40- 210-5318-00-000; and, PR No. 23392 10/27/23 CS Page 2 of 3 THAT, a copy of the caption of this Resolution shall be spread upon the Minutes of the Meeting of the City Council. READ, ADOPTED, AND APPROVED this day of , 2023 at a Regular Meeting of the City Council of the City of Port Arthur, Texas by the following vote: AYES: Mayor Councilmembers: NOES: Thurman Bill Bartie Mayor ATTEST: Sherri Bellard City Secretary APPROVE AS TO F . Valecia Tizeno City Attorney PR No. 23392 10/27/23 CS Page 3 of 3 APPROVED FOR ADMINISTRATION: Ronald Burton Calvin Matthews, .E. City Manager Water Utilities Director APPROVED AS TO THE AVAILABILITY OF FUNDS: Kandy Daniel Clifton Williams, CPPB Finance Direct r Purchasing Manager Exhibit "A" (Emergency Memo) ji orr rthur Texas INTEROFFICE MEMORANDUM UTILITY OPERATIONS DEPARTMENT-WASTEWATER TREATMENT DIVISION Date: May 9,2023 To_ Ronald Burton,City Manager • From: Calvin Matthews, P.E., Water Utilities Director RE: Water Purification Plant Centrifuge No. 2 • Per Jeffrey Wyble, the Water Purification Plant Superintendent, Centrifuge No. 2 at the Water Purification Plant is in need of immediate attention. A routine inspection of Centrifuge No. 2 revealed a number of deficiencies caused by the extreme stresses indicative of its normal operation and requires immediate attention in order to.prevent potentially catastrophic failures within the unit. The centrifuge is critical for removing waste material that's produced during the water treatment process, so the loss of this unit would significantly decrease our ability to adequately treat the City's drinking water. The repairs are estimated to take approximately 8 weeks so it's imperative that the work begin as soon as possible. The centrifuge repair at the Water Purification Plant will be about $81,132.32 per the attached quotes, but could be more, depending on whether more repairs are needed, which will be discovered when the tear down of equipment is complete. I, Ronald Burton, hereby authorize this emergency repair. "Remember we are here to serve the Citizens of Port Arthur" P.O BOX 1089 •PORT ARTHUR,TEXAS 77641-1089•409/983-8101 •FAX 409/982-6743 0 73 ale rr iT u O1.Q Exhibit "B" (Invoice) Centrifuge & Pump Services Corporation Invoice 2175 West Park Ct Stone Mountain, Georgia 30087 Date Invoice# 9/1/2023 02685L Bill To Ship To City of Port Arthur Attn. :J. Wyble 1101 Henry 0 Mills Blvd. Port Arthur,Texas 77640 P.Q.No. Terms Emergency Order Net 30 Item Description Qty Rate Amount Paint the individual rotating assembly components Prepare&ship the rotating assembly Freight from and to customer Subtotal for above items 71,128.00 Additional work/repairs based on findings after the disassembly Parts Unspecified Gear box-planetary gear bushings; 1st stage axle repair- 1 5.526.90 5.526.90 Press bronze onto axe!and machine to specification;2ND Stage thrust washer;Axle repair-Press bronze onto axel and machine to specification;2nd stage inside thrust washer;Repair bearing in-/out-side cover Service Unspecified Repair pillow block housing bores I 6,710.00 6.710.00 Service Unspecified Repair hub shaft bearing fits 1 6,490.00 6,490.00 Service Unspecified Repair spline bushing bore I 2,084.50 2,084.50 Isolator 30HA132... 3011,4132 Main frame isolator 750/705/706 4 1,227.50 4,910.00 isolator 3011A140... 3011A140 MotoriDrive frame isolator 750/705/706 4 581.00 2,324.0(1 Total S99,173.40 Phone# Fax# E-mail Web Site 678-581-9035 404-464-0809 sales(ricentrifugeservices.com www.centrifugeservices.com Page 2